PNP 2017-057, Supplement to Submittal of Palisades Nuclear Plant Site Emergency Plan, Rev. 29

From kanterella
Jump to navigation Jump to search
Supplement to Submittal of Palisades Nuclear Plant Site Emergency Plan, Rev. 29
ML17257A276
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/14/2017
From: Hardy J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17269A182 List:
References
PNP 2017-057
Download: ML17257A276 (2)


Text

Entergy Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 269.764.2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2017-057 September 14,2017 10 CFR 50.54(q)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Supplement to Submittal of Palisades Nuclear Plant Site Emergency Plan, Rev 29 Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Reference:

Letter from Entergy Nuclear Operations, Inc. to the Nuclear Regulatory Commission, "Revision to Palisades Nuclear Plant Site Emergency Plan,"

dated August 29, 2017

Dear Sir or Madam:

In accordance with 10 CFR 50.54(q), Entergy Nuclear Operations, Inc. is supplementing the referenced submittal to include Revision 4 of the Palisades Nuclear Plant (PNP) On-shift Staffing Analysis (OSA) (Attachment 1). It was identified that the referenced submittal had omitted the PNP OSA, Revision 4, as well as the summary of the analysis for the changes in the PNP Site Emergency Plan (SEP), Revision 29, which is required by 10 CFR 50.54(q)(5). to this supplement includes the summary of the analysis for the changes in the PNP SEP, Revision 29, and in the PNP OSA, Revision 4.

This letter contains no new commitments and no revisions to existing commitments.

Sincerely, JAH/bed

Document Control Desk PNP 2017-057 Page 2 : Palisades Nuclear Station On-shift Staffing Analysis, Revision 4 : Analysis Summary for Changes in Site Emergency Plan, Revision 29, and On-shift Staffing Analysis, Revision 4 CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC