PNP 2017-052, Submittal of Revision to Palisades Nuclear Plant Site Emergency Plan

From kanterella
Jump to navigation Jump to search
Submittal of Revision to Palisades Nuclear Plant Site Emergency Plan
ML17243A003
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/29/2017
From: Hardy J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17248A463 List:
References
PNP 2017-052
Download: ML17243A003 (1)


Text

~ Entergy PNP 2017-052 August 29,2017 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 269.764.2000 Jeffery A. Hardy Regulatory Assurance Manager 10 CFR 50.54(q)

Subject:

Revision to Palisades Nuclear Plant Site Emergency Plan Palisades Nuclear Plant Docket 50-255 License No. DPR-20

Dear Sir or Madam:

In accordance with 10 CFR 50.54(q), Entergy Nuclear Operations is submitting a revision to the Palisades Nuclear Plant Site Emergency Plan (SEP).

Entergy Nuclear Operations, Inc. has determined that the changes do not decrease the effectiveness of the PNP Site Emergency Plan.

A copy of the updated SEP (Revision 29) is attached.

This letter contains no new commitments and no revisions to existing commitments.

Sincerely, 9A~0:

JAH/bed : Palisades Nuclear Plant Site Emergency Plan Revision 29 CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC