PNP 2017-052, Submittal of Revision to Palisades Nuclear Plant Site Emergency Plan
| ML17243A003 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 08/29/2017 |
| From: | Hardy J Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17248A463 | List: |
| References | |
| PNP 2017-052 | |
| Download: ML17243A003 (1) | |
Text
~ Entergy PNP 2017-052 August 29,2017 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 269.764.2000 Jeffery A. Hardy Regulatory Assurance Manager 10 CFR 50.54(q)
Subject:
Revision to Palisades Nuclear Plant Site Emergency Plan Palisades Nuclear Plant Docket 50-255 License No. DPR-20
Dear Sir or Madam:
In accordance with 10 CFR 50.54(q), Entergy Nuclear Operations is submitting a revision to the Palisades Nuclear Plant Site Emergency Plan (SEP).
Entergy Nuclear Operations, Inc. has determined that the changes do not decrease the effectiveness of the PNP Site Emergency Plan.
A copy of the updated SEP (Revision 29) is attached.
This letter contains no new commitments and no revisions to existing commitments.
Sincerely, 9A~0:
JAH/bed : Palisades Nuclear Plant Site Emergency Plan Revision 29 CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC