NRC Generic Letter 1984-14

From kanterella
Jump to navigation Jump to search

NRC Generic Letter 1984-014: Replacement and Requalification Training Program
ML031180008
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Skagit, Marble Hill
Issue date: 05/11/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
GL-84-014, NUDOCS 8405110055
Download: ML031180008 (3)


toREGLe,,

- UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555

-May 11, 1984 TO ALL OPERATING POWER REACTOR LICENSEES

Gentlemen:

SUBJECT: REPLACEMENT AND REQUALIFICATION TRAINING PROGRAM

(Generic Letter No. 84-14)

One of the most important follow-up actions that has been identified as part of the operator licensing program reviews is to ensure that there is an accurate description of each licensee's requalification training program and replacement operator training program. This information is needed to ensure that candidates for operator licensing examinations have completed the necessary qualifications and training prior to examination and to ensure that requalifi- cation program audits by the Regions are based on the requalification training program as implemented.

Some utilities have provided a description of the program as part of the updated FSAR which was submitted in accordance with the requirements of 10 CFR 50.71(e)4. Other utilities, in the updated FSAR, have referenced the program, but have not provided the details or a description. In these latter instances, the regulatory staff finds it very difficult to prepare a proper audit.

The regulations, 10 CFR Part 50.54(i-1), require that licensees have a program in effect which meets the requirements of Appendix A to Part 55 and that changes to the approved program that decrease the scope, time allotted for the program or frequency in conducting different parts be approved. Therefore, we are requesting that the next annual update to the FSAR either include the current program or provide explicit reference, including date, to the submittal which is the program of record.

Licensees have submitted proposed changes to their replacement and requalifi- cation training programs and some proposed chances were submitted directly to the NRR technical review branches and Regional Offices. Proposed chances to training programs should be submitted to the Director, Division of Licensing, not the Regional Offices or technical review branches. All such proposed changes should be clearly identified and include appropriate fees.

' ~~Sgo

-2 -

We are also aware that a number of licensees are either in the process of ordering, or have already taken delivery on, plant-referenced simulators.

When these new simulators are available, revisions should be made to the replacement and requalification training programs to reflect their use. When the revision to the program involves only the identification of a plant- referenced simulator, no approval is required; therefore, no fee is required.

Sincerely, Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation DISTRIBUTION

Central Files FMiragl ia LQB Reading PHungerbuhler DHFS Reading-2 GMeyer HBooher TJCarter/HLefevre JPersensky GHolahan DMorisseau JZwolinski JAxelrad DEisenhut/RPurple JLeiberman This request has been approved by 0MB Clearance Number 3150-0018, which expires February 29, 1987.

  • PREVIOUS CONCURRENCES OBTAINED

DHFS:LQB* DHFS:LQB* DHI:S:LQB* DHFS:OLB* DHFS:DD* DHFS*YVI 4 IE* OELD*

DMorisseaLa JPersensky HB(,oher DBeckham WRussell HThompso JAxelrad JLeiberman

3/30/84 3/30/84 30/84 42//84 4/2/84 4/2/84 4/2/84 4/9/84 DL* DL:ORAw DL: ORA'X M

JCarter JZwol nski GHolaha glia) flsenhut seni4

5/3/84 5/1 /84 5/1 /84 5k3Y84 ( 5/,6/84

- 2 -

We are also aware that a number of licensees are either in the process of ordering, or have already taken delivery on, plant-referenced simulators.

When these new simulators are available, revisions should be made to the replacement and requalification training programs to reflect their use. When the revision to the program involves only the identification of a plant- referenced simulator, no approval is required; therefore, no fee is required.

Sincerely, Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation DISTRIBUTION

Central Files FMiragl ia LQB Reading PHungerbuhler DHFS Reading-2 GMeyer HBooher TJCarter/HLefevre JPersensky GHolahan DMorisseau DEisenhut/RPurple J. elrad JLeiberman

  • PREVIOUS CONCURRENCES OBTAINED

DHFS:LQB* DHFS:LQB* DHFS:LQB* DHFS:OLB* DHFS:DD* DHFS*

(-i rf1 IE* OELD*

DMorisseau JPersensky HBooher DBeckham WRussell HThompson JAxelrad JLeiberman

3/30/84 3/30/84 3/30/84 4/2/84 4/2/84 4/2/84 4/2/84 4/9/84 DLCI DL:ORAB DL:AD:SA DL: D

JC~ rter GHolahan FJMiragl ia DEisenhut

5/5,/84 5/ /84 5/ /84 5/ /84

Template:GL-Nav