Forwards Draft Steam Generator Tube Rupture Incident Rept, in Response to Insp Rept 50-285/84-13.Approval to Leave Refueling Shutdown & Proceed to Power Operation Requested. Final Rept Expected by 840619
ML20133P090
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/18/1984
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20133P091 List:
References
LIC-84-195, TAC-55237, NUDOCS 8508140138
Download: ML20133P090 (2)


Text

C e .1 l

Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 402/536-4000 June 18, 1984 LIC-84-195 Mr. J . T. Collins, Regional Administrator 'b - 1 U. S. Nuclear Regulatory Commission j bi Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 g @] l q

L

Reference:

Docket No. 50-285

Dear Mr. Collins:

Steam Generator Tube Failure Draft Report The purpose of this letter and the attached draft report is to summarize and document information concerning the Fort Calhoun Station steam generator tube failure incident. The attached draft report contains a description of the event, actions taken by the District, results of those actions, the District's 10 CFR 50.59 evaluation, and conclusions reached based upon those results. The report assumes successful completion of several actions during the remainder of this outage (i.e., tube plugging, tube removal, etc.). If the District is unable to complete any of the above actions, your office will be notified. The attached draft report also documents the completion of those items stated in the letter from J. T. Collins to W. C. Jones dated June 5, 1984.

This draft report has undergone reviews by a variety of District personnel and is under final review by the Plant Review Committee (PRC). The final report will be forwarded to your office on Tuesday, June 19, 1984.

The above referenced draft report documents a very comprehensive and thorough effort conducted by the District in order to establish an extremely high confidence level that the Fort Calhoun Station can be safely returned to power operation.

In addition, the District believes it has taken every reasonable and practical action to not only demonstrate that the Fort Calhoun Station can be safely returned to power operation, but that it can be operated until the next refueling outage.

h Q

f 455:24 Employment with Equal Opportunity Maiezremaie

/r0/

.A

.. 1 .

Mr. J. T. Collins LIC-84-195 Page Two Based upon the documented information in this draft report, .the District requests that Commission approval be immediately granted to allow the Fort Calhoun Station to leave refueling shutdown (Mode 5) and proceed to power operation.

Sincere,1y,

, l2 - >

W. C. 'ones Divisj n Manager Production Operations WCJ/JJF:jmm Attachment cc: Mr. James R. Miller, Chief U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D.C. 20555 LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C. 20036 Mr. E. G. Tourigny, Project Manager Mr. L. A. Yandell, Senior Resident Inspector i