NRC 2018-0040, NextEra Energy Point Beach, LLC, Exemption Request to Support Updated Final Response to NRC Generic Letter 2004-02

From kanterella
(Redirected from NRC 2018-0040)
Jump to navigation Jump to search
NextEra Energy Point Beach, LLC, Exemption Request to Support Updated Final Response to NRC Generic Letter 2004-02
ML18242A606
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/30/2018
From: Craven R
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-04-002, NRC 2018-0040
Download: ML18242A606 (16)


Text

NEXTera ENERGY ~

POINT BEACH August 30, 2018 NRC 2018-0040 10CFR50.12 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Docket 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 NextEra Energy Point Beach, LLC. Exemption Request to Support Updated Final Response to NRC Generic Letter 2004-02

Reference:

1. NextEra Energy Point Beach, LLC, Updated Final Response to NRC Generic Letter 2004-02, dated December 29, 2017 (ML17363A253)

By letter dated December 29, 2017 (Reference 1), NextEra Energy Point Beach, LLC (NextEra) submitted an updated final response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. In Reference 1, NextEra committed to submit no later than April 2018 an exemption from the single failure criterion in Point Beach site-specific General Design Criterion (GDC) 41, Engineered Safety Features Performance Capability, applicable to Region II Loss of Coolant Accident break sizes. After further discussions with the NRC, it was determined that an exemption from the single failure criterion of 10 CFR 50, Appendix K, Section (I)(D)(1) is the appropriate approach and that submittal by April 2018 was not necessary.

This letter transmits the exemption request from the single failure criterion of 10 CFR 50, Appendix K, Section (I)(D)(1) for Point Beach.

This letter contains no new regulatory commitments .

NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 If you have any questions please contact Mr. Eric Schultz, Licensing Manager, at (920) 755-7854.

Sincerely, NextEra Energy Point Beach, LLC Rob Craven Plant General Manager cc: Director, Office of Nuclear Reactor Regulation Administrator, Region Ill, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Enclosure

Enclosure 1 Request for Exemption from 10 CFR 50 Appendix K

1. Exemption Request Pursuant to 10 CFR 50.12, NextEra Energy Point Beach, LLC (NextEra) is submitting a request for permanent exemption from the single failure requirement in 10 CFR 50, Appendix K, Emergency Core Cooling System (ECCS) Models, Section (1)(0)(1) which states:

Single Failure Criterion. An analysis of possible failure modes of ECCS equipment and of their effects on ECCS performance must be made. In carrying out the accident evaluation the combination of ECCS subsystems assumed to be operative shall be those available after the most damaging single failure of ECCS equipment has taken place.

As discussed in the updated final response to NRC Generic Letter 2004-02 (Reference 1),

this request supports closure of Generic Safety Issue 191 (GSI-191) for Point Beach.

Pursuant to 10 CFR 50.12, NextEra is submitting this request for exemption from certain requirements of 10 CFR 50, Appendix K Section (1)(0)(1 ), namely "Single Failure Criterion". Key limitations of the exemption request are:

1. This exemption is limited to the application of Appendix K Section (1)(0)(1) as it pertains to meeting the acceptance criteria of 10 CFR 50.46(b )(5), namely "Long-term cooling".
2. The scope of the requested exemption is limited to the availability of both trains of the low head Emergency Core Cooling System (ECCS) in operation with both ECCS recirculation strainers available to accommodate the postulated debris load from a Region II break. (Reference1, p. E1-12)
3. The exemption is for large Region II breaks only. Selection of Region II breaks is consistent with NEI 04-07, Section 6 as described in Reference 1. Region II breaks are defined for Point Beach as reactor coolant system (RCS) main loop piping breaks greater than 17 inches in diameter. (Reference 1, p. E1-11)

Mitigation of a low probability Region II break would require both trains of the low head ECCS system to be in operation with both ECCS strainers available to accommodate the postulated debris load from a break of this size. (Reference1, p. E1-12) The exemption requested is permanent in duration.

2. Regulatory Requirements Involved NextEra is requesting exemption from the single failure requirement in 10 CFR 50, Appendix K, as stated in Section 1, above. This exemption request supports closure of Page 1 of 14

GSI-191 for Point Beach for Region II breaks (breaks greater than 17 inches in diameter).

In its GSI-191 evaluation, NextEra analyzed Region II breaks using the Alternate Evaluation Methodology provided in NEI 04-07 (Reference 2). The Alternate Evaluatiofl Methodology allows the use of more realistic analysis methods and assumptions .

Because the single failure requirement of Appendix K cannot be met for the low head ECCS in NexEra's GSI-191 evaluation for Point Beach, an exemption from the single failure requirement is necessary for this limited purpose.

10 CFR 50 requires compliance with 10 CFR 50, Appendix K per 10 CFR 50.46 (a)(1).

Specifically, 10 CFR 50.46 (a)(1) cites Appendix K for ECCS model for required documentation as well as required and acceptable features. 10 CFR 50.46 does not specifically direct single failure criterion. Rather, 10 CFR 50.46 cites Appendix K which does specify single failure criterion in Section (1)(0)(1 ). Therefore, with a limited exemption from Appendix K Section (1)(0)(1 ), further exemption from 10 CFR 50.46 (a)(1) is unnecessary.

NextEra's final response to Generic Letter (GL) 2004-02 in Reference 1 stated that it elected to use the Alternate Evaluation Methodology of NEI 04-07, Section 6. The NEI 04-07 Safety Evaluation Report (SER) Section 6.1, states in part:

While not a component of the 10 CFR 50.46 ECCS evaluation model, the calculation of sump performance is necessary to determine if the sump and the residual heat removal system are configured properly to provide enough flow to ensure long-term cooling, which is an acceptance criterion of 10 CFR 50. 46. Therefore, the staff considers the modeling of sump performance as the validation of assumptions made in the ECCS evaluation model.

Since the modeling of sump performance is a boundary calculation for the ECCS evaluation model, and acceptable sump performance is necessary for demonstrating long-term core cooling capability (1 0 CFR 50.46(b)(5)), the requirements of 10 CFR 50.46 are applicable.

Based on this, such an alternative approach might require plant-specific license amendment requests or exemption requests from the regulations, depending on each licensee's chosen resolution approach. Licensees could request, on a plant-specific basis, exemptions from the requirements associated with demonstrating long-term core cooling capability (1 0 CFR 50.46(b)(5)) . For example, exemptions from the requirements of 10 CFR 50.46(d) may be required if a licensee chooses to classify new equipment as nonsafety related or not single-failure proof.

10 CFR 50.46(a)(1)(i) states in part:

Each boiling or pressurized light-water nuclear power reactor fueled with uranium oxide pellets within cylindrical zircaloy or ZIRLO cladding must be provided with an emergency core cooling system (ECCS) that must be designed so that its calculated cooling performance following postulated loss-of-coolant accidents conforms to the criteria set forth in paragraph (b) of this section.

Page 2 of 14

As referenced in 10 CFR 50.46(a)(1 )(i), 10 CFR 50.46(b)(5) is an acceptance criterion part of paragraph (b) and states:

Long-term cooling. After any calculated successful initial operation of the ECCS, the calculated core temperature shall be maintained at an acceptably low value and decay heat shall be removed for the extended period of time required by the long-lived radioactivity remaining in the core.

This exemption request is consistent with the NEI 04-07 SER by ensuring 10 CFR 50.46(b )(5) acceptance criterion is met through an exemption to Appendix K Section (1)(0)(1). That is, 10 CFR 50.46(a)(1) establishes that the 10 CFR 50.46(b) acceptance criteria can be met with ECCS Model described in 10 CFR 50 Appendix K.

Granting of this exemption permits Appendix K to be met without the single failure criterion as it pertains to debris impacts on strainer loading and in-vessel effects for large Region II breaks only. As the exemption to Appendix K would allow for an acceptable ECCS Evaluation Model, no further exemptions are required to 10 CFR 50.46(b )(5).

10 CFR 50 Appendix K Section (1)(0)(1) contains requirements for single failure analysis as it pertains to other 10 CFR 50.46 requirements such as power distribution shape, peaking factor, and areas outside those covered in this exemption request. The exemption is exclusive to the impact of debris on strainer loading and in-vessel effects for large Region II breaks only.

The requested exemption does not result in any physical changes to the facility or changes to the operation of these systems. The exemption also does not change any of the programmatic requirements. For aspects not impacted by the exemption request, the ECCS model continues to be evaluated for compliance with Appendix K as modified by Point Beach's current licensing basis. The ECCS system and components continue to comply with their current design and licensing basis requirements.

In Reference 1, NextEra stated that it would submit an exemption request from the single failure requirement in Point Beach Units 1 and 2 site-specific General Design Criterion (GDC) 41, Engineered Safety Features Performance Capability, for a select (Region II) range of loss-of-coolant accident (LOCA) break sizes. Following discussions with the NRC, NextEra determined that the regulation from which Point Beach requires exemption is 10 CFR 50, Appendix K, Section (1)(0)(1 ).

3. Basis for Exemption Request Under 10 CFR 50.12(a), a licensee may request and the NRC may grant exemptions from the requirements of 10 CFR Part 50 when (1) the exemptions are authorized by law, will not present an undue risk to the public health and safety, are consistent with the common defense and security, and (2) when special circumstances are present.

Page3of14

This exemption request is submitted to support closure of GSI-191 for Point Beach, Units 1 and 2, and supports NextEra's use of the Alternate Evaluation Methodology provided in NEI 04-07, Pressurized Water Reactor Sump Performance Evaluation Methodology (Reference 2).

3.1 Justification for the Exemption Request 10 CFR 50.12, "Specific exemptions," allows the NRC to grant exemptions from the requirements of 10 CFR 50 provided the following three conditions are met as required by 10 CFR 50.12(a)(1):

1. The exemption is authorized by law.

10 CFR 50.12 allows the NRC to grant exemptions from Part 50 requirements with provision of proper justification. Approval of the exemption would not conflict with any provisions of the Atomic Energy Act of 1954, as amended, or the Commission's regulations.

2. The exemption does not present an undue risk to the public health and safety.

NextEra followed NEI 04-07, Section 6, Alternate Evaluation Methodology, when analyzing the effects of Region II LOCA break sizes (pipe breaks > 17 inches in diameter). The methodology builds on risk insights and uses realistic inputs and assumptions considering the low probability and risk impact of these larger postulated pipe breaks . As stated in the Safety Evaluation (SE) for NEI 04-07 (Reference 3), the models, assumptions, and equipment availability used for analyzing Region II breaks need to be demonstrated as functionally reliable, and may not necessarily be safety related or single failure proof. The Safety Evaluation also states that the Alternate Evaluation Methodology "provides an acceptable approach for evaluating PWR sump performance. Application of more realistic and risk-informed elements is technically justified based on the low likelihood of such breaks occurring." In addition, the NRC Staff pointed out that consideration of risk significance in the NEI Alternate Evaluation Methodology is consistent with 10 CFR 50.46 rulemaking and Regulatory Guide 1.174.

Application of the Alternate Evaluation Methodology in NEI 04-07 to Point Beach Units 1 and 2 demonstrates that the exemption from the single failure requirement for mitigating a Region II break will not present an undue risk to the public health and safety (see Section 4 ). As shown in Section 4, reasonable assurance exists that both low head ECCS trains will be available for mitigating a Region II break. As described in Section 4.0, the low head ECCS equipment is highly reliable in accordance with Technical Specifications and as monitored by 10 CFR 50.65 Maintenance Rule requirements. Further, the sump Page 4 of 14

strainer performance evaluation for Region II breaks has utilized several conservatisms.

Safety margins and defense-in-depth measures are available to mitigate the effects of the accidents (Reference 1, p. E1 -15).

3. The exemption is consistent with the common defense and security.

The exemption has no impact on the physical security plan or the ability to protect special nuclear material. Therefore, the exemption is consistent with the common defense and security.

3.2 Special Circumstances In accordance with 10 CFR 50.12(a)(2), special circumstances are present when at least one of the given criteria are met. The following special circumstance is applicable to this exemption request:

(ii) Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule.

An objective of 10 CFR 50 Appendix K is to provide model requirements that ensure safety systems (ECCS) maintain low risk to the public health and safety. Appendix K contains model features to provide assurance that the criteria of 10 CFR 50.46(b) are met.

Specifically, 10 CFR 50.46(a)(1 )(i) states, in part:

Comparisons to applicable experimental data must be made and uncertainties in the analysis method and inputs must be identified and assessed so that the uncertainty in the calculated results can be estimated. This uncertainty must be accounted for, so that, when the calculated EGGS cooling performance is compared to the criteria set forth in paragraph (b) of this section, there is a high level of probability that the criteria would not be exceeded.

A high level of probability of ECCS cooling performance for ensuring long term cooling is achieved using the Alternate Evaluation Methodology from Section 6 of NEI 04-07 (Reference 2), which describes acceptable methods for evaluating containment sump requirements. For meeting the long term cooling criterion, 10 CFR 50, Appendix K is intended to maintain low risk to the public health and safety through adequate functioning of the ECCS with a single failure. This system is supported by the containment sump strainers. Licensees are required to demonstrate this capability using a bounding calculation or other deterministic method assuming a single failure. As discussed in NextEra's Updated Final Response to NRC Generic Letter 2004-02 for Point Beach (Reference 1), all ECCS SSC design functions are demonstrated deterministically to be compliant with 10 CFR 50.46 considering strainer loading, pump net positive suction head, in-vessel effects, and downstream effects for all Region I breaks while accounting for uncertainties. The Point Beach analysis for Region II breaks used deterministic methods, Page 5 of 14

but credited both trains of low head ECCS in operation in order to accommodate the volume of debris generation postulated from a Region II break (Reference1, p. E 1-17). As discussed in Section 4 of this exemption request, given the low likelihood of these large breaks occurring, the change in risk attributed to debris in postulated Region II breaks (pipe breaks > 17 inches in diameter) is very small. Therefore, the underlying objective of the regulations to ensure adequate protection of public health and safety will remain met.

ECCS operation for mitigation of other (non-LOCA) events is not impacted. Secondary side pipe ruptures have the potential to generate some debris; however, the feedwater line breaks and main steam line breaks are mitigated without the need for ECCS to switchover to sump recirculation mode. Therefore, the non-LOCA events described in the Updated Final Safety Analysis Report (UFSAR) are not affected by debris and are not impacted by this request for exemption.

In addition to the considerations above, efforts driven by compliance with the single failure requirement in 10 CFR 50, Appendix K, to reduce the likelihood of sump strainer blockage have resulted in substantial occupational exposure, which is contrary to the underlying purpose of protecting the health and safety of the public given the expected safety benefit for this low probability event. From 2008 through 2011, for instance, Point Beach incurred in excess of 69 Rem modifying Units 1 and 2 to reduce the likelihood of sump strainer blockage.

Additionally, significant amounts of fibrous and particulate insulation would require replacement to ensure compliance with the single failure requirement in 10 CFR 50, Appendix K to mitigate Region II breaks. The estimated man-hours and dose for the expected highest dose modification, replacing the Unit 2 Steam Generator A and B insulation, is summarized in the table below.

Estimated Dose for Insulation Replacement at Point Beach Estimated Activity Estimated Dose Man-hours Replace Unit 2 Steam 20,350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> 152.6 Rem Generator A & B Insulation Replacement of the insulation on the resistance temperature device (RTD) piping in both Units 1 and 2, on both Trains A and B, would also be required to ensure compliance with the single failure requirement in 10 CFR 50, Appendix K to mitigate Region II breaks. The dose to workers associated with RTD piping insulation has not yet been developed, but is expected to be substantial.

The dose considerations discussed above demonstrate that compliance with the single failure requirement in 10 CFR 50, Appendix K to mitigate Region II breaks would result in substantial occupational exposure to workers to perform the necessary modifications in Page 6 of 14

the containments, which is contrary to the underlying purpose of protecting the health and safety of the public given the expected safety benefit for this low probability event.

The considerations discussed above demonstrate that compliance with the single failure requirement in 10 CFR 50 Appendix K, Section (I)(D)(1 ), for Region II breaks is not necessary to achieve the underlying purpose of the regulation, which is to ensure adequate protection of public health and safety. Consequently, the special circumstances described in 10 CFR 50.12(a)(2)(ii) apply to this exemption request.

4. Technical Justification for the Exemption Alternate Evaluation Methodology Section 6 of the NEI 04-07 describes the Alternate Evaluation Methodology for demonstrating acceptable containment sump performance. The Alternate Evaluation Methodology proposes separate analysis methods for two distinct break size regions (Reference 1):
  • Region 1:

o Defined as all breaks equal to or smaller than the alternate break size, the alternate break size being a complete guillotine break of the largest line connected to the reactor coolant system piping, and (for main RCS loop piping) a break of a 14 inch schedule 160 line (Reference 3).

o Analysis methods must meet the typical design basis rules for a deterministic evaluation.

  • Region II:

o Defined as breaks larger than the Region I alternate break size, up to and including double ended guillotine breaks (DEGBs) on the RCS loop piping.

o Mitigative capabilities must be demonstrated, but the fully deterministic design basis rules do not necessarily apply.

The Alternate Evaluation Methodology can be used to demonstrate reasonable assurance of adequate long term core cooling, as required by 10 CFR 50.46(b)(5), for the bounding breaks in Region II by allowing for the use of more realistic assumptions and methods as well as allowing credit for mitigative operator actions and defense-in-depth measures .

Based on various considerations, the NRC Staff determined that the division of the pipe

  • break spectrum proposed for evaluating debris generation is acceptable based on operating experience, application of sound engineering judgment, and consideration of risk-informed principles . Licensees using the methods described in Section 6 of NEI 04-07 can apply the DEGBs for distinguishing between Region I and Region II analyses. (Reference 3)

Page 7 of 14

The Region I evaluation for Point Beach Units 1 and 2 considered DEGBs at Class 1 lnservice Inspection (lSI) welds on piping connected to the RCS main loops, which have a maximum nominal pipe diameter of 10 inches, as well as postulated 17-inch partial breaks on the main loop piping (including multiple break orientations at each main loop lSI weld location) (Reference 1, p. E1-11 ). These bounding Region I breaks were evaluated in accordance with NRC-approved methods for a deterministic evaluation, and were shown to meet all acceptance criteria for strainer head loss (Reference 1, pp. E 1-11 and E 1-16).

The Region II evaluation for Point Beach Units 1 and 2 was limited to breaks larger than 17 inches in diameter on the main loop piping, and these breaks were analyzed using bounding DEGB quantities at the worst-case break locations. The bounding Region II debris quantities exceed the debris quantities that were used in the prototypical strainer head loss testing performed by NextEra if single failure of an ECCS recirculation system train is assumed; therefore, Region II breaks were evaluated using the Alternate Evaluation Methodology (Reference 1, p. E 1-12). The Alternate Evaluation assumes that both low head ECCS trains, including two trains of recirculation strainers, will be available to accommodate the volume of debris generated by a Region II break (Reference 1,

p. E1-14). NextEra requests exemption from the single failure requirement in 10 CFR 50, Appendix K, for the limited scope of low head ECCS recirculation system availability during a Region II break LOCA response for the impact of debris laden strainer head loss on ECCS recirculation system performance, for Point Beach Units 1 and 2.

Region II Risk Insights The relaxation of certain requirements for mitigating a Region II break is appropriate based on the low frequency associated with breaks that are greater than 17 inches in diameter at Point Beach Units 1 and 2. Based on NUREG-1829, Table 7.19, the mean frequency of breaks (without steam generator tube rupture contributions) greater than or equal to 14 inches is 4.8 E-07/yr using the end-of-plant-license estimates for 40 years average fleet operation (Reference 4). If all Region II breaks are conservatively assumed to result in strainer head loss failure due to the effects of debris and result in core damage, the risk associated with these failures (in terms of change in core damage frequency, b.CDF) would be 4.8 E-07/yr, which is within the acceptance guidelines of a very small change in Regulatory Guide 1.174 (Reference 5). The use of the mean frequency of breaks greater than or equal to 14 inches as the core damage frequency associated with failures due to strainer head loss is highly conservative. The mean frequency value includes break sizes ranging from 14 through 17 inches, which were evaluated as acceptable deterministically for Point Beach Units 1 and 2. Additionally, as shown in Section 3.f. 7 in NextEra's updated final response letter (Reference 1), the vast majority of Region II breaks are bounded by successful head loss testing conducted for Point Beach.

Only some outlier breaks larger than 17 inches are not bounded (Reference 1, pp. E1-111 through E1-112).

Page 8 of 14

Lastly, the use of the mean frequency of breaks greater than or equal to 14 inches as the core damage frequency associated with failures due to strainer head loss for these breaks conservatively assumes 100% failure of mitigative operator actions and defense-in-depth measures, in addition to a single train failure of the ECCS. Therefore, exemption from the single failure requirement in 10 CFR 50, Appendix K, for the limited scope of ECCS recirculation system availability during a Region II break LOCA response for the impact of debris laden strainer head loss on ECCS recirculation system performance, would not result in undue risk to the health and safety of the public.

In the small subset of Region II break cases not bounded by testing for Point Beach, the total quantity of debris transported to a single operating sump strainer is approximately twice the quantity that had been successfully tested (Reference 1, p. E1-14). Therefore, it is concluded that if both recirculation trains are in operation, effectively doubling the available strainer surface area, the quantity of debris that might be accumulated would not result in the failure of either recirculation train (Reference 1, p. E 1-14). ECCS train availability is monitored by 10 CFR 50.65, maintenance rule, and is comprised of highly reliable equipment whose out of service time is regulated by station Technical Specifications. Therefore, there is very high assurance that both trains of the ECCS will fulfill their safety functions. Additionally, no changes are proposed to the station design, current LOCA mitigation response, or safety analyses.

Additionally, as discussed in NextEra's updated final response letter (Reference 1, pp. E1-12 through E1-23), there is reasonable assurance that long term core cooling can be provided for the bounding Region II breaks based on the Emergency Operating Procedure (EOP) actions, defense-in-depth measures, substantial safety margin, and a realistic assessment of the actual accumulation and effects of debris on the ECCS strainers. Also, the ability to use additional mitigative measures such as the Emergency Contingency Actions (ECA) and the Severe Accident Management Guideline (SAMG) strategies provide reasonable assurance that all Region II breaks would be successfully mitigated (Reference 1, p. E1-16).

Point Beach head loss testing and analyses employed many conservatisms to enhance the safety margin discussed above. The following list summarizes the major margins and conservatisms used in containment strainer head loss testing as stated in the updated final response letter (Reference 1, pp. E1-17 through E1-21).

  • Head loss testing was conducted at a flow rate range which is 5% above the maximum RHR flow rate used in the limiting recirculation alignment for RHR Net Positive Suction Head (NPSH). Head loss data was inserted into NPSH equations without scaling the head loss to a flow rate of 2000 gpm, thus resulting in higher head loss and decreased NPSH margin.
  • The Point Beach head loss tests assumed a conservative sacrificial strainer area as not available to accommodate debris.

Page 9 of 14

  • The quantity of latent debris used to determine the strainer head loss is conservatively taken to be nearly 2.5 times greater than the actual quantity of latent debris documented for the plant.
  • 100% of unqualified coatings were assumed to fail for all breaks, conservatively maximizing the potential unqualified coatings load in the recirculation pool.
  • Qualified coatings inside the Zone of Influence (ZOI) were assumed to fail as 100%

particulate, conservatively treating it as the most easily transportable debris type.

  • During pool fill, debris transport to the inactive reactor cavity was conservatively limited to 15% for fine, small, and large debris. Actual debris transport to the inactive cavity without this limitation is expected to be significantly greater due to the relatively large inactive sump volume under the reactor vessel and the relatively high over-floor transport velocities during fill of the inactive sump.
  • It was conservatively assumed that fibrous debris fines suspended in the recirculation sump pool would not be captured by equipment or components in containment. Testing has demonstrated that fiber fines will attach themselves to components readily, which would result in a significant reduction of the quantity of fines that would make it to the strainer.
  • In the chemical effects analysis, maximum pH values were conservatively used to increase the calculated aluminum release, and minimum pH values were conservatively used to decrease the calculated aluminum solubility. These conditions are mutually exclusive and would not both occur during an actual LOCA.
  • In the chemical effects analysis, maximum temperature profiles were conservatively assumed for the 30-day post-LOCA event to increase the calculated aluminum release .

In light of these considerations, it is concluded that the underlying intent of Point Beach Units 1 and 2 10 CFR 50, Appendix K to prevent undue risk to the health and safety of the public will be served by the requested exemption. Exemption of Point Beach Units 1 and 2 from the single failure requirement in 10 CFR 50, Appendix K is limited in scope to ECCS recirculation system availability during a Region II break LOCA response for the impact of debris laden strainer head loss on ECCS recirculation system performance.

5. Environmental Consideration Pursuant to the requirements of 10 CFR 51.41 and 10 CFR 51.21, "Criteria for and identification of licensing and regulatory actions requiring environmental assessments,"

NextEra evaluated the requested exemption against the criteria for identification of licensing and regulatory actions requiring environmental assessments. It was determined that the requested exemption meets the criteria and is eligible for categorical exclusion as set forth in 10 CFR 51.22, "Criterion for categorical exclusion ; identification of licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring environmental review," paragraph (c)(9), as shown below.

Page 10 of 14

(i) The exemption involves no significant hazards consideration.

An evaluation of the three criteria set forth in 10 CFR 50.92(c) as applied to the exemption is provided below. The evaluation is consistent with the no significant hazards consideration determination.

(1) The requested exemption does not involve a significant increase in the probability or consequences of an accident previously evaluated.

The requested exemption from 10 CFR 50, Appendix K, Section (1)(0)(1) would eliminate the single failure requirement for mitigating a Region II pipe break when evaluating effects of LOCA-generated debris on sump strainer head loss. The probability of occurrence of a Region II break is very small (Section 4). The Alternate Evaluation Methodology in NEI 04-07 allows the use of realistic assumptions and relaxation of the single failure criteria for mitigating a Region II break.

The requested exemption does not implement any physical changes to the facility, does not change operation of the facility or accident response, and does not change any station

  • safety analyses. The proposed change confirms that required SSCs supported by the containment sumps will reliably perform their safety functions, and does not alter or prevent the ability of SSCs to perform their intended function to mitigate the consequences of an accident previously evaluated within the acceptance limits. The safety analysis acceptance criteria in the UFSAR continue to be met for the proposed change. The proposed change does not affect initiating events because it addresses existing initiating events; i.e., loss of coolant accidents. Therefore, it is concluded that the requested exemption does not involve a significant increase in the probability or consequences of any of the accidents previously evaluated.

(2) The requested exemption does not create the possibility of a new or different kind of accident from any accident previously evaluated.

The requested exemption would eliminate the single failure requirement when evaluating the debris effects associated with mitigating Region II LOCA breaks (pipe breaks > 17 inches in diameter). The requested exemption from the single failure requirement does not introduce any new failure mechanisms or malfunctions that can initiate an accident.

The requested exemption does not require any physical modifications to the plant and does not affect the operation of any systems or components. Therefore, it does not create the possibility for a new or different kind of accident.

Page 11 of 14

(3) The requested exemption does not involve a significant reduction in a margin of safety.

The requested exemption does not involve a change in any functional requirements or method of performing functions associated with any plant SSCs. The effects of LOCA-generated debris are analyzed for a full spectrum of LOCAs, including double-ended guillotine and partial breaks at all lSI welds within the Class 1 pressure boundary (Reference 1, p. E1-11 ). The requested exemption from the single failure requirement is only applicable to larger Region II breaks (pipe breaks> 17 inches in diameter) with a very low probability of occurrence.

The requested exemption does not implement any physical changes to the facility or affect station operation or accident response. The requested exemption does not affect existing safety margins in the barriers for the release of radioactivity, and there are no changes to the safety analyses in the UFSAR. Therefore, the requested exemption does not involve a significant reduction in a margin of safety.

(ii) The requested exemption involves no significant change in the types or significant increase in the amounts of any effluents that may be released offsite.

No physical changes are made to the plant, and no changes are made to station operation or accident mitigation. There is no change to the safety analyses in the UFSAR.

Therefore, there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite.

(iii) The requested exemption involves no significant increase in individual or cumulative occupational radiation exposure.

The requested exemption does not implement any physical changes to the facility, does not change operation of the facility, and has no change on station procedures or accident response. The requested exemption does not change any existing safety analyses in the UFSAR. Approval of this exemption request will prevent significant occupational radiation exposure that would be caused by performing modifications in the Point Beach Units 1 and 2 containments to meet deterministic resolution acceptance guidelines. Therefore, approval of this exemption request will not result in significant increase in individual or cumulative occupational radiation exposure.

Based on the above, NextEra concludes that the requested exemption meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) and concludes that the requested exemption would not result in a significant radiological environmental impact.

Page 12 of 14

6. Precedent On October 29, 1998, the NRC granted a similar Appendix K Section (1)(0)(1) exemption to Florida Power Corporation for Crystal River Unit 3. This exemption wa~ with respect to the long term cooling criterion contained in 10 CFR 50.46(b )(5). The licensee could not meet single failure because active methods of boric acid precipitation control might not have been available with the Section (1)(0)(1) criterion applied. The Crystal River Exemption request was based on 10 CFR 50.12(a)(2)(ii). The limited scope exemption was granted based on the low probability of the subject scenario (Reference 6).
7. Conclusion To support resolution of GSI-191, NextEra requests exemption for Point Beach Units 1 and 2 from the single failure requirement in 10 CFR 50, Appendix K, Section (1)(0)(1 ).

The request is limited in scope to ECCS recirculation system availability during a Region II break (pipe breaks > 17 inches in diameter) LOCA response for the impact of debris laden strainer head loss on ECCS recirculation system performance. The exemption requested is permanent in duration. This exemption request is consistent with the Alternate Evaluation Methodology stated in NEI 04-07, Section 6. Therefore, the approval of this exemption will not present an undue risk to the public health and safety and is consistent with the common defense and security as required by 10 CFR 50.12(a)(1). Special circumstances required by 10 CFR 50.12(a)(2) are shown to exist per the criteria in 10 CFR 50.12(a)(2)(ii). The exemption will not result in a significant radiological environmental impact and meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

8. Schedule NextEra requests review and approval of this exemption request within 12 months of the date of this submittal.

Page 13 of 14

9. References
1. NextEra Energy Point Beach, LLC, Updated Final Response to NRC Generic Letter 2004-02, December 29, 2017 (ML17363A253)
2. NEI 04-07, Pressurized Water Reactor Sump Performance Evaluation Methodology Volume 1, Revision 0, December 2004 (ML050550138)
3. NEI 04-07, Pressurized Water Reactor Sump Performance Evaluation Methodology, Volume 2, Safety Evaluation by the Office of Nuclear Reactor Regulation Related to NRC Generic Letter 2004-02, Revision 0, December 6, 2004, Revision 0, December 2004 (ML050550156)
4. NUREG-1829, Estimating Loss-of-Coolant Accident (LOCA) Frequencies Through the Elicitation Process, Volume 1, April 2008 (ML082250436)
5. Regulatory Guide 1.174, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, Revision 3, January 2018 (ML17317A256)
6. Issuance of Exemption from the Requirements of 10 CFR Part 50, Appendix K, Section I.D.1 -Crystal River Unit 3 (TAC No. M99892) (ML020670408)

Page 14 of 14

Text

NEXTera ENERGY ~

POINT BEACH August 30, 2018 NRC 2018-0040 10CFR50.12 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Docket 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 NextEra Energy Point Beach, LLC. Exemption Request to Support Updated Final Response to NRC Generic Letter 2004-02

Reference:

1. NextEra Energy Point Beach, LLC, Updated Final Response to NRC Generic Letter 2004-02, dated December 29, 2017 (ML17363A253)

By letter dated December 29, 2017 (Reference 1), NextEra Energy Point Beach, LLC (NextEra) submitted an updated final response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. In Reference 1, NextEra committed to submit no later than April 2018 an exemption from the single failure criterion in Point Beach site-specific General Design Criterion (GDC) 41, Engineered Safety Features Performance Capability, applicable to Region II Loss of Coolant Accident break sizes. After further discussions with the NRC, it was determined that an exemption from the single failure criterion of 10 CFR 50, Appendix K, Section (I)(D)(1) is the appropriate approach and that submittal by April 2018 was not necessary.

This letter transmits the exemption request from the single failure criterion of 10 CFR 50, Appendix K, Section (I)(D)(1) for Point Beach.

This letter contains no new regulatory commitments .

NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 If you have any questions please contact Mr. Eric Schultz, Licensing Manager, at (920) 755-7854.

Sincerely, NextEra Energy Point Beach, LLC Rob Craven Plant General Manager cc: Director, Office of Nuclear Reactor Regulation Administrator, Region Ill, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Enclosure

Enclosure 1 Request for Exemption from 10 CFR 50 Appendix K

1. Exemption Request Pursuant to 10 CFR 50.12, NextEra Energy Point Beach, LLC (NextEra) is submitting a request for permanent exemption from the single failure requirement in 10 CFR 50, Appendix K, Emergency Core Cooling System (ECCS) Models, Section (1)(0)(1) which states:

Single Failure Criterion. An analysis of possible failure modes of ECCS equipment and of their effects on ECCS performance must be made. In carrying out the accident evaluation the combination of ECCS subsystems assumed to be operative shall be those available after the most damaging single failure of ECCS equipment has taken place.

As discussed in the updated final response to NRC Generic Letter 2004-02 (Reference 1),

this request supports closure of Generic Safety Issue 191 (GSI-191) for Point Beach.

Pursuant to 10 CFR 50.12, NextEra is submitting this request for exemption from certain requirements of 10 CFR 50, Appendix K Section (1)(0)(1 ), namely "Single Failure Criterion". Key limitations of the exemption request are:

1. This exemption is limited to the application of Appendix K Section (1)(0)(1) as it pertains to meeting the acceptance criteria of 10 CFR 50.46(b )(5), namely "Long-term cooling".
2. The scope of the requested exemption is limited to the availability of both trains of the low head Emergency Core Cooling System (ECCS) in operation with both ECCS recirculation strainers available to accommodate the postulated debris load from a Region II break. (Reference1, p. E1-12)
3. The exemption is for large Region II breaks only. Selection of Region II breaks is consistent with NEI 04-07, Section 6 as described in Reference 1. Region II breaks are defined for Point Beach as reactor coolant system (RCS) main loop piping breaks greater than 17 inches in diameter. (Reference 1, p. E1-11)

Mitigation of a low probability Region II break would require both trains of the low head ECCS system to be in operation with both ECCS strainers available to accommodate the postulated debris load from a break of this size. (Reference1, p. E1-12) The exemption requested is permanent in duration.

2. Regulatory Requirements Involved NextEra is requesting exemption from the single failure requirement in 10 CFR 50, Appendix K, as stated in Section 1, above. This exemption request supports closure of Page 1 of 14

GSI-191 for Point Beach for Region II breaks (breaks greater than 17 inches in diameter).

In its GSI-191 evaluation, NextEra analyzed Region II breaks using the Alternate Evaluation Methodology provided in NEI 04-07 (Reference 2). The Alternate Evaluatiofl Methodology allows the use of more realistic analysis methods and assumptions .

Because the single failure requirement of Appendix K cannot be met for the low head ECCS in NexEra's GSI-191 evaluation for Point Beach, an exemption from the single failure requirement is necessary for this limited purpose.

10 CFR 50 requires compliance with 10 CFR 50, Appendix K per 10 CFR 50.46 (a)(1).

Specifically, 10 CFR 50.46 (a)(1) cites Appendix K for ECCS model for required documentation as well as required and acceptable features. 10 CFR 50.46 does not specifically direct single failure criterion. Rather, 10 CFR 50.46 cites Appendix K which does specify single failure criterion in Section (1)(0)(1 ). Therefore, with a limited exemption from Appendix K Section (1)(0)(1 ), further exemption from 10 CFR 50.46 (a)(1) is unnecessary.

NextEra's final response to Generic Letter (GL) 2004-02 in Reference 1 stated that it elected to use the Alternate Evaluation Methodology of NEI 04-07, Section 6. The NEI 04-07 Safety Evaluation Report (SER) Section 6.1, states in part:

While not a component of the 10 CFR 50.46 ECCS evaluation model, the calculation of sump performance is necessary to determine if the sump and the residual heat removal system are configured properly to provide enough flow to ensure long-term cooling, which is an acceptance criterion of 10 CFR 50. 46. Therefore, the staff considers the modeling of sump performance as the validation of assumptions made in the ECCS evaluation model.

Since the modeling of sump performance is a boundary calculation for the ECCS evaluation model, and acceptable sump performance is necessary for demonstrating long-term core cooling capability (1 0 CFR 50.46(b)(5)), the requirements of 10 CFR 50.46 are applicable.

Based on this, such an alternative approach might require plant-specific license amendment requests or exemption requests from the regulations, depending on each licensee's chosen resolution approach. Licensees could request, on a plant-specific basis, exemptions from the requirements associated with demonstrating long-term core cooling capability (1 0 CFR 50.46(b)(5)) . For example, exemptions from the requirements of 10 CFR 50.46(d) may be required if a licensee chooses to classify new equipment as nonsafety related or not single-failure proof.

10 CFR 50.46(a)(1)(i) states in part:

Each boiling or pressurized light-water nuclear power reactor fueled with uranium oxide pellets within cylindrical zircaloy or ZIRLO cladding must be provided with an emergency core cooling system (ECCS) that must be designed so that its calculated cooling performance following postulated loss-of-coolant accidents conforms to the criteria set forth in paragraph (b) of this section.

Page 2 of 14

As referenced in 10 CFR 50.46(a)(1 )(i), 10 CFR 50.46(b)(5) is an acceptance criterion part of paragraph (b) and states:

Long-term cooling. After any calculated successful initial operation of the ECCS, the calculated core temperature shall be maintained at an acceptably low value and decay heat shall be removed for the extended period of time required by the long-lived radioactivity remaining in the core.

This exemption request is consistent with the NEI 04-07 SER by ensuring 10 CFR 50.46(b )(5) acceptance criterion is met through an exemption to Appendix K Section (1)(0)(1). That is, 10 CFR 50.46(a)(1) establishes that the 10 CFR 50.46(b) acceptance criteria can be met with ECCS Model described in 10 CFR 50 Appendix K.

Granting of this exemption permits Appendix K to be met without the single failure criterion as it pertains to debris impacts on strainer loading and in-vessel effects for large Region II breaks only. As the exemption to Appendix K would allow for an acceptable ECCS Evaluation Model, no further exemptions are required to 10 CFR 50.46(b )(5).

10 CFR 50 Appendix K Section (1)(0)(1) contains requirements for single failure analysis as it pertains to other 10 CFR 50.46 requirements such as power distribution shape, peaking factor, and areas outside those covered in this exemption request. The exemption is exclusive to the impact of debris on strainer loading and in-vessel effects for large Region II breaks only.

The requested exemption does not result in any physical changes to the facility or changes to the operation of these systems. The exemption also does not change any of the programmatic requirements. For aspects not impacted by the exemption request, the ECCS model continues to be evaluated for compliance with Appendix K as modified by Point Beach's current licensing basis. The ECCS system and components continue to comply with their current design and licensing basis requirements.

In Reference 1, NextEra stated that it would submit an exemption request from the single failure requirement in Point Beach Units 1 and 2 site-specific General Design Criterion (GDC) 41, Engineered Safety Features Performance Capability, for a select (Region II) range of loss-of-coolant accident (LOCA) break sizes. Following discussions with the NRC, NextEra determined that the regulation from which Point Beach requires exemption is 10 CFR 50, Appendix K, Section (1)(0)(1 ).

3. Basis for Exemption Request Under 10 CFR 50.12(a), a licensee may request and the NRC may grant exemptions from the requirements of 10 CFR Part 50 when (1) the exemptions are authorized by law, will not present an undue risk to the public health and safety, are consistent with the common defense and security, and (2) when special circumstances are present.

Page3of14

This exemption request is submitted to support closure of GSI-191 for Point Beach, Units 1 and 2, and supports NextEra's use of the Alternate Evaluation Methodology provided in NEI 04-07, Pressurized Water Reactor Sump Performance Evaluation Methodology (Reference 2).

3.1 Justification for the Exemption Request 10 CFR 50.12, "Specific exemptions," allows the NRC to grant exemptions from the requirements of 10 CFR 50 provided the following three conditions are met as required by 10 CFR 50.12(a)(1):

1. The exemption is authorized by law.

10 CFR 50.12 allows the NRC to grant exemptions from Part 50 requirements with provision of proper justification. Approval of the exemption would not conflict with any provisions of the Atomic Energy Act of 1954, as amended, or the Commission's regulations.

2. The exemption does not present an undue risk to the public health and safety.

NextEra followed NEI 04-07, Section 6, Alternate Evaluation Methodology, when analyzing the effects of Region II LOCA break sizes (pipe breaks > 17 inches in diameter). The methodology builds on risk insights and uses realistic inputs and assumptions considering the low probability and risk impact of these larger postulated pipe breaks . As stated in the Safety Evaluation (SE) for NEI 04-07 (Reference 3), the models, assumptions, and equipment availability used for analyzing Region II breaks need to be demonstrated as functionally reliable, and may not necessarily be safety related or single failure proof. The Safety Evaluation also states that the Alternate Evaluation Methodology "provides an acceptable approach for evaluating PWR sump performance. Application of more realistic and risk-informed elements is technically justified based on the low likelihood of such breaks occurring." In addition, the NRC Staff pointed out that consideration of risk significance in the NEI Alternate Evaluation Methodology is consistent with 10 CFR 50.46 rulemaking and Regulatory Guide 1.174.

Application of the Alternate Evaluation Methodology in NEI 04-07 to Point Beach Units 1 and 2 demonstrates that the exemption from the single failure requirement for mitigating a Region II break will not present an undue risk to the public health and safety (see Section 4 ). As shown in Section 4, reasonable assurance exists that both low head ECCS trains will be available for mitigating a Region II break. As described in Section 4.0, the low head ECCS equipment is highly reliable in accordance with Technical Specifications and as monitored by 10 CFR 50.65 Maintenance Rule requirements. Further, the sump Page 4 of 14

strainer performance evaluation for Region II breaks has utilized several conservatisms.

Safety margins and defense-in-depth measures are available to mitigate the effects of the accidents (Reference 1, p. E1 -15).

3. The exemption is consistent with the common defense and security.

The exemption has no impact on the physical security plan or the ability to protect special nuclear material. Therefore, the exemption is consistent with the common defense and security.

3.2 Special Circumstances In accordance with 10 CFR 50.12(a)(2), special circumstances are present when at least one of the given criteria are met. The following special circumstance is applicable to this exemption request:

(ii) Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule.

An objective of 10 CFR 50 Appendix K is to provide model requirements that ensure safety systems (ECCS) maintain low risk to the public health and safety. Appendix K contains model features to provide assurance that the criteria of 10 CFR 50.46(b) are met.

Specifically, 10 CFR 50.46(a)(1 )(i) states, in part:

Comparisons to applicable experimental data must be made and uncertainties in the analysis method and inputs must be identified and assessed so that the uncertainty in the calculated results can be estimated. This uncertainty must be accounted for, so that, when the calculated EGGS cooling performance is compared to the criteria set forth in paragraph (b) of this section, there is a high level of probability that the criteria would not be exceeded.

A high level of probability of ECCS cooling performance for ensuring long term cooling is achieved using the Alternate Evaluation Methodology from Section 6 of NEI 04-07 (Reference 2), which describes acceptable methods for evaluating containment sump requirements. For meeting the long term cooling criterion, 10 CFR 50, Appendix K is intended to maintain low risk to the public health and safety through adequate functioning of the ECCS with a single failure. This system is supported by the containment sump strainers. Licensees are required to demonstrate this capability using a bounding calculation or other deterministic method assuming a single failure. As discussed in NextEra's Updated Final Response to NRC Generic Letter 2004-02 for Point Beach (Reference 1), all ECCS SSC design functions are demonstrated deterministically to be compliant with 10 CFR 50.46 considering strainer loading, pump net positive suction head, in-vessel effects, and downstream effects for all Region I breaks while accounting for uncertainties. The Point Beach analysis for Region II breaks used deterministic methods, Page 5 of 14

but credited both trains of low head ECCS in operation in order to accommodate the volume of debris generation postulated from a Region II break (Reference1, p. E 1-17). As discussed in Section 4 of this exemption request, given the low likelihood of these large breaks occurring, the change in risk attributed to debris in postulated Region II breaks (pipe breaks > 17 inches in diameter) is very small. Therefore, the underlying objective of the regulations to ensure adequate protection of public health and safety will remain met.

ECCS operation for mitigation of other (non-LOCA) events is not impacted. Secondary side pipe ruptures have the potential to generate some debris; however, the feedwater line breaks and main steam line breaks are mitigated without the need for ECCS to switchover to sump recirculation mode. Therefore, the non-LOCA events described in the Updated Final Safety Analysis Report (UFSAR) are not affected by debris and are not impacted by this request for exemption.

In addition to the considerations above, efforts driven by compliance with the single failure requirement in 10 CFR 50, Appendix K, to reduce the likelihood of sump strainer blockage have resulted in substantial occupational exposure, which is contrary to the underlying purpose of protecting the health and safety of the public given the expected safety benefit for this low probability event. From 2008 through 2011, for instance, Point Beach incurred in excess of 69 Rem modifying Units 1 and 2 to reduce the likelihood of sump strainer blockage.

Additionally, significant amounts of fibrous and particulate insulation would require replacement to ensure compliance with the single failure requirement in 10 CFR 50, Appendix K to mitigate Region II breaks. The estimated man-hours and dose for the expected highest dose modification, replacing the Unit 2 Steam Generator A and B insulation, is summarized in the table below.

Estimated Dose for Insulation Replacement at Point Beach Estimated Activity Estimated Dose Man-hours Replace Unit 2 Steam 20,350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> 152.6 Rem Generator A & B Insulation Replacement of the insulation on the resistance temperature device (RTD) piping in both Units 1 and 2, on both Trains A and B, would also be required to ensure compliance with the single failure requirement in 10 CFR 50, Appendix K to mitigate Region II breaks. The dose to workers associated with RTD piping insulation has not yet been developed, but is expected to be substantial.

The dose considerations discussed above demonstrate that compliance with the single failure requirement in 10 CFR 50, Appendix K to mitigate Region II breaks would result in substantial occupational exposure to workers to perform the necessary modifications in Page 6 of 14

the containments, which is contrary to the underlying purpose of protecting the health and safety of the public given the expected safety benefit for this low probability event.

The considerations discussed above demonstrate that compliance with the single failure requirement in 10 CFR 50 Appendix K, Section (I)(D)(1 ), for Region II breaks is not necessary to achieve the underlying purpose of the regulation, which is to ensure adequate protection of public health and safety. Consequently, the special circumstances described in 10 CFR 50.12(a)(2)(ii) apply to this exemption request.

4. Technical Justification for the Exemption Alternate Evaluation Methodology Section 6 of the NEI 04-07 describes the Alternate Evaluation Methodology for demonstrating acceptable containment sump performance. The Alternate Evaluation Methodology proposes separate analysis methods for two distinct break size regions (Reference 1):
  • Region 1:

o Defined as all breaks equal to or smaller than the alternate break size, the alternate break size being a complete guillotine break of the largest line connected to the reactor coolant system piping, and (for main RCS loop piping) a break of a 14 inch schedule 160 line (Reference 3).

o Analysis methods must meet the typical design basis rules for a deterministic evaluation.

  • Region II:

o Defined as breaks larger than the Region I alternate break size, up to and including double ended guillotine breaks (DEGBs) on the RCS loop piping.

o Mitigative capabilities must be demonstrated, but the fully deterministic design basis rules do not necessarily apply.

The Alternate Evaluation Methodology can be used to demonstrate reasonable assurance of adequate long term core cooling, as required by 10 CFR 50.46(b)(5), for the bounding breaks in Region II by allowing for the use of more realistic assumptions and methods as well as allowing credit for mitigative operator actions and defense-in-depth measures .

Based on various considerations, the NRC Staff determined that the division of the pipe

  • break spectrum proposed for evaluating debris generation is acceptable based on operating experience, application of sound engineering judgment, and consideration of risk-informed principles . Licensees using the methods described in Section 6 of NEI 04-07 can apply the DEGBs for distinguishing between Region I and Region II analyses. (Reference 3)

Page 7 of 14

The Region I evaluation for Point Beach Units 1 and 2 considered DEGBs at Class 1 lnservice Inspection (lSI) welds on piping connected to the RCS main loops, which have a maximum nominal pipe diameter of 10 inches, as well as postulated 17-inch partial breaks on the main loop piping (including multiple break orientations at each main loop lSI weld location) (Reference 1, p. E1-11 ). These bounding Region I breaks were evaluated in accordance with NRC-approved methods for a deterministic evaluation, and were shown to meet all acceptance criteria for strainer head loss (Reference 1, pp. E 1-11 and E 1-16).

The Region II evaluation for Point Beach Units 1 and 2 was limited to breaks larger than 17 inches in diameter on the main loop piping, and these breaks were analyzed using bounding DEGB quantities at the worst-case break locations. The bounding Region II debris quantities exceed the debris quantities that were used in the prototypical strainer head loss testing performed by NextEra if single failure of an ECCS recirculation system train is assumed; therefore, Region II breaks were evaluated using the Alternate Evaluation Methodology (Reference 1, p. E 1-12). The Alternate Evaluation assumes that both low head ECCS trains, including two trains of recirculation strainers, will be available to accommodate the volume of debris generated by a Region II break (Reference 1,

p. E1-14). NextEra requests exemption from the single failure requirement in 10 CFR 50, Appendix K, for the limited scope of low head ECCS recirculation system availability during a Region II break LOCA response for the impact of debris laden strainer head loss on ECCS recirculation system performance, for Point Beach Units 1 and 2.

Region II Risk Insights The relaxation of certain requirements for mitigating a Region II break is appropriate based on the low frequency associated with breaks that are greater than 17 inches in diameter at Point Beach Units 1 and 2. Based on NUREG-1829, Table 7.19, the mean frequency of breaks (without steam generator tube rupture contributions) greater than or equal to 14 inches is 4.8 E-07/yr using the end-of-plant-license estimates for 40 years average fleet operation (Reference 4). If all Region II breaks are conservatively assumed to result in strainer head loss failure due to the effects of debris and result in core damage, the risk associated with these failures (in terms of change in core damage frequency, b.CDF) would be 4.8 E-07/yr, which is within the acceptance guidelines of a very small change in Regulatory Guide 1.174 (Reference 5). The use of the mean frequency of breaks greater than or equal to 14 inches as the core damage frequency associated with failures due to strainer head loss is highly conservative. The mean frequency value includes break sizes ranging from 14 through 17 inches, which were evaluated as acceptable deterministically for Point Beach Units 1 and 2. Additionally, as shown in Section 3.f. 7 in NextEra's updated final response letter (Reference 1), the vast majority of Region II breaks are bounded by successful head loss testing conducted for Point Beach.

Only some outlier breaks larger than 17 inches are not bounded (Reference 1, pp. E1-111 through E1-112).

Page 8 of 14

Lastly, the use of the mean frequency of breaks greater than or equal to 14 inches as the core damage frequency associated with failures due to strainer head loss for these breaks conservatively assumes 100% failure of mitigative operator actions and defense-in-depth measures, in addition to a single train failure of the ECCS. Therefore, exemption from the single failure requirement in 10 CFR 50, Appendix K, for the limited scope of ECCS recirculation system availability during a Region II break LOCA response for the impact of debris laden strainer head loss on ECCS recirculation system performance, would not result in undue risk to the health and safety of the public.

In the small subset of Region II break cases not bounded by testing for Point Beach, the total quantity of debris transported to a single operating sump strainer is approximately twice the quantity that had been successfully tested (Reference 1, p. E1-14). Therefore, it is concluded that if both recirculation trains are in operation, effectively doubling the available strainer surface area, the quantity of debris that might be accumulated would not result in the failure of either recirculation train (Reference 1, p. E 1-14). ECCS train availability is monitored by 10 CFR 50.65, maintenance rule, and is comprised of highly reliable equipment whose out of service time is regulated by station Technical Specifications. Therefore, there is very high assurance that both trains of the ECCS will fulfill their safety functions. Additionally, no changes are proposed to the station design, current LOCA mitigation response, or safety analyses.

Additionally, as discussed in NextEra's updated final response letter (Reference 1, pp. E1-12 through E1-23), there is reasonable assurance that long term core cooling can be provided for the bounding Region II breaks based on the Emergency Operating Procedure (EOP) actions, defense-in-depth measures, substantial safety margin, and a realistic assessment of the actual accumulation and effects of debris on the ECCS strainers. Also, the ability to use additional mitigative measures such as the Emergency Contingency Actions (ECA) and the Severe Accident Management Guideline (SAMG) strategies provide reasonable assurance that all Region II breaks would be successfully mitigated (Reference 1, p. E1-16).

Point Beach head loss testing and analyses employed many conservatisms to enhance the safety margin discussed above. The following list summarizes the major margins and conservatisms used in containment strainer head loss testing as stated in the updated final response letter (Reference 1, pp. E1-17 through E1-21).

  • Head loss testing was conducted at a flow rate range which is 5% above the maximum RHR flow rate used in the limiting recirculation alignment for RHR Net Positive Suction Head (NPSH). Head loss data was inserted into NPSH equations without scaling the head loss to a flow rate of 2000 gpm, thus resulting in higher head loss and decreased NPSH margin.
  • The Point Beach head loss tests assumed a conservative sacrificial strainer area as not available to accommodate debris.

Page 9 of 14

  • The quantity of latent debris used to determine the strainer head loss is conservatively taken to be nearly 2.5 times greater than the actual quantity of latent debris documented for the plant.
  • 100% of unqualified coatings were assumed to fail for all breaks, conservatively maximizing the potential unqualified coatings load in the recirculation pool.
  • Qualified coatings inside the Zone of Influence (ZOI) were assumed to fail as 100%

particulate, conservatively treating it as the most easily transportable debris type.

  • During pool fill, debris transport to the inactive reactor cavity was conservatively limited to 15% for fine, small, and large debris. Actual debris transport to the inactive cavity without this limitation is expected to be significantly greater due to the relatively large inactive sump volume under the reactor vessel and the relatively high over-floor transport velocities during fill of the inactive sump.
  • It was conservatively assumed that fibrous debris fines suspended in the recirculation sump pool would not be captured by equipment or components in containment. Testing has demonstrated that fiber fines will attach themselves to components readily, which would result in a significant reduction of the quantity of fines that would make it to the strainer.
  • In the chemical effects analysis, maximum pH values were conservatively used to increase the calculated aluminum release, and minimum pH values were conservatively used to decrease the calculated aluminum solubility. These conditions are mutually exclusive and would not both occur during an actual LOCA.
  • In the chemical effects analysis, maximum temperature profiles were conservatively assumed for the 30-day post-LOCA event to increase the calculated aluminum release .

In light of these considerations, it is concluded that the underlying intent of Point Beach Units 1 and 2 10 CFR 50, Appendix K to prevent undue risk to the health and safety of the public will be served by the requested exemption. Exemption of Point Beach Units 1 and 2 from the single failure requirement in 10 CFR 50, Appendix K is limited in scope to ECCS recirculation system availability during a Region II break LOCA response for the impact of debris laden strainer head loss on ECCS recirculation system performance.

5. Environmental Consideration Pursuant to the requirements of 10 CFR 51.41 and 10 CFR 51.21, "Criteria for and identification of licensing and regulatory actions requiring environmental assessments,"

NextEra evaluated the requested exemption against the criteria for identification of licensing and regulatory actions requiring environmental assessments. It was determined that the requested exemption meets the criteria and is eligible for categorical exclusion as set forth in 10 CFR 51.22, "Criterion for categorical exclusion ; identification of licensing and regulatory actions eligible for categorical exclusion or otherwise not requiring environmental review," paragraph (c)(9), as shown below.

Page 10 of 14

(i) The exemption involves no significant hazards consideration.

An evaluation of the three criteria set forth in 10 CFR 50.92(c) as applied to the exemption is provided below. The evaluation is consistent with the no significant hazards consideration determination.

(1) The requested exemption does not involve a significant increase in the probability or consequences of an accident previously evaluated.

The requested exemption from 10 CFR 50, Appendix K, Section (1)(0)(1) would eliminate the single failure requirement for mitigating a Region II pipe break when evaluating effects of LOCA-generated debris on sump strainer head loss. The probability of occurrence of a Region II break is very small (Section 4). The Alternate Evaluation Methodology in NEI 04-07 allows the use of realistic assumptions and relaxation of the single failure criteria for mitigating a Region II break.

The requested exemption does not implement any physical changes to the facility, does not change operation of the facility or accident response, and does not change any station

  • safety analyses. The proposed change confirms that required SSCs supported by the containment sumps will reliably perform their safety functions, and does not alter or prevent the ability of SSCs to perform their intended function to mitigate the consequences of an accident previously evaluated within the acceptance limits. The safety analysis acceptance criteria in the UFSAR continue to be met for the proposed change. The proposed change does not affect initiating events because it addresses existing initiating events; i.e., loss of coolant accidents. Therefore, it is concluded that the requested exemption does not involve a significant increase in the probability or consequences of any of the accidents previously evaluated.

(2) The requested exemption does not create the possibility of a new or different kind of accident from any accident previously evaluated.

The requested exemption would eliminate the single failure requirement when evaluating the debris effects associated with mitigating Region II LOCA breaks (pipe breaks > 17 inches in diameter). The requested exemption from the single failure requirement does not introduce any new failure mechanisms or malfunctions that can initiate an accident.

The requested exemption does not require any physical modifications to the plant and does not affect the operation of any systems or components. Therefore, it does not create the possibility for a new or different kind of accident.

Page 11 of 14

(3) The requested exemption does not involve a significant reduction in a margin of safety.

The requested exemption does not involve a change in any functional requirements or method of performing functions associated with any plant SSCs. The effects of LOCA-generated debris are analyzed for a full spectrum of LOCAs, including double-ended guillotine and partial breaks at all lSI welds within the Class 1 pressure boundary (Reference 1, p. E1-11 ). The requested exemption from the single failure requirement is only applicable to larger Region II breaks (pipe breaks> 17 inches in diameter) with a very low probability of occurrence.

The requested exemption does not implement any physical changes to the facility or affect station operation or accident response. The requested exemption does not affect existing safety margins in the barriers for the release of radioactivity, and there are no changes to the safety analyses in the UFSAR. Therefore, the requested exemption does not involve a significant reduction in a margin of safety.

(ii) The requested exemption involves no significant change in the types or significant increase in the amounts of any effluents that may be released offsite.

No physical changes are made to the plant, and no changes are made to station operation or accident mitigation. There is no change to the safety analyses in the UFSAR.

Therefore, there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite.

(iii) The requested exemption involves no significant increase in individual or cumulative occupational radiation exposure.

The requested exemption does not implement any physical changes to the facility, does not change operation of the facility, and has no change on station procedures or accident response. The requested exemption does not change any existing safety analyses in the UFSAR. Approval of this exemption request will prevent significant occupational radiation exposure that would be caused by performing modifications in the Point Beach Units 1 and 2 containments to meet deterministic resolution acceptance guidelines. Therefore, approval of this exemption request will not result in significant increase in individual or cumulative occupational radiation exposure.

Based on the above, NextEra concludes that the requested exemption meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) and concludes that the requested exemption would not result in a significant radiological environmental impact.

Page 12 of 14

6. Precedent On October 29, 1998, the NRC granted a similar Appendix K Section (1)(0)(1) exemption to Florida Power Corporation for Crystal River Unit 3. This exemption wa~ with respect to the long term cooling criterion contained in 10 CFR 50.46(b )(5). The licensee could not meet single failure because active methods of boric acid precipitation control might not have been available with the Section (1)(0)(1) criterion applied. The Crystal River Exemption request was based on 10 CFR 50.12(a)(2)(ii). The limited scope exemption was granted based on the low probability of the subject scenario (Reference 6).
7. Conclusion To support resolution of GSI-191, NextEra requests exemption for Point Beach Units 1 and 2 from the single failure requirement in 10 CFR 50, Appendix K, Section (1)(0)(1 ).

The request is limited in scope to ECCS recirculation system availability during a Region II break (pipe breaks > 17 inches in diameter) LOCA response for the impact of debris laden strainer head loss on ECCS recirculation system performance. The exemption requested is permanent in duration. This exemption request is consistent with the Alternate Evaluation Methodology stated in NEI 04-07, Section 6. Therefore, the approval of this exemption will not present an undue risk to the public health and safety and is consistent with the common defense and security as required by 10 CFR 50.12(a)(1). Special circumstances required by 10 CFR 50.12(a)(2) are shown to exist per the criteria in 10 CFR 50.12(a)(2)(ii). The exemption will not result in a significant radiological environmental impact and meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

8. Schedule NextEra requests review and approval of this exemption request within 12 months of the date of this submittal.

Page 13 of 14

9. References
1. NextEra Energy Point Beach, LLC, Updated Final Response to NRC Generic Letter 2004-02, December 29, 2017 (ML17363A253)
2. NEI 04-07, Pressurized Water Reactor Sump Performance Evaluation Methodology Volume 1, Revision 0, December 2004 (ML050550138)
3. NEI 04-07, Pressurized Water Reactor Sump Performance Evaluation Methodology, Volume 2, Safety Evaluation by the Office of Nuclear Reactor Regulation Related to NRC Generic Letter 2004-02, Revision 0, December 6, 2004, Revision 0, December 2004 (ML050550156)
4. NUREG-1829, Estimating Loss-of-Coolant Accident (LOCA) Frequencies Through the Elicitation Process, Volume 1, April 2008 (ML082250436)
5. Regulatory Guide 1.174, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, Revision 3, January 2018 (ML17317A256)
6. Issuance of Exemption from the Requirements of 10 CFR Part 50, Appendix K, Section I.D.1 -Crystal River Unit 3 (TAC No. M99892) (ML020670408)

Page 14 of 14