MONTHYEARNRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired1999-09-24024 September 1999 Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired NRC-99-0072, Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement1999-09-10010 September 1999 Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement NRC-99-0078, Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included1999-08-25025 August 1999 Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included NRC-99-0048, Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl1999-07-30030 July 1999 Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl NRC-99-0035, Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages1999-04-20020 April 1999 Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages NRC-99-0025, Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.11999-03-23023 March 1999 Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 NRC-98-0122, Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl1998-09-28028 September 1998 Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl NRC-98-0128, Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a1998-08-26026 August 1998 Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a NRC-98-0117, Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals1998-07-23023 July 1998 Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals NRC-98-0044, Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci1998-07-17017 July 1998 Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 9809041998-06-26026 June 1998 Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L7981998-06-0505 June 1998 Application for Amend to License NPF-43,revising TS Section 2.1.2.Proprietary & non-proprietary Info,Encl.Proprietary Info Withheld NRC-98-0065, Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.11998-04-27027 April 1998 Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.1 NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications1998-04-0909 April 1998 Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications NRC-98-0043, Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS1998-04-0303 April 1998 Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS NRC-98-0062, Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/41998-04-0202 April 1998 Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/4 NRC-98-0057, Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors1998-04-0202 April 1998 Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors NRC-98-0033, Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray1998-03-27027 March 1998 Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray NRC-98-0034, Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned1998-03-27027 March 1998 Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned NRC-98-0003, Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS NRC-98-0027, Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a1998-01-28028 January 1998 Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a NRC-98-0006, Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements1998-01-28028 January 1998 Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements NRC-98-0002, Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement1998-01-28028 January 1998 Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement NRC-98-0008, Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed NRC-98-0023, Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor1998-01-28028 January 1998 Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor NRC-98-0025, Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access1998-01-28028 January 1998 Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access NRC-97-0115, Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR1997-12-15015 December 1997 Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR NRC-97-0105, Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms1997-12-10010 December 1997 Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20211J1971997-09-29029 September 1997 Application for Amend to License NPF-43,relocating Selected Requirements & Associated Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested NRC-97-0107, Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing1997-09-0505 September 1997 Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing NRC-97-0037, Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR1997-06-20020 June 1997 Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR NRC-97-0031, Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements1997-03-27027 March 1997 Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements NRC-96-0134, Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability1996-12-0202 December 1996 Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability ML20129F0611996-09-25025 September 1996 Application for Amend to License NPF-43,revising Tech Spec 4.8.4.3 Re Periodic Testing Requirement for Thermal Overload Protection Devices NRC-96-0075, Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value1996-09-0505 September 1996 Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value NRC-96-0003, Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys1996-03-25025 March 1996 Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys ML20095K4211995-12-21021 December 1995 Application for Amend to License NPF-43,incorporating 10CFR50,App J,Option B NRC-95-0124, Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.31995-11-22022 November 1995 Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.3 NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS1995-10-0202 October 1995 Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals1995-09-20020 September 1995 Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals NRC-94-0107, Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans1994-12-15015 December 1994 Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans NRC-94-0047, Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-081994-05-10010 May 1994 Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-08 NRC-94-0027, Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-322911994-04-26026 April 1994 Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-32291 NRC-93-0151, Application for Amend to License NPF-43 Re Reduced Testing During Power Operation1994-03-29029 March 1994 Application for Amend to License NPF-43 Re Reduced Testing During Power Operation NRC-93-0143, Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements1993-12-0909 December 1993 Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements NRC-93-0077, Application for Amend to License NPF-43.Amend Provides Updated Lab Testng Standard for Surveillance Testing of Activated Charcoal Samples from Control Room Emergency Filtration Sys1993-07-29029 July 1993 Application for Amend to License NPF-43.Amend Provides Updated Lab Testng Standard for Surveillance Testing of Activated Charcoal Samples from Control Room Emergency Filtration Sys NRC-93-0061, Application for Amend to License NPF-43,revising TS to Extend Instrument Calibr Intervals to 36 Months for Selected Instrumentation,Per BWROG Licensing Topical Rept NEDC-32160P,Dec 1992.GE Proprietary Rept Encl.Rept Withheld1993-07-29029 July 1993 Application for Amend to License NPF-43,revising TS to Extend Instrument Calibr Intervals to 36 Months for Selected Instrumentation,Per BWROG Licensing Topical Rept NEDC-32160P,Dec 1992.GE Proprietary Rept Encl.Rept Withheld NRC-93-0078, Application for Amend to License NPF-43,changing TS 6.8.5.e to Provide Proper Refs to 10CFR20 as Result of New Section Numbers1993-07-29029 July 1993 Application for Amend to License NPF-43,changing TS 6.8.5.e to Provide Proper Refs to 10CFR20 as Result of New Section Numbers NRC-93-0062, Application for Amend to License NPF-43,changing Tech Specs Include Modification to Job Titles Following Mgt Reorganization,Changes to Onsite Review Organization Membership Description & Change to Overtime Requirements1993-05-24024 May 1993 Application for Amend to License NPF-43,changing Tech Specs Include Modification to Job Titles Following Mgt Reorganization,Changes to Onsite Review Organization Membership Description & Change to Overtime Requirements NRC-93-0038, Application for Amend to License NPF-43,modifying Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys1993-05-24024 May 1993 Application for Amend to License NPF-43,modifying Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys 1999-09-24
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217N4301999-10-25025 October 1999 Amend 17 to License DPR-9,revising TS by Deleting SR D.3.c, Which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired1999-09-24024 September 1999 Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired NRC-99-0072, Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement1999-09-10010 September 1999 Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement NRC-99-0078, Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included1999-08-25025 August 1999 Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included NRC-99-0048, Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl1999-07-30030 July 1999 Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl NRC-99-0035, Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages1999-04-20020 April 1999 Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages ML20205Q7091999-04-15015 April 1999 Amend 16 to License DPR-9,allowing Possession of Nominal Amount of Special Nuclear Matl NRC-99-0025, Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.11999-03-23023 March 1999 Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 ML20198S3271999-01-0606 January 1999 Amend 15 to License DPR-9,consisting of Changes to TS ML20154R2251998-10-21021 October 1998 Amend 13 to License DPR-9,allowing Access Control Flexibility,Establishing Compensatory Provisions Re PA Boundary,Eliminating Redundancy Between Ts,Revising Figure B-1 & Correcting Typos NRC-98-0122, Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl1998-09-28028 September 1998 Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl NRC-98-0128, Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a1998-08-26026 August 1998 Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a NRC-98-0117, Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals1998-07-23023 July 1998 Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals NRC-98-0044, Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci1998-07-17017 July 1998 Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 9809041998-06-26026 June 1998 Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L7981998-06-0505 June 1998 Application for Amend to License NPF-43,revising TS Section 2.1.2.Proprietary & non-proprietary Info,Encl.Proprietary Info Withheld NRC-98-0065, Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.11998-04-27027 April 1998 Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.1 NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications1998-04-0909 April 1998 Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications NRC-98-0043, Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS1998-04-0303 April 1998 Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS NRC-98-0062, Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/41998-04-0202 April 1998 Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/4 NRC-98-0057, Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors1998-04-0202 April 1998 Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors NRC-98-0033, Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray1998-03-27027 March 1998 Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray NRC-98-0034, Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned1998-03-27027 March 1998 Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned NRC-98-0003, Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS NRC-98-0027, Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a1998-01-28028 January 1998 Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a NRC-98-0006, Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements1998-01-28028 January 1998 Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements NRC-98-0002, Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement1998-01-28028 January 1998 Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement NRC-98-0008, Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed NRC-98-0023, Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor1998-01-28028 January 1998 Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor NRC-98-0025, Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access1998-01-28028 January 1998 Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access NRC-97-0115, Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR1997-12-15015 December 1997 Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR NRC-97-0105, Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms1997-12-10010 December 1997 Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20211J1971997-09-29029 September 1997 Application for Amend to License NPF-43,relocating Selected Requirements & Associated Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested NRC-97-0107, Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing1997-09-0505 September 1997 Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing NRC-97-0037, Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR1997-06-20020 June 1997 Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR NRC-97-0031, Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements1997-03-27027 March 1997 Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements ML20133L6171997-01-0202 January 1997 Amend 11 to License DPR-9,allowing Certain Equipment & Instruments to Be Removed from Svc for Short Periods of Time Allowing for Maint,Testing,Insp & Account for Equipment Failures NRC-96-0134, Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability1996-12-0202 December 1996 Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability ML20129F0611996-09-25025 September 1996 Application for Amend to License NPF-43,revising Tech Spec 4.8.4.3 Re Periodic Testing Requirement for Thermal Overload Protection Devices NRC-96-0075, Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value1996-09-0505 September 1996 Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value NRC-96-0003, Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys1996-03-25025 March 1996 Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys ML20095K4211995-12-21021 December 1995 Application for Amend to License NPF-43,incorporating 10CFR50,App J,Option B NRC-95-0124, Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.31995-11-22022 November 1995 Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.3 NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS1995-10-0202 October 1995 Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals1995-09-20020 September 1995 Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals NRC-94-0107, Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans1994-12-15015 December 1994 Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans NRC-94-0047, Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-081994-05-10010 May 1994 Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-08 NRC-94-0027, Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-322911994-04-26026 April 1994 Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-32291 NRC-93-0151, Application for Amend to License NPF-43 Re Reduced Testing During Power Operation1994-03-29029 March 1994 Application for Amend to License NPF-43 Re Reduced Testing During Power Operation NRC-93-0143, Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements1993-12-0909 December 1993 Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements 1999-09-24
[Table view] |
Text
/) c %
( a ,,
- 8. Ralph Syld
, Sensor %ce President 6
Edison =~~
=4%N0rth D6ase HighWOy '
January 26, 1990 NIC-89-0298 U. S. Pelear Regulatory Ctanisbon Attn Document Control Desk Washington, D. C. 20555
References:
- 1) Fermi 2 NFC Docket No. 50-341 NIC License No. WF-43
- 2) Detroit Mison Letter to NIC, NIC-88-0173,
" Proposed Technical Specification Charge (License Amendnent) - Noninterruptible-Control Air System", dated August 5, 1988
- 3) Detroit Mison Letter to NIC, NIC-89-0076, .
" Withdrawal of Application for Technical Specification Change (License Amendment) - !
Noninterruptible Control Air System", I dated April 4) 1989
- 4) Detroit Mison' Letter to NIC,. NIC-89-0273,
" Proposed. Technical Speciflaatilon Change (License Amer 4 ment) - Containment Isolation .
Valves", dated January 26, 1990
Subject:
Proposed Technical Specification Change (License Awndment) - Nonintgrgyptible Control Air,3ygigm Pursuant to 10CFR50.90, Detroit Mison Coupany hereby proposes to amend Operating License WF-43 for the Fermi 2 plant by. incorporating the enclosed change into the Plant Technical Specifications. 'Ihe proposed change adds a new Specification, nunbered -3/4.7.10, for the-Noninterruptible Control Air System. A proposed Bases is also included.
Detroit Mison has evaluated the proposed Technical Specifications against the criteria of 10CFR50.92 and determined that no significant hazards consideration is involved. The Fermi 2 Onsite Review-Organization has approved and the Nuclear Safety Review Group has reviewed the proposed Technical. Specifications and concurs with the enclosed determinations. In accordance with 10CFR50.91, Detroit -
Mison has provided a copy of this letter to the State of Michigan. ,
i Thece changes were previously requested in Reference 2. In Reference 1 '
3, the Reference 2 application was withdrawn because additional
,9002060336 900126 ll= a=ck **gp : 3 ga&f/#f q
.i USNIC January 26, 1990 [
NIC-89-0298 :
Page 2 justification was requiral for scune aspects of the proposal. This proposal includes the needed additional justification.
If you have any questions, please contact Mr. Glen Ohlemacher at (313)-
586-4275.
Sincerely, hb Diclosure cc: A. B. Davis R. W. Defayette W. G. Rogers
- 'J. F. Stang l Supervisor, Myanced Planning and- Review Section, Michigan Public Service Commission l
'l !
USNRC' _ 26, 1990 January NRC-89-0298 j Page 3 !
r i
!- 1
.i I, B.' RPLPH SYLVIA, do hereby affirm that the foregoing statenents are based on facts and circunstances which are true and scurate to the ;
best-of my knowledge and belief. ,
t l
l l
l
. [
.hkr9ob s C "
B.RAIfHSYJNIA
-Senior Vice President- )
P On this 26th day of January- , 1990, before me personally appeared B. Ralph Sylvia, being first duly sworn ~ and says -
that he execute $ the foregoing as his free act and deed.
/' f Notar % b'lic SHutLEY L CARL 90N Notary Public, Wayne CourW. he ;
MyCommissionpJm 24,1991 F
t
?
%-- ., , y- y ---
-- - - - . - - - - . ~ _ _ . . _. - -- _ _ _ _ _ - -- - - - - --_-- - -
^
Enclosura to
'l NRC-89-0298 Page 1 INTRODUCTION l
l The Fermi 2 station and control air systems provide the plant with a reliable source of clean, dry, compressed air for plant operation.
These systems are the source of compressed air for use in routine maintenance operations, in equipment process cycles such as desineraliser backwashing, and as an instrument and control media.
,. The station air systen normally provides control air at 100 psig for operation and control of various plant systems that are safety related.
(.
as well as those that are nonsafety related. The control air ~
distribution system is divided into two distinct parts: .interruptible-and noninterruptible. Noninterruptible control air (Noninterruptible. ,
Air Supply or NIAS) supplies through two separate distribution systems (Divisions I and II) equipment in the Standby Gas Treatment System' )
(SGTS), Control Room Emergency Filtration System (CREFS), Main Steam .j Isolation Valve Leakage Control System (MSIVLCS), Primary Containment :
Monitoring System (PCNS), Energency Equipment Cooling Water Systen 1 (EECW), Primary Containment Pneumatic Supply System, Reactor .
Building - Suppression Chamber vacuum breaker testability feature, !
Reactor Building - Suppression Chamber vacuum breaker isolation i valves, and Reactor Building Railroad Car Airlock Door Seals. In ;
addition,. Division I NIAS provides control air for the primary ,
containment isolation valves on the drywell' equipment and floor drain- !
! sump pump discharge lines, Suppression Chamber narrow range level l indicating and alara instrumentation isolation valves, and a backup 1 supply for Division I nitrogen pneumatic supply to the Primary !
Containment. Division II NIAS supplies, in addition, air operated :
valves in the High Pressure Coolant Injection (HPCI) and Reactor Core l Isolation Cooling (RCIC) systems. All other control air users are l connected to the Interruptible Control Air distribution systen that is !
supplied separately by the station air system. A simplified diagram is attached.
During normal plant operation, the source of noninterruptible and interruptible' control air is through interconnections between the i station and control air systems.. Compressed air from the station air system is supplied through one of these interconnections to.the. j Division I and II noninterruptible control air compressor discharge i headers. The air then flows from each header through its divisional !
100 percent-capacity filter and dryer. After leaving the $
filter / dryer, the noninterruptible control air tiows to its divisional !
control air receiver from which it eventually flows to its point of use through its divisional noninterruptible control air distribution '
system.
Initiation of the Control Air System Compressor operation and isolation of the noninterruptible Control Air System occurs automatically on detection of low control air header pressure (85 psig-and 75 psig, respectively) or on loss of offsite power. In addition, ;
i a
)
, Enclosure te
} NRC-89-0298
_Page 2 l
both Control Air Compressors start on a Loss of Coolant Accident (LOCA) signal. The LOCA signal comes from level 2 low reactor water level or high drywell pressure. Normally, the intertie between the Station Air System and noninterruptible Control Air System is open and the Control Air Compressors are not running.'
Loss of NIAS to the RCIC, HPCI, and EECW systems does not affect their OPERABILITY. The remaining systems and components which are supplied 4 NIAS become inoperable upon loss of control air.
The PCNS is affected by a loss of control air through the closure of ,
~
system isolation valves. Affected monitoring functions include Drywell Hydrogen and Oxygen concentration, Drywell pressure, ;
. Suppression Chamber pressure and wide range water level, and, for ,
Division I only, Primary Containment Atmosphere Gaseous Radioactivity. j During operation with the two NIAS subsystems cross-tied, the capacity' i of the single control air compressor is not sufficient to allow both divisions of the MSIVLCS to operate simultaneously. Each division of the MSIVLCS is manually initiated and one division la required to +
operate to successfully complete the system's function. Therefore, simultaneous operation of both MSIVLCS divisions is not a required l function which must be supported by the single control air compressor.
Appropriate procedural controls will be put in place to ensure that both MSIVLCS divisions are not operated simultaneously while supported by a single control air compressor. ,
When control air is lost _to the Primary Containment Pneumatic Supply ,
System, the supply of nitrogen to the system is lost. This loss leads ;
to a loss of capability for manual operation of the Safety / Relief Valves (SRVs). The pressure relief safety function of.the SRVs does ,
not rely upon nitrogen pressure for operation. There are 7 SRVs-supported by Division I and 8 SRVs supported by Division _II. Five of j the SRVs are those associated with the Automatic Depressurization System (ADS) and two of the SRVs are associated with the low-low set l function. The ADS and low-low set SRVs each have a nitrogen accumulator to provide sufficient nitrogen for five cycles of SRV ;
actuation. Two SRVs, which are supported by Division I pneumatic supply, are capable of being controlled from the Remote Shutdown Panel. One of these SRVs has an accumulator to allow five cycles off operation without the nitrogen pneumatic supply. However, the Remote ;
Shutdown function requires multiple operation of both SRVs to reach Cold Shutdown. The loss of Division I pneumatics therefore leads to an inability to control the Ronote Shutdown Panel SRVs as required for I the Remote Shutdown function. It must be noted that this situation ,
- l. requires an extremely.unlikely sequence of events which are beyond the l Remote Shutdown System design basis. In addition, loss of Division I :
nitrogen pneumatic supply will result in closure of the inboard Main Steam Isolation Valves (MSIVs).
s
1
. Enslo:ura to
'l NRC-89-0298 i Page 3 l
)
When Division I of control air is lost to the isolation valves on the drywell equipment and floor drain sump pump discharge lines these .
valves fail to the isolated position. Manual action to provide an i alternative motive force to open these isolation valves is required to ,
monitor Reactor. Coolant System (RCS) leakage by monitoring Primary :
Containment sump flow rate per Specification 4.4 3 2.1.b. The '!
I isolation valves would be opened, and the ACTION provisions of .
Specification 3 6 3 entered, for intermittent short time periods ,
necessary to pump the Primary Containment sumps. If RCS leakage monitoring surveillance requirements cannot be met, appropriate ACTION-
~
will be taken per Specification 3.4 3 2. .
The Fermi 2 Control Air' System design includes redundancy not normally '
found in divisional systems iri that all control air requirements can be supplied by either division's air compressor. This added i redundancy provides a safety benefit which justifies an extended j
- out-of-service time for certain equipment, such as Control Air Compressors, whenever the two subsystems can be cross-tied. Should a- ,
Control Air Compressor fail, there is some likelihood that an extended ,
time will be required for the repairs. Detroit Edison is therefore
- proposing a new Technical Specification (attached) for the . '
l Noninterruptible Control Air system in order to prevent unnecessary plant shutdowns in the event of a Control Air Compressor failure which l requires extensive repairs. ,
EVALUATION
[
The proposed Limiting Condition for Operation (LCO) for the l Noninterruptible Control Air System is:
Two independent Noninterruptible Control Air (NIAS)'aysten subsystems shcIl bb OPERABLE with each subsystem: ,
- a. Consisting of one OPERABLE Control Air Compressor, Aftercooler, associated Dehydration and Filter Units, Air !
Receiver Tank, and associated' control instrumentation.
- b. Capable of automatic isolation from nonsafety grade air systems.
?
This LCO definas the number of NIAS system subsystems required to be v OPERADLE. For each subsystem, the required components are explicitly listed. Since each subsystem is normally connected to a nonsafety a grade air system, the requirement of automatic isolation capability is explicitly given.
The LCO is proposed to be APPLICABLE in all CPERATIONAL CONDITIONS and when irradiated fuel is being handled in the secondary containment, during CORE ALTERATIONS, or during operations with a potential fcr draining the reactor vessel (OPERATIONAL CONDITION *). This -
b 9 , -, , , .-n-- , - - ,,- - , a -, - , -n.,, A e - ,. m --~
Enclosura to
'l NRC-89-0298 Page 4 ]
'1
)
APPLICABILITY is consistent with the required APPLICABILITY of !
components which utilize the NIAS.
The ACTION requirements are stated separately for OPERATIONAL CONDITIONS 1, 2 and 3 and other OPERATIONAL CONDITIONS. In :
OPERATIONAL CONDITIONS 1, 2, and 3, the ACTION requirements aret l
- 1) With'one NIAS system subsystem inoperable due to an ;
inoperable Contro1~ Air Compressor, Aftercooler, associated Dehydration or Filter Unit, or associated control e instrumentation, cross-tie the NIAS system subsystem.to the' ;
OPERABLE NIAS system subsystem within one hour. Restore the inoperable NIAS system subsystem to OPERABLE status within-30 i days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> [
and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. If the ;
two NIAS subsystems are cross-tied under the above l provisions, then components and systems which are supplied by i the NIAS system do not become inoperable due to the i inoperability of the NIAS system subsystem.
- 2) With one NIAS system subsystem otherwise inoperable or unable to be cross-tied under the provisions of 1) above. ,
- a. Verify that the NIAS system subsystems are not cross-tied within one hour.
- b. Declare the affected Remote Shutdown Panel SRV controls (Division I only), Accident Monitoring Instrumentation (Drywell Hydrogen and Oxygen concentration, Drywell 5 pressure, and Suppression Chamber pressure and water level), Primary Containment Atmosphere Gaseous Radioactivity monitor (Division I only), MSIV Leakage Control System subsystem, Reactor Building - Suppression Chamber vacuue breaker isolation valve, Secondary Containment Railroad Bay Access Door, Standby Gas Treatment System subsystem, and Control Room Emergency i Filtration System components; inoperable and take the ACTIONS required by Specification 3 3 7.4, 3 3 7.5, 3.6.2.1, 3 4 3 1, 3 6.1.4, 3.6 3, 3.6.5.1,- 3 6.5 3, and 3 7.2.
- 3) With both NIAS system subsystems inoperable be in at least . '
HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Action 1 applies to situations where it is possible to continue to supply control air to the inoperable NIAS subsystem from the opposite division subsystem. In these cases, the single control air compressor has sufficient capacity to supply all the required uses in both NIAS-divisions.
, Enclecura to l ; NRC-89-0298 ]
i Page 5 l 1
i Detroit Edison has conducted a study using Probabilistic Risk Assessment (PRA) methods to determine both the appropriate action to take (cross-connect as opposed to not cross-connect) and the appropriate out-of-service time for this situation. This study ;
evaluated the impact of the possible configurations on the core damage i frequency (CDF) computed by the Fermi 2 PRA model. The study also -l evaluated the impact on the cvailability of other systems supported by l NIAS. The systems (such as SGTS, MSIVLCS, and CREFS), which are j typically referred to as containment systems, are not currently l included in the Fermi 2 PRA.
The availability of control air impacts the CDP through the effects of a loss of control air upon the Primary Containment Pneumatic Supply System. As described above, this loss impacts the ability to manually operate tL SRVs and causes a closure of the inboard MSIVs if the !
Division I subsystem is lost.
Two configurations of NIAS were evaluated to determine their impact on the core damage frequency. One configuration assumed the normal plant '
line-up with one of the NIAS compressors out-of-service due to maintenance or otherwise declared inoperable. The other configuration was identical to the first except that the cross tie between the two ~
divisions of NIAS is open. Operating with the first configuration results in a 1.0% increase in the core damage frequency over the normal mode of operation. This is to be expected since.the failure probability of NIAS would be higher with one NIAS compressor unable to i perform its function.
Operating with the second configuration results in less than a 0.1%
increase in the core damage frequency relative to the normal mode of operation. This represents a noticeably smaller increase when compared to the first case. It is due to the fact that in the second case both divisions of NIAS can be successfully fed by one compressor.
Following a loss of station air, starting and running the one ,
available NIAS compressor assures the potential for success of the system.
These results imply that if operating with the cross tie closed when one NIAS compressor is out-of-service is acceptable for 7 days (as currently allowed by Technical Specifications) then operating with the cross tie open under the same conditions should be acceptable for at ,
least 70 days or about 10 times as long. This conclusion is reached by equating the increased risk of operating with only one NIAS compressor to the increase in CDF multiplied by the exposure time to that risk. In the case with the cross tie closed, for the incremental acceptable time of 7 days (0.019-years) for which the system is allowed to be in this configuration, a risk increase of 3 6E-9 events is obtained. With the cross tie open, the risk increase is at least an order-of magnitude smaller so that the plant would have to operate l
Y 0 F
L. ,
. Enclo'ura to a
'l NRC-89-0298 Page 6 l for more than 70 days before the same level of risk as with the closed cross tie would be realized.
However, Detroit Edison in this proposal is conservatively reducing the allowed time to 30 days from the potentially justifiable 70 days.
About the same amount of risk is realized after operating with the ,
cross tie open and one NIAS compressor out-of-service for 30' days as operating with one NIAS compressor out-of-service and the cross tie closed for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
l Another way of approaching this problem is to determine the impact :
that NIAS has on success of the containment systsas. These play no part in the determination of CDF and become involved only if.a core damage event were to occur during the time the given air compressor is out-of-service. A basic assumption is that either division of a ,
containment system is adequate for the containment system's success. t A quantitative analysis, using failure rates typical for Fermi 2 was performed to determine which case (cross-tie open or cross-tie closed) should be favored when one NIAS control air compressor is inoperable.
If the failure rate of the containment systems themselves were ignored' then opening the cross-tie would result in a 4% reduction-in' containment systen availability.
As soon as the failure rates for the containment systems are included, the open cross-tie case becomes the favored condition. The open cross-tie case was found to represent a 45% improvement in containment system availability. This obvious benefit results from the potential ;
for either division offsetting a containment system failure in the other division when the air cross tie is open.- >
l '
i In the cross-tie open configuration, all of the components being supplied control air are in virtually the same situation. That is, they are receiving the normal non-safety grade air supply which is ,
backed up by a single safety grade air supply. Detroit Edison believes that this configuration is sufficient to support the OPERABILITY of the affected equipment.
Detroit Edison believes the above considerations' fully assess the impact of a loss of a single NIAS control air compressor and therefore, this proposal provides an appropriate ACTION requirement-for this situation.
Action 2 covers the situation where the NIAS systen subsystems aust.
not or cannot be cross-tied. In this case, the ACTIONS specified in the Technical Specifications for the resulting inoperability of the ,
supported systems are applied. The Primary Containment Atmosphere Gaseous Radioactivity monitor and the Remote Shutdown Panel SRV Controls are supported by only the Division I NIAS systen subsystem; accordingly, notations to this effect are included.
y - , - . - - - -
'. EncloOure to ;
'l NRC-89-0298 Page 7 In Reference 4, Detroit Edison proposed Technical Specification changes which revise the required actions for an inoperable Reactor.
Building-Suppression Chamber vacuum breaker isolation valve. Under-the Reference 4 proposal the action requirement for an inoperable ,
Reactor Building-Suppression Chamber vacuum breaker isolation valve will be contained in Specification 3 6.4.2. . The reference to Specification 3 6 3 in proposed action 2.b should be changed to 3 6.4.2 if approval of the Reicrence 4 proposal precedes this proposal. If approval of this proposal precedes the Reference 4' proposal the reference should be changed when the Reference 4 changes j are issued. 4 Action 3 requires a prompt plant shutdown if both NIAS system subsystems are inoperable. This is consistent with the required ACTION from the resulting inoperabilities. j In OPERATIONAL CONDITIONS 4, 5, OR # a similar philosophy is applied: .
- 1) With one NIAS system subsystem inoperable due to an ;
inoperable Control Air Compressor, Aftercooler, associated Dehydration or Filter Unit,or control instrumentation, cross-tie the NIAS system subsystem to the OPERABLE NIAS-system subsystem within one hour. If the two NIAS subsystems are cross-tied under the above provisions, then components .
and systems which are supplied air by the NIAS cystem do not become inoperable due to the inoperability of the NIAS system subsystem.
- 2) With NIAS otherwise inoperable or with the subsystems unable to be crosr.-tied under the provisions of 1) above, declare the Standby Gas Treatment subsystem (s), Control Roon Emergency ?iltration System component (s) and Secondary Containment Railroad Bay Access Doors inoperable and take the ,
ACTIONS required by Specifications 3 6.5 3, 3 7.2, and ,
3 6.5.1. .
When the two NIAS system subsystems are cross-tied all the supported
! equipment have a safety-grade air supply. In these OPERATIONAL CONDITIONS, redundancy in a function is typically not required.
Therefore, an unlimited period of time is proposed for this ;
situation. This provision also allows for extended maintenance on one division's control air components.
The following Surveillance. Requirements are proposed:
The Noninterruptible Control Air System shall be demonstrated OPERABLE:
- a. At least once per 31 days by verifying that the cross-tie valves and each valve (manual, power-operated or automatic) i 1
i 3
\
~
". Enclosure ta .
'.' NRC-89-0298 Page 8 r
I required for proper operation of the Control Air Compressors, '
Aftercoolers, Filter and Dehydration Units, and associated control instrumentation, that is not locked, sealed, or :
otherwise secured in position, is in its correct position. '
At least once per 18 months by verifying that each
~
b.
automatic valve which isolates the NIAS system subsystem from ,
nonsafety grade air systems actuates to its isolation position on each of the following automatic actuation test ;
signals:
- 1. Station air supply low pressure
- 2. NIAS control air header low pressure i
- 3. Loss of offsite power ;
- c. At least once per 18 months by verifying that each control ;
air compressor capacity is greater than or equal to 100 sofm.
- d. At least once per 18 months by verifying that each Control Air Compressor automatically starts on each of the following ,
automatic actuation test signals:
- 1. NIAS control air header. low pressure
- 2. Loss of Coolant Accident (Drywell Pressuro-High andor Reactor Vessel Level-Low Level 2) 3 Loss of offsite power i These requirements ensure that system alignment is. maintained and important aspects of system operation are functionally tested every 18 months. Detroit Edison believes that these Surveillance Requirements
- provide adequate assurance of proper system performance and are
- consistent with other Specifications for systems which fulfill a l similar function.
t .
l SIGNIFICANT HAZARDS CONSIDERATION l
In accordance with 10CFR50 92, Detroit Edison has made a determination that the proposed amendment involves no significant hazards
! considerations. To make this determination, Detroit Edison must l
establish that operation in accordance with the proposed amendment
- would not
- 1)-involve a significant increase in the probability or ,
l consequences of an accident previously. evaluated, or 2) create the possibility of a new or different kind of accident from any accident ;
previously evaluated, or, 3) involve a significant reduction in a l margin of safety.
l
. Enclosura to j
'l NRC-89-0298 j Page 9 i
'i I
The proposed change to include Technical Specifications previsions for the Noninterruptible Control Air System (NIAS) do not: !
1). Involve a significant increase in the probability or ;
consequence of an accident previously evaluated. The new :
explicit requirements were previously implied through the j
effect of the NIAS upon the OPERABILITY of equipment included in Technical Specifications. '1he new Specification also provides new out-of-service times for modes.of operation i which are described in the Fermi 2 safety analysis report,'
but are not adequately addressed by the concept of .
-l OPERABILITY. Further, the new out-of-service times are based ;
upon compensating design factures present at Fermi 2. Thus !
the probability or consequence of any previodsly evaluated accident is unchanged since the proposed changes either do i not represent actual changes in requirements or are based ,
upon compensatory design features.
T
- 2) Create the possibility of a new or different kind of accident from any accident previously evaluated. The change does not modify plant design or operation and therefore creates no new ,
accident modes. Operation with the two NIAS syntes
- subsystems cross-tied is provided for in the safety analysis l report and thus does not represent an unevaluated accident
! mode.
- 3) Involve a significant reduction in a margin of safety. . As discussed in 1) above, the new specification either provides explicit requirements which were previously implied or.
~
provides requirements to cover modes of operation previously ;
not specifically addressed. Where the proposal restates explicitly previously implicit requirements,.the margin of safety is unchanged since the actual requirement is unchanged. The Fermi 2 Noninterruptible Control Air System '
has unique design features in that the two subsystems can be cross-tied, and all required air uses can be supplied by a single air compressor. Studies using the Probabilistic Risk Assessment methodology have shown that operation with the two
- systems cross-tied present less risk than operation with no
- l safety-grade control air for one division. Recognizing these
- unique features in Technical Specifications by specifying an appropriate allowable out-of-service time does not represent a reduction in the margin of safety.
Based on the above reasoning, Detroit Edison has determined that the proposed amendment does not involve a significant hazards ,
consideration.
s
. Enclosur3 to '
. NRC-89-0298 Page 10 i
ENVIRONMENTAL IMPACT Detroit Edison has reviewed the proposed Technical Specification changes against the criteria of 10CFR51.22 for environmental considerations'. The proposed changes do not involve a significant ~
hazards consideration, nor significantly change the types or significantly increase the amounts of effluents that may be released offsite, nor significantly increase individual or cumulative occupational radiation exposures. Based on the foregoing, Detroit Edison concludes that the proposed Technical Specifications do meet
?
the criteria given in 10CFR51.22(c)(9) for a categorical.erclusion .
from the requirement for an Environmental Impact Statement. l 00NCLUSION l
Based on the evaluations above: 1) there is reasonable assurance that the health and safety of the public will not be endangered by i i
operation in the proposed manner, and 2) such activities will be ;
conducted in compliance with the Commission's regulations and proposed amendments will not be inimical to the common defense and security or.
to the health and safety of the public. '