Letter Sequence Request |
---|
EPID:L-2019-LLR-0016, Submittal of the Snubber Program Relief Request RR-S1 for the Fourth 10-Year Interval (Open) |
|
|
Similar Documents at Fermi |
---|
Category:Code Relief or Alternative
MONTHYEARML21253A0102021-10-15015 October 2021 Revised Relief Request RR-A39 for the Fourth 10-Year Inservice Inspection Interval NRC-20-0054, Submittal of Revised Relief Request RR-A39 for the Fourth Ten-Year Inservice Inspection Interval2020-12-30030 December 2020 Submittal of Revised Relief Request RR-A39 for the Fourth Ten-Year Inservice Inspection Interval ML20169A6522020-07-0808 July 2020 Revised Valve Relief Request VRR-004 for the Inservice Testing Program Fourth 10-Year Interval NRC-20-0030, Submittal of Relief Request RR-A42 for Inservice Inspection Impracticality During the Third Ten-Year Inservi?E Inspection Interval2020-04-30030 April 2020 Submittal of Relief Request RR-A42 for Inservice Inspection Impracticality During the Third Ten-Year Inservi?E Inspection Interval ML20014E7312020-01-24024 January 2020 Issuance of Relief Proposed Alternative Request Nos. VRR-002, VRR-003, VRR-006, VRR-008, and VRR-009 Associated with Fourth Ten Year Interval Inservice Testing of Various Valves (EPID L-2019-LLR-0048, EPID L-2019-LLR-0049 ML19336A0062020-01-10010 January 2020 Issuance of Relief Proposed Alternative Request Nos. PRR-001 and PRR-004 Associated with Fourth Ten Year Interval Pump Inservice Testing Program (EPID L-2019-LLR-0038 and EPID L-2019-LLR-0041) ML19171A3572019-06-27027 June 2019 Relief from the Requirements of the ASME Code PRR-002 and PRR-003 NRC-19-0016, Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Fourth Ten-year Interval2019-02-28028 February 2019 Submittal of the Inservice Inspection / Nondestructive Examination Program Relief Requests for the Fourth Ten-year Interval NRC-19-0017, Submittal of the Snubber Program Relief Request RR-S1 for the Fourth 10-Year Interval2019-02-28028 February 2019 Submittal of the Snubber Program Relief Request RR-S1 for the Fourth 10-Year Interval ML16357A2802017-01-18018 January 2017 Relief from the Requirements of the ASME Code ML16230A5082016-09-23023 September 2016 Revised Relief Request No. PRR-007 for the Inservice Testing Program Third10-year Interval (CAC No. Mf7573) ML14176A9292014-07-16016 July 2014 Alternative Request PVRR-001 Concerning the Third 10-Year Inservice Testing Program ML1027201602010-10-0505 October 2010 Relief Request No. PRR-09, Relief from Fixed Reference Value Testing for the Third 10-Year Inservice Testing Program Interval ML0311206062003-06-0303 June 2003 Second 10-Year Inservice Inspection Requests for Code Relief RR-A33 and RR-A34 2021-10-15
[Table view] Category:Letter type:NRC
MONTHYEARNRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2023-05-16016 May 2023 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-05-0505 May 2023 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage2023-05-0505 May 2023 License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2023-04-28028 April 2023 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2023-04-28028 April 2023 Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-23-0018, Annual Non-Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Non-Radiological Environmental Operating Report NRC-23-0024, Levels and Sources of Property Insurance Coverage2023-04-0303 April 2023 Levels and Sources of Property Insurance Coverage NRC-23-0021, ISFSI, Decommissioning Funding Plan Update2023-03-30030 March 2023 ISFSI, Decommissioning Funding Plan Update NRC-23-0016, Decommissioning Funding Status Report2023-03-30030 March 2023 Decommissioning Funding Status Report NRC-23-0015, Decommissioning Funding Status Report for Fermi 12023-03-30030 March 2023 Decommissioning Funding Status Report for Fermi 1 NRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis2023-03-0707 March 2023 License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2022-12-16016 December 2022 License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-22-0051, DTE Electric Company - Guarantee of Payment of Deferred Premiums2022-11-29029 November 2022 DTE Electric Company - Guarantee of Payment of Deferred Premiums NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report2022-11-14014 November 2022 Submittal of Biennial Review of the Fermi 1 Safety Analysis Report NRC-22-0041, Evacuation Time Estimate Report2022-10-0505 October 2022 Evacuation Time Estimate Report NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 20222022-08-29029 August 2022 Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 NRC-22-0030, Inservice Inspection Summary Report2022-08-10010 August 2022 Inservice Inspection Summary Report NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2022-08-0404 August 2022 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements NRC-22-0022, Annual Non-Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Non-Radiological Environmental Operating Report NRC-22-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report2022-04-29029 April 2022 Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report NRC-22-0020, Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring2022-04-28028 April 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring NRC-22-0003, Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2022-04-26026 April 2022 Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-22-0019, Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance2022-04-0404 April 2022 Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-22-0011, Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report2022-03-31031 March 2022 Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report 2024-01-12
[Table view] |
Text
Paul Fessler Senior Vice President and Chief Nuclear Officer DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.4153 Fax: 734.586.1431 Email: paul.fessler@dteenergy.com February 28, 2019 10 CFR 50.55a NRC-19-0017 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Submittal of the Snubber Program Relief Request RR-S1 for the Fourth 10-Year Interval Pursuant to 10 CFR 50.55a, Codes and Standards, paragraph (z)(1), DTE Electric Company (DTE) hereby requests NRC approval of the following relief request for the fourth Snubber Inservice Testing (IST) 10-year interval, which begins on May 2, 2019.
ASME has approved Code Case OMN-13, Revision 2, Performance-Based Requirements for Extending Snubber Inservice Visual Examination Interval at LWR Power Plants. This Code Case is unconditionally approved for use in Regulatory Guide (RG) 1.192, Operation and Maintenance Code Case Acceptability, ASME OM Code, Revision 2. Fermi 2s Code of Record for the fourth interval is the ASME OM-2012 Edition. However, Code Case OMN-13, Revision 2, states in the Applicability section that it is applicable to ASME OM Code 1995 Edition through 2011 Addenda. Fermi 2 will be implementing the ASME Code OM-2012 Edition and proposes to also implement Code Case OMN-13, Revision 2, for extending the examination interval for snubbers.
Fermi 2 has used Code Case OMN-13, Revision 0, during the previous Inservice Inspection (ISI) 10-year interval and proposes to continue with Revision 2 of this Code Case for the subsequent Snubber IST 10-year interval. Based on the required update of the ISI program and 10 CFR 50.55a(b)(3)(v), OM Condition: Snubbers ISTD, item (B), requirements for snubbers are moving from Section XI to the OM Code and hence this Code Case OMN-13 request is associated with the next Snubber IST 10-year interval.
USNRC NRC-19-0017 Page 2 DTE requests NRC approval of this relief request by February 28, 2020 to support planned testing for the fourth Snubber IST 10-year interval during the next refueling outage scheduled in the spring of 2020.
No new commitments are being made in this submittal.
Should you have any questions or require additional information, please contact Mr. Scott A. Maglio, Manager - Nuclear Licensing, at (734) 586-5076.
Sincerely, Paul Fessler Senior Vice President and CNO
Enclosure:
Relief Request RR-S1 for the Fourth 10-Year Interval cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III Michigan Public Service Commission Regulated Energy Division (kindschl@michigan.gov)
Enclosure to NRC-19-0017 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Relief Request RR-S1 for the Fourth 10-Year Interval
Enclosure to NRC-19-0017 Page 1 10 CFR 50.55a Relief Request RR-S1 Code Case OMN-13 for Snubbers Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1)
Alternative Provides Acceptable Level of Quality and Safety
- 1. ASME Code Component(s) Affected All snubbers within the scope of the Fermi 2 Snubber Program.
2. Applicable Code Edition and Addenda
American Society of Mechanical Engineers (ASME) code for Operation and Maintenance of Nuclear Power Plants (OM Code) 2012 Edition, no Addenda.
3. Applicable Code Requirement
ISTA-3130, Application of Code Cases, subparagraph (b) states, Code Cases shall be applicable to the edition and addenda specified in the test plan.
4. Reason for Request
Pursuant to 10 CFR 50.55a, Codes and Standards, paragraph (z)(1), an alternative is proposed to the ISTA-3130(b) requirement for implementation of Code Case OMN-13, Performance-Based Requirements for Extending Snubber Inservice Visual Examination Interval at LWR Power Plants, Revision 2. The basis for the request is that the proposed alternative would provide an acceptable level of quality and safety.
ISTA-3130(b) states, Code Cases shall be applicable to the edition and addenda specified in the test plan. ASME has approved Code Case OMN-13, Revision 2 (Ref. 8.1). This Code Case is unconditionally approved for use in Regulatory Guide (RG) 1.192, Operation and Maintenance Code Case Acceptability, ASME OM Code, Revision 2 (Ref. 8.2). Fermi 2s Code of Record for the fourth interval is the ASME OM-2012 Edition. However, Code Case OMN-13, Revision 2, states in the Applicability section that it is applicable to ASME OM Code 1995 Edition through 2011 Addenda. Fermi 2 will be implementing the ASME Code OM-2012 Edition and proposes to also implement Code Case OMN-13, Revision 2, for extending the examination interval for snubbers. Fermi 2 has used Code Case OMN-13, Revision 0, during the previous Inservice Inspection (ISI) 10-year interval and proposes to continue with Revision 2 of this Code Case for the subsequent Snubber Inservice Testing (IST) 10-year interval. Based on the required update of the ISI program and 10 CFR 50.55a(b)(3)(v), OM Condition: Snubbers ISTD, item (B), requirements for snubbers are moving from Section XI to the OM Code and hence this Code Case OMN-13 request is associated with the next Snubber IST 10-year interval.
Enclosure to NRC-19-0017 Page 2 10 CFR 50.55a Relief Request RR-S1 Code Case OMN-13 for Snubbers
- 5. Proposed Alternative and Basis for Use The proposed alternative to ISTA-3130(b) is requested to implement this Code Case since the Code Case Applicability statement covers only the 1995 Edition through the 2011 Addenda and ISTA-3130(b) requires applicability to the edition specified in the test plan, which will be the ASME OM-2012 Edition. A review of the 2012 Edition of the OM Code and Code Case OMN-13, Revision 2, confirmed that there are no changes in the applicable Code sections referenced within the Code Case when comparing the 2011 Addenda to the 2012 Edition. Regulatory Guide 1.192, Revision 2, Table 1, Acceptable OM Code Cases, lists Code Case OMN-13, Revision 2 (2012 Edition) as acceptable to the NRC for application in a licensee's IST program without conditions. Using the provisions of this request as an alternative to the requirements of ISTA-3130(b) will provide adequate detection of observable snubber degradation and, along with the testing and service life monitoring requirements of Subsection ISTD, will continue to provide reasonable assurance of the operational readiness of Fermi 2 snubbers. Therefore, the proposed alternative provides an acceptable level of quality and safety pursuant to 10 CFR 50.55a(z)(1).
- 6. Duration of Proposed Alternative The proposed alternative, upon approval, shall be utilized during the entire fourth Snubber IST 10-year interval which begins May 2, 2019 and is scheduled to end December 31, 2029 by using the provisions of ISTA-3120(d) to extend the interval to include the planned refueling outage in fall of 2029.
- 7. Precedent A similar relief request for snubber examinations was approved by the NRC for Nine Mile Point on December 10, 2018 (ML18318A422).
- 8. References
- 1. Code Case OMN-13, Performance-Based Requirements for Extending Snubber Inservice Visual Examination Interval at LWR Power Plants, Revision 2.
- 2. RG 1.192, Operation and Maintenance Code Case Acceptability, ASME OM Code, Revision 2, dated March 2017; published January 2018 (ML16321A337).