NRC-06-0052, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines

From kanterella
(Redirected from NRC-06-0052)
Jump to navigation Jump to search
Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines
ML062190206
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/28/2006
From:
DTE Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-06-0052
Download: ML062190206 (2)


Text

Donald K. Cobb Assistant Vice President, Nuclear Generation Fermi 2 6,100 North Dixie Hwy, Newport, Ml 48166 Tel: 734.586.5201 Fax: 734.586.4172 DTE Energy-July 28, 2006 NRC-06-0052 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Notification of Deviation from Boiling Water Reactor Vessel and Internals Project Guidelines Detroit Edison Company is providing the U.S. Nuclear Regulatory Commission two Notifications of Deviation from the Boiling Water Reactor Vessel and Internals Project Guidelines. The deviations described in the enclosure are for BWRVIP-25 guidance for inspections on core plate bolting, and BWRVIP-41 guidance for inspections on jet pump diffuser/adapter welds. This notification is provided for information only and no NRC action is being requested.

No regulatory commitments are contained in this letter.

Should you have any questions or require additional information, please contact Mr.

Ronald W. Gaston of my staff at (734) 586-5197.

Sincerely, Enclosure cc: D. H. Jaffe C. A. Lipa NRC Resident Office Regional Administrator, Region III Supervisor, Electric Operators, Michigan Public Service Commission Randy Stark, BWRVIP

Enclosure to NRC-06-0052 July 28, 2006 Page 1 Descriptions of Deviations from Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines The BWRVIP program implementation guidelines provide guidance to ensure the consistent application of BWRVIP guidelines by member utilities. When Detroit Edison does not implement any portion of an applicable "mandatory" or "needed" BWRVIP guideline that has been approved by the BWRVIP Executive Committee, we will notify the NRC and BWRVIP within 45 days following our approval of the disposition of the deviation. BWRVIP-25 and BWR-41 deviations are detailed as deviations from "needed" guidelines.

BWRVIP BWR VIP Alternative Document Requirement Exception In Lieu Of BWRVIP-25 Ultrasonic Testing EVT-1 inspections Tooling to perform the Core Plate Bolting (UT) or Enhanced cannot be performed in UT examination of Visual Test (EVT-1) the threaded area of the these bolts has not examination of the bolt. Tooling to been developed for the core plate rim hold- perform UT industry. The down bolts for all examination of these BWRVIP has plants that have not bolts has not been completed a core plate installed core plate developed. Visual Test bolt analysis project wedges by RF07 (VT-3) examinations, and has performed a (4/2000). which were performed, plant specific analysis.

cannot be credited to The analysis concluded verify the structural that inspection of the integrity of the bolts. core plate bolts at Fermi 2 is not necessary.

BWRVIP-41 Inspect 50% of Modified Visual Test During RIF I UT Jet Pump Welds accessible high priority (MVT-1) and EVT-l examination of 28% vs welds by RF07 examinations were the recommended 50%

(4/2000) with the performed on all other of the diffuser/adapter remaining welds Jet Pump Assembly welds were completed.

inspected by RFI 1 welds. The Jet Pump No indications of (4/2006). diffuser/adapter welds cracking were BWRVIP-41 identifies DF-3, AD-1 and AD-2 identified. The the DF-3, AD-i and had not been inspected remaining welds are AD-2 welds as by either EVT- I or UT scheduled to be necessary for examination prior to inspected before examination but RFI 1. start-up from RF14 recommends (10/2010).

inspection when I tooling is developed. I