Letter Sequence Request |
---|
|
|
MONTHYEARNOC-AE-19003684, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1)2019-09-26026 September 2019 Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Essential Cooling Water (Ecw) System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) Project stage: Request NOC-AE-19003677, License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2019-09-26026 September 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. Project stage: Request ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) Project stage: Draft Other ML19312A0962019-11-13013 November 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Alternative to ASME Requirements for Repair of Essential Cooling Water Class 3 Buried Piping Project stage: Acceptance Review NOC-AE-19003696, Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096)2019-11-26026 November 2019 Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) EPID: L 2019-LLR-0096) Project stage: Supplement ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Acceptance Review ML20036F5862020-02-0404 February 2020 Request for Additional Information - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L-2019-LLR-0096)Redacted Project stage: RAI NOC-AE-20003716, Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping2020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request ML20069L4992020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping Project stage: Request NL-20-039, (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1)2020-04-29029 April 2020 (04/29/2020) E-mail from R. Gaston to R. Guzman, Exemption Request from Requirements of 10 CFR Part 73, Appendix B, Section VI, Subsection C.3.(l)(1) Project stage: Other ML20128J8432020-05-15015 May 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20142A5202020-05-21021 May 2020 Exemption Request Due to COVID-19 Pandemic Project stage: Other NL-20-0620, SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation2020-05-22022 May 2020 SNC Requests a Temporary Exemption from the Quarterly Fire Brigade Drills and Annual Live Fire Fighting Training Requirements of the Regulation Project stage: Other NL-20-0640, Response to Request for Additional Information for Exemption Request2020-05-27027 May 2020 Response to Request for Additional Information for Exemption Request Project stage: Response to RAI ULNRC-06587, Supplement to Security Training Exemption Request Due to COVID-192020-06-17017 June 2020 Supplement to Security Training Exemption Request Due to COVID-19 Project stage: Supplement NOC-AE-20003749, Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20197A2612020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Response to RAI ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 Project stage: Approval ML20212L5682020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement NOC-AE-20003755, Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)2020-07-30030 July 2020 Supplement to Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) Project stage: Supplement ML20232D1442020-08-26026 August 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20227A3852020-09-0303 September 2020 Nonproprietary - Proposed Alternative RR-ENG-3-24 to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping Project stage: Other 2020-05-15
[Table View] |
|
---|
Category:Legal-Affidavit
[Table view] Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML22326A2962022-11-22022 November 2022 Clarification on STPNOC Response to Request for Additional Information Regarding Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material ML22244A1152022-09-0101 September 2022 Response to NRC Comments on Relief Request RR-ENG-3-25 ML22231A4692022-08-19019 August 2022 STPNOC Response to Request for Additional Information Regarding Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material ML22091A3082022-04-0101 April 2022 Supplement to Request for Exemption from Certificate of Compliance (CoC) Inspection Requirement for One Multipurpose Canister ML21308A6032021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material ML21067A7722021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing ML20154K7652020-06-0202 June 2020 Supplemental Response Regarding Bulletin 2012-01 NOC-AE-20003735, Supplemental Response Regarding Bulletin 2012-012020-06-0202 June 2020 Supplemental Response Regarding Bulletin 2012-01 NOC-AE-20003733, Response to Request for Additional Information for Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01)2020-05-18018 May 2020 Response to Request for Additional Information for Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) ML20139A2162020-05-18018 May 2020 Response to Request for Additional Information for Proposed Alternatives to ASME OM Code 2012 Edition for the Fourth Inservice Test Interval (Relief Request PRR-01) NOC-AE-20003716, Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping2020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping ML20069L4992020-03-0909 March 2020 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping NOC-AE-19003673, Response to Request for Additional Information for South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-00782019-06-25025 June 2019 Response to Request for Additional Information for South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-0078 NOC-AE-19003637, Supplement to South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-0078)2019-05-16016 May 2019 Supplement to South Texas Project (STP) Units 1 & 2 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) (L-2018-LLA-0078) NOC-AE-18003602, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating)2018-12-0606 December 2018 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) NOC-AE-18003598, Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16)2018-09-26026 September 2018 Response to Request for Additional Information Request for Relief from the Third 10-Year Interval ISI Program ASME Section Xl Code Requirements for Category B-N-2 and B-N-3 Welds (Relief Request RR-ENG-3-16) NOC-AE-18003574, Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 55.472018-05-21021 May 2018 Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 55.47 NOC-AE-17003441, Revised Response Request for Additional Information for the Review of the South Texas Project License Renewal Application2017-02-0909 February 2017 Revised Response Request for Additional Information for the Review of the South Texas Project License Renewal Application NOC-AE-17003434, Response to Request for Additional Information on Revised Applicability Matrix for Questions Regarding Risk-Informed GSI-191 Licensing Application2017-01-19019 January 2017 Response to Request for Additional Information on Revised Applicability Matrix for Questions Regarding Risk-Informed GSI-191 Licensing Application NOC-AE-17003435, Response to NRC Security Reactive Inspection Report 05000498/2016407, 05000499/2016407, EA-16-2502017-01-19019 January 2017 Response to NRC Security Reactive Inspection Report 05000498/2016407, 05000499/2016407, EA-16-250 IR 05000498/20164072017-01-19019 January 2017 South Texas Project, Units 1 and 2 - Response to NRC Security Reactive Inspection Report 05000498/2016407, 05000499/2016407, EA-16-250 NOC-AE-16003428, Response to Request for Additional Information for the Review of License Renewal Application2017-01-12012 January 2017 Response to Request for Additional Information for the Review of License Renewal Application NOC-AE-16003429, Response to Requests for Additional Information for Review License Renewal Application - RAI 82.1.8-32017-01-0505 January 2017 Response to Requests for Additional Information for Review License Renewal Application - RAI 82.1.8-3 NOC-AE-16003427, Revised Applicability Matrix for Response to Request for Additional Information Questions APLA-1a and APLA-1b Regarding STP Risk-Informed GSl-191 Licensing Application2016-12-0707 December 2016 Revised Applicability Matrix for Response to Request for Additional Information Questions APLA-1a and APLA-1b Regarding STP Risk-Informed GSl-191 Licensing Application ML16321A4072016-11-0909 November 2016 Response to Request for Additional Information Regarding Sensitivity Studies for STPNOC Risk-Informed Pilot GSl-191 Application NOC-AE-16003356, Flooding Mitigating Strategies Assessment (MSA) Report Submittal2016-09-29029 September 2016 Flooding Mitigating Strategies Assessment (MSA) Report Submittal NOC-AE-16003404, Response to Request for Additional Information for the Review of License Renewal Severe Accident Mitigation Alternatives2016-09-27027 September 2016 Response to Request for Additional Information for the Review of License Renewal Severe Accident Mitigation Alternatives NOC-AE-16003412, Revised Response to Request for Additional Information APLA-4-4 STP Risk-Informed GSI-191 Licensing Application2016-09-12012 September 2016 Revised Response to Request for Additional Information APLA-4-4 STP Risk-Informed GSI-191 Licensing Application NOC-AE-16003394, Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937)2016-07-28028 July 2016 Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937) ML16230A2322016-07-21021 July 2016 Responses to Apla Round 4 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application NOC-AE-16003395, Third Set of Responses to Requests for Additional Information STP Risk-Informed GSI-191 Licensing Application2016-07-21021 July 2016 Third Set of Responses to Requests for Additional Information STP Risk-Informed GSI-191 Licensing Application NOC-AE-16003368, Third Sets of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application2016-07-18018 July 2016 Third Sets of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSI-191 Licensing Application NOC-AE-16003328, Second Supplement to Response to RAI for Information Pursuant to 10 CFR 50.54(f) Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident: Phase 2 Staffing Assessment2016-06-30030 June 2016 Second Supplement to Response to RAI for Information Pursuant to 10 CFR 50.54(f) Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident: Phase 2 Staffing Assessment NOC-AE-16003367, Second Set of Responses to April 11, 2016 Requests for Additional Information Regarding Risk-Informed GSI-191 Licensing Application2016-06-16016 June 2016 Second Set of Responses to April 11, 2016 Requests for Additional Information Regarding Risk-Informed GSI-191 Licensing Application NOC-AE-16003380, Request for Additional Information Set 35 for the Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937)2016-05-19019 May 2016 Request for Additional Information Set 35 for the Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937) NOC-AE-16003366, First Set of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application2016-05-11011 May 2016 First Set of Responses to April 11, 2016 Requests for Additional Information Regarding STP Risk-Informed GSl-191 Licensing Application NOC-AE-16003357, Revision to Proposed Exemption to 10CFR50.46 Described in Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond To..2016-04-13013 April 2016 Revision to Proposed Exemption to 10CFR50.46 Described in Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond To.. NOC-AE-16003347, Response to Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program2016-03-17017 March 2016 Response to Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program NOC-AE-16003348, Response to Request for Additional Information for License Renewal Application 2014 Annual Update (Tac. Nos. ME4936 and ME4937)2016-03-10010 March 2016 Response to Request for Additional Information for License Renewal Application 2014 Annual Update (Tac. Nos. ME4936 and ME4937) NOC-AE-15003320, Response to Request for Additional Information Set 34 for the Review of the License Renewal Application2015-12-17017 December 2015 Response to Request for Additional Information Set 34 for the Review of the License Renewal Application NOC-AE-15003318, Response to Request for Additional Information and Supplement to Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 202015-12-0909 December 2015 Response to Request for Additional Information and Supplement to Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 NOC-AE-15003303, Response to Request for Additional Information for the Review of the License Renewal Application - Set 322015-11-12012 November 2015 Response to Request for Additional Information for the Review of the License Renewal Application - Set 32 NOC-AE-15003296, Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program2015-10-0808 October 2015 Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program ML15251A2492015-10-0505 October 2015 Summary of Telephone Conference Call Held on August 6, 2015, Between the U.S. Nuclear Regulatory Commission and STP Nuclear Operating Company, Concerning Request for Additional Information, Set 32, Pertaining to the South Texas Project, Lic ML15246A1282015-08-20020 August 2015 Attachment 1-5 Response to 2009 RAIs Through 1-6 Responses to Round 2 RAIs NOC-AE-15003278, Response to Request for Additional Information for the Review of License Renewal Application - Set 312015-07-29029 July 2015 Response to Request for Additional Information for the Review of License Renewal Application - Set 31 NOC-AE-15003276, Response to Request for Additional Information Regarding Relief Request RR-ENG-3-17 Regarding Deferral of Inservice Inspection of Reactor Pressure Vessel Cold Leg Nozzle Dissimilar Metal Butt Welds2015-07-22022 July 2015 Response to Request for Additional Information Regarding Relief Request RR-ENG-3-17 Regarding Deferral of Inservice Inspection of Reactor Pressure Vessel Cold Leg Nozzle Dissimilar Metal Butt Welds NOC-AE-15003255, Supplement to Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Phase 2 Staffing Assessment2015-07-0202 July 2015 Supplement to Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Phase 2 Staffing Assessment 2022-09-01
[Table view] |
Text
Withhold Enclosure 1 from Public Disclosure in Accordance with 10 CFR 2.390.
in Accordance with 10 CFR 2.390.
March 9, 2020 NOC-AE-20003716 10 CFR 50.55a 10 CFR 2.390 File No. D43.01 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 South Texas Project Unit 1 & 2 Docket No. STN 50-498 and STN 50-499 Request for Additional Information for Proposed Alternative to ASME Section XI Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) (EPID: L 2019-LLR-0096)
References:
- 1. Letter; R. Dunn to U.S. NRC Document Control Desk; "Proposed Alternative to ASME Boiler & Pressure Vessel Code Section Xl Requirements for Repair/Replacement of Essential Cooling Water (ECW) System Class 3 Buried Piping in accordance with 10 CFR 50.55a(z)(a) (Relief Request RR-ENG-3-24)"; September 26, 2019; (NOC-AE-19003684) (ML19274C393).
- 2. Letter; D. Galvin to G. T. Powell; "South Texas Project Units 1 and 2 - Supplemental Information needed for acceptance of requested licensing action RE: Proposed alternative to ASME code requirements for the repair of essential cooling water system class 3 buried piping (EPID: L 2019-LLR-0096)"; November 13, 2019; (AE-NOC-19003235)
(ML19312A096).
- 3. Letter; R. Dunn to U.S. NRC Document Control Desk; "Supplemental Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24)
(EPID: L 2019-LLR-0096)"; November 26, 2019; (NOC-AE-19003696) (ML19331A202).
- 4. E-mail; D. Galvin to A. M. Richards; South Texas Project - Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID: L 2019-LLR-0096);
February 4, 2020; (AE-NOC-200003246) (ML20036F586)
By Reference 1, STP Nuclear Operating Company (STPNOC) submitted a proposed alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) at South Texas Project Units 1 and 2. The proposed alternative to ASME Code, Section Xl, IWA-4000, applies a carbon fiber reinforced polymer system for the internal repair of buried essential cooling water piping. Reference 3 is the supplemental information provided to the NRC in response to the request in Reference 2. By Reference 4, the NRC staff identified additional information that would be needed to complete its review. The STPNOC RAI responses providing this additional information are in Enclosure 1.
Withhold Enclosure 1 from Public Disclosure in Accordance with STI: 34993227 10 CFR 2.390.
in Accordance with 10 CFR 2.390.
Withhold Enclosure 1 from Public Disclosure in Accordance with NOC-AE-20003716 10 CFR 2.390. Page 2 of 2 The information provided in Enclosure 1 was prepared by Structural Group, Inc. and Simpson Gumpertz & Heger, Inc., and includes information proprietary to these two companies. The affidavits set forth the bases by which the information may be withheld from the public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.390. Accordingly, it is respectfully requested that the information, which is proprietary to Structural Group, Inc., and Simpson Gumpertz & Heger, Inc., be withheld from public disclosure in accordance with 10 CFR 2.390. A non-proprietary version of the RAI responses is provided in Enclosure 2. The affidavits are included in Enclosure 3.
There are no commitments in this letter.
If there are any questions or if additional information is needed, please contact Nic Boehmisch at (361) 972-8172 or me at (361) 972-7743.
'7-^=^^^
Roland Dunn General Manager, Engineering
Enclosures:
- 1. Response to Request for Additional Information [Proprietary].
- 2. Response to Request for Additional Information [Non-Proprietary].
- 3. Applications for Withholding Proprietary Information from Public Disclosure ec:
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 E. Lamar Boulevard Arlington, TX 76011-4511
NOC-AE-20003716 Enclosure 2 Enclosure 2 Response to Request for Additional Information
[Non-Proprietary]
Enclosure 2 Page 1 of 11 SOUTH TEXAS PROJECT UNITS 1 AND 2 DOCKET NUMBERS 50-498 AND 50-499 REQUEST FOR ADDITIONAL INFORMATION PROPOSED ALTERNATIVE TO ASME SECTION XI REQUIREMENTS FOR REPAIR/REPLACEMENT OF ESSENTIAL COOLING WATER CLASS 3 BURIED PIPING IN ACCORDANCE WITH 10 CFR 50.55A(Z)(1)
By letter dated September 26, 2019 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML19274C393), as supplemented by letter dated November 26, 2019 (ADAMS Accession No. ML19331A202), STP Nuclear Operating Company (the licensee) requested Nuclear Regulatory Commission (NRC) approval of a proposed alternative to Section Xl, IWA-4221(b) of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), which requires repaired/replacement piping to meet the original Construction Code requirements. The proposed alternative is to allow the use of a carbon fiber reinforced polymer (CFRP) composite system for the internal repair of the buried Essential Cooling Water (ECW) piping during the third and fourth 10-year ISI intervals at South Texas Project Electric Generation Station (STP), Units 1 and 2.
To complete its review, the NRC staff requests the following additional information. The proprietary information in this document is marked with double brackets and bold font such as
((Example)).
Enclosure 2 Page 2 of 11 NPHP RAI 1 Enclosure 1, Section 4, page 5 of 21 of the request states that the ECW piping is fabricated of aluminum-bronze material. Discuss what measures have been conducted to demonstrate that CFRP can be applied to the inside surface of aluminum-bronze pipes with adequate adhesion and strength for the intended application (e.g. mockup tests).
RESPONSE to NPHP RAI 1:
NPHP RAI 2 RESPONSE to NPHP RAI 2:
Enclosure 2 Page 3 of 11 NPHP RAI 3 Discuss whether a pressure test will be performed in accordance with the ASME Code,Section XI, IWA-5000 and IWD-5000 after the CFRP repair is installed and prior to system startup.
RESPONSE to NPHP RAI 3:
System start-up testing will be in accordance with ASME B&PVC, Section Xl, IWA-5244(2), which directs that the system pressure test for non-isolable buried components shall consist of a test to confirm that flow during operation is not impaired. This testing will demonstrate and document performance of VT-2 examinations on the ECW System flow paths that support the required safety functions.
NPHP RAI 4 RESPONSE to NPHP RAI 4:
Enclosure 2 Page 4 of 11 NPHP RAI 5 RESPONSE NPHP RAI 5:
NPHP RAI 6 RESPONSE NPHP RAI 6:
Enclosure 2 Page 5 of 11 RESPONSE to NPHP RAI 7:
EMIB RAI 1 RESPONSE to EMIB RAI 1:
EMIB RAI 2 RESPONSE to EMIB RAI 2:
Enclosure 2 Page 6 of 11 EMIB RAI 3 RESPONSE to EMIB RAI 3:
Enclosure 2 Page 7 of 11 EMIB RAI 4 Section 5B.6 of Attachment 5B to Enclosure 5 of the request discusses CFRP composite system termination detail at straight ends. Repair terminations at host pipe substrate at the ends of repair with a good bond are critical to maintain structural integrity so that the CFRP composite system can transfer loads to the host pipe. Provide information or a sketch to address the following related to the intact or non-repaired side of terminations:
(a) Address whether the intact piping on the non-repaired side of terminations is buried, or whether all non-repaired side is exposed. If buried, discus whether credit is taken for attenuation along the buried length.
(b) The distance from termination end to the end of buried portion of pipe or to the beginning of aboveground piping in the buildings.
(c) The distance from termination end to the piping supports or anchors in the vicinity for the aboveground piping.
(d) Repair terminations interface with the repaired and the non-repaired sides of the piping. It appears that the loads from the repaired side are considered. Provide a discussion on structural integrity of the terminations from any dead weight, thermal, seismic, and any other applicable loadings from the non-repaired side.
RESPONSE to EMIB RAI 4:
(a) The intact piping on the non-repaired side of terminations may be buried or exposed within the structures, depending on the scope of repair. The non-repair side pipe is considered sufficient to be taking all the design forces and other demands and no attenuation is considered.
(b, c) The location of terminations and the distance from termination end to the end of buried portion of pipe or to the beginning of above ground piping in the buildings (and supports and anchors of above ground piping in the buildings) will be determined during inspections. Regardless of the location of termination, the metal pipe within the terminal end and beyond the CFRP repair will meet the requirements for the aluminum bronze piping. The minimum distance between the termination end and the end of the buried portion at building wall is zero as the repair may end at the building wall.
(d) If the repair end is buried and away from the buildings, the forces and demands considered on the repair design in longitudinal direction are the highest forces that can occur anywhere along the buried pipeline, including any demands originating in the non-repaired portions of the buried pipeline. If the repair end is close to a building, forces from the non-repair building side are resisted by the supports inside and the building wall, except that the longitudinal force is resisted by pipe soil friction per original Bechtel design calculation. This longitudinal force is smaller than the force for which the repair is designed and can therefore be resisted by the CFRP repair.
EMIB RAI 5 Table 1 in Attachment B of Enclosure 4 of the request lists Mechanical Property Tests Required for V-Wrap CFRP Composite System. ASTM Standard D3526 does not address testing of Shear Bond Strength Between CFRP and aluminum-bronze. Please provide the applicable ASTM Standard for testing this property.
Enclosure 2 Page 8 of 11 RESPONSE to EMIB RAI 5:
The applicable standard is ASTM D3528, Standard Test Method for Strength Properties of Double Lap Shear Adhesive Joints by Tension Loading.
EMIB RAI 6 RESPONSE to EMIB RAI 6:
Enclosure 2 Page 9 of 11 EMIB RAI 7 RESPONSE to EMIB RAI 7:
EMIB RAI 8 RESPONSE to EMIB RAI 8:
Enclosure 2 Page 10 of 11 EMIB RAI 9 RESPONSE to EMIB RAI 9:
EMIB RAI 10 RESPONSE to EMIB RAI 10:
Enclosure 2 Page 11 of 11 EMIB RAI 11 RESPONSE to EMIB RAI 11:
NOC-AE-20003716 Enclosure 3 Enclosure 3 Applications for Withholding Proprietary Information from Public Disclosure
strucrturral group March 5, 2020 U.S. Nuclear Regulatory Commission Document Control Desk 11555RockvillePike Rockville, MD20852
Subject:
Application forWithholding Proprietary Information from Public
References:
- 1. STPNOC Letterto Nuclear Regulatory Commission (NRC), Proposed Alternative to ASME Section Xl Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1), September 26, 2019, NOC-AE-19003684, ML19274C393, Docket Nos. 50-498/499
- 2. NRC letter to STPNOC, South Texas Project Units 1 and 2, Supplemental Information Needed for Acceptance of Request Licensing Action, (EPID:L2019-LLR-0096)",
November 13, 2019; AE-NOC-19003235, ML19312A096, Docket Nos. 50-498/499
- 3. Email from NRC (Dennis Calvin, Dennis.Galvin@nrc.gov) to STP (Drew Richards, amrichards@STPEGS.com), Tuesday, February 4, 2020 at 4:25 PM, subject South Texas Pmj'ect-Request for Additional Information, NOC-AE-20003246, STI:
34981524, Docket Nos. 50-498/499
- 4. STPNOC Letter to Nuclear Regulatory Commission, Response to Request for Additional Information for Proposed Alternative to ASME Code Requirements for the Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping (Relief Request RR-ENG-3-24) (EPID: L 2019-LLR-0096), March 5, 2020, STI: 34993227, NOC-AE-20003716, Docket Nos. 50-498/499 5.10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding Ladies and Gentlemen:
Structural Group, lnc.,(SGI) has provided certain proprietary information to STP Nuclear Operating Company (STPNOC) in connection with a response by STPNOC for RAI from the U.S. Nuclear Regulatory Commission (NRC) to use an alternative to the requirements of 10 CFR50.55a(z)(1). This application requests that proprietary information of SGI provided in reference 4 be protected from public disclosure.
The proprietary information for which withholding is being requested identified in the attached affidavit signed by the owner of the proprietary information, SGI, on behalf of itself and any wholly-owned subsidiaries or affiliated companies. An affidavit accompanies this letter, setting forth the basis on which the information may be withheld from public disclosure by the NRC and addressing with specificity the considerations listed in paragraph (b)(4) of 10CFR 2.390 of the NRC's regulations.
Accordingly, this letter authorizes the utilization of the accompanying Affidavit by STPNOC.
structural group Correspondence with respect to the proprietary aspects of the Application or the Affidavit should reference this letter and be addressed to Scott Greenhaus, Executive Vice President, Structural Group, Inc., 10150 Old Columbia Road, Columbia, MD 21046.
Sincerel Scott Greenhaus Executive Vice Resident 0 (410) 859-6458, M (410) 340-3205 S G ree nhaus(5).structuralaroup.com
strucrturral group AFFIDAVIT I, Scott Greenhaus, am Executive Vice President of Structural Group, Inc. (SGI).
In my capacity as Executive Vice President I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in conjunction with nuclear plant licensing and rulemaking proceedings and am authorized to apply for its withholding on behalf of SGI and its affiliates.
I am making this Affidavit in conformance with the provisions of 10 CFR 2.390 of the U.S. Nuclear Regulatory Commission (NRC) regulations and in conjunction with SGI's Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
I have personal knowledge of the criteria and procedures utilized by SGI in designating information as a trade secret, privileged or as confidential commercial or financial information.
Pursuant to the provisions of paragraph (b) (4) of 10 CFR 2.390 of the NRC's regulations, the following is furnished for consideration by the NRC in determining whether the information sought to be withheld from public disclosure should be withheld.
The information sought to be withheld from public disclosure is owned by and has been held in confidence by SGI. Specific portions of the response to the NRC's "Request for Additional Information" (RAI) which include SGI proprietary information are:
- 1. NPHP RAI 1
- 2. NPHP RAI 2
- 3. NPHP RAI 4
- 4. NPHP RAI 5
- 5. NPHP RAI 7
- 6. EMIB RAI 1
- 7. EMIB RAI 5
- 8. EMIB RAI 6 The information is of a type customarily held in confidence by SGI and not disclosed to the public. SGI has a rational basis for determining the types of information customarily held in confidence by it and utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system provides a rational basis for maintaining confidentiality and justifies the NRC withholding the information from public disclosure.
Under SGI's system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, asfollows:
- 1) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by a competitor of SGI without license constitutes a competitive advantage over other companies.
- 2) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
strucrturral group
- 3) Its use by a competitor would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
- 4) It reveals cost or price information, production capacities, budget levels, or commercial strategies of SG I, their customers or suppliers.
- 5) It reveals aspects of past, present, or future development plans funded by SGI or its customer, and programs of potential commercial value to SGI.
- 6) It contains patentable ideas, for which patent protection may be desirable.
There are sound policy reasons behind the SGI system which include the following;
- 1) The use of such information by SGI gives it a competitive advantage over competitors. It is, therefore, withheld from disclosure to protect SGI's competitive position.
- 2) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes SGI's ability to sell products and services involving the use of the information.
- 3) Use by a competitor would put SGI at a competitive disadvantage by reducing the competitor's expenditure of resources and capital.
- 4) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage.
If competitors acquire components of proprietary information, any one component may be the key to the entire process, thereby depriving SGI of its competitive advantage.
- 5) Unrestricted disclosure would jeopardize the position of prominence of SGI in the world marketplace, and thereby give a market advantage to competitor in those countries in which SGI operates.
- 6) SGI's capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
The information is being transmitted to the NRC in confidence and, under the provisions of 10 CFR 2.390, it is to be received in confidence by the NRC. The information sought to be protected is not available in public sources and, to the best of our knowledge and belief, available information has not been previously employed in the same original manner or method.
The proprietary information sought to be withheld in this submittal is that which is appropriately marked in STPNOC RAI responses to the NRC being transmitted by STPNOC letter and reflected in SGI's Application for Withholding Proprietary Information from Public Disclosure dated March 5, 2020 addressed to the NRC Document Control Desk. The proprietary information as submitted by SGI is that associated with the Proposed Alternative to ASME Section Xl Requirements for Repair/Replacement of Circulating and Sen/ice Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) for STP Units 1 and 2 and may be used only for that purpose.
This information is part of that which will enable SGI to:
- 1) Provide input to STPNOC to provide to the N RC for review of the STP Unit 1 and 2, 10 CFR 50.46 submittal; and
- 2) Provide licensing support for the STPNOC submittal.
strurtur'al group SGI owns or is permitted to use the proprietary information referenced in this Affidavit under agreements that include SGI's maintaining the confidentiality of such information, as contemplated in this Affidavit.
Further this information has substantial commercial value as follows;
- 1) The SGI plan to sell the use of this information to their customers for the purpose of installing Carbon Fiber Reinforced Polymer (CFRP) in safety related piping.
- 2) That SGI can sell support and defense of the technology to their customers in the licensing process.
- 3) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by SGI.
- 4) Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of SGI because it would enhance the ability of competitors to provide similar licensing services for commercial power reactors without commensurate expenses.
- 5) Public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
- 6) The development of the technology described in part by the proprietary information is the result of applying the results of many years of experience in an intensive effort by SGI and the expenditure of a considerable sum of money and resources. In order for competitors to duplicate this information, similar technical programs would have to be performed including a significant expenditure money and resources.
Further the deponent sayeth not.
strucrturral group strucrturral group AFFIDAVIT State of Maryland )
County of Howard )
Before me, the undersigned authority, personally appeared Scott Greenhaus, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Structural Group, Inc. and that the averments of fact set forth in this Affidavit ar^true and correct to the best of his knowledge, information, and belief, Scott Greenhaus Executive Vice President
^^
Sworn to and subscribed before me this 3rd day of March 2020
.-><"'T'">"^
Notary Public f^^^^ *^x
."s Q3
'%:'^BL'o.^y
^-^
"ELOlSE C. &ROWN "NOTARYPUBUC^
ANNEARUNDELCOUNTY '"<<tHlUf>>>>
MARYLAND.
MY COMMISSION EXPIRES JUNE 9, 2020
SIMPSON GUMPERTZ & HEGER 3 March 2020 ' " ~ ' ,ZZ^
and Building Enclosures U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852
Subject:
Withholding of Certain Proprietary Information Pursuant to 10 CFR 2.390
Reference:
(1) Letter from STP Nuclear Operating Company to US NRC, "Proposed Alternative to ASME Boiler & Pressure Vessel Code Section Xl Requirements for Repair/Replacement of Essential Cooling Water System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1)," Docket Nos, 50-498 and 50-499, Document No. NOC-AE-19003684.
(2) Letter from Structural Group, Inc. to NRC, "Application for Withholding Proprietary Information from Public Disclosure," dated 11 September 2019.
Document No.: 190801-SGH-L-002 In Reference (1), the STP Nuclear Operating Company will provide a submittal to the U.S. Nuclear Regulatory Commission (NRC) that contains certain proprietary information owned by Simpson Gumpertz & Heger Inc. (SGH). SGH provided the information to STP Nuclear Operating Company or a STP Nuclear Operating Company affiliate to support the request made in Reference (1), and STP Nuclear Operating Company is authorized to use this information. As explained in the attached affidavit, SGH's proprietary information contained in Reference (1) qualifies for withholding under the exemption from disclosure set forth in the Freedom of Information Act
("FOIA"), 5 U.S.C. Section 552(b)(4), the Trade Secrets Act, 18 U.S.C. Section 1905, and NRC regulations 10 CFR 9.17(a)(4) and 2.390(a)(4) for trade secrets and commercial information. SGH respectfully requests that the NRC withhold this information from public disclosure. An affidavit supporting this request is attached.
In Reference (2), STP Nuclear Operating Company consultant Structural Group, Inc. also made a similar request for certain other information contained in Reference (1).
Please contact me by phone at 781.907.9231 or email at RPOjdrovic@sgh.com if you have any questions concerning this request.
Kind regards,
,k^ U^f0/(c Rasko P. Ojdrovic Vice President and Senior Principal Simpson Gumpertz & Heger Inc.
\\sgh.com\offices\BOS\Projects\2019M90801.00-STPN\WP\002RPOJdrovlc-L-190801.00.kri.docx
Attachment:
10 CFR 2.390 Affidavit SIAAPSON GUMPERTZ & HEGER INC.
480 Totten Pond Road, Waltham, MA 0245) main: 78 1,907.90(X> fox: 781,907.9009 www.sgh.com Boston ! Chicago l Houston l New York l San Francisco l Southern California l Washington, DC
10 CFR 2.390 Affidavit
\\\DC - 035120/000001 - 3152313 vl
SIMPSON GUMPERTZ & HEGER INC.
10 CFR 2.390 AFFIDAVIT OF RASKO P. OJDROVIC AFFIDAVIT I, Rasko P. Ojdrovic, hereby state as follows:
(1) I am a Vice President and Senior Principal of Simpson Gumpertz & Heger Inc. (SGH),
and I have been authorized to execute this affidavit on behalf of SGH.
(2) STP Nuclear Operating Company will submit a transmittal to the US NRC entitled "Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair /Replacement of Essential Cooling Water System Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(l)," Docket Nos. 50-498 and 50-499, Document No. NOC-AE-19003684. Certain portions of that transmittal contain proprietary information that is owned by SGH and should be held in confidence and withheld from public disclosure by the NRC. Specifically, the SGH proprietary information that SGH requests be withheld is contained in the following sections of the RAI submitted in the STP Nuclear Operating Company's transmittal:
Responses by request for additional information sections:
- Attachment A (3) In making this application for withholding of proprietary information of which it is the owner, SGH believes that the information qualifies for withholding under the exemption from disclosure set forth in the Freedom of Information Act ("FOIA"), 5 U.S.C. Section 552(b)(4), the Trade Secrets Act, 18 U.S.C. Section 1905, andNRC regulations 10 CFR 9.17(a)(4) and 2.390(a)(4) for trade secrets and commercial information because:
- i. This information is and has been held in confidence by SGH.
ii. This information is of a type that is customarily held in confidence by SGH, and there is a rational basis for doing so because the information includes proprietary information that was developed and compiled by SGH at a Affidavit Page 1
\\\DC - 035120/000001 - 3152313 vl
significant cost to SGH. This information is classified as proprietary because it contains information relevant to analytical approaches and methodologies not available elsewhere.
iii. The information is being transmitted to the NRC voluntarily and in confidence, iv. This information is not available in public sources and could not be gathered readily from other publicly available information.
- v. A substantial effort has been expended by SGH to develop and evaluate this information. Public release of this information could lead to additional significant cost to SGH and is likely to cause substantial harm to SGH's competitive position and foreclose or reduce the availability ofprofit-making opportunities. The value of this information to SGH would be lost or devalued if the information were disclosed to the public.
vi. Public disclosure of the information sought to be withheld would provide other parties, including competitors, with valuable information. SGH's competitive advantage would be lost if its competitors are able to use the results ofSGH's activities to aid their own commercial activities. For example, SGH's competitive advantage would be lost if its competitors are able to use the results of SGH's analyses to normalize or verity their own process or if they are able to claim an equivalent understanding by demonstrating that they can arrive at the same or similar conclusions. Making such information available to competitors without their having been required to undertake a similar expenditure of resources would unfairly provide competitors with a windfall and deprive SGH of the opportunity to exercise its competitive advantage to seek an adequate return on its large investment.
vii. The commercial value of the information extends beyond the original development cost and includes development of the expertise to determine and apply the appropriate evaluation process to the information. The research, development, engineering, and analytical costs that went into generating this information comprise a substantial investment of time and money by SGH. The precise value of this information is difficult to quantify, but clearly is substantial.
I declare under penalty of perjury under the laws of the United States of America that the foregoing is true and correct.
Executed on 3 March 2020. /^L^fe^P C^fC>^(C Rasko P. Ojdrovic Affidavit Page 2 WDC-035120/000001 -3152313 vl