Due Date Extension for Three-Month Response to Generic Letter 2008-01
ML081050250
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/09/2008
From: Head S
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-08-001, NOC-AE-08002287, STI 32291660
Download: ML081050250 (3)


Text

Nuclear Operating Company South Texas Pro/ect ElectricGeneratingStation P0 Box 289 Wadsworth, Texas 77483 J April 9, 2008 NOC-AE-08002287 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket No. STN 50-498, STN 50-499 Due Date Extension for Three-Month Response to Generic Letter 2008-01

Reference:

NRC Generic Letter 2008-01, "Managing. Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," dated January 11, 2008 Because of the outage schedules for STP Unit 1 and Unit 2, STP Nuclear Operating Company (STPNOC) will not be able to complete the necessary assessments to fully respond to the referenced Generic Letter (GL) 2008-01 by the requested nine-month date (October 11, 2008).

GL 2008-01 includes provisions for a three-month response if a licensee cannot provide the information requested for the nine-month response. In a phone call on April 3, 2008, STPNOC and the NRC staff agreed that the three-month response can be deferred to May 12, 2008.

The additional time for the three-month letter will allow STPNOC to perform some of the GL 2008-01 evaluations required for Unit 1 during the spring outage currently in progress and better define the remaining Unit 1 evaluation scope. The extended due date provides time to prepare and submit the response after the outage is completed.

STPNOC is tracking the May 12, 2008 committed date for the three month response as action CR 08-796-9 (see Attachment).

If there are any questions or if additional information is needed, please contact Wayne Harrison at (361) 972-7298 or me at (361) 972-7136.

Scott M. Head Manager, Licensing

Attachment:

Commitment STI 32291660

cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani U. S. Nuclear Regulatory Commission Mohan C. Thadani Thad Hill Senior Project Manager Eddy Daniels U.S. Nuclear Regulatory Commission Catherine Callaway One White Flint North (MS 7 D1) Brad Porlier 11555 Rockville Pike Steve Winn Rockville, MD 20852 Staney Rostad NRG South Texas LP Senior Resident Inspector Ed Alarcon U. S. Nuclear Regulatory Commission J. J. Nesrsta P. O. Box 289, Mail Code: MN116 R. K. Temple Wadsworth, TX 77483 Kevin Polio City Public Service C. M. Canady Jon C. Wood City of Austin Cox Smith Matthews Electric Utility Department 721 Barton Springs Road C. Kirksey Austin, TX 78704 City of Austin Richard A. Ratliff Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756-3189

Attachment NOC-AE-08002287 Page 1 of 1 Commitment Provide three-month Due 5/12/2008 CR 08-796-9 response to GL 2008-01 STI 32291660

Text

Nuclear Operating Company South Texas Pro/ect ElectricGeneratingStation P0 Box 289 Wadsworth, Texas 77483 J April 9, 2008 NOC-AE-08002287 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket No. STN 50-498, STN 50-499 Due Date Extension for Three-Month Response to Generic Letter 2008-01

Reference:

NRC Generic Letter 2008-01, "Managing. Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," dated January 11, 2008 Because of the outage schedules for STP Unit 1 and Unit 2, STP Nuclear Operating Company (STPNOC) will not be able to complete the necessary assessments to fully respond to the referenced Generic Letter (GL) 2008-01 by the requested nine-month date (October 11, 2008).

GL 2008-01 includes provisions for a three-month response if a licensee cannot provide the information requested for the nine-month response. In a phone call on April 3, 2008, STPNOC and the NRC staff agreed that the three-month response can be deferred to May 12, 2008.

The additional time for the three-month letter will allow STPNOC to perform some of the GL 2008-01 evaluations required for Unit 1 during the spring outage currently in progress and better define the remaining Unit 1 evaluation scope. The extended due date provides time to prepare and submit the response after the outage is completed.

STPNOC is tracking the May 12, 2008 committed date for the three month response as action CR 08-796-9 (see Attachment).

If there are any questions or if additional information is needed, please contact Wayne Harrison at (361) 972-7298 or me at (361) 972-7136.

Scott M. Head Manager, Licensing

Attachment:

Commitment STI 32291660

cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani U. S. Nuclear Regulatory Commission Mohan C. Thadani Thad Hill Senior Project Manager Eddy Daniels U.S. Nuclear Regulatory Commission Catherine Callaway One White Flint North (MS 7 D1) Brad Porlier 11555 Rockville Pike Steve Winn Rockville, MD 20852 Staney Rostad NRG South Texas LP Senior Resident Inspector Ed Alarcon U. S. Nuclear Regulatory Commission J. J. Nesrsta P. O. Box 289, Mail Code: MN116 R. K. Temple Wadsworth, TX 77483 Kevin Polio City Public Service C. M. Canady Jon C. Wood City of Austin Cox Smith Matthews Electric Utility Department 721 Barton Springs Road C. Kirksey Austin, TX 78704 City of Austin Richard A. Ratliff Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756-3189

Attachment NOC-AE-08002287 Page 1 of 1 Commitment Provide three-month Due 5/12/2008 CR 08-796-9 response to GL 2008-01 STI 32291660