Request for Additional Information Reactor Equipment Cooling System
ML082110435
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/01/2008
From: Lyon C
NRC/NRR/ADRO/DORL/LPLIV
To: Minahan S
Nebraska Public Power District (NPPD)
Lyon, C F, NRR/DLPM, 415-2296
References
TAC MD7881
Download: ML082110435 (5)


Text

August 1, 2008 Mr. Stewart B. Minahan Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321

SUBJECT:

COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION RE: REACTOR EQUIPMENT COOLING SYSTEM (TAC NO. MD8374)

Dear Mr. Minahan:

By application dated March 24, 2008 (Agencywide Documents Access and Management System Accession No. ML080910062), Nebraska Public Power District (NPPD, the licensee) requested the U.S. Nuclear Regulatory Commission (NRC) staff approval of an amendment to the Cooper Nuclear Station facility operating license and technical specifications (TSs) to revise TS Section 3.7.3, "Reactor Equipment Cooling (REC) System," to allow credit for the ability to align the service water (SW) system to the REC system.

The NRC staff reviewed the information provided in your application and determined that additional information is required in order to complete its review. Please provide a response to the enclosed questions by September 19, 2008.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for NRC staff review and contribute toward the NRC=s goal of efficient and effective use of NRC staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-2296.

Sincerely,

/RA/

Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298

Enclosure:

Request for Additional Information cc w/encl: See next page

ML082110435

  • memo dated OFFICE LPL4/PM LPL4/LA IOLB/BC LPL4/BC(A)

LPL4/PM NAME FLyon GLappert NSalgado(*)

MThadani FLyon DATE 8/1/08 7/31/08 7/25/08 8/01/08 8/1/08

Cooper Nuclear Station cc:

Mr. Ronald D. Asche President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. Gene Mace Nuclear Asset Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. John C. McClure Vice President and General Counsel Nebraska Public Power District P.O. Box 499 Columbus, NE 68602-0499 Mr. David Van Der Kamp Licensing Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. Michael J. Linder, Director Nebraska Department of Environmental Quality P.O. Box 98922 Lincoln, NE 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE 68305 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. H. Floyd Gilzow Deputy Director for Policy Missouri Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102-0176 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 218 Brownville, NE 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd, Suite 400 Arlington, TX 76011-4125 Director, Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102-0116 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson Suite 310 Topeka, KS 66612-1366 Ms. Melanie Rasmussen Radiation Control Program Director Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319 Mr. Keith G. Henke, Planner Division of Community and Public Health Office of Emergency Coordination 930 Wildwood P.O. Box 570 Jefferson City, MO 65102

Cooper Nuclear Station cc:

Mr. Paul V. Fleming, Director of Nuclear Safety Assurance Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. John F. McCann, Director Licensing, Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601-1813

OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION RELATED TO REACTOR EQUIPMENT COOLING SYSTEM NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION DOCKET NO. 50-298 By letter dated March 24, 2008 (Agencywide Documents Access and Management System Accession No. ML080910062), Nebraska Public Power District, the licensee for Cooper Nuclear Station, requested a license amendment to revise Technical Specification 3.7.3, Reactor Equipment Cooling (REC) System.

The Operator Licensing and Human Performance Branch (IOLB) staff performed an initial review of the license amendment request (LAR) in the area of human performance. The licensees responses to the following request for additional information with regard to the human performance aspects of the license amendment are needed for the IOLB staff to complete its review.

1.

The LAR stated that operator action to align the Service Water (SW) system to the REC critical loops following a loss of the REC system during a loss of coolant accident (LOCA) can be performed within an hour. How much time does the operator actually have available to realign the SW system to provide cooling to the Emergency Core Cooling System pump rooms if the REC system is not available or determined to be inoperable during a LOCA? How was the one hour time frame determined? Does the assumed available time of one hour bound the recent (June 30, 2008) Measurement Uncertainty Recapture power uprate approved by the NRC?

2.

Discuss whether the operating crews will have an opportunity during operator training to perform a variety of scenarios involving the recognition of the loss of the REC system and realignment of the SW system to the REC system (in addition to long-term recovery from a LOCA).