Transmittal of Radiological Emergency Plan Addendum Revision
ML17227A199
Person / Time
Site: Nine Mile Point, 07201036  Constellation icon.png
Issue date: 08/09/2017
From: David Gudger
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML17227A189 List:
References
NMP1L3174 EP-AA-1013, Add. 3, Rev. 3, EP-AA-1013, Add. 4, Rev. 2
Download: ML17227A199 (2)


Text

-  ;,G'

'*5EY Exelon Generation 200 Exelon Way Ke~nett Square, PA 19348 www.exeloncorp.com 10 CFR 50.4 10 CFR 50.54(q)(5) 10 CFR 72.44(f)

NMP1L3174 August 9, 2017 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220. 50-410. and 72-1036

Subject:

Exelon Nuclear Radiological Emergency Plan Addendum Revisions In accordance with 10 CFR 50.4(b)(5), "Emergency plan and related submissions," Exelon Generation Company, LLC (Exelon) is submitting Emergency Plan Addendum revisions listed in the table below for the Nine Mile Point Nuclear Station (NMP).

Procedure No. Revision Title Nine Mile Point Nuclear Station Unit 1

Emergency Classification Technical Bases N in e Mile Point Nuclear Station Unit 2 EP-AA-1013, Addendum 4 2

'----~~~~~~~~~~"--~~~--'--

Emergency Classification Technical Bases The changes to the Emergency Plan Addendums for NMP noted above were evaluated under the requirements of 10 CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan for NMP. This notification is being submitted within 30 days of implementation of the changes as required by 10 CFR 50.54(q)(5). The changes continue to meet the applicable planning standards established in 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

In addition, as required by 10 CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan Addendums.

This submittal also satisfies the reporting requirements associated with 10 CFR 72.44(f),

which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, Division of Spent Fuel Management.

A copy of the revised Emergency Plan Addendums and supporting change summary analysis are included in the attachments to this letter. ,A X4r;;

vtJ/S S 2 (p
J/( fC-AJJvf .5 ~

U.S. Nuclear Regulatory Commission Emergency Plan Addendum Revisions Docket Nos. 50-220, 50-410, and 72-1036 August 9, 2017 Page2 There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

Respifully, j k{~*J-7 ~Jyv-David T. Gudger Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1. 10 CFR 50.54(q)(5) Procedure Change Summary Analysis

2. EP-AA-1O13, Addendum 3, Revision 3, "Nine Mile Point Nuclear Station Unit 1 Emergency Classification Technical Bases"
3. EP-AA-1013, Addendum 4, Revision 2, "Nine Mile Point Nuclear Station Unit 2 Emergency Classification Technical Bases" cc: w/ Attachment 1 only Regional Administrator- NRG Region I Director, Division of Spent Fuel Management, ONMSS NRG Senior Resident Inspector - Nine Mile Point NRG Project Manager, NRR - Nine Mile Point A. L. Peterson, NYSERDA