Discontinuance of Relief Request RI-13 for Fourth 10-Year Interval Inservice Inspection Program
ML081050254
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/09/2008
From: Vanderkamp D
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2008035, TAC MD0281
Download: ML081050254 (3)


Text

H Nebraska Public Power District Always there when you need us NLS2008035 April 9, 2008 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 2055.5-0001

Subject:

Discontinuance of Relief Request RM-13 for Fourth 10-Year Interval Inservice Inspection Program Cooper Nuclear Station, Docket No. 50-298, DPR-46

Reference:

Letter from David Terao, U.S. Nuclear Regulatory Commission, to Randall K.

Edington, Nebraska Public Power District, dated September 8, 2006, "Cooper Nuclear Station Re: Fourth 10-Year Interval Inservice Inspection Request for Relief No. RI-13 (TAC No. MD0281)"

Dear Sir or Madam:

The purpose of this letter is to inform the Nuclear Regulatory Commission (NRC) that Nebraska Public Power District (NPPD) is no longer utilizing Relief Request RI- 13 for snubber inserivice inspection and testing at Cooper Nuclear Station (CNS). By letter dated September 8, 2006 (Reference), the NRC authorized NPPD's Relief Request RI- 13 for the entire fourth 10-year interval of the inservice inspection program for CNS. The NRC concluded in the Safety Evaluation (enclosure to Reference) that the proposed alternative to use CNS Technical Requirements Manual (TRM) T3.7.3 for snubber visual inspection and functional testing provided an acceptable level of quality and safety.

NPPD has adopted the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code), Subsection ISTD, "Inservice Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Power Plants," 2001 Edition through the 2003 Addenda, in lieu of utilizing Relief Request RI- 13 for snubber inspection and functional testing requirements. Use of ASME OM Code, Subsection ISTD, has been approved by the NRC and is included in 10 CFR 50.55a(b)(3)(v) as an acceptable alternate method to ASME Boiler and Pressure Vessel Code,Section XI, Article IWF-5000. The CNS TRM has been revised to refer to Subsection ISTD of the ASME OM Code for snubber surveillance and service life monitoring requirements.

COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com ,3

NLS2008035 Page 2 of 2 This notification is being provided for information only. Should you have any questions concerning this matter, please contact me at (402) 825-2904.

Sincerely, David W. Van Der Kamp Licensing Manager

/bk cc: Regional Administrator USNRC - Region IV Cooper Project Manager USNRC - NRR Project Directorate IV-1 Senior Resident Inspector USNRC - CNS NPG Distribution CNS Records

.' A.

ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS@

ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS3 Correspondence Number: NLS2008035 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None 4- 4 4- 4 i 4 4- 4 4- 4 I PROCEDURE 0.42 REVISION 22 PAGE 18 OF 25