NL-21-0484, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis

From kanterella
Jump to navigation Jump to search
Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis
ML21134A050
Person / Time
Site: Farley, 07200042  Southern Nuclear icon.png
Issue date: 05/14/2021
From: Gayheart C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
NL-21-0484
Download: ML21134A050 (3)


Text

Regulatory Affairs 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 205 992 5000 tel 205 992 7601 fax May 14, 2021 Docket Nos.: 50-348 NL-21-0484 50-364 72-42 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Units 1 and 2 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis Ladies and Gentlemen:

In accordance with 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), Southern Nuclear Operating Company (SNC) hereby submits descriptions of changes to the emergency plan and a summary of the analysis demonstrating that the changes do not reduce the effectiveness of the plan. The emergency plan continues to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b). A description of the changes and a summary of the 50.54(q) analysis is enclosed.

This letter contains no NRC commitments. If you have any questions, please contact Jamie Coleman at (205) 992-6611.

Respectfully submitted, Cheryl Gayheart Regulatory Affairs Director CAG/efb/cbg

Enclosure:

1. Description of Emergency Plan Changes and Summary of 50.54(q) Analysis cc: NRC Regional Administrator, Region II NRC NRR Project Manager - Farley NRC Senior Resident Inspector - Farley Alabama - State Board of Health - Director of Radiation Control SNC Records RTYPE: CFA04.054

Joseph M. Farley Nuclear Plant Units 1 and 2 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis Enclosure 1 Description of Emergency Plan Changes and Summary of 50.54(q) Analysis to NL-21-0484 SNC 50.54(q) Summary of Analysis Description of Emergency Plan Changes and Summary of 50.54(q) Analysis On April 15th, 2021, Joseph M. Farley Nuclear Plant (FNP) Units 1 and 2 implemented changes to the emergency plan implementing procedures for the FNP emergency classification scheme.

The procedures were updated to align with the language developed in Emergency Preparedness Frequently Asked Question (EPFAQ) 2016-002. Specifically, the changes incorporated revisions to the definition of VISIBLE DAMAGE and corresponding clarification notes to initiating conditions (ICs) CA6 and SA9. Additional clarification language was added to SU7 and the Fission Product Barrier Matrix. These updates have no negative impact on the affected Emergency Action Levels (EALs) and the requirements defined in the SNC Standard Emergency Plan or the FNP Emergency Plan Annex.

SNC has written 50.54(q) evaluations for these changes and has concluded that the changes do not result in a reduction in effectiveness. The SNC Standard Emergency Plan, FNP Emergency Plan, and the FNP EAL implementing procedures continue to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b).

Page E1-1