MONTHYEARNL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 NL-23-0003, Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 12023-01-20020 January 2023 Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1 NL-23-0069, Correction of Technical Specification Omission and Typographical Error2023-01-20020 January 2023 Correction of Technical Specification Omission and Typographical Error NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-11-30030 November 2022 Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0850, Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-11-18018 November 2022 Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .2022-10-27027 October 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF . NL-22-0800, Supplement to Authorized Relief Request HNP-ISI-RR-05-022022-10-27027 October 2022 Supplement to Authorized Relief Request HNP-ISI-RR-05-02 NL-22-0801, Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of .2022-10-14014 October 2022 Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of . NL-22-0757, Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-09-30030 September 2022 Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NL-22-0687, Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 22022-08-31031 August 2022 Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 2 NL-22-0406, Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes2022-08-19019 August 2022 Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes NL-22-0650, Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-08-19019 August 2022 Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0590, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten2022-08-18018 August 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten NL-22-0672, Registration of Spent Fuel Cask Use2022-08-17017 August 2022 Registration of Spent Fuel Cask Use NL-22-0564, and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use2022-07-21021 July 2022 and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 NL-22-0499, Registration of Spent Fuel Cask Use2022-06-27027 June 2022 Registration of Spent Fuel Cask Use NL-22-0362, Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2022-06-0101 June 2022 Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update NL-22-0365, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R302022-05-31031 May 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R30 NL-22-0335, Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And.2022-05-17017 May 2022 Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And. NL-22-0344, Annual Radiological Environmental Operating Reports for 20212022-05-10010 May 2022 Annual Radiological Environmental Operating Reports for 2021 NL-22-0315, Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days2022-05-0404 May 2022 Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days NL-22-0325, Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-05-0303 May 2022 Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0283, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-04-29029 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. NL-22-0271, Changes to the Physical Security Plan2022-04-19019 April 2022 Changes to the Physical Security Plan NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations NL-21-0918, License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 52022-03-31031 March 2022 License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5 NL-22-0220, Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 20222022-03-28028 March 2022 Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 2022 NL-22-0221, Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2022-03-28028 March 2022 Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) 2024-01-30
[Table view] |
Text
Charles A. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 A.
Birmingham, AL 35242 Tel 205.992.7872 Fax 205.992.7601 SOUTHERN COMPANY January 23, 2015 Docket Nos.: 50-366 NL-15-0082 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant- Unit 2 Response to Request for Information Regarding Proposed lnservice Inspection Alternative HNP-ISI-ALT-HDPE-01. Version 2.0 Ladies and Gentlemen:
By letter dated September 19, 2014, Southern Nuclear Operating Company (SNC) submitted proposed lnservice Inspection (lSI) Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 for Nuclear Regulatory Commission (NRC) staff review and approval (SNC letter NL-14-1250). This Alternative requests authorization to replace buried steel Plant Service Water piping with High Density Polyethylene (HOPE) piping for the duration of the license at Edwin I. Hatch Nuclear Plant (HNP), Unit 2.
By letter dated January 13, 2015, the NRC sent SNC a Request for Additional Information (RAJ) letter. Enclosure 1 provides the SNC response to the RAJ questions. In addition, the RAJ proposes that SNC incorporate additional clarification into the Alternative Technical Requirements (ATR) provided in of NL-14-1250. Enclosure 2 of this letter provides revised pages for the ATR, and is a direct replacement for pages E2-28 and E2-31 sent in NL 1250. As such, the "header and '1ooter of Enclosure 2 of this letter are consistent with pages E2-28 and E2-31 of the NL-14-1250.
This Jetter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.
C. R. Pierce Regulatory Affairs Director CRP/RMJ
U.S. Nuclear Regulatory Commission NL-15-0082 Page 2
Enclosures:
- 1. SNC Response to NRC RAis
- 2. Revised Pages E2-28 and E2-31 of Alternative Technical Requirements cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bast, Executive Vice President & Chief Nuclear Officer Mr. D. R. Vineyard, Vice President- Hatch Mr. M. D. Meier, Vice President- Regulatory Affairs Mr. D. R. Madison, Vice President- Fleet Operations Mr. B. J. Adams, Vice President- Engineering Mr. G. L. Johnson, Regulatory Affairs Manager - Hatch RTYPE: CHA02.004 U.S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager- Hatch Mr. D. H. Hardage, Senior Resident Inspector- Hatch
Edwin I. Hatch Nuclear Plant - Unit 2 Response to Request for Information Regarding Proposed lnservice Inspection Alternative HNP-ISI-ATL-HDPE-01, Version 2.0 Enclosure 1 SNC Response to NRC RAis to NL-15-0082 SNC Response to NRC RAis NRC RAI Question 1 Describe the quality control process for embedding flaws for the proposed Ultrasonic Testing qualification program. How will you determine location of flaws, etc?
SNC Response to NRC RAI Question 1 SNC is engaged with EPRI in plans to produce flawed specimens specifically for the Hatch Project. These specimens will be used for qualification I demonstration of both the ultrasonic testing (UT) procedures and for the non-destructive examination (NDE) personnel. Surface-connected flaws required for the demonstration joint will be produced using very thin cutting tools after the joint is fused. Various methods currently exist for producing internal flaws, primarily by trial and error as was the case with Callaway. EPRI plans to refine techniques for producing internally-flawed specimens during an HOPE Mechanical Test Comparison Project, expected to commence in early 2015. Successful development of any techniques and quality control practices learned from developing and verifying flawed specimens for that project should be available prior to preparation of the Hatch specimens. Otherwise the Hatch specimens will be produced using existing trial-and-error methods, and verified using volumetric NDE (e.g. double-angle radiography).
NRC RAI Question 2 For the High Speed Tensile Test and the Side Bend Test, you state that four test specimens will be removed at intervals approximately 90 degrees apart for each test. Will these be at random locations or at cardinal locations?
SNC Response to NRC RAI Question 2 Orientation of mechanical test specimens will typically commence at random locations. During the heating process, however, localized areas of surfaces to be fused sometimes experience wave-like conditions. SNC therefore retains the option to align tests with areas of such anomalous surface conditions to verify the conditions are not deleterious to the finished fused joint.
NRC RAI Question 3 Paragraph 4231 (c) states for items with different DRs, the item with the smaller DR will be counter bored and tapered to equal the wall thickness, or its outside diameter will be machined and tapered to equal the wall thickness of the item with the larger DR. Please specify NDE techniques and measurements that will be incorporated to assure the required DRs are met and that machined surface is free of indication and possible porosity.
SNC Response to NRC RAI Question 3 4231 (c) has been revised in part to read (without the underline): " ... with Fig.
4230-1 (a) or (b). Machined surfaces will be visually examined to verify absence of porosity or other deleterious surface conditions, and required wall thicknesses will be verified by direct measurement." Direct measurement will typically be by E1-1 to NL-15-0082 SNC Response to NRC RAis tape or rule, but may also be by calibrated ultrasonic thickness measurement. of this letter contains the revised page E2-28 of the ATR.
NRC RAI Question 4 Paragraph 4412(a)(1) should include that the joint in addition to the surface heaters used for fusing will be free of scale, rust, oil, grease, dust, fine particulates and other deleterious material. In addition, cleaners that form a film (acetone) shall not be used on the joint preparation.
SNC Response to NRC RAI Question 4 4412{a) has been clarified in part to read (without the underline): "(2) The joint will be protected from the above and all other deleterious contamination ... " In addition, the following subparagraph will be added to 4412(a):
"(3) 70% (minimum) isopropyl alcohol solutions will be used for cleaning all film, oil or other foreign material from machined fusion surfaces." of this letter contains the revised page E2-31 of the ATR.
NRC RAI Question 5 Paragraph 5114 (Qualification of Volumetric Examination Procedures)- should state that the qualification test should be blind.
SNC Response to NRC RAI Question 5 NDE procedures are required to be qualified I demonstrated as capable of detecting 100% of rejectable indications from the smallest rejectable surface-connected flaw to the maximum postulated flaw. In order to validate this detection capability to the satisfaction of the Inspector and Owner (SNC),
identification of the approximate locations of some minor flaws may be necessary during the procedure demonstration. However, the NDE procedure may only be applied for inspection of the actual product by trained personnel who have demonstrated their ability to adequately detect flaws in a purely blind fashion.
Reference paragraph 5422(b)(3): The demonstration will be performed in a blind fashion."
NRC RAI Question 6 Table 3-254- Paragraph 3-403.4 Cross Sectional Area is an essential variable.
The cross sectional area = (rr) diameter x thickness and both of these are essential variables.
SNC Response to NRC RAI Question 6 This is correct. Table 3-254(a) depicts the requirements of Section IX. Table 3-254(b) reflects the additional requirements for this project. Nominal diameter, nominal thickness and nominal cross-sectional area are all considered essential parameters for procedures, even though the latter is a product of the first two.
E1-2
Edwin I. Hatch Nuclear Plant- Unit 2 Response to Request for Information Regarding Proposed lnservice Inspection Alternative HNP-ISI-ATL-HDPE-01, Version 2.0 Enclosure 2 Revised Pages E2-28 and E2-31 of Alternative Technical Requirements to NL-14-1250 Proposed Alternative Technical Requirements to ASME Section XI Requirements for Replacement of Class 3 Buried Piping in Accordance with 10 CFR 50.55a(a)(3)(i)
(c) For items with different DRs, the item with the smaller DR will be counterbored and tapered to equal the wall thickness, or its outside diameter will be machined and tapered to equal the wall thickness of the item with the larger DR and will comply with Fig. 4230-1 (a) or (b). Machined surfaces will be visually examined to verify absence of porosity or other deleterious surface conditions, and required wall thickness will be verified by direct measurement.
Fig.4230-1 Tapered Tranition Joint Component of Component of lower DR I hiAherDR I
ct.
t" l (ab _ of thmncr component c'a.tn 2 St' c',-nJu~ arc after focmg 0
035 < [(b-_-, **] , < 0 60 ra'- 0.05t' r:*- 005t" (a) Reinforcement on Inside Diameter Component of r Component of r lowerOR -- higherOR *-
~~~-t
~L~
t"
- tw. - ofthmncr component c*-* 2.St' c*,*alues Me lifter fxmg 0
OJS< [ - - ] < 060 (h - , ** ,
r,*_
- O.OSt' (b) Reinforcement on Outside Diameter E2-28 to NL-14-1250 Proposed Alternative Technical Requirements to ASME Section XI Requirements for Replacement of Class 3 Buried Piping in Accordance with 10 CFR 50.55a(a)(3)(i) 4400 RULES GOVERNING MAKING, EXAMINING, AND REPAIRING FUSED JOINTS 4410 PRECAUTIONS TO BE TAKEN BEFORE FUSING 4411 Identification, Storage and Handling of Materials SNC (or its approved Certificate Holder) will be responsible for control of the materials that are used in the fabrication and installation of components. Suitable identification, storage, and handling of material will be maintained.
4412 Cleanliness and Protection of Fusing Surfaces (a) Precautions will be taken to prevent contamination of the joint during the fusing process.
( 1) The surfaces of the heaters used for fusing will be free of scale, rust, oil, grease, dust, fine particulate and other deleterious material.
(2) The joint will be protected from the above and all other deleterious I contamination including rain, snow, dust, fine particulate and wind during fusing operations.
Fusing may not be performed on wet surfaces or surfaces containing dust or fine particulate.
(3) 70% (minimum) isopropyl alcohol solutions will be used for cleaning all film, oil or other foreign material from machined fusion surfaces.
(b) Fusing will not be performed at ambient temperatures less than 50°F or greater than l25°F, unless an environmental enclosure is used to control work area temperature between 50°F and 125 °F. For ambient fusing temperatures between 100°F and l25°F, minimum cooling time shall be 13 minutes per in. of thickness.
4420 RULES FOR MAKING FUSED JOINTS 4421 Heating Cycle (a) Immediately prior to inserting the heater plate between the faced ends to be joined, the temperature will be verified to be within the required range by measuring at four locations approximately 90 degrees apart in the fusing zone, on both sides of the heater plate.
(b) Care will be taken upon heater removal to ensure uniform flat heated surfaces on both pipe ends of the joint prior to fusing together.
4422 Surfaces of Fused Joints Fused beads will usually remain intact after completion of fusing.
(a) When required, fused beads may be removed, but only after the visual inspection required by 5210(b) is completed and documented. The entire surface at the removed bead locations must be inspected and must meet the acceptance criteria of 5322 after bead removal.
(b) The finished joint must be suitable for required visual and volumetric examinations.
E2-31