NL-12-0371, Provision of Engineering Drawings Is Support of Technical Specification Revision Request for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System

From kanterella
Jump to navigation Jump to search
Provision of Engineering Drawings Is Support of Technical Specification Revision Request for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System
ML12055A060
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/23/2012
From: Ajluni M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-12-0371
Download: ML12055A060 (7)


Text

Mark J. Ajluni, P.E. Southern Nuclear Nuclear Licensing Director Operating Company, Inc.

40 Invemess Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7673 Fax 205.992.7885 SOUTHERN . \

February 23, 2012 COMPANY Docket No.: 50-425 NL-12-0371 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant - Unit 2 Provision of Engineering Drawings is Support of Technical Specification Revision Request for TS 3.7.14 Engineered Safety Features (ESF) Room Cooler and Safety-Related Chiller System Ladies and Gentlemen:

Southern Nuclear Operating Company (SNC) in Letter NL-11-1628, dated December 19, 2011 ,

proposed to revise the Vogtle Electric Generating Plant (VEGP) Unit 2 Technical Specification (TS), Appendix A to Operating License NPF-81 (specifically, TS 3.7 .14) in accordance with 10 CFR 50 .90.

In the course of the Nuclear Regulatory Commission's (NRC) review of that proposed TS change, a need for certain engineering drawings was recognized by the NRC staff, and a request for those drawings was made to SNC. Pursuant to that request, please find the enclosed subject drawings.

As noted in its initial proposed TS revision , SNC requests that the proposal be reviewed and approved on or before December 21, 2012, such that the revised TS can be applied prior to the refueling outage scheduled to begin on March 10, 2013.

This letter contains no commitments to the NRC. If you have any questions, please contact Mr.

B. D. McKinney at (205) 992-5982.

U. S. Nuclear Regulatory Commission NL-12-0371 Page 2 Mr. M. J. Ajluni states he is Nuclear Licensing Director of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and to the best of his knowledge and belief, the facts set forth in this letter are true.

Respectfully submitted.

~~~-

M. J. Ajluni Nuclear Licensing Director scribed before me this ~ day of F~ ~ ,2012.

\=;

My commission expires:

MJA !WEB

Enclosure:

Four Piping and Instrument Diagrams (P&ID) for ESF Room Cooler and Safety-Related Chiller System cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO (w/o enclosure)

Mr. D. G. Bost, Chief Nuclear Officer (w/o enclosure)

Mr. B. L. Ivey, Vice President - Regulatory Affairs (w/o enclosure)

Mr. B. J. Adams, Vice President - Fleet Operations (w/o enclosure)

Mr. T. E. Tynan, Vice President - Vogtle (w/o enclosure)

RType: CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. P. G. Boyle, NRR Senior Project Manager - Vogtle Mr. L. M. Cain, Senior Resident Inspector - Vogtle

Vogtle Electric Generating Plant Unit 2 Engineering Drawings is Support of Request For TS Revision for TS 3.7.14 ESF Room Cooler and Safety-Related Chiller System Enclosure 1 NL-12-0371 Alvin W. Vogtle Nuclear Plant P&I Diagram - ESF Room Coolers, System 1555 2X4DB228 Alvin W. Vogtle Nuclear Plant P&I Diagram - Safety Related (Essential) Chillers Unit 2 Trains A and B, System 1592 2X4DB221 Alvin W. Vogtle Nuclear Plant P&I Diagram - Essential Chilled Water Cooling Coils Unit 2 Trains A, System 1592 2X4DB233 Alvin W. Vogtle Nuclear Plant P&I Diagram - Essential Chilled Water Cooling Coils Unit 2 Trains B, System 1592 2X4DB234

Date: 1/24/2012 Time : 01:06:40 PM

Title:

C:\Documents and Settings\jlseay\Documentum\Viewed\2X4DB228.cal

Date: 1/24/2012 Time : 01:09:46 PM

Title:

C:\Documents and Settings\jlseay\Documentum\Viewed\2X4DB221.cal

Date: 1/24/2012 Time : 01:11:03 PM

Title:

C:\Documents and Settings\jlseay\Documentum\Viewed\2X4DB234.cal

Date: 1/24/2012 Time : 01:13:24 PM

Title:

C:\Documents and Settings\jlseay\Documentum\Viewed\2X4DB233.cal