MONTHYEARNL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 NL-23-0003, Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 12023-01-20020 January 2023 Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1 NL-23-0069, Correction of Technical Specification Omission and Typographical Error2023-01-20020 January 2023 Correction of Technical Specification Omission and Typographical Error NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-11-30030 November 2022 Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0850, Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-11-18018 November 2022 Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .2022-10-27027 October 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF . NL-22-0800, Supplement to Authorized Relief Request HNP-ISI-RR-05-022022-10-27027 October 2022 Supplement to Authorized Relief Request HNP-ISI-RR-05-02 NL-22-0801, Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of .2022-10-14014 October 2022 Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of . NL-22-0757, Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-09-30030 September 2022 Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NL-22-0687, Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 22022-08-31031 August 2022 Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 2 NL-22-0406, Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes2022-08-19019 August 2022 Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes NL-22-0650, Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-08-19019 August 2022 Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0590, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten2022-08-18018 August 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten NL-22-0672, Registration of Spent Fuel Cask Use2022-08-17017 August 2022 Registration of Spent Fuel Cask Use NL-22-0564, and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use2022-07-21021 July 2022 and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 NL-22-0499, Registration of Spent Fuel Cask Use2022-06-27027 June 2022 Registration of Spent Fuel Cask Use NL-22-0362, Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2022-06-0101 June 2022 Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update NL-22-0365, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R302022-05-31031 May 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R30 NL-22-0335, Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And.2022-05-17017 May 2022 Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And. NL-22-0344, Annual Radiological Environmental Operating Reports for 20212022-05-10010 May 2022 Annual Radiological Environmental Operating Reports for 2021 NL-22-0315, Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days2022-05-0404 May 2022 Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days NL-22-0325, Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-05-0303 May 2022 Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0283, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-04-29029 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. NL-22-0271, Changes to the Physical Security Plan2022-04-19019 April 2022 Changes to the Physical Security Plan NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations NL-21-0918, License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 52022-03-31031 March 2022 License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5 NL-22-0220, Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 20222022-03-28028 March 2022 Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 2022 NL-22-0221, Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2022-03-28028 March 2022 Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) 2024-01-30
[Table view] |
Text
Mark J. Ajluni, P.E. Southern Nuclear Nuclear licensing Director Operating Company. Inc.
40 Inverness Cente r Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7673 Fax 205.992.7885 August 16, 2011 SOUIHERN'\
COMPANY Docket Nos.: 50-366 NL-11-1716
- u. S, Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant - Unit 2 Proposed Alternative HNP-ISI-ALT-11 In Accordance With 10 CFR 50.55a{a)(3)(i)
Response to NRC Request for Additional Information Ladies and Gentlemen:
By letter dated May 17, 2011, (ADAMS Accession No. ML111380211) Southern Nuclear Operating Company (SNC) submitted a request for proposed alternative HNP-ISI-ALT-11, for the lSI Program, in accordance with 10 CFR 50.55a{a){3){i).
Subsequently, by letter dated July 28, 2011, (ADAMS Accession No. ML11206A001) the NRC submitted a Request for Additional Information (RAI) to enable completion of the review. The SNC response to the RAls are provided in the Enclosure, This letter contains no NRC commitments. If you have any questions, please contact Jack Stringfellow at (205) 992-7037.
Respectfully submitted,
~~T M. J. Ajluni Nuclear Licensing Director MJAlGALllac
Enclosure:
Edwin I. Hatch Nuclear Plant - Unit 2 Proposed Alternative HNP-ISI- AL T -11, Response to NRC Request for Additional Information
U. S. Nuclear Regulatory Commission NL-11-1716 Page 2 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, Vice President - Hatch Ms. P. M. Marino, Vice President - Engineering RTYPE: CHA02.004 U. S. Nuclear Requlatorv Commission Mr. V. M. McCree, Regional Administrator Mr. P. G. Boyle, NRR Project Manager Mr. E. D. Morris, Senior Resident Inspector - Hatch
Edwin I. Hatch Nuclear Plant - Unit 2 Proposed Alternative HNP-ISI-ALT-11, in Accordance With 10 CFR SO.SSa(a)(3)(i) Response to NRC Request for Additional Information Enclosure Edwin I. Hatch Nuclear Plant - Unit 2 Proposed Alternative HNP-ISI-ALT-11, Response to NRC Request for Additional Information
Enclosure to NL-11-1716 Edwin I. Hatch Nuclear Plant - Unit 2 Proposed Alternative HNP-ISI-ALT-11, Response to NRC Request for Additional Information
- 1. NRC RAI Confirm that the neutron fluence calculations used in the application conform to the requirements set forth in the NRC safety evaluation pertaining to the Radiation Analysis Modeling Application (RAMA) code, dated May 13, 2005.
Specifically confirm that:
The best-estimate [reactor pressure vessel] neutron fluence prediction is determined using the RAMA transport code, detailed plant-speci'fic geometry, core operating history, and the BUGLE-96 nuclear data library with a minimum of a P3 Legendre polynomial approximation in the iron inelastic scattering.
If this is not the case, detail how the neutron fl!Jence calculations used in the application are acceptable.
SNC RESPONSE As documented in TransWare Enterprises report, SNC-FLU-002-R-001, Revision 0, the Hatch-2 fluence evaluation was completed using the RAMA transport code, detailed plant-specific geometry, core operating history, and the BUGLE-96 nuclear data library. The RAMA transport calculation uses information from the RAMA nuclear data library to determine the scope of the flux calculation. This information includes the Legendre expansion of the scattering cross sections that is used in the treatment of anisotropy of the problem. By default, the RAMA transport calculation uses the maximum order of expansion that is available for each nuclide in the RAMA nuclear data library (Le., through P5 scattering for actinide and zirconium nuclides and through P7 scattering for all other nuclides in the model).
E-2
Enclosure to NL-11-1716 Edwin I. Hatch Nuclear Plant - Unit 2 Proposed Alternative HNP-ISI-ALT-11, Response to NRC Request for Additional Information
- 2. NRC RAI The mean nil-ductility transition reference temperature (RTNOT) values reported in Tables 1 and 2 of the submittal are based on delta RTNOT values from "SIA ART Calculation[s]." Explain in detail how these calculations are, or are not, consistent with the guidance provided in Regulatory Guide (RG) 1.99, Rev. 2, "Radiation Embrittlement of Reactor Vessel Materials." If they are not consistent with the guidance in RG 1.99, Rev. 2, please indicate whether these proposed values (Le., the delta RTNOT values used in the calculation of the mean RTNOT values in this submittal) have been previously reviewed and accepted by the staff.
SNC RESPONSE As documented in SIA report, HTCH-21 Q-302R1, the updated fluence values were used to determine the RTNOT shift and projected Adjusted Reference Temperature (ART) values for the Hatch-2 reactor pressure vessel materials.
The calculations performed by SIA were performed using the equations and values provided in Regulatory Guide 1.99, Revision 2. Adjusted reference temperatures were calculated for each of the Reactor Pressure Vessel (RPV) welds and plates in locations projected to reach or exceed a fluence of 1 x 1017 n/cm 2 (> 1.0 MeV). The results were then tabulated in a series of Excel spreadsheets with ART calculations performed for 19.5, 36, 40, 44, 48, and 50.1 EFPY. The TransWare report provided outputs of fluence values at 19.5 (end of Cycle 18) and 50.1 EFPY (Cycle 18 extrapolated to end of extended period of operation). Fluence values were determined for selected intermediate Effective Full Power Years (EFPY) by use of linear interpolation. Material properties used for these calculations including chemistry values, chemistry factors and initial reference temperatures, were compared and found to agree with the values provided for the Hatch-2 RPV from the U. S. Nuclear Regulatory Commission, "Reactor Vessel Integrity Database Version 2.0.1," dated September 7, 2000.