NL-08-0475, Joseph M. Farley, Unit 2, Reactor Vessel Surveillance Capsule V Results

From kanterella
Jump to navigation Jump to search
Joseph M. Farley, Unit 2, Reactor Vessel Surveillance Capsule V Results
ML081130646
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/18/2008
From: Jones D H
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-08-0475
Download: ML081130646 (3)


Text

David H. Jones Southern Nuclear Vice President Operating Company, Inc.Engineering 40 Inverness Center Parkway Birmingham, Alabama 35242 Tel 205.992.5984 Fax 205.992.0341 April 18, 2008 Energy to Serve Your World'Docket No.: 50-364 NL-08-0475 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant -Unit 2 Reactor Vessel Surveillance Capsule V Results Ladies and Gentlemen:

In accordance with the provisions of 10 CFR 50 Appendix H, Southern Nuclear Operating Company (SNC) hereby submits Westinghouse Report WCAP-16918-NP, Rev. 1, April 2008, "Analysis of Capsule V from the Southern Nuclear Operating Company Joseph M. Farley Unit 2 Reactor Vessel Radiation Surveillance Program." This report presents the test results from Capsule V, the 6th and final surveillance capsule removed from the reactor vessel. These test results were used to evaluate reactor vessel material properties following 21.8 effective full power years (EFPY) of plant operation (equivalent to about 78 EFPY of capsule fluence).Based on the enclosed surveillance capsule test results, properties of the reactor beltline materials are predicted to remain more than adequate for continued safe plant operation through the end of the renewed license period (i.e. to about 54 EFPY). However, review of the capsule test results with respect to the FNP Unit 2 Pressure Temperature Limits Report (PTLR) showed that the pressure temperature limit curves currently in the PTLR, which are labeled for a service period to 33.8 EFPY, must have their service period reduced to 32.8 EFPY.The Unit 2 PTLR will be revised to incorporate the Capsule V analysis results and re-label the pressure temperature limit curves to 32.8 EFPY. The revised Unit 2 PTLR will be submitted by September 30, 2008.4ovg U. S. Nuclear Regulatory Commission NL-08-0475 Page 2 If you have any questions, please advise.Vice President

-Engineering DHJ/DWD/daj

Enclosure:

WCAP-16351-NP, Rev. 11, April 2008, "Analysis of Capsule V from the Southern Nuclear Operating Company, Joseph M. Farley Unit 2 Reactor Vessel Radiation Surveillance Program" cc: Southern Nuclear Operatinq Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President

-Farley RTYPE: CFA04.054; LC#14740 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Acting Regional Administrator Mr. R. A. Jervey, NRR Project Manager -Farley Mr. E. L. Crowe, Senior Resident Inspector

-Farley Joseph M. Farley Nuclear Plant -Unit 2 Reactor Vessel Surveillance Capsule V Results Enclosure WCAP-16351 -NP, Rev. 1, April 2008, "Analysis of Capsule V from the Southern Nuclear Operating Company, Joseph M. Farley Unit 2 Reactor Vessel Radiation Surveillance Program"