NL-08-0001, Withdrawal of Request for Relief, RR-59, Temporary Non-Code Repair of Service Water Piping

From kanterella
Jump to navigation Jump to search
Withdrawal of Request for Relief, RR-59, Temporary Non-Code Repair of Service Water Piping
ML080140218
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/11/2008
From: George B
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-08-0001
Download: ML080140218 (1)


Text

Southern Nuclear Operating Company, Inc.

Post Office Box 1295 Birmingham, Alabama 35201-1295 Tel 205.992.5000 SOUTHERN COMPANY A

January 11, 2008 Energy to Serve Your WorldS" Docket No.: 50-364 NL-08-0001 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Unit 2 Withdrawal of Request for Relief, RR-59 Temporary Non-Code Repair of Service Water Piping Ladies and Gentlemen:

On May 11, 2006, Southern Nuclear Operating Company (SNC) submitted a proposed request for relief (RR-59) for a temporary non-Code repair of a service water piping pinhole leak downstream of Q2P16V560. The request for relief was to remain in effect until the next refueling outage or the next Unit 2 cold shutdown greater than 30 days, whichever occurred first. Pursuant to the submittal of the request for relief, the subject pinhole leak was repaired during the Unit 2 outage (2R18). Therefore, SNC hereby withdraws the proposed request for relief, RR-59.

This letter contains no NRC commitments.

If you have any questions, please advise.

~~,---

B. J. George Manager, Nuclear Licensing BJG/JLS/phr cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Plant Farley Mr. D. H. Jones, Vice President - Engineering RType: CFA04.054; LC# 14709 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Acting Regional Administrator Ms. K. R. Cotton, NRR Project Manager - Farley Mr. E. L. Crowe, Senior Resident Inspector - Farley