MONTHYEARNL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 NL-23-0069, Correction of Technical Specification Omission and Typographical Error2023-01-20020 January 2023 Correction of Technical Specification Omission and Typographical Error NL-23-0003, Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 12023-01-20020 January 2023 Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1 NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-11-30030 November 2022 Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0850, Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-11-18018 November 2022 Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .2022-10-27027 October 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF . NL-22-0800, Supplement to Authorized Relief Request HNP-ISI-RR-05-022022-10-27027 October 2022 Supplement to Authorized Relief Request HNP-ISI-RR-05-02 2024-07-09
[Table view] |
Text
Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201 -1295 COMPANY August 3, 2007 Energy to Serve Your Worldsu Docket No.: 50-321 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant - Unit 1 Response to Request for Additional lnformation Concerning Projected Fluence Values for the Limitina CircumferentialWeld Ladies and Gentlemen:
Pursuant to your request for additional information of July 6, 2007 Southern Nuclear Operating Company (SNC) hereby provides its response concerning the projected fluence values for the limiting circumferential weld. ISI-ALT-8 (letter NL-07-0270, dated March 8,2007) was submitted to extend the authorization for the elimination of the RPV circumferential shell weld examinations required by ASME Code through the renewed license period of extended operation (PEO) at Plant Hatch-Unit 1.
NRC's request for additional information and SNC's response are provided in the enclosure to this letter.
This letter contains no NRC commitments. If you have any questions, please advise.
B. J. ~ e o j ~ e Manager, Nuclear Licensing
Enclosure:
Restatement of NRC Request for lnformation and SNC Response for Plant Hatch - Unit 1 Concerning Projected Fluence Values for the Limiting Circumferential Weld
U. S. Nuclear Regulatory Commission NL-07-1491 Page 2 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, Vice President - Hatch Mr. D. H. Jones, Vice President - Engineering RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Hatch Mr. J. A. Hickey, Senior Resident Inspector - Hatch
Edwin I. Hatch Nuclear Plant Unit 1 Response to Request for Additional lnformation Concerning Projected Fluence Values for the Limiting Circumferential Weld Enclosure Restatement of NRC Request for lnformation and SNC Response for Plant Hatch Unit 1
Enclosure Restatement of NRC Request for lnformation and SNC Response for Plant Hatch Unit 1 Concerning Projected Fluence Values for the Limiting Circumferential Weld Restatement of NRC Request for Additional Information Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(a)(3)(i),
Request for Alternative ISI-ALT-8 proposed an alternative to extend the authorization for the elimination of the Reactor Vessel (RV) circumferential shell weld examinations required by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI through the end of the extended period of operation at Hatch 1. In its January 28, 2005 Safety Evaluation Report (SER) for your original relief request on this topic (RR-38), the NRC staff authorized the elimination of these circumferential shell weld examinations only through July 31, 2007. The staff approval of RR-38 for this limited duration was based on a finding that the neutron fluence values used in RR-38 to justify elimination of the RV circumferential weld examinations through the end of the extended period of operation were based on a fluence calculational methodology (RAMA) that had not yet been reviewed and approved by the NRC staff at that time.
The use of the RAMA ,fluence methodology was subsequently reviewed and conditionally approved by the NRC in an SER dated May 13, 2005. The conditions for the application of the RAMA fluence methodology to the RV fluence calculations at Hatch 1 have been met.
The staff requests that you confirm whether the projected fluence value for the limiting circumferential weld at the end of the extended period of operation at Hatch 1 (i.e., the fluence intended for use as a basis for the current request, ISI-ALT-08) is the same as that reported for Hatch 1 in Enclosure 1 of RR-38 for the period corresponding to 54 effective full power years (EFPY) of facility operation.
If the 54 EFPY fluence for Request ISI-ALT-8 is different than what was originally reported in Enclosure 1 of RR-38 for 54 EFPY, please provide an updated mean RTNDT value for the limiting Hatch 1 circumferential shell weld and compare it to the acceptance criterion for the circumferential weld RTNDT value specified for Combustion Engineering fabricated RVs in Table 2.6-5 of the July 28, 1998, NRC SER for the Boiling Water Reactor Vessel and lnternals Project (BWRVIP)-05 report, "BWR Vessel and lnternals Project, BWR Reactor Pressure Vessel Shell Weld Inspection Recommendations (BWRVIP-05)."
Enclosure Restatement of NRC Request for Information and SNC Response for Plant Hatch Unit 1 Concerning Projected Fluence Values for the Limiting Circumferential Weld SNC Response for Plant Hatch Unit 1 The projected fluence value calculated by RAMA for the limiting circumferential weld at the end of the period of extended operation (PEO) at Hatch 1 is higher than that previously reported for Hatch 1 in Enclosure 1 of Relief Request 38 (RR-38). As noted in the request for additional information (RAI), Relief Request RR-38, which used GE fluence methodology, was approved on a limited time basis (through July 2007) pending review and approval by the NRC of the RAMA fluence methodology. ISI-ALT-8 proposed a code alternative to examination of the circumferential welds that would extend through the PEO based on calculations using the RAMA methodology. As shown in the table below, the fluence at the end of the PEO was previously stated in RR-38 as 0.236 x 10
n/cm2while the RAMA calculated fluence used in ISI-ALT-8 at the end of the PEO is 0.296 x 10" n/cm2. 'The end of the PEO for Plant Hatch Unit 1 in RR-38 was based on an assumed 90% capacity factor, or 54 EFPY (effective full power years of operation). For the RAMA calculations, a more detailed evaluation of the capacity factor was performed, which resulted in the end of the PEO being defined at 49.3 EFPY.
For comparison purposes, updated values for the limiting Hatch 1 circumferer~tial shell weld at the end of the PEO and the values specified for Combustion Engineering (CE) fabricated RVs in Table 2.6-5 of the July 28, 1998, NRC SER are shown in the below table. Also included for comparison are the values used as the basis for RR-38.
As demonstrated in the table, the increase in projected fluence using the RAMA methodology has resulted in a slight increase in mean RTNDT at the end of the PEO (53.3 vs. 48.5). However, the Hatch 1 RTNDT is still bounded by the mean RTNDT calculated using either CE(VIP) or CE(CE0G) chemistry data as provided in the 1998 NRC SER for BWRVlP-05.
Group CE(VIP) CE(CE0G) Hatch 1 Hatch 1 End of PEO End of 64 EFPY 64 EFPY 54 EFPY PEO (Table 2.6-5) (Table 2.6-5) (RR-38) 49.3 EFPY (G E) (RAMA)
Cu% 0.13 0.183 0.197 0.197 Ni% 0.71 0.704 0.060 0.060 CF 151.7 172.2 91.O 91.O Fluence 0.40 0.40 0.236 0.296 (10 n/cm2)
ARTNDT 113.2 128.5 48.5 53.3 (OF)
RTNDT(U) 0 0 -10 -10 (OF)
Mean RTNDT 113.2 128.5 38.5 43.3 (OF)
P(F/E) 1.99E-4 4.38E-4 --- ---
NRC P(F/E) --- --- --- ---
BWRVIP