Category:Letter type:NL
MONTHYEARNL-21-034, Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals2021-05-26026 May 2021 Notification of Expected Date of Transfer of Ownership of Nuclear Units to Holtec Indian Point 2, LLC and Holtec Indian Point 3, LLC; and Notification of Receipt of All Required Regulatory Approvals NL-21-039, Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary2021-05-20020 May 2021 Response to Request for Additional Information - License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary NL-21-033, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2021-05-11011 May 2021 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-21-032, Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center2021-05-11011 May 2021 Termination of Emergency Response Data System Feed to the U.S. Nuclear Regulatory Commission at Indian Point Energy Center NL-21-005, Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions2021-05-11011 May 2021 Cancellation of Commitments Related to Beyond-Design-Basis External Events Seismic and Flooding Actions NL-21-030, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report NL-21-027, Registration of Spent Fuel Cask Use2021-04-20020 April 2021 Registration of Spent Fuel Cask Use NL-21-021, Registration of Spent Fuel Cask Use2021-04-19019 April 2021 Registration of Spent Fuel Cask Use NL-21-017, Pre-Notice of Disbursement from Decommissioning Trusts2021-04-0808 April 2021 Pre-Notice of Disbursement from Decommissioning Trusts NL-21-010, Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2021-02-17017 February 2021 Submittal of 2020 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-21-006, Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement2021-02-10010 February 2021 Relief Request IP3-ISI-RR-16, Proposed Alternative to American Society of Mechanical Engineers Code Case N-513-4 Inspection Requirement NL-21-014, Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2021-01-26026 January 2021 Response to 2nd Round Request for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-082, Notice of Planned Transfer of Decommissioning Funds2020-12-14014 December 2020 Notice of Planned Transfer of Decommissioning Funds NL-20-081, Pre-Notice of Disbursement from Decommissioning Trusts2020-12-0909 December 2020 Pre-Notice of Disbursement from Decommissioning Trusts NL-20-080, Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-93212020-11-19019 November 2020 Report in Accordance with 10 CFR 71.95(a) for Failure to Comply with Certificate of Compliance No. 71-9321 NL-20-079, (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-12012 November 2020 (IP2 and IP3) - Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NL-20-077, Submittal of Quality Assurance Program Manual Revision 22020-11-0909 November 2020 Submittal of Quality Assurance Program Manual Revision 2 NL-20-078, Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-11-0909 November 2020 Response to Requests for Additional Information - License Amendment Request to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-076, Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal2020-11-0202 November 2020 Revision of Commitment Related to Nuclear Reactor Safeguards Interim Compensatory Measure - Section B.5.b Issue Regarding Spent Fuel Dispersal NL-20-069, One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency2020-10-0808 October 2020 One-time Scheduler Exemption Request from 10 CFR 50, Appendix E Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Public Health Emergency NL-20-070, Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-10-0202 October 2020 Response to Requests for Additional Information, License Amendment Request to Revise the Indian Point Nuclear Generating Unit No. 3 Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-067, Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-09-16016 September 2020 Redacted Version of Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-064, 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments2020-09-0101 September 2020 10 CFR 50.59(d)(2) Summary Report of Changes, Tests and Experiments NL-20-060, Status of Remaining Actions for Generic Letter 2004-022020-08-11011 August 2020 Status of Remaining Actions for Generic Letter 2004-02 NL-20-057, Cancellation of Commitment Related to Large Break LOCA Reanalysis2020-07-30030 July 2020 Cancellation of Commitment Related to Large Break LOCA Reanalysis NL-20-0851, 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material2020-07-22022 July 2020 30-Day 10 CFR 21 Notification - Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material NL-20-051, Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center2020-07-0707 July 2020 Submittal of Quality Assurance Program Manual, Revision 1 for the Indian Point Energy Center NL-20-052, Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results2020-07-0707 July 2020 Unsatisfactory 10 CFR 26 Fitness-For-Duty Blind Performance Testing Results NL-20-012, Application to Revise Provisional Operating License and Technical Specifications2020-06-30030 June 2020 Application to Revise Provisional Operating License and Technical Specifications NL-20-050, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-06-24024 June 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-041, Registration of Unit 3 Spent Fuel Cask Use2020-05-13013 May 2020 Registration of Unit 3 Spent Fuel Cask Use NL-20-042, Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel2020-05-12012 May 2020 Certifications of Permanent Cessation of Power Operations and Permanent Removal of Fuel from the Reactor Vessel NL-20-033, Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2020-04-28028 April 2020 Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-20-038, Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline2020-04-23023 April 2020 Response to U.S. Nuclear Regulatory Commission Region I Letter Regarding Algonquin Incremental Market Project Pipeline NL-20-035, Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-16016 April 2020 Response to Request for Additional Information - Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-034, Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic2020-04-13013 April 2020 Temporary Exemption Request from 10 CFR Appendix R, Section Iii.H Due to COVID-19 Pandemic NL-20-021, Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device2020-03-24024 March 2020 Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device NL-20-020, Submittal of 2019 Annual Fitness for Duty Performance Data Report Update2020-02-26026 February 2020 Submittal of 2019 Annual Fitness for Duty Performance Data Report Update NL-20-015, Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report2020-02-10010 February 2020 Submittal of 2019 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report NL-20-008, Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane2020-01-0606 January 2020 Transmittal of Presentation Slides for Partially Closed Pre-Submittal Meeting to Discuss a Planned License Amendment Request to Replace the Fuel Handling Building Crane NL-19-094, 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report2019-12-16016 December 2019 2018 Annual 10 CFR 50.46 Emergency Core Cooling System Evaluation Changes Report NL-19-084, Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2019-11-21021 November 2019 Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.12019-11-21021 November 2019 Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 NL-19-092, Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-11-20020 November 2019 Request for Rescission of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-043, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.122019-10-22022 October 2019 Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 NL-19-073, Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2019-10-22022 October 2019 Request for Relaxation of Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) NL-19-078, Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications2019-10-22022 October 2019 Supplement to Technical Specifications Proposed Change - Permanently Defueled Technical Specifications NL-19-091, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use2019-10-17017 October 2019 Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Cask Use NL-19-090, Registration of Unit 2 Spent Fuel Cask Use2019-10-0909 October 2019 Registration of Unit 2 Spent Fuel Cask Use NL-19-079, 50.59(d)(2) Summary Report of Changes, Tests and Experiments2019-09-26026 September 2019 50.59(d)(2) Summary Report of Changes, Tests and Experiments 2021-05-06
[Table view] Category:Technical Specifications
MONTHYEARML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML22307A0452023-11-17017 November 2023 Enclosure 1 - Amendment No. 297 to Rfl No. DPR-26 for Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements with Spent Fuel Transfer to Dry Storage ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML20297A3262020-11-23023 November 2020 Enclosure 2, Draft Conforming Amendments for Transfer of Facility Operating Licenses to Holtec International, Owner, and Holtec Decommissioning International, LLC, Operator ML20100H9922020-06-0202 June 2020 Issuance of Amendment No. 269 Proposed Technical Specification Changes to City Water Surveillance Requirement and Condensate Storage Tank Required Action A.1 ML20081J4022020-04-28028 April 2020 Issuance of Amendment No. 294 Permanently Defueled Technical Specifications ML20110A0052020-04-27027 April 2020 Correction to Amendment No. 267 Issued April 10, 2020, Changes to Technical Specifications for a Permanently Defueled Condition ML20071Q7172020-04-10010 April 2020 Issuance of Amendment Nos. 292 and No. 267 Changes to Technical Specification Sections 1.1, 4.0, and 5.0 for a Permanently Defueled Condition ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19072A1342019-03-15015 March 2019 Amended Provisional Operating License DPR-5, 3-22-2019 ML18212A1902018-09-17017 September 2018 Renewed Facility Operating License DPR-64, Technical Specifications, Appendix a ML18212A1852018-09-17017 September 2018 Renewed Facility Operating License DPR-26, Technical Specifications, Appendix B ML18212A1942018-09-17017 September 2018 Renewed Facility Operating License DPR-64, Technical Specifications, Appendix B ML18212A1952018-09-17017 September 2018 Renewed Facility Operating License DPR-64, Technical Specifications, Appendix C ML16064A2152016-04-12012 April 2016 Issuance of Amendments Cyber Security Plan Implementation Schedule NL-16-027, Response to Request for Additional Information Related to License Amendment Request Regarding Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2016-03-0202 March 2016 Response to Request for Additional Information Related to License Amendment Request Regarding Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement ML15349A7942016-02-23023 February 2016 Generation, Unit No. 2 - Issuance of Amendment Extension of the Containment Integrated Leak Rate Test to 15 Years NL-15-144, License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2015-12-10010 December 2015 License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement NL-15-144, Indian Point, Units 2 and 3 - License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement2015-12-10010 December 2015 Indian Point, Units 2 and 3 - License Amendment Request - Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement NL-15-118, Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 32015-09-0303 September 2015 Post Accident Monitoring (PAM) Report for an Inoperable Reactor Vessel Level Indication System (RVLIS) Train B, Indian Point Unit 3 ML15226A1592015-09-0303 September 2015 Issuance of Amendment Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML15110A0092015-05-26026 May 2015 Issuance of Amendment Re Implementation of Technical Specification Task Force Traveler 510, Revision 2, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection(Tac Nos. MF3752 & MF3753) ML15083A4902015-04-0202 April 2015 Issuance of Amendment Proposed License Amendment Regarding a Change to Technical Specification 3.1.4 Reactivity Control Systems ML15028A3082015-03-13013 March 2015 Issuance of Amendment Extension of the Type a Containment Integrated Leak Rate Test Frequency from 10 to 15 Years NL-14-128, Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years2014-12-0909 December 2014 Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years ML14265A3292014-09-24024 September 2014 Issuance of Amendment Temporary Change to Technical Specification 3.8.6 Battery 22 Surveillance Requirement (Exigent Circumstances) ML14287A2942014-09-17017 September 2014 Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Revision 25, Technical Requirements Manual ML14198A1612014-09-0505 September 2014 Issuance of Amendment H* Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (Tac No. MF3369) ML14169A5832014-07-17017 July 2014 Issuance of Amendment Revised Containment Integrity Analysis (Tac No. MF0591) NL-14-053, Response to Request for Additional Information Regarding Emergency Diesel Generator Fuel Oil Storage Supplies2014-04-14014 April 2014 Response to Request for Additional Information Regarding Emergency Diesel Generator Fuel Oil Storage Supplies NL-14-035, Proposed Changes to Technical Specifications Regarding Reactor Vessel Pressure/Temperature Limit Curves2014-04-0101 April 2014 Proposed Changes to Technical Specifications Regarding Reactor Vessel Pressure/Temperature Limit Curves ML14045A2482014-03-0505 March 2014 Issuance of Amendment Pressure-Temperature Limit Curves and Low Temperature Over Pressure Requirements NL-14-032, Supplemental Information to Proposed Changes to Indian Point 2 Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Over Pressure Requirements Indian Point Unit Number 22014-02-24024 February 2014 Supplemental Information to Proposed Changes to Indian Point 2 Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Over Pressure Requirements Indian Point Unit Number 2 NL-14-001, Indian Point, Unit 2 - Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair2014-01-16016 January 2014 Indian Point, Unit 2 - Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair NL-14-001, Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair2014-01-16016 January 2014 Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications NL-12-039, Proposed License Amendment Regarding Atmospheric Dump Valves2012-05-23023 May 2012 Proposed License Amendment Regarding Atmospheric Dump Valves NL-12-002, Proposed Change to Containment Purge System and Pressure Relief Line Isolation Instrumentation Technical Specifications2012-01-11011 January 2012 Proposed Change to Containment Purge System and Pressure Relief Line Isolation Instrumentation Technical Specifications NL-11-119, Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication2011-10-18018 October 2011 Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication NL-10-072, Proposed Technical Specification Change Regarding RWST Surveillance Requirement2010-10-0606 October 2010 Proposed Technical Specification Change Regarding RWST Surveillance Requirement NL-09-167, Proposed Exigent License Amendment Re One Time Extension of the Auxiliary Boiler Feedwater Pump Allowed Outage Time2009-12-15015 December 2009 Proposed Exigent License Amendment Re One Time Extension of the Auxiliary Boiler Feedwater Pump Allowed Outage Time NL-09-129, Indian Point, Unit 3, Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources2009-11-19019 November 2009 Indian Point, Unit 3, Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources NL-09-129, Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources2009-11-19019 November 2009 Proposed License Amendment to Change Technical Specifications Regarding Surveillance Requirements for AC and DC Sources NL-09-119, Proposed License Amendment Regarding Diesel Generator Air Start Receiver Pressure, Indian Point Units 2 & 32009-11-17017 November 2009 Proposed License Amendment Regarding Diesel Generator Air Start Receiver Pressure, Indian Point Units 2 & 3 ML0834304242009-05-29029 May 2009 License Amendment, Technical Specifications Regarding Removal of Spent Fuel from Unit 1 and Drain Down of the Spent Fuel Pool NL-08-137, Reply to Request for Additional Information Regarding Amendment Application on Control Room Envelope Habitability2008-09-18018 September 2008 Reply to Request for Additional Information Regarding Amendment Application on Control Room Envelope Habitability ML0811401772008-06-0909 June 2008 Tec Specs to Amedment 236, License No. DPR-64 for Indian Point, Unit 3 ML0727805822007-10-0404 October 2007 Technical Specifications, Change of Pressure-temperature and Low Temperature Protection System Limits ML0722901282007-08-16016 August 2007 Technical Specifications 2023-12-05
[Table view] |
Text
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
Indian Point Energy Center LUJPVeW 296 Broadway, Suite 1 RO Box 249 Buchanan, NY 10511 0249 April 29, 2002 Re: Indian Point Unit No. 2 Docket No. 50-247 NL-02-063 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop 0-P1-17 Washington, D.C. 20555-0001
SUBJECT:
Updated Replacement Pages of Technical Specifications for License Amendment Request (LAR 01-010) Regarding Spent Fuel Storage Pit Rack Criticality Analysis with Soluble Boron Credit, Indian Point Energy Center, Unit No. 2 (TAC No. MB2989)
References:
- 1. Entergy Nuclear Operations, Inc. letter (NL-01-110) to NRC, "License Amendment Request (LAR 01-010) for Spent Fuel Storage Pit Rack Criticality Analysis with Soluble Boron Credit," dated September 20, 2001 Entergy Nuclear Operations, Inc. (ENO) hereby submits updated replacement pages for changes to the Indian Point Energy Center, Unit No. 2 (IP2) Technical Specifications (TS) requested by letter dated September 20, 2001 (Ref. 1). These updated pages remove the background shading from the added text, delete the text marked by strikeouts, and add the right margin revision bars required for issuance of the requested license amendment. These pages also contain other changes incorporated into the IP2 TS since the original Ref. 1 application.
Additionally, the updated replacement pages include the following editorial adjustments.
To support the addition of the proposed Insert A from Ref. 1 into TS 3.8.D.1, the action statement portion of the existing TS 3.8.D.1 has been renumbered as TS 3.8.D.2, and the existing TS 3.8.D.2 and 3.8.D.3 have been renumbered as 3.8.D.3 and 3.8.D.4, respectively. This will ensure the action statements are not confused with the required fuel storage configurations specified by the new paragraph insert. References to TS 3.8.D.2 in the existing TS 3.8.D.1 and in the associated Bases paragraph have also been renumbered to TS 3.8.D.3 accordingly. The reference to Figure 3.8-1 in the proposed TS 3.8.D.1 .d has been capitalized and Specification 1 of TS 5.4 has been aligned with the other paragraphs of that TS.
The Attachment to this letter provides the updated pages for the IP2 TS and the associated Bases, which can be directly used as replacement pages for license amendment issuance. A proposed page replacement instruction sheet is also provided.
O\C
NL-02-063 Page 2 of 3 The assessment submitted in Ref. 1 that concluded that the proposed changes to the TS did not involve a significant hazards consideration is not affected by the updated replacement TS pages submitted herewith in support of the application.
There are no commitments contained in this submittal.
Should you or your staff have any questions regarding this submittal, please contact Mr.
John F. McCann, Manager, Nuclear Safety and Licensing at (914) 734-5074.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, Executed on 3v/O2-Fred Dacimo Vice President - Operations Indian Point Energy Center Unit No. 2 Attachment cc: See page 3
NL-02-063 Page 3 of 3 Hubert J. Miller Regional Administrator US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Patrick D. Milano, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management US Nuclear Regulatory Commission Mail Stop 0-8-2C Washington, DC 20555 NRC Senior Resident Inspector US Nuclear Regulatory Commission PO Box 38 Buchanan, NY 10511 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Paul Eddy NYS Department of Public Service 3 Empire Plaza Albany, NY 12223 Mr. William F. Flynn NYS ERDA Corporate Plaza West 286 Washington Ave. Extension Albany, NY 12223-6399
ATTACHMENT TO NL-02-063 TECHNICAL SPECIFICATION AND BASES PAGES ENTERGY NUCLEAR OPERATIONS, INC INDIAN POINT ENERGY CENTER UNIT NO. 2 DOCKET NO. 50-247
ATTACHMENT TO LICENSE AMENDMENT NO.
FACILITY OPERATING LICENSE NO. DPR-26 DOCKET NO. 50-247 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Pages Insert Pages ix ix 3.8-4 3.8-4 3.8-5 3.8-5 3.8-6 3.8-6 Figure 3.8-1 (DELETED) Figure 3.8-1 Figure 3.8-2 Figure 3.8-2 Figure 3.8-3 Figure 3.8-3 Figure 3.8-4 Figure 3.8-5 5.4-1 5.4-1
LIST OF FIGURES Title Figure No.
Reactor Core Safety Limit-Four Loops In Operation 2.1-1 PORV Open Pressure 3.1 .A-1 Maximum RCS Pressure: OPS Inoperable and 1 Charging Pump Capable of Injecting into the RCS 3.1 .A-2 Maximum RCS Pressure: OPS Inoperable and 2 Charging Pumps Capable of Injecting into the RCS 3.1 .A-3 Maximum RCS Pressure: OPS Inoperable and 3 Charging Pumps Capable of Injecting into the RCS 3.1 .A-4 Maximum RCS Pressure: OPS Inoperable and Start of 1 RCP with SGs 40°F Hotter than RCS 3.1 .A-5 Maximum RCS Pressure: OPS Inoperable and Start of 1 RCP with SGs 100°F Hotter than RCS 3.1 .A-6 Reactor Coolant System Heatup and Leak Test Limitations Applicable for the First 25 EFPY 3.1 .B-1 Reactor Coolant System Cooldown Limitations Applicable for the First 25 EFPY 3.1.B-2 Spent Fuel Storage Rack Layout 3.8-1 Region 1-1 Limiting Fuel Burnup versus Initial Enrichment 3.8-2 Region 1-2 Minimum Number of IFBA Rods versus Initial Enrichment 3.8-3 Region 2-1 Limiting Fuel Burnup versus Initial Enrichment 3.8-4 Region 2-2 Limiting Fuel Burnup versus Initial Enrichment 3.8-5 Required Hot Shutdown Margin versus Reactor Coolant Boron Concentration 3.10-1 DELETED 4.3-1 Map Defining Unrestricted Areas for Radioactive Gaseous and Liquid Effluents 5.1-1 Amendment No. ix
not be moved on or above El. 95' in the Fuel Storage Building. Additionally, loads in excess of the nominal weight of a fuel and control rod assembly and associated handling tool shall not be moved over spent fuel in the spent fuel pit. The weight of installed crane systems shall not be considered part of these loads.
- 2. The spent fuel storage pit water level shall be maintained at an elevation of at least 93'2". In the event the level decreases below this value, all movement of fuel assemblies in the spent fuel pool storage pit and crane operations with loads over spent fuel in the spent fuel pit shall cease and water level shall be restored to within its limit within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
D. The following conditions are applicable to the spent fuel pit anytime it contains fuel:
- 1. The spent fuel racks are categorized as either Region 1-1, 1-2, 2-1, or 2-2 as specified in Figure 3.8-1. Fuel assemblies to be stored in the spent fuel storage racks are qualified based on burnup, enrichment, and cooling time as specified in Figures 3.8-2 through 3.8-5.
- a. Storage of fuel in Region 1-1 is restricted to assemblies that meet the burnup criteria in Figure 3.8-2.
- b. Storage of fuel in Region 1-2 is restricted to assemblies with enrichments
< 4.5 weight percent (w/o) or < 5.0 w/o with a minimum number of Integral Fuel Burnable Absorbers (IFBA) rods as specified in Figure 3.8-3. Fuel that meets the criteria for Region 1-2 may be stored in Region 1-1 in a checkerboard (1 out of 2 cells with every other cell left vacant) loading configuration.
- c. Storage of fuel in Region 2-1 is restricted to assemblies that meet the burnup criteria in Figure 3.8-4.
- d. Storage of fuel in Region 2-2 is restricted to assemblies that meet the burnup criteria in Figure 3.8-5. Fuel that meets the criteria for Region 2-1 may be stored in Region 2-2 in "peripheral" cells. As shown in Figure 3.8-1, the peripheral cells are located along the west wall and are separated by at least 3 cells.
- 2. In the event any fuel assembly is found to be stored in a configuration other than specified, immediate action shall be initiated to:
- a. Verify the spent fuel storage pit boron concentration meets the requirements of Specification 3.8.D.3, and Amendment No. 2-8-4
- b. Return the stored fuel assembly to the specified configuration.
- 3. At all times the spent fuel storage pit boron concentration shall be at least 2000 ppm. With the boron concentration less than this value, all fuel movement within the spent fuel storage pit shall cease and immediate action shall be initiated to restore the boron concentration to at least the minimum specified. The required boron concentration shall be verified by chemical analysis at the frequency specified on Table 4.1-2.
- 4. During operations described in Specification 3.8.8, the spent fuel storage pit boron concentration shall be at least equal to that required in Specification 3.8.8.2. With the boron concentration less than the specified value either:
- a. Isolate the spent fuel storage pit from the refueling cavity, or
- b. Take actions required by Specification 3.8.B.12.
E. Specification 3.0.1 is not applicable to the requirements of Specification 3.8.
Basis The equipment and general procedures to be utilized during refueling are discussed in the FSAR. Detailed instructions, the above-specified precautions, and the design of the fuel-handling equipment incorporating built-in interlocks and safety features, provide assurance that no incident could occur during the refueling operations that would result in a hazard to public health and safety('). Whenever changes are not being made in core geometry, one flux monitor is sufficient. This permits maintenance of the instrumentation. Continuous monitoring of radiation levels and neutron flux provides immediate indication of an unsafe condition. The residual heat removal pump is used to maintain a uniform boron concentration.
The shutdown margin requirements will keep the core subcritical. During refueling, the reactor refueling cavity is filled with borated water. The minimum boron concentration of this water is the more restrictive of either 2000 ppm or else sufficient to maintain the reactor subcritical by at least 5% Ak/k in the cold shutdown condition with all rods inserted. These limitations are consistent with the initial conditions assumed for the boron dilution incident in the safety analyses. Periodic checks of refueling water boron concentration ensure the proper shutdown margin. The specifications allow the control room operator to inform the manipulator operator of any impending unsafe condition detected from the main control board indicators during fuel movement.
In addition to the above safeguards, interlocks are utilized during refueling to ensure safe handling.
An excess weight interlock is provided on the lifting hoist to prevent movement of more than one Amendment No. 3.8-5
fuel assembly at a time. The spent fuel transfer mechanism can accommodate only one fuel assembly at a time.
The 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> decay time following plant shutdown and the 23 feet of water above the top of the reactor vessel flanges are consistent with the assumptions used in the dose calculations for fuel-handling accidents both inside and outside of the containment. The analysis of the fuel handling accident inside and outside of the containment takes no credit for removal of radioactive iodine by charcoal filters.
The requirement for the fuel storage building charcoal filtration system to be operating when spent fuel movement is being made provides added assurance that the offsite doses will be within acceptable limits in the event of a fuel-handling accident. The additional month of spent fuel decay time will provide the same assurance that the offsite doses are within acceptable limits and therefore the charcoal filtration system would not be required to be operating.
The spent fuel storage pit water level requirement in Specification 3.8.C.2 provides approximately 24 feet of water above fuel assemblies stored in the spent fuel storage racks.
The fuel enrichment and burnup limits in Specification 3.8.D.1, the partial credit taken for Boraflex panels, and the boron requirements in Specification 3.8.D.3 assure the limits assumed in the spent fuel storage safety analysis will not be exceeded. The analysis (Ref. 2) takes credit for the amount of Boraflex predicted to be available through 2006.
The requirement that at least one RHR pump and heat exchanger be in operation ensures that 0
sufficient cooling capacity is available to maintain reactor coolant temperature below 140 F, and sufficient coolant circulation is maintained through the reactor core to minimize the effect of a boron dilution incident and prevent boron stratification.
The requirement to have two RHR pumps and heat exchangers operable when there is less than 23 feet of water above the vessel flange ensures that a single failure will not result in a complete loss of residual heat removal capability. With the head removed and at least 23 feet of water above the flange, a large heat sink is available for core cooling, thus allowing adequate time to initiate actions to cool the core in the event of a single failure.
References (1) FSAR Section 9.5.2 (2) Northeast Technology Corporation Report NET-1 73-01, "Criticality Analysis for Soluble Boron and Burnup Credit in the Con Edison Indian Point Unit No. 2 Spent Fuel Storage Racks."
Amendment No. 3.8-6
9n PP 9Jý 97 DF DL DJ GTON22 DC DE CP CF CM CK CK CH CH CF CF CD Cc BN BN BL BK I BJ BH BG BF BE BD BC AM AK AH AF AD AB PERIPHERAL CELL Figure 3.8-1 Spent Fuel Storage Rack Layout Amendment No.
40 30 20 10 0
1 2 3 4 5 Initial Enrichment, w/o U2..
Figure 3.8-2 Region 1 Limiting Burnup versus Initial Enrichment Amendment No.
25 20 Acceptable for Storage in Region 1-2 or Checkerboard
-a 0
15 Loading in Region 1-1 m
U 0
-~10 E
z Not Acceptable for Storage in Region 1-2 or Checkerboard Loading in Region 1-1 5
I 0
4.5 4.6 4.7 4.8 4.9 5 235 Initial Enrichment, w/o U Figure 3.8-3 REGION 1 MINIMUM NUMBER OF IFBA RODS VERSUS INITIAL ENRICHMENT Amendment No.
0 Years Cooling 60 5 Yr Cooling 10 Yr. Cooling 15Yr Cooling 50 20 Yr. Cooling t Al Acceptable for D Storage in Region 2-1 7 I 40 0
Storage inRgo ~ -
61 30 7-
/
L. 7 7
m "I
20 Accetabegofor Ntotag 10 "I,
I I . I 0 I I 1 2 3 4 5 Initial Enrichment, w/o U235 Figure 3.8-4 Region 2 Limiting Burnup versus Initial Enrichment Amendment No.
40 0 Cooling Time 5 Years Cooling
-- 10 Years Cooling
15YearsCooling
. 20 Years Cooling 30
,777
- 7
-7 D Acceptable for Storage in Region 2-2 7 7
(.9 20
,,/
CO 13 10
// Not Acceptable for Storage in Region 2-2
/
0 I I I I I II I I 1 2 3 4 5 Initial Enrichment, w/o U23 .
Figure 3.8-5 Region 2 Limiting Burnup versus Initial Enrichment Amendment No.
Table 4.1-2 Frequencies for Sampling Tests Maximum lime Check Frequency Between Tests
- 1. Reactor Coolant Samples Gross Activity (1) 5 daystweek (1) 3days Radiochemical (2) Monlhly 45 days E Determninalion Semi-annually (3) 30weeks Trhium Activity Weeldy (1) 10 days F,CI&O2 Weekly 10 days
- 2. Reactor Coolant Boron Boron Concenlration Twice/week 5 days
- 3. Refueling Water Storage Boron Concenlralion Monthly 45 days Tank Water Sample
- 4. Boric Add Tank Boron Concentralion Twice/week 5days
- 5. DELETED
- 6. DELETED
- 1. Accumulator Boron Concentration Monthly 45 days
- 8. Spent Fuel Pit Boron Concentralion Weeky 10 days
- 9. Secondary Coolant Iodine-131 Weeky (4) 10 days
- 10. Containment Iodine Iodine-131 and Continuous When NA*
Particulate Monitor Parliculate Activily Above Cold Shutdown (5) or Gas Monitor or Gross Gaseous Activity Amendment No. (Page I of 2)
5.4 FUEL STORAGE Applicability Applies to the capacity and storage arrays of new and spent fuel.
Objective To define those aspects of fuel storage relating to prevention of criticality in fuel storage areas.
Specifications
- 1. The spent fuel pit structure is designed to withstand the anticipated earthquake loadings as a Class I structure. The spent fuel pit has a stainless steel liner to ensure against loss of water.
2.A. The new fuel storage rack is designed so that it is inpossible to insert assemblies in other than an array of vertical fuel assemblies with a sufficient center-to-center distance between assemblies to assure Kf < 0.95, even if unborated water were used to fill the pit and with fuel assemblies containing a maxinmum enrichment of 5.0 weight percent U-235, and poisons, if necessary to meet the K, limit.
2.B. The spent fuel storage racks are designed and their loading maintained within the limits of Technical Specification 3.8.D.1, such that Kf < 1. 0 in unborated water and Kf, < 0.95 with credit for soluble boron and with the fuel assemblies containing a nmaxinm enrichment of 5.0 weight percent U-235 (or equivalent reactivity).
Amendment No- 5.4-1