ML081140177

From kanterella
Jump to navigation Jump to search

Tec Specs to Amedment 236, License No. DPR-64 for Indian Point, Unit 3
ML081140177
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 06/09/2008
From:
NRC/NRR/ADRO/DORL/LPLI-1
To:
tsw1
Shared Package
ml081140171 List:
References
TAC MD8206
Download: ML081140177 (3)


Text

(4) ENO pursuant to the Act and 10 CFR Parts 30, 40 and 70, Amdt. 203 to receive, possess, and use in amounts as required any 11/27/00 byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) ENO pursuant to the Act and 10 CFR Parts 30 and 70, to Amdt. 203 possess, but not separate, such byproduct and special 11/27/00 nuclear materials as may be produced by the operation of the facility.

C. This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level ENO is authorized to operate the facility at steady state reactor core power levels not-in excess of 3216 megawatts thermal (100% of rated power).

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 236, are hereby incorporated in the License. ENO shall operate the facility in accordance with the Technical Specifications.

(3) (DELETED) Amdt. 205 2-27-01 (4) (DELETED) Amdt. 205 2-27-01 D. (DELETED) Amdt.46 2-16-83 E .(DELETED) Amdt.37 5-14-81 F. This amended license is also subject to appropriate conditions by the New York State Department of Environmental Conservation in its letter of May 2, 1975, to Consolidated Edison Company of New York, Inc., granting a Section 401 certification under-the Federal Water Pollution Control Act Amendments of 1972.

Amendment No. 236

Facility Operating License No. DPR-64 Appendix A - Technical Specifications TABLE OF CONTENTS 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 3.4.2 RCS Minimum Temperature for Criticality 3.4.3 RCS Pressure and Temperature (P/T) Limits 3.4.4 RCS Loops-MODES 1 and 2 3.4.5 RCS Loops-MODE 3 3.4.6 RCS Loops-MODE 4 3.4.7 RCS Loops-MODE 5, Loops Filled 3.4.8 RCS Loops-MODE 5, Loops Not Filled 3.4.9 Pressurizer 3.4.10 Pressurizer Safety Valves 3.4.11 Pressurizer Power Operated Relief Valves (PORVs) 3.4.12 Low Temperature Overpressure Protection (LTOP) 3.4.13 RCS Operational LEAKAGE 3.4.14 RCS Pressure Isolation Valve (PIV) Leakage 3.4.15 RCS Leakage Detection Instrumentation 3.4.16 RCS Specific Activity 3.4.17 Steam Generator (SG) Tube Integrity 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.1 Accumulators 3.5.2 ECCS-Operating 3.5.3 ECCS -Shutdown 3.5.4 Refueling Water Storage Tank (RWST) 3.6 CONTAINMENT SYSTEMS 3.6.1 Containment

.3.6.2 Containment Air Locks 3.6.3 Containment Isolation Valves 3.6.4 Containment Pressure 3.6.5 Containment Air Temperature 3.6.6 Containment Spray System and Containment'Fan Cooler System 3.6.7 Recirculation pH Control System 3.6.8 Not Used 3.6.9 Isolation Valve Seal Water (IVSW) System 3.6.10 Weld Channel and Penetration Pressurization System (WC & PPS)

(continued)

INDIAN POINT 3 ii Amendment 236

Recirculation pH Control Systemi 3.6.7 3.6 CONTAINMENT SYSTEMS 3.6.7 Recirculation pH Control System LCO 3.6.7 The Recirculation pH Control System shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Recirculation pH Control A.1 Restore Recirculation 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> System inoperable. pH Control System to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND B.2 Be in MODE 5. 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.7.1 Perform a visual inspection of the eight sodium 24 months tetraborate storage baskets to verify each. of the following:

a. Each storage basket is in place and intact; and,
b. Collectively contain Ž 8096 pounds (160 cubic feet) of sodium tetraborate decahydrate, or equivalent.

INDIAN POINT 3 3.6.7-1 Amendment 236