MONTHYEARNG-18-0137, Inservice Inspection Report2018-12-11011 December 2018 Inservice Inspection Report NG-17-0042, Fifth Inservice Inspection Interval Program Plan2017-03-0707 March 2017 Fifth Inservice Inspection Interval Program Plan NG-17-0011, Submittal of Inservice Inspection Report2017-01-27027 January 2017 Submittal of Inservice Inspection Report NG-16-0128, Inservice Testing Program for the Fifth Ten-Year Interval2016-06-15015 June 2016 Inservice Testing Program for the Fifth Ten-Year Interval NG-15-0020, Inservice Inspection Report2015-02-19019 February 2015 Inservice Inspection Report NG-15-0003, Fifth Ten-Year Interval Inservice Testing Program Relief Requests2015-01-30030 January 2015 Fifth Ten-Year Interval Inservice Testing Program Relief Requests NG-13-0060, Inservice Inspection Report2013-02-21021 February 2013 Inservice Inspection Report NG-11-0320, Fourth 10-Year Inservice Inspection Plan2011-08-31031 August 2011 Fourth 10-Year Inservice Inspection Plan NG-11-0201, Report of Facility Changes, Tests and Experiments, Fire Plan Changes, and Commitment Changes2011-06-0808 June 2011 Report of Facility Changes, Tests and Experiments, Fire Plan Changes, and Commitment Changes NG-11-0058, Inservice Inspection Report for Cycle 22 and Refueling Outage No. 22 of the Fourth 10-Year ISI Interval2011-03-0303 March 2011 Inservice Inspection Report for Cycle 22 and Refueling Outage No. 22 of the Fourth 10-Year ISI Interval NG-09-0413, Submittal of Inservice Inspection Report2009-05-29029 May 2009 Submittal of Inservice Inspection Report NG-08-0141, Transmittal of Corrected Sections of the Fourth Ten Year Inservice Inspection Summary Report for Refueling Outage 202008-02-28028 February 2008 Transmittal of Corrected Sections of the Fourth Ten Year Inservice Inspection Summary Report for Refueling Outage 20 NG-08-0137, Request to Allow Use of the Provisions of IWA-4132 for Remainder of the Fourth Ten-Year Inservice Inspection Interval2008-02-28028 February 2008 Request to Allow Use of the Provisions of IWA-4132 for Remainder of the Fourth Ten-Year Inservice Inspection Interval NG-08-0135, Request for NRC Approval of Alternative to Nozzle to Vessel Weld and Inner Radius Examinations2008-02-28028 February 2008 Request for NRC Approval of Alternative to Nozzle to Vessel Weld and Inner Radius Examinations NG-07-0492, Inservice Inspection Report2007-06-12012 June 2007 Inservice Inspection Report NG-07-0255, Withdrawal of Relief Request to Use the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment2007-03-15015 March 2007 Withdrawal of Relief Request to Use the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment NG-06-0866, Responses to Requests for Additional Information and Revised Relief Requests NDE-R005 and NDE-R007 - Fourth 10-Year Inservice Inspection Program2006-12-21021 December 2006 Responses to Requests for Additional Information and Revised Relief Requests NDE-R005 and NDE-R007 - Fourth 10-Year Inservice Inspection Program NG-06-0439, Fourth 10-Year Inservice Inspection Plan2006-06-30030 June 2006 Fourth 10-Year Inservice Inspection Plan NG-06-0005, Fourth Ten-Year Interval Inservice Testing Program Relief Requests2006-01-0404 January 2006 Fourth Ten-Year Interval Inservice Testing Program Relief Requests NG-05-0427, Inservice Testing Program, Fourth Ten-Year Interval Update2005-08-0101 August 2005 Inservice Testing Program, Fourth Ten-Year Interval Update NG-05-0420, Inservice Inspection Report2005-07-29029 July 2005 Inservice Inspection Report NG-03-0577, Evaluation of Indication in Dollar Weld HCC-B0022003-08-0707 August 2003 Evaluation of Indication in Dollar Weld HCC-B002 NG-03-0509, Inservice Inspection Report2003-07-18018 July 2003 Inservice Inspection Report NG-02-0259, Submittal of Proposed Risk Informed Inservice Inspection Program for the Duane Arnold Energy Center2002-03-29029 March 2002 Submittal of Proposed Risk Informed Inservice Inspection Program for the Duane Arnold Energy Center 2018-12-11
[Table view] Category:Letter type:NG
MONTHYEARNG-24-0004, 2023 Annual Radiological Environmental Operating Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Operating Report NG-24-0003, Submittal of 2023 Annual Radioactive Material Release Report2024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Material Release Report NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update NG-24-0002, 2023 Annual Exposure Report - Form 5s2024-03-0606 March 2024 2023 Annual Exposure Report - Form 5s NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, And Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 And Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0021, Registration of Independent Spent Fuel Installation Storage Casks2022-02-24024 February 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0014, Registration of Independent Spent Fuel Installation Storage Casks2022-02-10010 February 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0009, Registration of Independent Spent Fuel Installation Storage Casks2022-01-20020 January 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0001, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister2022-01-0606 January 2022 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61BTH Type 2 Dry Shielded Canister NG-21-0038, Registration of Independent Spent Fuel Installation Storage Casks2021-12-22022 December 2021 Registration of Independent Spent Fuel Installation Storage Casks NG-21-0035, Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister2021-12-10010 December 2021 Supplement to Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister NG-21-0030, Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister2021-10-21021 October 2021 Exemption Request for Failed Fuel Can Weight in a Certificate of Compliance 1004 Renewed Amendment 17 61 Bth Type 2 Dry Shielded Canister NG-21-0028, Request for Approval of NextEra Energy Duane Arnold, Llc'S Decommissioning Quality Assurance Program Revision 02021-07-30030 July 2021 Request for Approval of NextEra Energy Duane Arnold, Llc'S Decommissioning Quality Assurance Program Revision 0 NG-21-0010, License Amendment Request (TSCR-192): Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme2021-06-28028 June 2021 License Amendment Request (TSCR-192): Independent Spent Fuel Storage Installation (ISFSI) Emergency Plan and Emergency Action Level Scheme NG-21-0026, CFR 72.48 Report of Changes. Tests. and Experiments2021-06-16016 June 2021 CFR 72.48 Report of Changes. Tests. and Experiments NG-21-0011, Submittal of 2020 Annual Radiological Environmental Operating Report2021-05-0404 May 2021 Submittal of 2020 Annual Radiological Environmental Operating Report NG-21-0009, Report of Facility Changes. Tests and Experiments. and Commitment Changes2021-04-27027 April 2021 Report of Facility Changes. Tests and Experiments. and Commitment Changes NG-21-0021, Supplement to License Amendment Request (TSCR-185): Application to Revise Operating License to Remove Cyber Security Plan Requirements2021-04-22022 April 2021 Supplement to License Amendment Request (TSCR-185): Application to Revise Operating License to Remove Cyber Security Plan Requirements NG-21-0006, 2021 Annual Decommissioning and Spent Fuel Management Funding Status Report2021-03-31031 March 2021 2021 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-21-0005, NextEra Energy Duane Arnold, LLC - Transmittal of the DAEC Defueled Safety Analysis Report Revision 02021-03-29029 March 2021 NextEra Energy Duane Arnold, LLC - Transmittal of the DAEC Defueled Safety Analysis Report Revision 0 NG-20-0094, License Amendment Request (TSCR-189): Revision to Facility License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool2021-02-19019 February 2021 License Amendment Request (TSCR-189): Revision to Facility License and Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool NG-21-0004, Response to Request for Additional Information Related to Post Shutdown Decommissioning Activities Report2021-02-0505 February 2021 Response to Request for Additional Information Related to Post Shutdown Decommissioning Activities Report NG-20-0078, Update to Spent Fuel Management Plan Pursuant to 10 CFR 50.54(bb)2021-01-13013 January 2021 Update to Spent Fuel Management Plan Pursuant to 10 CFR 50.54(bb) NG-20-0101, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 Pandemic2020-12-29029 December 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID-19 Pandemic NG-20-0099, Response to Request for Additional Information Relating to License Amendment Request (TSCR-187): Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2020-12-0101 December 2020 Response to Request for Additional Information Relating to License Amendment Request (TSCR-187): Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme NG-20-0093, Supplement to License Amendment Request (TSCR-187): Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2020-10-29029 October 2020 Supplement to License Amendment Request (TSCR-187): Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme NG-20-0090, Certification of Permanent Removal of Fuel from the Reactor Vessel for Duane Arnold Energy Center2020-10-12012 October 2020 Certification of Permanent Removal of Fuel from the Reactor Vessel for Duane Arnold Energy Center NG-20-0083, Registration of Independent Spent Fuel Installation Storage Casks2020-10-12012 October 2020 Registration of Independent Spent Fuel Installation Storage Casks NG-20-0069, Response to Request for Additional Information Relating to Request for Exemption from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E2020-10-0707 October 2020 Response to Request for Additional Information Relating to Request for Exemption from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E NG-20-0082, Registration of Independent Spent Fuel Installation Storage Casks2020-09-28028 September 2020 Registration of Independent Spent Fuel Installation Storage Casks NG-20-0071, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Evaluated Exercise Requirements Due to COVID-19 Pandemic2020-09-22022 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Evaluated Exercise Requirements Due to COVID-19 Pandemic NG-20-0077, Registration of Independent Spent Fuel Installation Storage Casks2020-09-10010 September 2020 Registration of Independent Spent Fuel Installation Storage Casks 2024-05-08
[Table view] |
Text
NEXTeraM ENERGY~
DUANE ARNOLD December 11, 2018 NG-18-0137 10 CFR 50.55a U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket No. 50-331 Renewed Op. License No. DPR-49 lnservice Inspection Report In accordance with the Code of Federal Regulations, Title 10, Part 50.55a, NextEra Energy Duane Arnold, LLC, submits the attached lnservice Inspection (ISi) Summary Report (Owner's Activity Report, Form OAR-1) for the Duane Arnold Energy Center (DAEC).
This report has been prepared in accordance with Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, 2007 Edition through 2008 Addenda, and ASME Code Case N-532-5. This report includes the examinations performed at the DAEC during Cycle 26 operations and Refueling Outage RF026 of the fifth 10-year ISi interval.
This letter contains no new commitments nor revises any previous commitments.
If you have any questions, please contact J. Michael Davis at (319) 851-7032.
5J~~_o Dean Curtland Site Director, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Attachment cc: Administrator, Region Ill, USNRC Project Manager, DAEC, USNRC Senior Resident Inspector, DAEC, USNRC NextEra Energy Duane Arnold, LLC , 3277 DAEC Road, Palo, IA 52324
Attachment for NG-18-0137 Page 1 of 6 NextEra Energy Duane Arnold, LLC Duane Arnold Energy Center lnservice Inspection Summary Report For RF026 Duane Arnold Energy Center 3277 DAEC Rd Palo, IA 52324 Date of Commercial Service February 1, 1975
Attachment for NG-18-0137 Page 2 of 6 INDEX Summary ............................................................................................................ Section 1 OAR-1 Form, Owner's Activity Report.. .............................................................. Section 2 Table 1 .............................................................................................................. Section 3 Table 2 .............................................................................................................. Section 4
Attachment for NG-18-0137 Page 3 of 6 Section 1 Summary The Duane Arnold Energy Center, Fifth Ten-Year lnservice Inspection (ISi) Plan was developed to comply with 10 CFR 50.55a(g), which implements, by reference, the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 2007 Edition through the 2008 Addenda.
The following summary report is being submitted pursuant to the reporting requirements of ASME Section XI as amended by ASME Code Case N-532-5, "Repair/Replacement Activity Documentation Requirements and lnservice Summary Report Preparation and Submission Section XI, Division 1."
This summary report contains the Form OAR-1 Owner's Activity Report and Tables 1 and 2 of the ASME Code Case N-532-5 with information for Duane Arnold Energy Center during Cycle 26 and Refueling Outage RF026. This is the fifth inspection interval, first period, first outage and includes Repair/Replacement Activities from October 31, 2016 to September 21, 2018.
Attachment for NG*18..0137 Page 4 of&
Section 2 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number ISl-PDA-RF026-2018 Plant Duane Arnold Enerav Center. 3277 DAEC Road. palo. IA 52324 Unit No. 1 Commercial Service Date February 1. 1975 Refueling Outage No..... R....F0 ....2-..6....__ _
Current Inspection Interval IS! - Fifth Interval IWE - Third Interval Current Inspection period !SI - First Period IWE - First Period Edition and Addenda of Section XI applicable to the Inspection plan 2007 Edition through 2008 Addenda Date and revision of inspection plan ISi - August 29. 2018 Rev. 2 IWE- September 6. 2018 Rev.O Edition and Addenda of Section XI applicable to repairs and replacements, if different than the Inspection plan Same Code Cases used: N-508-4 N-532-5 N-613-2 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made In this Owner's Activity Report are correct; (b) and the examinations and tests met the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluaUons supporting the completion of RF026 conform to the requirements of Section XI.
r-Signed ~ ";;> (I:>!',.. /.;,, ...-w;" / .t:~< '* *. /1'e.~
,e ~ ~ ,... OWner or OWner's Designee, Title
/l Date ___l._G:..,...*;/_~..,.." ~c-."..
) '
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by The Hartford Steam Boller Inspection and Insurance Company of Hartford, Connecticut have Inspected the Items described In this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the inspector nor his employer makes any warranty, expressed or Implied, concerning the repair/replacements activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
~ _:::;;z.. ~.,.--- Commissions NB /'MW A:z.. N ;J:.
~nae National Board, siate, Province and Endorsements Date tt /,, i /za11{
L
Attachment for NG-18-0137 Page 5of6 Section 3 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number N/A N/A N/A
Attachment for NG-18-0137 Page 6 of 6 Section 4 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Date Repair/Replacement Item Description Description of Work Class Completed Plan Number GBC002, RHRSW, 3 Replaced Elbow 3/21/17 40373671-01 45 Degree Elbow Replace %" valve &
3 V13-0057, %" Valve 08/17/18 40603942-01 short section of piping CV4415, Remove Unacceptable 1 10/04/18 40598471-10 Inboard MSIV PT Indications Replaced a short GBC001, 3 section of 16 pipe due 09/09/18 40568577-14 RHRSW Piping to wall thinning DCA014, 1 Replaced Hanger Rod 09/25/18 40622076-01 Rod Hanger