ITAAC Closure Notification on Completion of ITAAC 2.3.03.02 (Index Number 319)
ML22314A228
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/10/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
ND-22-0730, ITAAC 2.3.03.02
Download: ML22314A228 (1)


Text

Jamie M. Coleman 7825 River Road

,>-. Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6926 tel

Docket No.: 52-026

ND-22-0730 10 CFR 52.99(c)(1)

U.S. Nuc lea r Regulatory Commission Document Control Desk Washington, DC 20555-0001

Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 ITAAC Closu re Notification on Completion of ITAAC 2.3.03.02 (Index Number 319)

Ladies and Gentlemen :

In accordance with 1 O CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 4 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.3.03.02 (Index Number 319) for verifying the ancillary diesel generator fuel tank can withstand a seismic event. The closure process fo r this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 1 O CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 1 O CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848 - 6991.

Respectfully submitted,

!{Jffe!l~~

Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 4 Completion of ITAAC 2.3.03.02 [Index Number 319)

JMC / PAW / sfr U.S. Nuclear Regulatory Commission ND-22-0730 Enclosure Page 2 of 2

cc: Regional Administrator, Region II Director, Office of Nuclear Reactor Regulation (NRR)

Director, Vogtle Project Office NRR Senior Resident Inspector - Vogtle 3 & 4 U.S. Nuclear Regulatory Commission ND-22-0730 Enclosure Page 1 of 3

Southern Nuclear Operating Company ND-22-0730 Enclosure

Vogtle Electric Generating Plant (VEGP) Unit 4 Completion of ITAAC 2.3.03.02 [Index Number 319]

U.S. Nuclear Regulatory Commission ND-22-0730 Enclosure Page 2 of 3

ITAAC Statement

Design Commitment

2. The ancillary diesel generator fuel tank can withstand a seismic event.

Inspections, Tests, Analyses

Inspection will be performed for the existence of a report verifying that the as-built ancillary diesel generator fuel tank and its anchorage are designed using seismic Category II methods and criteria.

Acceptance Criteria

A report exists and concludes that the as-built ancillary diesel generator fuel tank and its anchorage are designed using seismic Category II methods and criteria.

ITAAC Determination Basis

An inspection is conducted to verify that the ancillary diesel generator fuel tank can withstand a seismic event. The inspection confirms the existence of a report verifying that the as-built ancillary diesel generator fuel tank and its anchorage are designed using the seismic Category II methods and criteria described in VEGP 3&4 Updated Final Safety Analysis Report, Section 3.7, Seismic Design (Reference 1 ). VEGP 3&4 Updated Final Safety Analysis Report, Table 3.2-3, AP1000 Classification of Mechanical and Fluid Systems, Components and Equipment (Reference 2) identifies the ancillary diesel generator fuel tank as Seismic Category II.

The ancillary diesel generator fuel tank supplier issued a seismic analysis report that is referenced in the Ancillary Diesel Generator Fuel Tank and Anchorage As-Built Report SV4-1010 -GCR-003 (Reference 3). The as-built report was reviewed to verify that the ancillary diesel generator fuel tank and anchorage meets seismic Category II requirements using the seismic Category II methods and criteria described in Reference 1. Inspections were performed following ancillary diesel generator fuel tank installation to confirm that the as-built tank and its anchorage are installed per design report specifications. Inspection non-conformances are documented and dispositioned to ensure the as-built tank and its anchorage were designed and constructed to seismic Category II methods and criteria.

The Ancillary Diesel Fuel Tank and Anchorage As-Built Report SV4-1010-GCR-003 documents that the as-built ancillary diesel generator fuel tank and its anchorage are designed using seismic Category II methods and criteria. This report is available for NRC inspection as part of the ITAAC Completion Package (Reference 4).

ITAAC Finding Review

In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found that there are no relevant ITAAC findings associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package (Reference 4) and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-22-0730 Enclosure Page 3 of 3

IT AAC Completio n Statemen t

Based on the above information, SNC hereby notifies the NRC that ITAAC 2.3.03.02 was performed for VEGP Unit 4 and that the prescribed acceptance cr iteria are met.

Systems, structures and components verified as part of this ITAAC are being maintained in their as designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (availa bl e fo r NRC in spection)

1. VEGP Units 3&4 UFSAR, Rev. 11.1, Section 3.7, Seismic Design 2. VEGP Units 3&4 UFSAR, Rev. 11. 1, Table 3.2-3, AP1000 Classification of Mechanical and Fluid Systems, Components and Equipment
3. SV4-101 0-GCR-003, Rev. 0, Vogtle Unit #4 As-Built Summary Report: DOS Ancillary Tank Ancho rage Design