1 Lois James From:
Lois James Sent:
Friday, March 21, 2025 3:25 PM To:
akucuk@epri.com Cc:
RidsNrrOd Resource; RidsNrrDnrl Resource; RidsNrrDnrlNphp Resource; RidsNrrDorlLlpb Resource; RidsNrrLADHarrison Resource; RidsNrrDraApob Resource; RidsNrrDss Resource; RidsNrrDssScpb Resource; RidsACRS_MailCTR Resource; RidsNrrDssSfnb Resource; RidsNrrDorl Resource; RidsNrrDra Resource; RidsNrrDnrlNvib Resource; RidsNrrDssSfnb Resource; James Delosreyes; Ekaterina Lenning; Demetrius Murray; John Lehning; Brandon Wise; Seung Min; David Rudland; Matthew Leech; Gerond George; Scott Krepel; Matthew Mitchell; Antonios Zoulis; Michele Sampson; Samuel Lee; Bo Pham; Aida Rivera-Varona; Jamie Pelton; Meena Khanna; Antonios Zoulis; Scott Burnell; Dave McIntyre; fsmith@epri.com; AKucuk@epri.com
Subject:
RE: Final RAI-EPRI Rpt 3002028675(NP)/3002028674(P), LOCA Analysis of FFRD for W 2-,
3-, 4-Loop Plants - Evaluation of Cladding Rupture in High Burnup Fuel Rods Susceptible to Fine Fragmentation-Rev 0 (EPID L-2024-NTR-0003)
Please note that EPRIs response to these RAIs are due within 90 days of this email.
From: Lois James <Lois.James@nrc.gov>
Sent: Friday, March 21, 2025 1:30 PM To: akucuk@epri.com Cc: RidsNrrOd Resource <RidsNrrOd.Resource@nrc.gov>; RidsNrrDnrl Resource <RidsNrrDnrl@nrc.gov>;
RidsNrrDnrlNphp Resource <RidsNrrDnrlNphp.Resource@nrc.gov>; RidsNrrDorlLlpb Resource
<RidsNrrDorlLlpb.Resource@nrc.gov>; RidsNrrLADHarrison Resource <RidsNrrLADHarrison.Resource@nrc.gov>;
RidsNrrDraApob Resource <RidsNrrDraApob.Resource@nrc.gov>; RidsNrrDss Resource <RidsNrrDss.Resource@nrc.gov>;
RidsNrrDssScpb Resource <RidsNrrDssScpb.Resource@nrc.gov>; RidsACRS_MailCTR Resource
<RidsACRS_MailCTR.Resource@nrc.gov>; RidsNrrDssSfnb Resource <RidsNrrDssSfnb@nrc.gov>; RidsNrrDorl Resource
<RidsNrrDorl.Resource@nrc.gov>; RidsNrrDra Resource <RidsNrrDra.Resource@nrc.gov>; RidsNrrDnrlNvib Resource
<RidsNrrDnrlNvib@usnrc.mail.onmicrosoft.com>; RidsNrrDssSfnb Resource <RidsNrrDssSfnb@nrc.gov>; James Delosreyes <James.Delosreyes@nrc.gov>; Lois James <Lois.James@nrc.gov>; Ekaterina Lenning
<Ekaterina.Lenning@nrc.gov>; Demetrius Murray <Demetrius.Murray@nrc.gov>; John Lehning
<John.Lehning@nrc.gov>; Brandon Wise <Brandon.Wise@nrc.gov>; Seung Min <Seung.Min@nrc.gov>; David Rudland
<David.Rudland@nrc.gov>; Matthew Leech <Matthew.Leech@nrc.gov>; Gerond George <Gerond.George@nrc.gov>;
Scott Krepel <Scott.Krepel@nrc.gov>; Matthew Mitchell <Matthew.Mitchell@nrc.gov>; Antonios Zoulis
<Antonios.Zoulis@nrc.gov>; Michele Sampson <Michele.Sampson@nrc.gov>; Samuel Lee <Samuel.Lee@nrc.gov>; Bo Pham <Bo.Pham@nrc.gov>; Aida Rivera-Varona <Aida.Rivera-Varona@nrc.gov>; Jamie Pelton
<Jamie.Heisserer@nrc.gov>; Meena Khanna <Meena.Khanna@nrc.gov>; Antonios Zoulis <Antonios.Zoulis@nrc.gov>;
Scott Burnell <Scott.Burnell@nrc.gov>; Dave McIntyre <dave.mcintyre@nrc.gov>; fsmith@epri.com; AKucuk@epri.com
Subject:
Final RAI-EPRI Rpt 3002028675(NP)/3002028674(P), LOCA Analysis of FFRD for W 2-, 3-, 4-Loop Plants -
Evaluation of Cladding Rupture in High Burnup Fuel Rods Susceptible to Fine Fragmentation-Rev 0 (EPID L-2024-NTR-0003)
Dr. Aylin Kucuk Program Manager, Nuclear Fuels Electric Power Research Institute Palo Alto Office 3420 Hillview Ave.
Palo Alto, CA 94304-133
ML24170A812), the NRC accepted the EPRI topical reports (TRs) for review and approval. The NRC acceptance package includes completion forms and schedules for three TRs, and the withholding determination for the proprietary TR.
The NRC staff the Nuclear Methods and Fuel Analysis Branch (SFNB) in the Division of Safety Systems (DSS) is in the process of reviewing your application. Based on our review, the NRC staff has identified the attached draft requests for additional information (RAIs).
The staffs request contains some proprietary materials. The proprietary contents are identified using a
(( yellow highlighted, bolded, double bracketed )) text format. Consistent with the Commission proprietary withholding criteria in 10 CFR 2.390, the staff is protecting the identified proprietary material from public disclosure. For the redacted version, publicly available version of the RAI, the protected material will be deleted from the bolded brackets (i.e., designated by a blank (( )) bracketed format). The proprietary RAIs have been placed in the NRC BOX and Kurshad Muftuoglu and Fred Smith have been given access. The nonproprietary version of the RAIs will be publicly available within 6 business days.
These requests for additional information were discussed with Kurshad Muftuoglu of your staff, and a mutually agreeable date for the response is within 60 days from the date of this email.
If you have any questions, please contact me by e-mail Lois.James@nrc.gov.
Sincerely, James Delosreyes, Project Manger Office of Nuclear Reactor Regulation (NRR)
U.S. Nuclear Regulatory Commission Lois.James@nrc.gov Docket No. 99902021
Enclosure:
As stated ADAMS Accession Nos.: ML25080A216 (pkg); ML25080A217 (email);
ML25080A218 (PROPRIETARY RAIs - nonpublic ); ML25080A219 (Nonproprietary RAIs)
+via RAI App *via email NRR-106 OFFICE NRR/DORL/LLPB/PM NRR/DSS/SNFB/BC DORL/LLPB/BC DORL/LLPB/PM NAME LJames+
SKrepel+
GGeorge+
LJames6236 DATE 02/10/2025 01/30/2025 02/18/2025 03/21/2025