Annual Assessment Letter for Turkey Point Nuclear Generating Units 3 & 4 - Report 05000250/2024006 and 05000251/2024006
ML25066A149
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/11/2025
From: Shawn Smith
NRC/RGN-II/DORS
To: Coffey R
Florida Power & Light Co
References
IR 2024006
Download: ML25066A149 (7)


Text

March 11, 2025

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR TURKEY POINT NUCLEAR GENERATING, UNITS 3 & 4 - REPORT 05000250/2024006 AND 05000251/2024006

Dear Robert Coffey:

The NRC has completed its end-of-cycle performance assessment of Turkey Point Nuclear Generating, Units 3 & 4, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Turkey Point Nuclear Generating, Units 3 & 4, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2026.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 404-997-4890 with any questions you have regarding this letter.

Sincerely, Steven P. Smith, Chief Projects Branch 6 Division of Operating Reactor Safety Docket Nos. 05000250 and 05000251 License Nos. DPR-31 and DPR-41 Enclosure:

Turkey Point Activity/Inspection Plan (3/1/2025 - 12/31/2026)

cc w/ encl: Distribution via LISTSERV Signed by Smith, Steven on 03/07/25

ML25066A149 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DORS RII/DORS NAME P. Carman S. Smith DATE 03//25 03/7/25

Site Inspection Activity Plan Enclosure 07200062 - Turkey Point (ISFSI)

03/01/2025 - 12/31/2026 PREOPERATIONAL TESTING OF AN ISFSI

10/6/2025 10/10/2025 IP 60853 000999 Onsite Fabrication of Components and Construction of an Independent Spent Fuel Storage Installation 10/6/2025 10/10/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations 11/3/2025 11/7/2025 IP 60854 001000 Preoperational Testing Of An ISFSI 11/3/2025 11/7/2025 IP 60856 001003 Review of 10 CFR 72.212(b) Evaluations 11/10/2025 11/14/2025 IP 60854 001000 Preoperational Testing Of An ISFSI Unit Start End Activity CAC Title Staff Count

Turkey Point 03/01/2025 - 12/31/2026 RP OCCUPATIONAL RADIATION SAFETY BASELINE INSPECTION

3,4 3/3/2025 3/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 3/3/2025 3/7/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3,4 3/3/2025 3/7/2025 IP 71124.04 000728 Occupational Dose Assessment 3,4 3/3/2025 3/7/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 3,4 3/3/2025 3/7/2025 IP 71151 000746 Performance Indicator Verification 3,4 3/31/2025 4/4/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 3/31/2025 4/4/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 3,4 3/31/2025 4/4/2025 IP 71124.04 000728 Occupational Dose Assessment 3,4 3/31/2025 4/4/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 3,4 3/31/2025 4/4/2025 IP 71151 000746 Performance Indicator Verification TURKEY POINT RETAKE EXAM

3,4 3/10/2025 3/13/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

SECURITY BASELINE INSPECTION

3,4 5/19/2025 5/22/2025 IP 71130.02 000734 Access Control 3,4 5/19/2025 5/22/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 3,4 5/19/2025 5/22/2025 IP 71130.07 000739 Security Training 3,4 5/19/2025 5/22/2025 IP 71130.09 001656 Security Plan Changes 3,4 5/19/2025 5/22/2025 IP 71151 001338 Performance Indicator Verification FOCUSED ENGINEERING INSPECTION (FPTI)

3,4 6/9/2025 6/13/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

3,4 6/23/2025 6/27/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

TURKEY POINT INITIAL EXAM

3,4 7/13/2025 7/19/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

3,4 8/17/2025 8/30/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

PROBLEM IDENTIFICATION AND RESOLUTION

3,4 7/14/2025 7/18/2025 IP 71152B 000747 Problem Identification and Resolution 3,4 7/28/2025 8/1/2025 IP 71152B 000747 Problem Identification and Resolution CYBER SECURITY INSPECTION

TURKEY POINT REQUAL INSPECTION

3,4 8/4/2025 8/8/2025 IP 71130.10 000741 Cybersecurity Unit Start End Activity CAC Title Staff Count UNIT 4 IN-SERVICE INSPECTION +SG

4 3/10/2025 3/21/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Site Inspection Activity Plan

3,4 10/6/2025 10/10/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EMERGENCY PREPAREDNESS PROGRAM INSPECTION

3,4 1/12/2026 1/16/2026 IP 71114.02 000717 Alert and Notification System Testing 3,4 1/12/2026 1/16/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 3,4 1/12/2026 1/16/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 3,4 1/12/2026 1/16/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness 3,4 1/12/2026 1/16/2026 IP 71151 001397 Performance Indicator Verification UNIT 3 IN-SERVICE INSPECTION +SG

RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION

3,4 2/23/2026 2/27/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 3,4 3,4 2/23/2026 2/23/2026 2/27/2026 2/27/2026 IP 71124.08 IP 71151 000732 000746 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Performance Indicator Verification FOCUSED ENGINEERING INSPECTION (CGD)

3,4 4/13/2026 4/17/2026 IP 71111.21N.03 001808 Commercial Grade Dedication 3,4 4/27/2026 5/1/2026 IP 71111.21N.03 001808 Commercial Grade Dedication SECURITY BASELINE INSPECTION

3,4 5/18/2026 5/21/2026 IP 71130.02 000734 Access Control 3,4 5/18/2026 5/21/2026 IP 71130.09 001656 Security Plan Changes 3,4 5/18/2026 5/21/2026 IP 71151 001338 Performance Indicator Verification RP PUBLIC RAD SAFETY BASELINE INSPECTION

3,4 7/13/2026 7/17/2026 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 3,4 7/13/2026 7/17/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program 3,4 7/13/2026 7/17/2026 IP 71151 000746 Performance Indicator Verification TURKEY POINT INITIAL LICENSE EXAM

3,4 6/21/2026 6/27/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

3,4 7/19/2026 8/1/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

TARGET SET INSPECTION

3,4 11/3/2025 11/6/2025 IP 71130.14 000743 Review of Power Reactor Target Sets

2/23/2026 3/6/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)