Text
August 26, 2024 FS-24-0074 Page 1 of 2 Orano Federal Services LLC 32125 32nd Avenue S Suite 220 Federal Way WA 98001 Tel: +1 253-552-1322 ATTN: Document Control Desk Director, Division of Fuel Management (DFM)
Storage and Transportation Licensing Branch (STLB)
U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Submittal of BEA Research Reactor Package CoC Amendment and CoC Renewal Request, Docket No. 71-9341, EPID L-2023-LLA-0090
REFERENCES:
- 1) NRC Certificate of Compliance for the Model No. BEA Research Reactor (BRR) Package, USA/9341/B(U)F-96, Revision 10, NRC Accession Number ML22266A276, September 2022.
- 2) Quality Assurance Program Approval for Orano Federal Services LLC, NRC Accession Number ML24170B005, June 2024.
Dear Mr. Saverot:
Orano Federal Services LLC (Orano FS) hereby submits for approval a request to amend and renew the BEA Research Reactor (BRR) Package CoC [1]. The associated Safety Analysis Report (SAR), Revision 19, Docket No. 71-9341 (Enclosure 1) is being amended to add to the list of approved contents two general groups of payloads:
- 1. Research reactor type ATR, MITR-II, and MURR Low Enriched Uranium versions of currently authorized HEU versions of the same fuels and;
- 2. To add encapsulated and segmented PWR fuel rod segments within a new basket known as the Rods-In-Tubes Canister (RITC) basket The revised SAR includes structural, thermal, shielding, and criticality evaluations for the new payloads. All changes are marked with a revision bar in the right margin. There is one new SAR drawing, drawing 1910-01 SAR, which adds the RITC Basket and other necessary hardware components.
To assist in evaluating the revised SAR, a change summary list is included as. The BRR package complies with all applicable requirements of 10 CFR 71. The Orano FS quality assurance program, approved by the NRC satisfies the provisions of Part 71, Subpart H Quality Assurance [2].
Also, to ensure timely renewal of the BRR package CoC, this submission also requests renewal of the existing Revision 10 CoC [1] prior to the February 28, 2025, expiration date. If the CoC has not been amended by this date, then we would request a renewal of the current Revision 10 CoC.
August 26, 2024 FS-24-0074 Page 2 of 2 Orano Federal Services LLC 32125 32nd Avenue S Suite 220 Federal Way WA 98001 Tel: +1 253-552-1322 Should you have any questions regarding this submittal, please contact me at (233) 552-1322 or via email (chris.backus@orano.group).
Yours Truly, 8/26/2024 Chris Backus Licensing Manager Orano Federal Services LLC Copies (per email):
Pierre Saverot, Project Manager, NRC Rich Smith, Project Manager, Orano Federal Services LLC Eric C Woolstenhulme, Program Manager, Idaho National Laboratory Edward Mai, Manager, Idaho National Laboratory
Enclosures:
- BEA Research Reactor Package Safety Analysis Report, Revision 19 : BEA Research Reactor Package Table of Changes for BRR SAR, Revision 19 Digitally signed by BACKUS Christopher