|
---|
Category:Letter
MONTHYEARML24220A1502024-10-0909 October 2024 Examination Report Letter No. 50-020/OL-24-02 Massachusetts Institute of Technology ML24220A1512024-10-0909 October 2024 Examination Result Letter No 50 020 OL 24 02 Massachusetts Institute of Technology IR 05000020/20242012024-09-12012 September 2024 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000020/2024201 ML24199A1082024-07-23023 July 2024 Examination Confirmation Letter No. 50-020/OL-24-02, Massachusetts Institute of Technology ML24052A2102024-06-0606 June 2024 Examination Result Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML24127A1012024-04-26026 April 2024 Mit - Update of Professor Ian A. Waitz Named as Mit Vice President for Research ML24127A1002024-04-24024 April 2024 Mit - Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor ML24094A0482024-03-29029 March 2024 Mit Nuclear Reactor Lab., Annual Report for 2023, Per Technical Specification 7.7.1 ML24081A1642024-03-11011 March 2024 Massachusetts Institute of Technology, NF-0343 & NW-0681 - Submittal of Rescinding Notice of Cancellation ML24022A0972024-01-22022 January 2024 Massachusetts Institute of Technology– Change of Facility Backup Project Manager ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology IR 05000020/20232032023-11-21021 November 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023203 ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology IR 05000020/20232012023-10-12012 October 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2023201 IR 05000020/20232022023-09-27027 September 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000020/2023202 ML23194A0412023-07-11011 July 2023 Mit Research Reactor - Duties of Reactor Superintendent ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML23094A1102023-03-30030 March 2023 Massachusetts Institute of Technology (Mit), Submittal of Annual Report for 2022, Technical Specification 7.7.1 ML23072A0242023-03-0707 March 2023 Mit, Nuclear Reactor Lab., Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor IR 05000020/20222012023-02-0707 February 2023 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2022201 ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML22095A2412022-03-31031 March 2022 Annual Report for the Mit Research Reactor for the Period from January 1, 2021, to December 31, 2021 ML22062B0422022-02-10010 February 2022 Proposal for Conversion to Low Enriched Uranium (Leu), Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology IR 05000020/20212032021-11-0909 November 2021 Massachusetts Institutes of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000020/2021203 IR 05000020/20212012021-09-30030 September 2021 Massachusetts Institute of Technology - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000020/2021201 ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21165A1542021-05-28028 May 2021 Mit - Emergency Plan and Procedures, 10 CFR 50.54(q)(5) ML21140A3622021-05-17017 May 2021 Massachusetts Institute of Technology (Mit) - Supplement to Response to the Request for Additional Information for Battery Upgrade License Amendment Request (EPID: L-2021 -NFA-0000) ML21132A2512021-05-0606 May 2021 Massachusetts Institute of Technology, License No. R-37, Docket No. 50-20, Reportable Occurrence 50-20/2021-: Operation with Less than the Required Staffing on Site; NRC OPS Center Log EN 55212 ML21112A1672021-04-12012 April 2021 Massachusetts Institute of Technology - Physical Security Plan Revision Regarding Biometric Readers ML21105A3602021-04-0707 April 2021 Duties of Reactor Superintendent ML21099A1132021-03-31031 March 2021 Massachusetts Institute of Technology - Annual Report, Docket No. 50-20, License R-37, Technical Specification 7.7.1 ML21091A2082021-03-24024 March 2021 Mit Nuclear Reactor Lab - Response to Request for Additional Information for Battery Upgrade License Amendment Request ML21076A0232021-03-18018 March 2021 Requests for Additional Information - Related to License Amendment Request to Replace Emergency Power System Batteries ML21070A1852021-03-0202 March 2021 Mit Nuclear Reactor Laboratory, License Amendment Request Regarding Emergency Battery Surveillances in Technical Specification 4.6, Docket No. 50-20, License R-37 ML21063A2552021-02-25025 February 2021 Proposal for Conversion to Low Enriched Uranium (Leu), :Mit Research Reactor, Docket No. 50-20, 10 CFR 50.64 (c)(2)(ii) of That Paragraph ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML21036A0852021-02-19019 February 2021 Massachusetts Institute of Technology - Acceptance of License Amendment Request to Revise Surveillance Frequency During Extended Reactor Shutdown ML21035A2582021-01-29029 January 2021 Massachusetts Institute of Technology (Mit), Supplement to Technical Specifications Surveillance Frequency Definition Update for Improved Compliance Under 10 CPR 50.36(c)(3) ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20307A4202020-11-0505 November 2020 Granting of Extension Request to Supplement License Amendment to Revise Surveillance Requirement Frequency ML20304A1172020-10-19019 October 2020 Time Extension Request for LAR on Technical Specifications Surveillance Frequency Update for Improved Compliance Under 10 CFR 50.36(c)(3) for the Mit Research Reactor ML20248H5682020-09-22022 September 2020 Mit Research Reactor Routine Inspection Report with Enforcement Discretion (EA-20-109) - August 2020 ML20161A3342020-07-24024 July 2020 Massachusetts Institute of Technology - Issuance of Amendment NO.44 to Renewed Facility Operation License No. R-37 to Amend Technical Specifications Related to Level 1 Position Title Change ML20182A7092020-07-0909 July 2020 Acceptance Review Amendment Request to Revise Surveillance Frequency - Opportunity to Supplement ML20192A0762020-06-30030 June 2020 Mit - Supplemental Information for License Amendment Request for Position Title Change in Technical Specifications for Level 1 Staff ML20070H2672020-06-0404 June 2020 Examination Report No. 50-020/OL-20-01, Massachusetts Institute of Technology ML20119A8272020-05-29029 May 2020 Massachusetts Institute of Technology - Issuance of Amendment No. 43 Extending Time to Implement License Amendment No. 42 to Facility Operating License No. R-37 2024-09-12
[Table view] Category:License-Operator
MONTHYEARML24220A1502024-10-0909 October 2024 Examination Report Letter No. 50-020/OL-24-02 Massachusetts Institute of Technology ML24199A1082024-07-23023 July 2024 Examination Confirmation Letter No. 50-020/OL-24-02, Massachusetts Institute of Technology ML24052A2102024-06-0606 June 2024 Examination Result Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML22343A1372023-01-0303 January 2023 Examination Confirmation Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML19345F3782019-12-11011 December 2019 Examination Confirmation Letter No. 50-020/OL-20-01, Massachusetts Institute of Technology ML19295F4202019-10-30030 October 2019 Examination Report No. 50-020/OL-19-03, Massachusetts Institute of Technology ML19191A1512019-07-10010 July 2019 Examination Confirmation Letter No. 50-020/OL-19-03, Massachusetts Institute of Technology ML19084A0752019-04-0202 April 2019 Examination Report No. 50-020-OL-19-02, Massachusetts Institute of Technology ML19024A0682019-01-28028 January 2019 Examination Confirmation Letter No. 50-020/OL-19-02, Massachusetts Institute of Technology ML18317A2982018-11-0707 November 2018 Examination Report No. 50-020/OL-19-01, Massachusetts Institute of Technology ML18247A1942018-08-30030 August 2018 Examination Confirmation Letter 50-020/OL-19-01, Massachusetts Institute of Technology ML18011A0062018-01-0303 January 2018 Examination Confirmation Letter No. 50-020/OL 18-01 Massahusetts Institute of Technology ML17283A2152017-10-11011 October 2017 Examination Report No. 50-20/OL-17-03, Massachusetts Institute of Technology ML17170A1542017-06-21021 June 2017 Examination Confirmation Letter 50-020 OL 17-03, Massahusetts Institute of Technology ML17058A0972017-02-28028 February 2017 Examination Report No. 50-020/OL-17-02, Massachusetts Institute of Technology ML16334A1392016-11-29029 November 2016 Examination Confirmation Letter No. 50-020/OL-17-02, Massachusetts Institute of Technology ML16177A1302016-06-28028 June 2016 Examination Notification Letter, No. 50-020/OL-17-01, Massachusetts Institute of Technology ML14247A2202014-09-0202 September 2014 Rescheduled Examination, No. 50-020/OL-14-02, Massachusetts Institute of Technology ML13261A0832013-10-0101 October 2013 Examination Results Report, No. 50-20/OL-13-02, Massachusetts Institute of Technology ML13261A1072013-10-0101 October 2013 Examination Results Letter No. 50-020/OL-13-02, Massachusetts Institute Technology ML13045A4522013-02-19019 February 2013 Examination Results Letter No. 50-020/OL-13-01, Massachusetts Institute of Technology ML13003A3152013-01-10010 January 2013 Massachusetts Institute of Technology - Corporate Notification Letter No. 50-020/OL-13-01 ML1203400872012-03-0808 March 2012 Examination Results Letter, No. 50-020/OL-12-02, Massachusetts Institute of Technology ML1130500382011-11-0101 November 2011 Examination Corporate Notification Letter, No. 50-020/OL-12-02, Massachusetts Institute of Technology ML1129405982011-10-25025 October 2011 Examination Results Letter No. 50-20/OL-12-01, Massachusetts Institute of Technology ML1120606302011-08-0808 August 2011 Corporate Notification Letter No. 50-20/OL-12-01, Massachusetts Institute of Technology ML1105601812011-03-11011 March 2011 Initial Examination Report No. 50-20/OL-11-01, Massachusetts Institute of Technology ML1030802232010-11-0404 November 2010 Initial Examination Corporation Notification Letter No. 50-20/OL-11-01, Massachusetts Institute of Technology ML1025902802010-09-17017 September 2010 Initial Examination Results Letter, No. 50-20/OL-10-01, Massachusetts Institute of Technology ML0915903922009-06-0909 June 2009 Initial Examination Corporate Notification Letter, No. 50-020/OL-09-01, Massachusetts Institute of Technology ML0715000072007-05-31031 May 2007 Initial Examination Corporate Notification Letter, No. 50-020-OL-07-02, Mit ML0527303902005-10-0707 October 2005 Initial Examination Results Letter No. 50-20/OL-05-01, Massachusetts Institute Technology ML0518102892005-07-0707 July 2005 Initial Examination Corporate Notification Letter No. 50-20/OL-05-01, Massachusetts Institute of Technology, September 6, 2005 ML0427804202004-10-0808 October 2004 Initial Examination Results Letter No. 50-20/OL-04-02, Massachusetts Institute of Technology ML0420804472004-07-30030 July 2004 Retake Examination Results Letter, No. 50-020/OL-04-01, Massachusetts Institute of Technology ML0417400872004-06-24024 June 2004 Retake Examination Corporate Notification Letter No. 50-020/OL-04-01, Massachusetts Institute of Technology ML0417005012004-06-21021 June 2004 Initial Examination Corporate Notification Letter No. 50-020/OL-04-02, Massachusetts Institute of Technology ML0407002102004-03-22022 March 2004 Initial Examination 50-20/OL-04-01 Results, Massachusetts Institute of Technology ML0332302722003-11-20020 November 2003 Corporate Notification Letter No. 50-20/OL-04-01, Massachusetts Institute of Technology ML0303606752003-02-14014 February 2003 Retake Examination Results Letter No. 50-020/OL-03-01, Massachusetts Institute of Technology ML0233807912002-12-0909 December 2002 Retake Examination Corporate Notification Letter No. 50-20/OL-03-01, Massachusetts Institute of Technology 2024-07-23
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24220A1502024-10-0909 October 2024 Examination Report Letter No. 50-020/OL-24-02 Massachusetts Institute of Technology ML24199A1082024-07-23023 July 2024 Examination Confirmation Letter No. 50-020/OL-24-02, Massachusetts Institute of Technology ML24052A2102024-06-0606 June 2024 Examination Result Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML23354A1442024-01-0505 January 2024 Examination Confirmation Letter No. 50-020/OL-24-01, Massachusetts Institute of Technology ML23242A3382023-11-0606 November 2023 Examination Report Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23242A3392023-11-0606 November 2023 Examination Result Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML23103A2632023-05-10010 May 2023 Examination Confirmation Letter No. 50-020/OL-23-01 Massachusetts Institute of Technology ML22343A1372023-01-0303 January 2023 Examination Confirmation Letter No. 50-020/OL-23-01, Massachusetts Institute of Technology ML22189A0492022-07-25025 July 2022 Examination Confirmation Letter No.50-020/OL-22-02, Massachusetts Institute of Technology ML21328A2342021-11-29029 November 2021 Examination Confirmation Letter No. 50-020/OL-22-01, Massachusetts Institute of Technology ML21186A0032021-07-16016 July 2021 Examination Confirmation Letter No. 50-020/OL-21-02, Massachusetts Institute of Technology ML21053A4372021-02-23023 February 2021 Examination Confirmation Letter No. 50-020/OL-21-01, Massachusetts Institute of Technology ML19345F3782019-12-11011 December 2019 Examination Confirmation Letter No. 50-020/OL-20-01, Massachusetts Institute of Technology ML19295F4202019-10-30030 October 2019 Examination Report No. 50-020/OL-19-03, Massachusetts Institute of Technology ML19191A1512019-07-10010 July 2019 Examination Confirmation Letter No. 50-020/OL-19-03, Massachusetts Institute of Technology ML19084A0752019-04-0202 April 2019 Examination Report No. 50-020-OL-19-02, Massachusetts Institute of Technology ML18317A2982018-11-0707 November 2018 Examination Report No. 50-020/OL-19-01, Massachusetts Institute of Technology ML18247A1942018-08-30030 August 2018 Examination Confirmation Letter 50-020/OL-19-01, Massachusetts Institute of Technology ML18011A0062018-01-0303 January 2018 Examination Confirmation Letter No. 50-020/OL 18-01 Massahusetts Institute of Technology ML17283A2152017-10-11011 October 2017 Examination Report No. 50-20/OL-17-03, Massachusetts Institute of Technology ML17170A1542017-06-21021 June 2017 Examination Confirmation Letter 50-020 OL 17-03, Massahusetts Institute of Technology ML17058A0972017-02-28028 February 2017 Examination Report No. 50-020/OL-17-02, Massachusetts Institute of Technology ML16334A1392016-11-29029 November 2016 Examination Confirmation Letter No. 50-020/OL-17-02, Massachusetts Institute of Technology ML16177A1302016-06-28028 June 2016 Examination Notification Letter, No. 50-020/OL-17-01, Massachusetts Institute of Technology ML14247A2202014-09-0202 September 2014 Rescheduled Examination, No. 50-020/OL-14-02, Massachusetts Institute of Technology ML13261A1072013-10-0101 October 2013 Examination Results Letter No. 50-020/OL-13-02, Massachusetts Institute Technology ML13003A3152013-01-10010 January 2013 Massachusetts Institute of Technology - Corporate Notification Letter No. 50-020/OL-13-01 ML1129405982011-10-25025 October 2011 Examination Results Letter No. 50-20/OL-12-01, Massachusetts Institute of Technology ML1120606302011-08-0808 August 2011 Corporate Notification Letter No. 50-20/OL-12-01, Massachusetts Institute of Technology ML1105601812011-03-11011 March 2011 Initial Examination Report No. 50-20/OL-11-01, Massachusetts Institute of Technology ML1025902802010-09-17017 September 2010 Initial Examination Results Letter, No. 50-20/OL-10-01, Massachusetts Institute of Technology ML0915903922009-06-0909 June 2009 Initial Examination Corporate Notification Letter, No. 50-020/OL-09-01, Massachusetts Institute of Technology ML0715000072007-05-31031 May 2007 Initial Examination Corporate Notification Letter, No. 50-020-OL-07-02, Mit ML0527303902005-10-0707 October 2005 Initial Examination Results Letter No. 50-20/OL-05-01, Massachusetts Institute Technology ML0518102892005-07-0707 July 2005 Initial Examination Corporate Notification Letter No. 50-20/OL-05-01, Massachusetts Institute of Technology, September 6, 2005 ML0427804202004-10-0808 October 2004 Initial Examination Results Letter No. 50-20/OL-04-02, Massachusetts Institute of Technology ML0420804472004-07-30030 July 2004 Retake Examination Results Letter, No. 50-020/OL-04-01, Massachusetts Institute of Technology ML0417400872004-06-24024 June 2004 Retake Examination Corporate Notification Letter No. 50-020/OL-04-01, Massachusetts Institute of Technology ML0417005012004-06-21021 June 2004 Initial Examination Corporate Notification Letter No. 50-020/OL-04-02, Massachusetts Institute of Technology ML0407002102004-03-22022 March 2004 Initial Examination 50-20/OL-04-01 Results, Massachusetts Institute of Technology ML0332302722003-11-20020 November 2003 Corporate Notification Letter No. 50-20/OL-04-01, Massachusetts Institute of Technology ML0303606752003-02-14014 February 2003 Retake Examination Results Letter No. 50-020/OL-03-01, Massachusetts Institute of Technology ML0233807912002-12-0909 December 2002 Retake Examination Corporate Notification Letter No. 50-20/OL-03-01, Massachusetts Institute of Technology 2024-07-23
[Table view] |
Text
July 7, 2005 Dr. David E. Moncton, Director of Reactor Operations Nuclear Reactor Laboratory Massachusetts Institute of Technology 138 Albany Street Cambridge, MA 02139
SUBJECT:
INITIAL EXAMINATION CORPORATE NOTIFICATION LETTER NO. 50-20/OL-05-01, MASSACHUSETTS INSTITUTE OF TECHNOLOGY
Dear Dr. Moncton:
I made arrangements with Frank Warmsley for the administration of operator licensing examinations at the Massachusetts Institute of Technology reactor. The written and operating examinations are scheduled for the week of September 5, 2005.
In order to meet this schedule, please furnish the material listed in Enclosure 1, "Reference Material for Reactor/Senior Reactor Operator Licensing Examinations (Non-Power)" at least 60 days prior to the examination date to the following address:
(U.S. Postal Service) (Overnight Delivery)
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission ATTN: Kevin Witt ATTN: Kevin Witt Mail Stop O-12 G-13 Mail Stop O-12 G-13 Washington, D.C. 20555 11555 Rockville Pike Rockville, MD 20852-2738 , "Facility Licensee Responsibilities for Written Examinations," describes your responsibilities for conducting written examinations. Enclosure 3, "Candidate Responsibilities for the Written Examination," describes applicant responsibilities during the administration of the written examination. Please ensure that all applicants are aware of these rules.
Your review of the written examination will be conducted in accordance with the procedures specified in Enclosure 4, "Facility Review of Written Examinations."
Final, signed senior reactor operator license applications certifying that all training has been completed must be submitted at least 14 days before the first examination dates. This will allow the chief examiner time to review the training and experience of the candidates, process the medical certifications, and process the applications. If the review cannot be completed in time to determine an applicant's eligibility, that applicant may not be permitted to sit for the examination. Therefore, it is recommended that license applications be provided as soon as possible to ensure an appropriate level of review. The NRC has copies of the application forms Personal Qualification Statement -- Licensee (NRC form 398) and Certificate of Medical History
Dr. D. Moncton by Facility Licensee (NRC form 396) available on the Internet in Adobe Acrobat format. The forms are located at www.nrc.gov/reading-rm/doc-collections/forms/ nrc398.pdf and www.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf respectively.
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0018, which expires June 30, 2006. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records Branch, (T-6 E-6), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to
<bjs1@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.
If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-4094, or Internet e-mail pty@nrc.gov.
Sincerely,
/RA/
Phillip T. Young, Chief Examiner Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-20
Enclosures:
- 1. Reference Material for NRC Operator Licensing Examinations
- 2. Facility Licensee Responsibilities for Written Examinations
- 3. Applicant Responsibilities for Written Examinations
- 4. Facility Review of Written Examinations Prior to Administration cc w/enclosures: Frank Warmsley, Massachusetts Institute of Technology
Massachusetts Institute of Technology Docket No. 50-20 cc:
City Manager City Hall Cambridge, MA 02139 Department of Environmental Quality Engineering 100 Cambridge Street Boston, MA 02202 Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611
Dr. D. Moncton July 7, 2005 by Facility Licensee (NRC form 396) available on the Internet in Adobe Acrobat format. The forms are located at www.nrc.gov/reading-rm/doc-collections/forms/ nrc398.pdf and www.nrc.gov/reading-rm/doc-collections/forms/nrc396.pdf respectively.
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0018, which expires June 30, 2006. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records Branch, (T-6 E-6), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001; or by Internet electronic mail to
<bjs1@nrc.gov>, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.
If you have any questions regarding the examination procedures and requirements, please contact me at (301) 415-4094, or Internet e-mail pty@nrc.gov.
Sincerely,
/RA/
Phillip T. Young, Chief Examiner Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-20
Enclosures:
- 1. Reference Material for NRC Operator Licensing Examinations (Non-Power)
- 2. Administration of Written Examinations
- 3. Procedures for Administration of Written Examinations
- 4. Facility Review of Written Examinations Prior to Administration cc w/enclosures: Frank Warmsley, Massachusetts Institute of Technology DISTRIBUTION:
PUBLIC RNRP/R&TR r/f Facility File (EBarnhill) O-6 F-2 WBeckner AAdams, PM PMadden EXAMINATION PACKAGE ACCESSION NO.: ML051810250 CORPORATE NOTIFICATION LETTER ACCESSION NO.: ML051810289 TEMPLATE #: NRR-079 OFFICE: RNRP:CE IROB:LA RNRP:SC NAME: PYoung EBarnhill PMadden DATE: 7/ 6 /2005 7/ 6 /2005 7/ 6 /2005 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY
REFERENCE MATERIAL FOR NRC OPERATOR LICENSING EXAMINATIONS (NON-POWER)
- 1. Training materials should include all substantive written material used for preparing applicants for initial RO and SRO licensing. The written material should include learning objectives if available and the details presented during lectures, rather than outlines.
Training materials should be identified, bound, and indexed. Training materials should include the following:
System descriptions including descriptions of all operationally relevant flow Paths, components, controls and instrumentation. System training material should draw parallels to the actual procedures used for operating and applicable system.
Complete and operationally useful descriptions of all safety-system interactions, secondary interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
Training material used to clarify and strengthen understanding of emergency operating procedures.
- 2. Complete Procedure Index (including temporary procedures).
- 3. All administrative procedures as applicable to reactor operation or safety.
- 4. All integrated plant procedures, normal or general operating procedures and procedures for experiments.
- 5. All emergency procedures, emergency instructions, abnormal or special procedures.
- 6. Standing orders or procedures changed by reactor supervision and important orders or changes that are safety related and may supersede the regular procedures.
- 7. Applicable procedures (procedures that are run frequently).
- 8. Fuel-handling and core-loading procedures and initial core-loading procedure, when appropriate.
- 9. Any annunciator/alarm procedures, as applicable.
ENCLOSURE 1
- 10. Radiation protection manual, radiation control manual or procedures.
- 11. Emergency plan implementing procedures.
- 12. Safety Analysis Report, Technical Specifications and interpretations, if available.
- 13. System operating procedures, including experiments.
- 14. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams, as applicable.
- 15. Technical Data Book, and/or plant curve information as used by operators and facility precautions, limitations, and set points for the facility.
- 16. Questions and answers specific to the facility training program which may be used in the written or operating examinations (voluntary by facility licensee).
- 17. Additional material as requested by the examiners to develop examinations that meet the requirements of the Non-power Reactor Examiner Standards and Regulations.
The above reference material should be approved final issues and so marked. If a facility has not finalized some of the material, the Chief Examiner should verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination.
FACILITY LICENSEE RESPONSIBILITIES FOR THE WRITTEN EXAMINATION
- 1. The facility licensee is responsible for providing a single room for the administration of the written examination. The location of this room and supporting restroom facilities should be such as to prevent contact with all other facility personnel during the written examination.
- 2. Minimum spacing is necessary to ensure examination integrity as determined by the Chief Examiner (i.e., one applicant per table, with a three-foot space between tables).
- 3. The facility may make arrangements subject to chief examiner review, if the applicants are to have lunch, coffee or other refreshments. These arrangements shall comply with Item 1 above.
- 4. The facility licensee may provide pads of 8-1/2 by 11 inch lined paper in unopened packages for each applicant's use in completing the examination. The examiner will distribute these pads to the applicants as needed.
- 5. Applicants may bring pens, pencils, calculators and slide rules into the examination room.
Only black ink or dark pencils should be used for writing answers to questions.
- 6. The Chief Examiner must approve any wall charts, models, or other training materials present in the examination room. No other equipment or reference material will be allowed unless provided by the examiner.
- 7. The facility staff will be provided a copy of the written examination with answer key at the beginning of the administration of the written examination. The facility staff may start reviewing the examination immediately. The facility staff will then have five (5) working days to provide formal written comments with supporting documentation regarding written examination questions and answers to the Chief Examiner.
Please NOTE: All arrangements are subject to Chief Examiner review.
ENCLOSURE 2
CANDIDATE RESPONSIBILITIES FOR THE WRITTEN EXAMINATION
- 1. You must provide a picture identification.
- 2. You must not review your examination until instructed to do so by the examiner/proctor.
- 3. Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
- 4. When you have completed your examination, you must sign the statement at the bottom of the cover sheet, prior to handing in the examination to the examiner/proctor.
- 5. Only one applicant may leave the room for a trip to the restroom. You must avoid all contact with anyone outside the examination room to avoid even the appearance or possibility of cheating. NOTE: The examiner/proctor may modify this requirement to only one applicant of each sex.
- 6. Use black ink or dark pencil only to facilitate legible reproductions.
- 7. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
- 8. Mark your answers on the answer sheet provided.
- 9. The point value for each question is shown in [brackets] after the question.
- 10. If the intent of a question is unclear, ask questions of the examiner only.
- 11. When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets. In addition, turn in all scrap paper.
- 12. You must achieve a grade of 70 percent or greater in each category to pass the examination.
- 13. There is a time limit of one hour per section of the examination. A one section examination has a one hour time limit, a two section examination has a two hour time limit and a three section examination has a three hour time limit.
- 14. After turning in your examination, leave the examination area (DEFINE THE AREA). If you are observed in this area while the examination is still in progress, your license may be denied or revoked.
ENCLOSURE 3
FACILITY REVIEW OF WRITTEN EXAMINATIONS PRIOR TO ADMINISTRATION
- 1. At the option of the Program Director, New, Research and Test Reactors (RNRP), the facility may review the written examination up to two weeks prior to its administration. This review may take place at the facility or at an NRC office. The Chief Examiner will coordinate the details of the review with the facility. An NRC examiner will always be present during the review. The examination or written notes will NOT be retained by the facility.
Whenever this option of examination review is utilized, the facility reviewers will sign the following statement prior to being allowed access to the examination.
- a. Pre-Examination Security Agreement I ______________________ acknowledge that I have acquired specialized knowledge concerning the examination scheduled for _________________ at
___________________ as of the date of my signature below. I agree that I will not knowingly divulge any information concerning this examination to any unauthorized persons. I understand that I am not to participate in any instruction involving those applicants scheduled to be administered the above examination from this date until after the examination has been administered. I further understand that violation of the conditions of this agreement may result in the examinations being cancelled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.
Signature/Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.
- b. Post-Examination Security Agreement I _________________ did not, to the best of my knowledge, divulge any information concerning the examinations administered during the week of
____________________________ at ____________________ or any instruction to those applicants who were administered the examination from the date I entered into this security agreement until the completion of examination administration.
Signature/Date ENCLOSURE 4
- 2. Regardless of whether the above examination review option is exercised, immediately following the administration of the written examination, the facility staff is provided a marked-up copy of the examination and the answer key. The copy of the written examination includes pen and ink changes made to questions during the examination administration.
If the facility did not review the examination prior to its administration, they will have five (5) working days from the day of the written examination to submit formal comments. If the facility reviewed the examination prior to its administration, any additional comments must be given to an examiner prior to his/her leaving the facility. These comments will be addressed to the Chief Examiner by the Reactor Supervisor. Comments not submitted within the required time frame will be considered for inclusion in the grading process on a case-by-case basis. This may cause delays in grading the examinations.
- 3. The following format should be used for submittal of specific comments:
- a. Listing of NRC question, answer and reference
- b. Facility comment/recommendation
- c. Reference (to support facility comment)
NOTES: 1. No change to the examination will be made without a reference to support the facility comment. Any supporting documentation that was not previously supplied, should be provided.
- 2. Comments made without a concise facility recommendation will not be addressed.
- 3. A two-hour post examination review may be held at the discretion of the Chief Examiner. If this review is held, the facility staff should be informed that only written comments that are properly supported will be considered in the grading of the examination.