ML23283A027

From kanterella
Jump to navigation Jump to search
Inservice Testing Program for Pumps and Valves - Part 5: IST Valve Scope Table Revision 4
ML23283A027
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/09/2023
From:
DTE Electric Company
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23283A021 List:
References
NRC-23-0063
Download: ML23283A027 (1)


Text

DSN: 1ST Valve Scope Table, Rev.4 , Page 1 of 183 FERMI 2 INSERVICE TESTING PROGRAM FOR PUMPS AND VALYES FERMI 2 FOURTH 10 YEAR INTERVAL - START DATE 02/ 17/2020 PART 5: 1ST VALVE SCOPE TABLE REVISION 4 Revision Summary:

Revised per LCR 20-024-151 (Abandonment of Thermal Recombiner System).

Revised per LCR 20-025-151 (Transfer HPCI & RCIC Pressure Isolation Boundaries).

Revised per LCR 20-045-151 (Misc. updates).

OUAL Jeffrey D. Auler, e55603, see attached email. 1118/21 Prepared:--=========================~ Date: - - - - - PE-03 fxF IST Program Manager Craig Shepherd, e55018, see attached email.

Reviewed:_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_ Date: 11/8/21

.....__ ___, PE-03 ~

Qualified Program Engineer James Wines, e54431, see attached email.

I Reviewed:=-================--

Date: 11112121 NIA Supervisor, Performance Engineering Randy Breymaier, e50801 , see attached 11115/21 Approved:-=e=m=ai=I.=======================--- D ate: ......_ _ __, NIA Manager, Performance Engineering INFORMATION AND PROCEDURES DSN: IST Valve Scope Table Rev: 4 Date: 1/25/21 DTC: TMPLAN File: 1715.04 Recipient: _ _ _ _ __

Date Approved: _ _ _ _ _ __ Release authorized by: _ _ _ _ _ _ _ _ __

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4, Page 2 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B2100F010A NB FEEDWATER SPLY INBD PC 5715-1 / E-2 A/C Active 1 20 CK SA SD O/C N/A LTJ AppJ 43.401.303, AT-1, AT-4 CHECK VLV 43.401.511 cvo cs 24.107.01 CSJ-002 eve RO 43.401.303 ROJ-001 B2100F010B NB FEEDWATER SPLY INBD PC 5715-1 / E-1 A/C Active 1 20 CK SA SD O/C N/A LTJ AppJ 43.401.304, AT-1, AT-4 CHECK VLV 43.401.511 cvo cs 24.107.01 CSJ-002 eve RO 43.401.304 ROJ-001 B2100F029A NB AIR ACCUMULATOR A002C 5701-1/H-4 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 B2100F029B NB AIR ACCUMULATOR A002D 5701-1 / F-4 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 B2100F029C NB AIR ACCUMULATOR A002A 5701-1 / D-4 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 B2100F029D NB AIR ACCUMULATOR A002B 5701-1 / C-4 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 INLET CHECK VLV eve RO 24.137.02 ROJ-003 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 1 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 3 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B2100F029D NB AIR ACCUMULATOR A002B 5701-1 / C-4 A/C Active 3 1 CK SA SD O/C N/A cvo RO 24.137.02 ROJ-003 INLET CHECK VLV B2100F031A NB MSIV B2103F028A OPERA TOR 5701-1/H-4 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 CT-SP AIR ACCUMULATOR B2103A002C RELIEF VLV B2100F031B NB MSIV B2103F028B OPERATOR 5701-1 / F-4 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 CT-SP AIR ACCUMULATOR B2103A002D RELIEF VLV B2100F031C NB MSIV B2103F028C OPERATOR 5701-1 / D-4 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 CT-SP AIR ACCUMULATOR B2103A002A RELIEF VLV B2100F031D NB MSIV B2103F028D OPERATOR 5701-1 / C-4 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 CT-SP AIR ACCUMULATOR B2103A002B RELIEF VLV B2100F037A NB SAFETY/RELIEF VLV F013P 5701-1 / B-7 C Active 2 8 VRV SA SD O/C N/A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 cvo RO 24.201.01 ROJ-019 B2100F037B NB SAFETY/RELIEF VLV F013J 5701-1 / D-6 C Active 2 8 VRV SA SD O/C N/A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 cvo RO 24.201.01 ROJ-019 B2100F037C NB SAFETY/RELIEF VLV F013R 5701-1/D-7 C Active 2 8 VRV SA SD O/C N/A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 cvo RO 24.201.01 ROJ-019 B2100F037D NB SAFETY/RELIEF VLV F013D 5701-1 / E-6 C Active 2 8 VRV SA SD O/C N/A VBSP 2Y 24.201.01 VACUUM BREAKER VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 2 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 4 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B2100F037D NB SAFETY/ RELIEF VLV F013D 5701-1 / E-6 C Active 2 8 VRV SA SD O/ C N/ A eve RO 24.201.01 ROJ-019 VACUUM BREAKER VLV cvo RO 24.201.01 ROJ-019 B2100F037E NB SAFETY/ RELIEF VLV F013K 5701-1 / E-7 C Active 2 8 VRV SA SD O/ C N/ A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 cvo RO 24.201.01 ROJ -019 B2100F037F NB SAFETY/ RELIEF VLV F013F 5701-1 / E-7 C Active 2 8 VRV SA SD O/ C N/ A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ -019 cvo RO 24.201.01 ROJ -019 B2100F037G NB SAFETY/ RELIEF VLV F013H 5701-1 / D-6 C Active 2 8 VRV SA SD O/ C N/ A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ -019 cvo RO 24.201.01 ROJ-019 B2100F037H NB SAFETY/ RELIEF VLV F013G 5701 - 1 / E-6 C Active 2 8 VRV SA SD O/ C N/ A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 cvo RO 24.201.01 ROJ-019 B2100F037J NB SAFETY/ RELIEF VLV F013B 5701 - 1 / D-6 C Active 2 8 VRV SA SD O/ C N/ A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 cvo RO 24.201.01 ROJ -019 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 3 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4, Page 5 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B2100F037K NB SAFETY/RELIEF VLV F013E 5701-1/D-7 C Active 2 8 VRV SA SD O/C N/A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 cvo RO 24.201.01 ROJ-019 B2100F037L NB SAFETY/RELIEF VLV F013C 5701-1 / E-6 C Active 2 8 VRV SA SD O/C N/A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 cvo RO 24.201.01 ROJ-019 B2100F037M NB SAFETY/RELIEF VLV F013M 5701-1 / G-7 C Active 2 8 VRV SA SD O/C N/A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 cvo RO 24.201.01 ROJ-019 B2100F037N NB SAFETY/RELIEF VLV F013N 5701-1 / G-6 C Active 2 8 VRV SA SD O/C N/A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 cvo RO 24.201.01 ROJ-019 B2100F037P NB SAFETY/RELIEF VLV F013A 5701-1 / B-6 C Active 2 8 VRV SA SD O/C N/A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 cvo RO 24.201.01 ROJ-019 B2100F037R NB SAFETY/RELIEF VLV F013L 5701-1 / G-6 C Active 2 8 VRV SA SD O/C N/A VBSP 2Y 24.201.01 VACUUM BREAKER VLV eve RO 24.201.01 ROJ-019 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 4 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 6 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B2100F037R NB SAFETY/RELIEF VLV F013L 5701-1 / G-6 C Active 2 8 VRV SA SD O/C N/A cvo RO 24.201.01 ROJ-019 VACUUM BREAKER VLV B2100F076A NB FEEDWATERSPLYCHECKAOV 5715-1 / F-2 A/C Active 1 20 SCK AO/SA SD C N/A ovo 2Y 24.107.01 RPI 2Y 24.107.01 LTJ AppJ 43.401 .303, AT-1 , AT-4 43.401.511 ovc AppJ 43.401.303 VRR-004 BOO cs 24.107.01 CSJ-002 eve RO 43.401.303 ROJ-001 B2100F076B NB FEEDWATER SPLY CHECK AOV 5715-1 / F-1 A/C Active 1 20 SCK AO/SA SD C N/A ovo 2Y 24.107.01 RPI 2Y 24.107.01 LTJ AppJ 43.401.304, AT-1 , AT-4 43.401.511 ovc AppJ 43.401.304 VRR-004 BOO cs 24.107.01 CSJ-002 eve RO 43.401.304 ROJ-001 B2100F248A NB DIV1 RPV WTR LVL INST 5701-2 / D- 1 Aug - Active NC 0.375 CK SA 0 C N/A LT 2Y 43.401.511 AT-4 BACKFILL LINE CHECK VLV A/C BOO RO 43.401.511 TP-15 eve RO 43.401.511 TP - 15 B2100F248B NB DIV2 RPV WTR LVL INST 5701-2 / C-8 Aug Active NC 0.375 CK SA 0 C N/A LT 2Y 43.401.511 AT-4 BACKFILL LINE CHECK VLV -A/C BOO RO 43.401.511 TP-15 eve RO 43.401.511 TP - 15 B2100F249A NB DIV1 RPV WTR LVL INST 5701-2 / E-1 Aug- Active NC 0.375 CK SA 0 C N/A LT 2Y 43.401.511 AT-4 BACKFILL LINE CHECK VLV A/C BOO RO 43.401.511 TP - 15 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 5 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 7 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B2100F249A NB DIV1 RPV WTR LVL INST 5701-2 / E-1 Aug- Active NC 0.375 CK SA 0 C N/A eve RO 43.401.511 TP-15 BACKFILL LINE CHECK VLV A/C B2100F249B NB DIV2 RPV WTR LVL INST 5701-2 / C-8 Aug Active NC 0.375 CK SA 0 C N/A LT 2Y 43.401.511 AT-4 BACKFILL LINE CHECK VLV -A/C BOO RO 43.401.511 TP-15 eve RO 43.401.511 TP-15 B2103F016 NB MAIN STEAM DRAIN LINE 5701-1 / F-5 A Active 1 3 GA MOL-C C C FAI ETC 2Y 24.137.18 INBD PC ISO MOV ETO 2Y 24.137.18 STC 2Y 24.137.1 8 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.302 AT- 1, AT-4 B2103F019 NB MAIN STEAM DRAIN LINE 5701-1 / F-4 A Active 1 3 GA MOL-C C C FAI ETC 2Y 24.137.18 OTBD PC ISO MOV ETO 2Y 24.137.18 STC 2Y 24.137.1 8 DIAG App3 47.306.06 ovc App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 6 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 8 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B2 103 F0 19 NB MAIN STEAM DRA IN LI NE 570 1- 1 / F-4 A Active 1 3 GA MOL-C C C FAI ovo App3 47.306.06 OTBD PC ISO MOV RPI App3 47.306.06 LTJ AppJ 43.40 1.302 AT-1 , AT-4 B2103 F022A NB MS L "A" INBD PC ISO AOV 570 1- 1 / G- 5 A Active 1 26 GL AO 0 C C ovc 2Y 24.1 37.0 1 ovo 2Y 24.1 37.0 1 RPI 2Y 24. 137.03 LTJ AppJ 43.40 1. 500 AT- 9 ETC cs 24.137.03 CSJ-006 FSC cs 24.1 37.03 CSJ-006 STC cs 24.1 37.03 CSJ -006 B2 103 F022B NB MS L "B" INBD PC ISO AOV 5701-1 / E-5 A Active 1 26 GL AO 0 C C ovc 2Y 24.1 37.0 1 ovo 2Y 24.137.01 RPI 2Y 24.1 37.03 LTJ AppJ 43.40 1. 500 AT-9 ETC cs 24.1 37.03 CSJ -006 FSC cs 24.1 37.03 CSJ-006 STC cs 24. 137.03 CSJ-006 B2 103 F022C NB MS L "C" INBD PC ISO AOV 570 1-1 / C- 5 A Active 1 26 GL AO 0 C C ovc 2Y 24.1 37.01 ovo 2Y 24.137.0 1 RPI 2Y 24. 137.03 LTJ AppJ 43.40 1.500 AT- 9 ETC cs 24.1 37.03 CSJ-006 FSC cs 24.1 37.03 CSJ-006 STC cs 24.1 37.03 CSJ-006 B2 103 F022 D NB MS L "D" INBD PC ISO AOV 5701- 1 / B-5 A Active 1 26 GL AO 0 C C ovc 2Y 24.1 37.0 1 ovo 2Y 24.1 37.0 1 RPI 2Y 24.1 37.03 Jan 8, 2021 6:20 AM Iddeal Suite V. 9. 35.2.1 Page 7 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 9 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B2103 F022 D NB MS L "D" INBD PC ISO AOV 5701- 1 / B-5 A Active 1 26 GL AO 0 C C LTJ AppJ 43.40 1. 500 AT- 9 ETC cs 24.1 37.03 CSJ -006 FSC cs 24.1 37.03 CSJ-006 STC cs 24.137.03 CSJ-006 B2 103 F028A NB MS L "A" OTBD PC ISO AOV 570 1-1 / G-4 A Active 1 26 GL AO 0 C C ovc 2Y 24.1 37.01 ovo 2Y 24.1 37.01 RPI 2Y 24.137.03 LTJ AppJ 43.401 .500 AT-9 ETC cs 24. 137.03 CSJ-006 FSC cs 24.1 37.03 CSJ-006 STC cs 24.137.03 CSJ-006 B2 103 F028B NB MS L "B" OTBD PC ISO AOV 5701 - 1/ E-4 A Active 1 26 GL AO 0 C C ovc 2Y 24.1 37.0 1 ovo 2Y 24. 137.0 1 RP I 2Y 24.1 37.03 LTJ AppJ 43.401 .500 AT- 9 ETC cs 24.1 37.03 CSJ-006 FSC cs 24.1 37.03 CSJ-006 STC cs 24.1 37.03 CSJ-006 B2 103 F028C NB MS L "C" OTBD PC ISO AOV 570 1- 1 /C-4 A Active 1 26 GL AO 0 C C ovc 2Y 24.137.01 ovo 2Y 24. 137.0 1 RPI 2Y 24.1 37.03 LTJ AppJ 43.40 1. 500 AT- 9 ETC cs 24.1 37.03 CSJ-006 FSC cs 24. 137.03 CSJ-006 STC cs 24.1 37.03 CSJ-006 B2103 F028D NB MS L "D" OTBD PC ISO AOV 5701- 1 / B-4 A Active 1 26 GL AO 0 C C ovc 2Y 24.137.01 ovo 2Y 24.1 37.0 1 RP I 2Y 24. 137.03 LTJ AppJ 43.40 1. 500 AT- 9 Jan 8, 2021 6:20 AM Iddeal Suite V. 9. 35.2.1 Page 8 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 10 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B2103F028D NB MSL "D" OTBD PC ISO AOV 5701-1 / B-4 A Active 1 26 GL AO 0 C C ETC cs 24.137.03 CSJ-006 FSC cs 24.137.03 CSJ-006 STC cs 24.137.03 CSJ-006 B2104F013A NB MSL "D" RELIEF VLV 5701-1 / B-6 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.059 RV 6Y 43.137.001 OMN - 17 B2104F013B NB MSL "C" RELIEF VLV 5701-1 / D-7 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.059 RV 6Y 43.137.001 OMN-17 B2104F013C NB MSL "B" RELIEF VLV 5701 - 1 / E- 6 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.060 RV 6Y 43.137.001 OMN-17 B2104F013D NB MSL "B " RELIEF VLV 5701-1 / E-6 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.060 RV 6Y 43.137.001 OMN - 17 B2104F013E NB MSL "C" RELIEF VLV 5701-1 / D-7 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.059 RV 6Y 43.137.001 OMN - 17 B2104F013F NB MSL "B" RELIEF VLV 5701 - 1 / E-7 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.059 RV 6Y 43.137.001 OMN-17 B2104F013G NB MSL "B" RELIEF VLV 5701 - 1 / E- 6 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.060 RV 6Y 43.1 37.001 OMN - 17 B2104F013H NB MSL "C" RELIEF VLV 5701-1 / D-6 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.059 RV 6Y 43.137.001 OMN - 17 B2104F013J NB MSL "C" RELIEF VLV 5701 - 1 / D-6 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.059 RV 6Y 43.137.001 OMN-17 B2104F013K NB MSL "B" RELIEF VLV 5701-1 / E-7 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.060 RV 6Y 43.137.001 OMN-17 B2104F013L NB MSL "A" RELIEF VLV 5701 - 1 / G-6 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.060 RV 6Y 43.1 37.001 OMN - 17 B2104F013M NB MSL "A" RELIEF VLV 5701-1 / G-7 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.060 RV 6Y 43.137.001 OMN - 17 B2104F013N NB MSL "A" RELIEF VLV 5701 - 1 / G-7 B/ C Active 1 6 RV AO/ SA C O/ C N/ A FV 18M 44.210.060 RV 6Y 43.137.001 OMN-17 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 9 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 11 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B2104F013P NB MSL "D" RELIEF VLV 5701-1 / B-7 B/e Active 1 6 RV AO/SA e O/e N/A FV 18M 44.210.059 RV 6Y 43.137.001 OMN-17 B2104F013R NB MSL "e" RELIEF VLV 5701-1/D-7 B/e Active 1 6 RV AO/SA e O/e N/A FV 18M 44.210.059 RV 6Y 43.137.001 OMN-17 B21F501A NB MSL "A" EFeV 5701-1 / G-4 A/e Active 1 1 XeK SA 0 o;e N/A eve 10Y 44.220.113 VRR-001 evo 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ove 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-001 RPI 10Y 44.220.113 VRR-001 B21F501B NB MSL "B" EFeV 5701-1/E-4 A/e Active 1 1 XeK SA 0 o;e N/A eve 10Y 44.220.113 VRR-001 evo 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ove 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-001 RPI 10Y 44.220.113 VRR-001 B21F501C NB MSL "C" EFeV 5701-1/e-4 A;e Active 1 1 XeK SA 0 O/e N/A eve 10Y 44.220.110 VRR-001 evo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ove 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B21F501D NB MSL "D" EFeV 5701-1 / B-4 A;e Active 1 1 XeK SA 0 O/e N/A eve 10Y 44.220.110 VRR-001 evo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ove 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B21 F502A NB MSL "A" EFeV 5701-1 / G-4 A;e Active 1 1 XeK SA 0 O/e N/A eve 10Y 44.220.113 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 10 of 178

.. Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 12 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F502A NB MSL "A" EFeV 5701-1 / G-4 A/e Active 1 1 XeK SA 0 O/e N/A evo 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ove 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-001 RPI 10Y 44.220.113 VRR-001 B21F502B NB MSL "B" EFeV 5701-1 / E-4 Ale Active 1 1 XeK SA 0 O/e N/A eve 10Y 44.220.113 VRR-001 evo 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ove 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-001 RPI 10Y 44.220.113 VRR-001 B21F502e NB MSL "e" EFeV 5701-1 / 0-4 Ale Active 1 1 XeK SA 0 O/e N/A eve 10Y 44.220.110 VRR-001 evo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ove 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B21F502D NB MSL "D" EFeV 5701-1/B-4 A/e Active 1 1 XeK SA 0 O/e N/A eve 10Y 44.220.110 VRR-001 evo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ove 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B21 F503A NB MSL "A" EFeV 5701-1/F-4 A/e Active 1 1 XeK SA 0 o;e N/A eve 10Y 44.220.110 VRR-001 evo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ove 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 11 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 13 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F503B NB MSL "B" EFCV 5701-1/E-4 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.115 VRR-001 evo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ove 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B21F503e NB MSL "e" EFeV 5701-1 / e-4 A/e Active 1 1 XeK SA 0 O/e N/A eve 10Y 44.220.112 VRR-001 evo 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ove 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F503D NB MSL "D" EFeV 5701-1 / B-4 A/e Active 1 1 XeK SA 0 o;e N/A eve 10Y 44.220.115 VRR-001 evo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ove 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B21F504A NB MSL "A" EFeV 5701-1/F-4 A/e Active 1 1 XeK SA 0 o;e N/A eve 10Y 44.220.110 VRR-001 evo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ove 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B21F504B NB MSL "B" EFCV 5701-1 / D-4 A/e Active 1 1 XeK SA 0 o;e N/A eve 10Y 44.220.115 VRR-001 evo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ove 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 12 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 14 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F504B NB MSL "B" EFeV 5701-1 / 0-4 A/e Active 1 1 XeK SA 0 O/e N/A RPI 10Y 44.220.115 VRR-001 B21F504e NB MSL "C" EFeV 5701-1 / e-4 A/e Active 1 1 XeK SA 0 O/e N/A eve 10Y 44.220.112 VRR-001 evo 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ove 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F504D NB MSL "D" EFeV 5701-1 / A-4 A/e Active 1 1 XeK SA 0 o;e N/A eve 10Y 44.220.115 VRR-001 evo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ove 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B21F506 NB RPV EFeV 5701-2 / G-4 A/e Active 1 1 XeK SA 0 O/e N/A eve 10Y 44.220.115 VRR-001 evo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ove 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B21F507 NB RPV EFeV 5701 -2 / E-4 Ale Active 1 1 XeK SA 0 O/e N/A eve 10Y 44.220.115 VRR-001 evo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ove 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B21F508 NB RPV EFeV 5701-2 / G-6 A/e Active 1 1 XeK SA 0 O/e N/A eve 10Y 44.220.112 VRR-001 evo 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ove 10Y 44.220.112 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 13 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 15 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F508 NB RPV EFCV 5701-2 / G-6 A/C Active 1 1 XCK SA 0 O/C N/A ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F509 NB RPV EFCV 5701-2 / E-6 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.112 VRR-001 cvo 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ovc 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F510 NB RPV EFCV 5701-2 / F-4 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.115 VRR-001 cvo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ovc 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B21F511 NB RPV EFCV 5701-2 / F-6 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.112 VRR-001 cvo 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ovc 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F512 NB RPV EFCV 5701-2 / G-6 A/C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.112 VRR-001 eve 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ovc 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F513A NB RPV CALIBRATED JET PUMP 5701-2 / B/C-3 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.112 VRR-001 NO. 15 DIV1 EFCV cvo 10Y 44.220.112 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 14 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 16 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F513A NB RPV CALIBRATED JET PUMP 5701-2 / B/ C-3 A/C Active 1 1 XCK SA 0 O/ C N/ A LT 10Y 44.220.112 VRR-001 NO. 15 DIV1 EFCV ovc 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F513B NB RPV CALIBRATED JET PUMP 5701 -2 / D-6 A/ C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.112 VRR-001 NO. 5 DIV2 EFCV cvo 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ovc 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F513C NB RPV CALIBRATED JET PUMP 5701-2 / B/ C-3 A/C Active 1 1 XCK SA 0 C N/ A BDO 10Y 44.220.115 VRR-001 NO. 20 DIV1 EFCV eve 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ovc 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B21F513D NB RPV CALIBRATED JET PUMP 5701 -2 / B/ C-4 A/ C Active 1 1 XCK SA 0 C N/ A BDO 10Y 44.220.111 VRR-001 NO. 10 DIV2 EFCV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 15 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 17 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F513D NB RPV CALIBRATED JET PUMP 5701-2 / B/C-4 A/C Active 1 1 XCK SA 0 C N/A eve 10Y 44.220.111 VRR-001 NO. 10 DIV2 EFCV LT 10Y 44.220.111 VRR-001 ovc 10Y 44.220.111 VRR-001 ovo 10Y 44.220.111 VRR-001 RPI 10Y 44.220.111 VRR-001 B21F514A NB RPV CALIBRATED JET PUMP 5701-2 / B/C-3 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.110 VRR-001 NO. 15 DIV1 EFCV cvo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ovc 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B21F514B NB RPV CALIBRATED JET PUMP 5701-2 / E-6 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.111 VRR-001 NO. 5 DIV2 EFCV cvo 10Y 44.220.111 VRR-001 LT 10Y 44.220.111 VRR-001 ovc 10Y 44.220.111 VRR-001 ovo 10Y 44.220.111 VRR-001 RPI 10Y 44.220.111 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 16 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 18 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F514C NB RPV CALIBRATED JET PUMP 5701-2 / B/ C-3 A/C Active 1 1 XCK SA 0 C N/ A BOO 10Y 44.220.110 VRR-001 NO. 20 DIV1 EFCV eve 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ovc 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B21F514D NB RPV CALIBRATED JET PUMP 5701 -2 / B/ C-4 A/ C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.111 VRR-001 NO. 10 DIV2 EFCV eve 10Y 44.220.111 VRR-001 LT 10Y 44.220.111 VRR-001 ovc 10Y 44.220.111 VRR-001 ovo 10Y 44.220.111 VRR-001 RPI 10Y 44.220.111 VRR-001 B21F515A NB RPV JET PUMP NO. 11 DIV1 5701-2 / B/ C- 3 A/C Active 1 1 XCK SA 0 C N/ A BDO 10Y 44.220.110 VRR-001 EFCV eve 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ovc 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 17 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 19 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F515A NB RPV JET PUMP NO. 11 DIV1 5701-2 / B/ e-3 A/e Active 1 1 XeK SA 0 e N/ A RPI 10Y 44.220.110 VRR-001 EFeV B21F515B NB RPV JET PUMP NO. 1 DIV2 5701-2 / B/ e-4 Ale Active 1 1 XeK SA 0 e N/ A BOO 10Y 44.220.111 VRR-001 EFeV eve 10Y 44.220.111 VRR-001 LT 10Y 44.220.111 VRR-001 ove 10Y 44.220.111 VRR-001 ovo 10Y 44.220.111 VRR-001 RPI 10Y 44.220.111 VRR-001 B21F515e NB RPV JET PUMP NO. 12 DIV1 5701 -2 / B/ e - 3 A/ e Active 1 1 XeK SA 0 e N/A BDO 10Y 44.220.112 VRR-001 EFeV eve 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ove 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F515D NB RPV JET PUMP NO. 2 DIV2 5701-2 / B/ e-4 A/e Active 1 1 XeK SA 0 e N/ A BDO 10Y 44.220.111 VRR-001 EFeV eve 10Y 44.220.111 VRR-001 LT 10Y 44.220.111 VRR-001 ove 10Y 44.220.111 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 18 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 20 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F515D NB RPV JET PUMP NO. 2 DIV2 5701-2 / B/ e-4 A;e Active 1 1 XeK SA 0 e N/ A ovo 10Y 44.220.111 VRR-001 EFeV RPI 10Y 44.220.111 VRR-001 B21F515E NB RPV JET PUMP NO. 13 DIV1 5701-2 / B/ e-3 A;e Active 1 1 XeK SA 0 e N/ A BDO 10Y 44.220.112 VRR-001 EFeV eve 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ove 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F515F NB RPV JET PUMP NO. 3 DIV2 5701-2 / B/ e-4 A;e Active 1 1 XeK SA 0 e N/ A BDO 10Y 44.220.111 VRR-001 EFeV eve 10Y 44.220.111 VRR-001 LT 10Y 44.220.111 VRR-001 ove 10Y 44.220.111 VRR-001 ovo 10Y 44.220.111 VRR-001 RPI 10Y 44.220.111 VRR-001 B21F515G NB RPV JET PUMP NO. 14 DIV1 5701 -2 / E- 3 A/ e Active 1 1 XeK SA 0 e N/ A BDO 10Y 44.220.112 VRR-001 EFeV eve 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 19 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 21 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F515G NB RPV JET PUMP NO. 14 DIV1 5701-2 / E-3 A/e Active 1 1 XeK SA 0 e N/A ove 10Y 44.220.112 VRR-001 EFeV ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F515H NB RPV JET PUMP NO. 4 DIV2 5701-2 / B/e-4 Ale Active 1 1 XeK SA 0 e N/A BDO 10Y 44.220.114 VRR-001 EFeV eve 10Y 44.220.114 VRR-00 1 LT 10Y 44.220.114 VRR-001 ove 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B21F515L NB RPV JET PUMP NO. 16 DIV1 5701-2 / B/e-3 A/e Active 1 1 XeK SA 0 e N/A BDO 10Y 44.220.112 VRR-001 EFeV eve 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ove 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B21F515M NB RPV JET PUMP NO. 6 DIV2 5701-2 / B/e-4 A/e Active 1 1 XeK SA 0 e N/A BDO 10Y 44.220.114 VRR-001 EFeV eve 10Y 44.220.114 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 20 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 22 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F515M NB RPV JET PUMP NO. 6 DIV2 5701-2 / B/ e-4 A;e Active 1 1 XeK SA 0 e N/ A LT 10Y 44.220.114 VRR-001 EFeV ove 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B21F515N NB RPV JET PUMP NO. 17 DIV1 5701 -2 / B/ e - 3 A/ e Active 1 1 XeK SA 0 e N/ A BDO 10Y 44.220.113 VRR-001 EFeV eve 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ove 10Y 44.220.113 VRR-001 ovo 10Y 44.220.11 3 VRR-001 RPI 10Y 44.220.113 VRR-001 B21F515P NB RPV JET PUMP NO. 7 DIV2 5701-2 / B/ e-4 A;e Active 1 1 XeK SA 0 e N/ A BDO 10Y 44.220.114 VRR-001 EFeV eve 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ove 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B21F515R NB RPV JET PUMP NO. 18 DIV1 5701 -2 / B/ e - 3 A/ e Active 1 1 XeK SA 0 e N/ A BDO 10Y 44.220.113 VRR-001 EFeV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 21 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 23 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F515R NB RPV JET PUMP NO. 18 DIV1 5701-2 / B/e-3 A/e Active 1 1 XeK SA 0 e N/A eve 10Y 44.220.113 VRR-001 EFeV LT 10Y 44.220.113 VRR-001 ove 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-001 RPI 10Y 44.220.113 VRR-001 B21F515S NB RPV JET PUMP NO. 8 DIV2 5701-2 / B/e-4 A/e Active 1 1 XeK SA 0 e N/A BOO 10Y 44.220.114 VRR-001 EFeV eve 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ove 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B21F515T NB RPV JET PUMP NO. 19 DIV1 5701-2 / B/e-3 A/e Active 1 1 XeK SA 0 e N/A BDO 10Y 44.220.113 VRR-001 EFeV eve 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ove 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-001 RPI 10Y 44.220.113 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 22 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 24 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F515U NB RPV JET PUMP NO. 9 DIV2 5701-2 / B/e-4 A;e Active 1 1 XeK SA 0 e N/A BOO 10Y 44.220.114 VRR-001 EFeV eve 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ove 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B21F516A NB RPV PRESS BELOW CORE 5701-2 / D-4 A/e Active 1 1 XeK SA 0 C N/A BDO 10Y 44.220.113 VRR-001 PLATE EFeV eve 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ovc 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-001 RPI 10Y 44.220.113 VRR-001 B21F516B NB RPV PRESS BELOW CORE 5701-2 / D-6 A;e Active 1 1 XeK SA 0 e N/A BDO 10Y 44.220.114 VRR-001 PLATE EFCV eve 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ove 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 23 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 25 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F516B NB RPV PRESS BELOW CORE 5701-2 / 0-6 A/C Active 1 1 XCK SA 0 C N/A RPI 10Y 44.220.114 VRR-001 PLATE EFCV B21F516C NB RPV PRESS BELOW CORE 5701-2 / C-6 A/C Active 1 1 XCK SA 0 C N/A BOO 10Y 44.220.110 VRR-001 PLATE EFCV eve 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ovc 10Y 44.220.110 VRR-00 1 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B21F517A NB RPV PRESS ABOVE CORE 5701-2 / D-6 A/C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.111 VRR-001 PLATE EFCV eve 10Y 44.220.111 VRR-001 LT 10Y 44.220.111 VRR-001 ovc 10Y 44.220.111 VRR-001 ovo 10Y 44.220.111 VRR-001 RPI 10Y 44.220.111 VRR-001 B21F517B NB RPV PRESS ABOVE CORE 5701-2 / D-6 A/C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.112 VRR-001 PLATE EFCV eve 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ovc 10Y 44.220.112 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 24 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 26 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B21F517B NB RPV PRESS ABOVE CORE 5701-2 / 0-6 A/C Active 1 1 XCK SA 0 C N/ A ovo 10Y 44.220.112 VRR-001 PLATE EFCV RPI 10Y 44.220.112 VRR-001 B21F517C NB RPV PRESS ABOVE CORE 5701-2 / C-6 A/C Active 1 1 XCK SA 0 C N/ A BOO 10Y 44.220.115 VRR-001 PLATE EFCV eve 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ovc 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B21F517D NB RPV PRESS ABOVE CORE 5701-2 / C-4 A/C Active 1 1 XCK SA 0 C N/ A BDO 10Y 44.220.112 VRR-001 PLATE EFCV eve 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ovc 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 B3100F014A RR CRD SPLY TO DIV1 INBD SEAL 5702 - 1 / E-6 A Active 2 0.75 GL AO 0 C C ovc 2Y 23.138.01 PF11 CAVITY INBD CNTM ISO AOV ovo 2Y 23.1 38.01 PF11 RPI 2Y 24.138.02 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 25 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 27 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B3100F014A RR CRD SPLY TO DIV1 INBD SEAL 5702-1 / E-6 A Active 2 0.75 GL AO 0 C C LTJ AppJ 43.401.361 AT-1 CAVITY INBD CNTM ISO AOV ETC cs 24.138.02 CSJ-007 FSC cs 24.138.02 CSJ-007 STC cs 24.138.02 CSJ-007 B3100F014B RR CRD SPLY TO DIV2 INBD SEAL 5702-1 / B-6 A Active 2 0.75 GL AO 0 C C ovc 2Y 23.138.01 PF11 CAVITY INBD CNTM ISO AOV ovo 2Y 23.138.01 PF11 RPI 2Y 24.138.02 LTJ AppJ 43.401.360 AT-1 ETC cs 24.138.02 CSJ-007 FSC cs 24.138.02 CSJ-007 STC cs 24.138.02 CSJ-007 B3100F016A RR CRD SPLY TO DIV1 INBD SEAL 5702-1 / D-8 A Active 2 0.75 GL AO 0 C C ovc 2Y 23.138.01 PF11 CAVITY OTBD CNTM ISO AOV ovo 2Y 23.138.01 PF11 RPI 2Y 24.138.02 LTJ AppJ 43.401.361 AT-1 ETC cs 24.138.02 CSJ-007 FSC cs 24.138.02 CSJ-007 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 26 of 178

.. Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 28 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B3100F016A RR CRD SPLY TO DIV1 INBD SEAL 5702-1 / 0-8 A Active 2 0.75 GL AO 0 C C STC cs 24.138.02 CSJ-007 CAVITY OTBD CNTM ISO AOV B3100F016B RR CRD SPLY TO DIV2 INBD SEAL 5702-1 / B-8 A Active 2 0.75 GL AO 0 C C ovc 2Y 23.138.01 PF11 CAVITY OTBD CNTM ISO AOV ovo 2Y 23.138.01 PF11 RPI 2Y 24.138.02 LTJ AppJ 43.401.360 AT-1 ETC cs 24.138.02 CSJ-007 FSC cs 24.138.02 CSJ-007 STC cs 24.138.02 CSJ-007 B3100F019 RR RX WTR SAMPLE LINE INBD 5702-1 / F-6 A Active 1 0.75 GL AO KC C C ovc 2Y 73.714.01 PF12 CNTM ISOAOV ovo 2Y 73.714.01 PF12 RPI 2Y 24.138.02 LTJ AppJ 43.401.330 AT-1 ETC Q 24.138.02, 24.138.04 FSC Q 24.138.02, 24.138.04 STC Q 24.138.02, 24.138.04 B3100F020 RR RX WTR SAMPLE LINE OTBD 5702-1 / F-8 A Active 1 0.75 GL AO KC C C ovc 2Y 73.714.01 PF12 CNTM ISOAOV ovo 2Y 73.714.01 PF12 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 27 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 29 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B3100F020 RR RX WTR SAMPLE LINE OTBD 5702-1 / F-8 A Active 1 0.75 GL AO KC C C RPI 2Y 24.138.02 CNTM ISOAOV LTJ AppJ 43.401 .330 AT-1 ETC Q 24.138.02, 24.138.04 FSC Q 24.138.02, 24.138.04 STC Q 24.138.02, 24.138.04 B3105F031A RR PMP "A" DISCH MOV 5702-1 / E-4 B Active 1 28 GA MOL 0 C FAI ETC 2Y 24.138.02 ETO 2Y 24.138.02 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 B3105F031 B RR PMP "B" DISCH MOV 5702-1 / B-4 B Active 1 28 GA MOL 0 C FAI ETC 2Y 24.138.02 ETO 2Y 24.138.02 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 B31F501A RR PMP DISCH B3101C001B 5702-1 / H-6 A/C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.115 VRR-001 HEADER FEEDER LINE DIV1 V13-2351 EFCV cvo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 28 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 30 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B31F501A RR PMP DISCH B3101C001B 5702-1 / H-6 A/C Active 1 1 XCK SA 0 O/ C N/ A ovc 10Y 44.220.115 VRR-001 HEADER FEEDER LINE DIV1 V13-2351 EFCV ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B31F501B RR PMP DISCH B3101C001B 5702 - 1 / H-6 A/ C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.114 VRR-001 HEADER FEEDER LINE DIV2 V13 -

2352 EFCV cvo 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ovc 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B31F501C RR PMP DISCH B3101C001B 5702-1 / H-6 A/C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.115 VRR-001 HEADER FEEDER LINE DIV1 V13-2353 EFCV cvo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 29 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 31 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B31F501C RR PMP DISCH B3101C001B 5702-1 / H-6 A/C Active 1 1 XCK SA 0 O/ C N/ A ovc 10Y 44.220.115 VRR-001 HEADER FEEDER LINE DIV1 V13-2353 EFCV ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B31F501D RR PMP DISCH B3101C001B 5702 - 1 / H-6 A/ C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.114 VRR-001 HEADER FEEDER LINE DIV2 V13 -

2354 EFCV cvo 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ovc 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B31 F502A RR PMP DISCH B3101C001A 5702-1 / G-6 A/C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.115 VRR-001 HEADER FEEDER LINE DIV1 V13-2355 EFCV cvo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 30 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 32 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B31 F502A RR PMP DISCH B3101C001A 5702-1 / G-6 A/C Active 1 1 XCK SA 0 O/ C N/ A ovc 10Y 44.220.115 VRR-001 HEADER FEEDER LINE DIV1 V13-2355 EFCV ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B31F502B RR PMP DISCH B3101C001A 5702 - 1 / G-6 A/ C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.114 VRR-001 HEADER FEEDER LINE DIV2 V13 -

2356 EFCV cvo 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ovc 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B31F502C RR PMP DISCH B3101C001A 5702-1 / G-6 A/C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.115 VRR-001 HEADER FEEDER LINE DIV1 V13-2357 EFCV cvo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 31 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 33 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B31F502C RR PMP DISCH B3101C001A 5702-1 / G-6 A/C Active 1 1 XCK SA 0 O/ C N/ A ovc 10Y 44.220.115 VRR-001 HEADER FEEDER LINE DIV1 V13-2357 EFCV ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 B31F502D RR PMP DISCH B3101C001A 5702 - 1 / G- 6 A/ C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.114 VRR-001 HEADER FEEDER LINE DIV2 V13 -

2358 EFCV cvo 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ovc 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B31 F503A RR PMP DISCH B3101C001A V13- 5702-1 / F-3 A/C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.110 VRR-001 2359 EFCV cvo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ovc 10Y 44.220.110 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 32 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 34 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B31 F503A RR PMP DISCH B3101C001A V13- 5702-1 / F-3 A/C Active 1 1 XCK SA 0 O/ C N/ A ovo 10Y 44.220.110 VRR-001 2359 EFCV RPI 10Y 44.220.110 VRR-001 B31F503B RR PMP DISCH B3101C001 B V13- 5702-1 / 0-3 A/C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.110 VRR-001 2360 EFCV cvo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ovc 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B31F504A RR PMP DISCH B3101C001A V13- 5702-1 / F-3 A/C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.110 VRR-001 2361 EFCV cvo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ovc 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B31F504B RR PMP DISCH B3101C001 B V13 - 5702 - 1 / D-3 A/ C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.110 VRR-001 2362 EFCV cvo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 33 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 35 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B31F504B RR PMP DISCH B3101C001 B V13- 5702-1 / 0-3 A/C Active 1 1 XCK SA 0 O/C N/A ovc 10Y 44.220.110 VRR-001 2362 EFCV ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B31 F505A RR PMP DISCH B3101C001A V13- 5702-1 / G-3 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.110 VRR-001 2363 EFCV cvo 10Y 44.220.110 VRR-00 1 LT 10Y 44.220.110 VRR-001 ovc 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B31F505B RR PMP DISCH B3101C001 B V13- 5702-1 / E-3 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.110 VRR-001 2364 EFCV cvo 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ovc 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B31F506A RR PMP DISCH B3101C001A V13- 5702-1 / G-3 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.110 VRR-001 2365 EFCV cvo 10Y 44.220.110 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 34 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 36 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B31F506A RR PMP DISCH B3101C001A V13- 5702-1 / G-3 A/C Active 1 1 XCK SA 0 O/ C N/ A LT 10Y 44.220.110 VRR-001 2365 EFCV ovc 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 B31F506B RR PMP DISCH B3101C001 B V13 - 5702 - 1 / E-3 A/ C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.113 VRR-001 2366 EFCV cvo 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ovc 10Y 44.220.113 VRR-001 ovo 10Y 44.220.11 3 VRR-001 RPI 10Y 44.220.113 VRR-001 B31 F510A RR PUMP B3101C001A SUCT LINE 5702-1 / D-3 A/C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.113 VRR-001 EFCV cvo 10Y 44.220.113 VRR-001 LT 10Y 44.220.11 3 VRR-001 ovc 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-001 RPI 10Y 44.220.113 VRR-001 B31F510B RR PUMP B3101C001 B SUCT LINE 5702 - 1 / C-3 A/ C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.114 VRR-001 EFCV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 35 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 37 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B31F510B RR PUMP B3101C001B SUCT LINE 5702-1 / C-3 A/C Active 1 1 XCK SA 0 O/ C N/ A cvo 10Y 44.220.114 VRR-001 EFCV LT 10Y 44.220.114 VRR-001 ovc 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B31F511A RR PMP DISCH B3101C001A V13- 5702-1 / D-3 A/C Active 1 1 XCK SA 0 O/ C N/ A eve 10Y 44.220.113 VRR-001 2369 EFCV cvo 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ovc 10Y 44.220.11 3 VRR-001 ovo 10Y 44.220.113 VRR-001 RPI 10Y 44.220.113 VRR-001 B31F511B RR PMP DISCH B3101C001 B V13 - 5702 - 1 / C-3 A/ C Active 1 1 XCK SA 0 O/ C N/A eve 10Y 44.220.114 VRR-001 2370 EFCV cvo 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ovc 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 36 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 38 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B31 F512A RR PMP DISCH B3101C001B V13- 5702-1 / F-8 A/C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.113 VRR-001 2371 EFCV eve 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ovc 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-00 1 RPI 10Y 44.220.113 VRR-001 B31F512B RR PMP DISCH B3101C001 B V13- 5702-1 / F-8 A/C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.114 VRR-001 2372 EFCV eve 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ovc 10Y 44.220.114 VRR-001 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B31F515A RR PMP B310 1C001A SEAL 5702-1 / E-8 A/C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.113 VRR-001 CAVITY NO. 2 V13-2373 EFCV eve 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ovc 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 37 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 39 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B31F515A RR PMP B3101C001A SEAL 5702-1 / E-8 A/C Active 1 1 XCK SA 0 C N/A RPI 10Y 44.220.113 VRR-001 CAVITY NO. 2 V13-2373 EFCV B31F515B RR PMP B3101(001 B SEAL CAVITY 5702-1 / C-8 A/C Active 1 1 XCK SA 0 C N/A BOO 10Y 44.220.114 VRR-001 NO. 1 V13-2374 EFCV eve 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ovc 10Y 44.220.114 VRR-00 1 ovo 10Y 44.220.114 VRR-001 RPI 10Y 44.220.114 VRR-001 B31 F516A RR PMP B3101C001A SEAL 5702-1 / E-8 A/C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.113 VRR-001 CAVITY NO. 1 V13-2375 EFCV eve 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ovc 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-001 RPI 10Y 44.220.113 VRR-001 B31F516B RR PMP B3101C001 B SEAL CAVITY 5702-1 / C-8 A/C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.114 VRR-001 NO. 1 V13-2376 EFCV eve 10Y 44.220.114 VRR-001 LT 10Y 44.220.114 VRR-001 ovc 10Y 44.220.114 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 38 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 40 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req B31F516B RR PMP B3101C001 B SEAL CAVITY 5702-1 / C-8 A/C Active 1 1 XCK SA 0 C N/A ovo 10Y 44.220.114 VRR-001 NO. 1 V13-2376 EFCV RPI 10Y 44.220.114 VRR-001 C1100F010 CRD SCRAM DISCH VOL VENT 5703-2 / G-6 A Active 2 1 GL AO 0 C C ovc 2Y 22.000.04 PF16 AOV ovo 2Y 22.000.04 PF16 RPI 2Y 24.106.04 LTJ AppJ 43.401.355 AT-1 ETC Q 24.106.04 FSC Q 24.106.04 STC Q 24.106.04 C1100F011 CRD SCRAM DISCH HEADERS 5703-2 / F-7 A Active 2 2 GL AO 0 C C ovc 2Y 22.000.04 PF16 CLEAN RW DRAIN AOV ovo 2Y 22.000.04 PF16 RPI 2Y 24.106.04 LTJ AppJ 43.401.355 AT-1 ETC Q 24.106.04 FSC Q 24.106.04 STC Q 24.106.04 C1100F180 CRD SCRAM DISCH VOL VENT 5703-2 / G-6 A Active 2 1 GL AO 0 C C ovc 2Y 22.000.04 PF16 AOV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 39 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 41 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req C1100F180 CRD SCRAM DISCH VOL VENT 5703-2 / G-6 A Active 2 1 GL AO 0 C C ovo 2Y 22.000.04 PF16 AOV RPI 2Y 24.106.04 LTJ AppJ 43.401.355 AT-1 ETC Q 24.106.04 FSC Q 24.106.04 STC Q 24.106.04 C1100F181 CRD SCRAM DISCH VOL TO 5703-2 / D-7 A Active 2 2 GL AO 0 C C ovc 2Y 22.000.04 PF16 TORUS ROOM SUMP D065 DRAIN AOV ovo 2Y 22.000.04 PF16 RPI 2Y 24.106.04 LTJ AppJ 43.401.355 AT-1 ETC Q 24.106.04 FSC Q 24.106.04 STC Q 24.106.04 C4100F006 STANDBY LIQUID CONTROL 5704 / E-7 A/C Active 1 1.50 CK SA SD O/C N/A ovo 2Y 24.139.03 OUTBOARD CHECK VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 40 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 42 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req C4100F006 STANDBY LIQUID CONTROL 5704 / E-7 A/C Active 1 1.50 CK SA SD O/C N/A RPI 2Y 24.139.03 OUTBOARD CHECK VLV LTJ AppJ 43.401 .347 AT-1 ovc AppJ 43.401.347 VRR-004 eve CM 43.401.347 CMJ-02 cvo CM 24.139.03 CMJ-02 C4100F007 STANDBY LIQUID CONTROL 5704 / E-8 A/C Active 1 1.50 CK SA SD O/C N/A LTJ AppJ 43.401.347 AT-1 INBOARD CHECK VLV eve CM 43.401.347 CMJ-02 cvo CM 24.139.03 CMJ-02 C4100F008 SLC MANUAL INJECTION VLV 5704 / D-8 B Pa ssive 1 1.50 GL MA LO 0 N/A ovc 2Y 24.139.03 ovo 2Y 24. 139.03 RPI 2Y 24.139.03 C4100F029A SLC PUMP C4103C001A DISCH 5704 / E-5 C Active 2 2 RV SA C O/C N/A RV 10Y 43.000.020 PRESS RELIEF VLV C4100F029B SLC PUMP C4103C001B DISCH 5704 / D-5 C Active 2 2 RV SA C O/C N/A RV 10Y 43.000.020 PRESS RELIEF VLV C4100F033A SLC PUMP "A" DISCH CHECK VLV 5704 / E-5 C Active 2 2 CK SA SD O/C N/A cvo Q 24.139.02 eve RO 43.401.709 ROJ-018 C4100F033B SLC PUMP "B" DISCH CHECK VLV 5704 / D-5 C Active 2 2 CK SA SD O/C N/A cvo Q 24.139.02 eve RO 43.401.709 ROJ -018 C4104F004A SLC EXPLOSIVE (SQUIB) VLV 5704 / E-7 D Active 2 1.50 EX EXP KC 0 N/A EXP 10Y 24.139.03 C4104F004B SLC EXPLOSIVE (SQUIB) VLV 5704 / E-7 D Active 2 1.50 EX EXP KC 0 N/A EXP 10Y 24.139.03 C5100F001A TIP CHANNEL "A" SHEAR VALVE 5705 / F-4 D Active 2 0.375 EX EXP 0 C N/A EXP 10Y 43.606.001 C5100F001B TIP CHANNEL "B" SHEAR VALVE 5705 / F-4 D Active 2 0.375 EX EXP 0 C N/A EXP 10Y 43.606.001 C5100F001C TIP CHANNEL "C" SHEAR VALVE 5705 / F-4 D Active 2 0.375 EX EXP 0 C N/A EXP 10Y 43.606.001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 41 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 43 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req C5100F001D TIP CHANNEL "D" SHEAR VALVE 5705 / F-4 D Active 2 0.375 EX EXP 0 C N/A EXP 10Y 43.606.001 C5100F001 E TIP CHANNEL "E" SHEAR VALVE 5705 / F-4 D Active 2 0.375 EX EXP 0 C N/A EXP 10Y 43.606.001 C5100F002A NMS TIP CHNL "A" BALL VLV 5705 / E-4 A Active 2 0.375 BA so C C C LTJ AppJ 43.401.338 AT-1 ovc AppJ 43.401.338 VRR-002 ovo AppJ 43.401.338 VRR-002 RPI AppJ 43.401.338 VRR-002 ETC Q 24.606.01 FSC Q 24.606.01 STC Q 24.606.01 C5100F002B NMS TIP CHNL "B" BALL VLV 5705 / E-4 A Active 2 0.375 BA so C C C LTJ AppJ 43.401.337 AT-1 ovc AppJ 43.401.337 VRR-002 ovo AppJ 43.401.337 VRR-002 RPI AppJ 43.401.337 VRR-002 ETC Q 24.606.01 FSC Q 24.606.01 STC Q 24.606.01 C5100F002C NMS TIP CHNL "C" BALL VLV 5705 / E-4 A Active 2 0.375 BA so C C C LTJ AppJ 43.401.339 AT-1 ovc AppJ 43.401.339 VRR-002 ovo AppJ 43.401.339 VRR-002 RPI AppJ 43.401.339 VRR-002 ETC Q 24.606.01 FSC Q 24.606.01 STC Q 24.606.01 C5100F002D NMS TIP CHNL "D" BALL VLV 5705 / E-4 A Active 2 0.375 BA so C C C LTJ AppJ 43.401.341 AT-1 ovc AppJ 43.401.341 VRR-002 ovo AppJ 43.401.341 VRR-002 RPI AppJ 43.401.341 VRR-002 ETC Q 24.606.01 FSC Q 24.606.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 42 of 178

.. Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 44 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req C5100F002D NMS TIP CHNL "D" BALL VLV 5705 / E-4 A Active 2 0.375 BA so C C C STC Q 24.606.01 C5100F002E NMS TIP CHNL "E" BALL VLV 5705 / E-4 A Active 2 0.375 BA so C C C LTJ AppJ 43.401.340 AT-1 ovc AppJ 43.401.340 VRR-002 ovo AppJ 43.401.340 VRR-002 RPI AppJ 43.401.340 VRR-002 ETC Q 24.606.01 FSC Q 24.606.01 STC Q 24.606.01 E1100F001A RHR DIV1 HX "A" THERMAL RELIEF 5706-2 / D-3 C Active 2 0.50 TRV SA C O/C N/A RV 10Y 43.000.020 VLV E1100F001B RHR DIV2 HX "B" THERMAL 5706-1 / D-7 C Active 2 0.50 TRV SA C O/C N/A RV 10Y 43.000.020 RELIEF VLV E1100F020A RHR DIV1 HX "A" SERVICE WATER 5706-2 / B-4 C Active 3 24 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-01 RETURN CHECK VLV cvo CM 24.205.05 CMJ -01 E1100F020B RHR DIV2 HX "B" SERVICE WATER 5706-1 / B-6 C Active 3 24 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-01 RETURN CHECK VLV cvo CM 24.205.06 CMJ-01 E1100F025A RHR DIV1 HX E1101 B001A 5706-2 I F-3 C Active 2 1.5 RV SA C O/C N/A RV 10Y 43.000.020 DISCHARGE HEADER THERMAL RELIEF VLV E1100F025B RHR DIV2 HX E1101B001B 5706-1 / F-7 C Active 2 1.5 RV SA C O/C N/A RV 10Y 43.000.020 DISCHARGE HEADER THERMAL RELIEF VLV E1100F029 RHR S/D COOLING RELIEF VLV 5706-1 / D-3 C Active 2 1 TRV SA C O/C N/A RV 10Y 43.000.020 VRR-005 E1100F030A RHR DIV1 PUMP "A" SUPR POOL 5706-2 I D-6 C Active 2 1 TRV SA C O/C N/A RV 10Y 43.000.020 SUCT LINE THERMAL RELIEF VLV E1100F030B RHR DIV2 PUMP "B" SUPR POOL 5706-1 / D-4 C Active 2 1 TRV SA C O/C N/A RV 10Y 43.000.020 SUCT LINE THERMAL RELIEF VLV E1100F030C RHR DIV1 PUMP "C" SUPR POOL 5706-2 / D-8 C Active 2 1 TRV SA C O/C N/A RV 10Y 43.000.020 SUCT LINE THERMAL RELIEF VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 43 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 45 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1100F030D RHR DIV2 PUMP "D" SUPR POOL 5706-1 / D-3 C Active 2 1 TRV SA C O/C N/A RV 10Y 43.000.020 SUCT LINE THERMAL RELIEF VLV E1100F031A RHR DIV1 PUMP "A" DISCHARGE 5706-2 / B-5 C Active 2 20 CK SA SD O/C N/A eve Q 24.204.01 CHECK VLV cvo Q 24.204.01 E1100F031B RHR DIV2 PUMP "B" DISCHARGE 5706-1 / B-6 C Active 2 20 CK SA SD O/C N/A eve Q 24.204.06 CHECK VLV cvo Q 24.204.06 E1100F031C RHR DIV1 PUMP "C" DISCHARGE 5706-2 / B-7 C Active 2 20 CK SA SD O/C N/A eve Q 24.204.01 CHECK VLV cvo Q 24.204.01 E1100F031D RHR DIV2 PUMP "D" DISCHARGE 5706-1 / B-4 C Active 2 20 CK SA SD O/C N/A eve Q 24.204.06 CHECK VLV cvo Q 24.204.06 E1100F046A RHR DIV1 PUMP "A" MIN FLOW 5706-2 I B-5 C Active 2 3 CK SA SD O/C N/A eve CM 24.204.01 CMJ-03 LINE CHECK VLV cvo CM 43.000.010 CMJ-03 CVP CM 24.204.01 CMJ-03 E1100F046B RHR DIV2 PUMP "B" MIN FLOW 5706-1 / B-5 C Active 2 3 CK SA SD O/C N/A eve CM 24.204.06 CMJ-03 LINE CHECK VLV cvo CM 43.000.010 CMJ-03 CVP CM 24.204.06 CMJ-03 E1100F046C RHR DIV1 PUMP "C" MIN FLOW 5706-2 / C-7 C Active 2 3 CK SA SD O/C N/A eve CM 24.204.01 CMJ-03 LINE CHECK VLV cvo CM 43.000.010 CMJ-03 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 44 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 46 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1100F046C RHR DIV1 PUMP "C" MIN FLOW 5706-2 / C-7 C Active 2 3 CK SA SD O/ C N/ A CVP CM 24.204.01 CMJ-03 LINE CHECK VLV E1100F046D RHR DIV2 PUMP "D" MIN FLOW 5706-1 / C-3 C Active 2 3 CK SA SD O/ C N/ A eve CM 24.204.06 CMJ-03 LINE CHECK VLV cvo CM 43.000.010 CMJ-03 CVP CM 24.204.06 CMJ-03 E1100F050A RHR DIV1 INBD ISO TESTABLE 5706- 2 I G-7 A/ C Active 1 24 CK SA SD O/ C N/ A LT AppJ 43.401.516 VRR-003 / AT- 10 CHECKAOV eve CM 43.401.516 CMJ-13 cvo CM 24.204.05 CMJ - 13 ovc CM 43.401.516 CMJ - 13 ovo CM 24.204.05 CMJ-13 RPI CM 24.204.05 CMJ - 13 E1100F050B RHR DIV2 INBD ISO TESTABLE 5706-1 / E-4 A/C Active 1 24 CK SA SD O/ C N/ A LT AppJ 43.401.516 VRR-003 / AT-10 CHECK AOV eve CM 43.401.516 CMJ - 13 cvo CM 24.204.05 CMJ-13 ovc CM 43.401.516 CMJ-13 ovo CM 24.204.05 CMJ - 13 RPI CM 24.204.05 CMJ-13 E1100F056A RHR DIV1 HEAT EXCHANGER "A" 5706- 2 / C-3 C Active 3 0.50 TRV SA C O/ C N/ A RV 10Y 43.000.020 TO DRW THERMAL RELIEF VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 45 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 47 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1100F056B RHR DIV2 HEAT EXCHANGER "B" 5706-1 / B-7 C Active 3 0.50 TRV SA C O/C N/A RV 10Y 43.000.020 TO DIRTY RW THERMAL RELIEF VLV E1100F078 RHR REACTOR VESSEL EM ERG 5706-1/E-7 C Active 2 12 CK SA SD C N/A ovc 2Y 24.204.05 INJECTION LINE CHECK AOV ovo 2Y N/A TP -0 1 RPI 2Y 24.204.06 BDO Q 24.204.06 eve Q 24.204.06 E1100F079A RHR DIV1 HX "A" SAMPLE AOV 5706-2 / D-3 B Active 2 0.50 GL AO C C C ovc 2Y 73.714.01 PF14 ovo 2Y 73.714.01 PF14 RPI 2Y 24.204.05 ETC Q 24.204.01 FSC Q 24.204.01 STC Q 24.204.01 E1100F079B RHR DIV2 HX "B" SAMPLE AOV 5706-1 / D-7 B Active 2 0.50 GL AO C C C ovc 2Y 73.714.01 PF15 ovo 2Y 73.714.01 PF15 RPI 2Y 24.204.05 ETC Q 24.204.06 FSC Q 24.204.06 STC Q 24.204.06 E1100F080A RHR DIV1 RHR HX "A" PROCESS 5706-2 / D-2 B Active 2 0.50 GL AO C C C ovc 2Y 73.714.01 PF14 SAMPLING ISO AOV ovo 2Y 73.714.01 PF14 RPI 2Y 24.204.05 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 46 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 48 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1100F080A RHR DIV1 RHR HX "A" PROCESS 5706-2 / D-2 B Active 2 0.50 GL AO C C C ETC Q 24.204.01 SAMPLING ISO AOV FSC Q 24.204.01 STC Q 24.204.01 E1100F080B RHR DIV2 HX "B" PROCESS 5706-1 / 0-8 B Active 2 0.50 GL AO C C C ovc 2Y 73.714.01 PF15 SAMPLING ISO AOV ovo 2Y 73.714.01 PF15 RPI 2Y 24.204.05 ETC Q 24.204.06 FSC Q 24.204.06 STC Q 24.204.06 E1100F089 RHR DEMINERALIZED WATER SPLY 5706-1 / H-5 C Active 2 4 CK SA SD C N/A BDO Q 24.204.02 KEEP FILL CHECK VLV eve Q 24.204.06 E1100F090 RHR DEMINERALIZED WATER 5706-1 / H-4 C Active 2 4 CK SA SD C N/A BDO Q 24.204.02 SPLY KEEP FILL CHECK VLV eve Q 24.204.06 E1100F148A RHRSW PUMP "A" DISCHARGE 5706-3 / F-4 C Active 3 16 CK SA SD O/C N/A eve Q 24.205.05 CHECK VLV cvo Q 24.205.05 E1100F148B RHRSW PUMP "B" DISCHARGE 5706-3 / F-5 C Active 3 16 CK SA SD O/C N/A eve Q 24.205.06 CHECK VLV cvo Q 24.205.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 47 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 49 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1100F148C RHRSW PUMP "C" DISCHARGE 5706-3 / F-4 C Active 3 16 CK SA SD O/C N/A eve Q 24.205.05 CHECK VLV cvo Q 24.205.05 E1100F148D RHRSW PUMP "D" DISCHARGE 5706-3 / F-5 C Active 3 16 CK SA SD O/C N/A eve Q 24.205.06 CHECK VLV cvo Q 24.205.06 E1100F1 84 RHR DIV1 DEMINERALIZED WATER 5706-2 / G-6 C Active 2 2 CK SA SD C N/A BDO Q 24.204.02 SPLY HEADER CHECK VLV eve Q 24.204.01 E1100F1 85 RHR DIV1 DEMINERALIZED 5706-2 / G-6 C Active 2 2 CK SA SD C N/A BDO Q 24.204.02 WATER SPLY HEADER CHECK VLV eve Q 24.204.01 E1100F408 RHR DIV2 S/D COOLING BYPASS 5706-1 / E- 3 A/C Active 1 0.75 CK SA SD O/C N/A LTJ AppJ 43.401.307 AT-1 CHECK VLV eve RO 43.401.307 ROJ-012 cvo RO 43.401.307 ROJ-012 E1100F409 RHR DIV2 S/D COOLING BYPASS 5706-1 / E-3 C Active 1 0.75 CK SA SD O/C N/A eve RO 43.401.307 ROJ-012 CHECK VLV cvo RO 43.401.307 ROJ-012 E1150F003A RHR DIV1 HX "A" OUTLET MOV 5706-2 / F-3 B Passive 2 20 GA MO KO 0 FAI ovc 2Y 23.205 PF25 ovo 2Y 23.205 PF25 RPI 2Y 24.204.05 E1150F003B RHR DIV2 HX "B" OUTLET MOV 5706-1/E-7 B Passive 2 20 GA MO KO 0 FAI ovc 2Y 23.205 PF25 ovo 2Y 23.205 PF25 RPI 2Y 24.204.05 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 48 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 50 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F004A RHR DIV1 PUMP "A" SUPR POOL 5706-2 / D-7 B Active 2 24 GA MOL KO O/C FAI ETC 2Y 24.204.05 SUCT ISO MOV ETO 2Y 24.204.05 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E1150F004B RHR DIV2 PUMP "B" SUPR POOL 5706-1 / D-4 B Active 2 24 GA MOL KO O/C FAI ETC 2Y 24.204.05 SUCT ISO MOV ETO 2Y 24.204.05 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E1150F004C RHR DIV1 PUMP "C" SUPR POOL 5706-2 / E-7 B Active 2 24 GA MOL KO O/C FAI ETC 2Y 24.204.05 SUCT ISO MOV ETO 2Y 24.204.05 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 49 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 51 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F004C RHR DIV1 PUMP "C" SUPR POOL 5706-2 / E-7 B Active 2 24 GA MOL KO O/C FAI RPI App3 47.306.06 SUCT ISO MOV E1150F004D RHR DIV2 PUMP "D" SUPR POOL 5706-1 / D-4 B Active 2 24 GA MOL KO O/C FAI ETC 2Y 24.204.05 SUCTISO MOV ETO 2Y 24.204.05 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E1150F006A RHR DIV1 PUMP "A" S/D COOLING 5706-2 I D-6 B Active 2 20 GA MOL C O/C FAI ETC 2Y 24.204.05 ISO MOV ETO 2Y 24.204.05 DIAG App3 47.306.06 VRR-010 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E1150F006B RHR DIV2 PUMP "B" S/D 5706-1 / C-4 B Active 2 20 GA MOL C O/C FAI ETC 2Y 24.204.05 COOLING ISO MOV ETO 2Y 24.204.05 DIAG App3 47.306.06 VRR-010 ovc App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 50 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 52 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F006B RHR DIV2 PUMP "B" S/ D 5706-1 / C-4 B Active 2 20 GA MOL C O/ C FAI ovo App3 47.306.06 COOLING ISO MOV RPI App3 47.306.06 E1150F006C RHR DIV1 PUMP "C" S/ D COOLING 5706-2 I D-8 B Active 2 20 GA MOL C O/ C FAI ETC 2Y 24.204.05 ISO MOV ETO 2Y 24.204.05 DIAG App3 47.306.06 VRR-010 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E1150F006D RHR DIV2 PUMP "D" S/ D 5706-1 / C-3 B Active 2 20 GA MOL C O/ C FAI ETC 2Y 24.204.05 COOLING ISO MOV ETO 2Y 24.204.05 DIAG App3 47.306.06 VRR-010 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E1150F007A RHR DIV1 PUMPS "A" & "C" MIN 5706-2 I E- 5 B Active 2 4 GA MOL 0 O/ C FAI ETC 2Y 24.204.01 FLOWMOV ETO 2Y 24.204.01 DIAG App3 47. 306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 51 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 53 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F007A RHR DIV1 PUMPS "A" & "C" MIN 5706-2 / E-5 B Active 2 4 GA MOL 0 O/C FAI ovc App3 47.306.06 FLOWMOV ovo App3 47.306.06 RPI App3 47.306.06 E1150F007B RHR DIV2 PUMPS "B" & "D" MIN 5706-1 / E-5 B Active 2 4 GA MOL 0 O/C FAI ETC 2Y 24.204.06 FLOWMOV ETO 2Y 24.204.06 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E1150F008 RHR DIV1 & 2 S/D COOLING 5706-1 / E-3 A Active 1 20 GA MOL-C C O/C FAI ETC 2Y 24.204.08 OTBD CNTM ISO MOV ETO 2Y 24.204.08 STC 2Y 24.204.08 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LT AppJ 43.401.512 VRR-003 / AT-10 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 52 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 54 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F008 RHR DIV1 & 2 S/0 COOLING 5706-1 / E-3 A Active 1 20 GA MOL-C C O/C FAI LTJ AppJ 43.401.307 AT-1 OTBD CNTM ISO MOV E1150F009 RHR DIV1 & 2 S/D COOLING 5706-1 / E-3 A Active 1 20 GA MOL-C C O/C FAI ETC 2Y 24.204.08 INBD CNTM ISO MOV ETO 2Y 24.204.08 STC 2Y 24.204.08 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LT AppJ 43.401.512 VRR-003 / AT-10 LTJ AppJ 43.401.307 AT-1 E1150F010 RHR DIV1 & 2 CROSS-TIE ISO 5706-2 / E-6 B Passive 2 24 GA MO KO 0 FAI ovc 2Y 23.205 PF25 MOV ovo 2Y 23.205 PF25 RPI 2Y 24.204.08 E1150F015A RHR DIV1 LPCI INBD ISO MOV 5706-2 / G-6 A Active 1 24 GA MOL C O/C FAI ETC 2Y 24.204.05 ETO 2Y 24.204.05 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LT AppJ 43.401.516 VRR-003 / AT-10 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 53 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 55 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F015B RHR DIV2 LPCI INBD ISO MOV 5706-1 / E-5 A Active 1 24 GA MOH C O/C FAI DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LT AppJ 43.401.516 VRR-003 / AT-10 ETC RO 24.204.05 ROJ-022 ETO RO 24.204.05 ROJ-022 E1150F016A RHR DIV1 DRYWELL SPRAY OTBD 5706-2 I H-6 A Active 2 12 GL MOL-C KC O/C FAI ETC 2Y 24.204.05 ISO MOV ETO 2Y 24.204.05 ovc 2Y 24.204.05 ovo 2Y 24.204.05 STC 2Y 24.204.05 DIAG App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.344 AT-1 E1150F016B RHR DIV2 DRYWELL SPRAY OTBD 5706-1 / F-4 A Active 2 12 GL MOL-C KC O/C FAI ETC 2Y 24.204.05 ISO MOV ETO 2Y 24.204.05 ovc 2Y 24.204.05 ovo 2Y 24.204.05 STC 2Y 24.204.05 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 54 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 56 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F01 6B RHR DIV2 DRYWELL SPRAY OTBD 5706-1 / F-4 A Active 2 12 GL MOL-C KC O/C FAI DIAG App3 47.306.06 ISO MOV RPI App3 47.306.06 LTJ AppJ 43.401.345 AT-1 E1150F017A RHR DIV1 LPCI MOV 5706-2 / G-6 B Active 2 24 GL MOL 0 O/C FAI ETC 2Y 24.204.05 ETO 2Y 24.204.05 ovc 2Y 23.205 PF23 ovo 2Y 23.205 PF23 DIAG App3 47.306.06 RPI App3 47.306.06 E1150F017B RHR DIV2 LPCI MOV 5706-1 / F-5 B Active 2 24 GL MOL 0 O/C FAI ETC 2Y 24.204.05 ETO 2Y 24.204.05 ovc 2Y 23.205 PF23 ovo 2Y 23.205 PF23 DIAG App3 47.306.06 RPI App3 47.306.06 E1150F021A RHR DIV1 DRYWELL SPRAY INBD 5706-2 / H-7 A Active 2 12 GA MOL-C C O/C FAI ETC 2Y 24.204.05 ISO MOV ETO 2Y 24.204.05 STC 2Y 24.204.05 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 55 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 57 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F021A RHR DIV1 DRYWELL SPRAY INBD 5706-2 / H-7 A Active 2 12 GA MOL-C C O/C FAI LTJ AppJ 43.401.344 AT-1 ISO MOV E1150F021B RHR DIV2 DRYWELL SPRAY INBD 5706-1 / F-4 A Active 2 12 GA MOL-C C O/C FAI ETC 2Y 24.204.05 ISO MOV ETO 2Y 24.204.05 STC 2Y 24.204.05 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.345 AT-1 E1150F022 RHR RPV HEAD SPRAY INBD 5706-1 / G-3 A Passive 2 6 GA MO C C FAI RPI 2Y 24.204.05 CNTM ISO MOV LTJ AppJ 43.401.313 AT-1 ovc AppJ 43.401.313 VRR-004 ovo AppJ 43.401.313 VRR-004 E1150F023 RHR RPV HEAD SPRAY OTBD 5706-1 / G-4 A Passive 2 6 GA MO C C FAI RPI 2Y 24.204.05 CNTM ISO MOV LTJ AppJ 43.401.313 AT-1 ovc AppJ 43.401.313 VRR-004 ovo AppJ 43.401.313 VRR-004 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 56 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 58 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F024A RHR DIV1 CNTM COOLING/TEST 5706-2 / G-5 A Active 2 18 GL MOH-C C O/ C FAI ovo 2Y 24.204.01 ISO MOV DIAG App3 47.306.06 ovc App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.381 AT-1 ETC Q 24.204.01 ETO Q 24.204.01 STC Q 24.204.01 E1150F024B RHR DIV1 CNTM COOLING/TEST 5706-1 / F-6 A Active 2 18 GL MOL-C C O/ C FAI ETC 2Y 24.204.06 ISO MOV ETO 2Y 24.204.06 ovo 2Y 24.204.06 STC 2Y 24.204.06 DIAG App3 47.306.06 ovc App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.380 AT-1 E1150F026B RHR DIV2 WARM -UP LINE ISO 5706- 1 / D-5 B Passive 2 4 GA MO C C FAI ovc 2Y 23.205 PF25 MOV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 57 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 59 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F026B RHR DIV2 WARM-UP LINE ISO 5706-1 / D-5 B Passive 2 4 GA MO C C FAI ovo 2Y 23.205 PF25 MOV RPI 2Y 24.204.06 E1150F027A RHR DIV1 SUPR POOL CNTM 5706-2 / G-5 A Active 2 6 GL MOL-C C O/ C FAI ETC 2Y 24.204.01 SPRAY INBD CNTM ISO MOV ETO 2Y 24.204.01 ovo 2Y 24.204.01 STC 2Y 24.204.01 DIAG App3 47.306.06 ovc App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.381 AT-1 E1150F027B RHR DIV2 SUPR POOL CNTM 5706-1 / F-5 A Active 2 6 GL MOL-C C O/ C FAI ETC 2Y 24.204.06 SPRAY INBD CNTM ISO MOV ETO 2Y 24.204.06 ovo 2Y 24.204.06 STC 2Y 24.204.06 DIAG App3 47.306.06 ovc App3 47.306.06 RPI App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 58 of 178

.. Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 60 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F027B RHR DIV2 SUPR POOL CNTM 5706-1 / F-5 A Active 2 6 GL MOL-C C O/ C FAI LTJ AppJ 43.401.380 AT-1 SPRAY INBD CNTM ISO MOV E1150F028A RHR DIV1 SUPR POOL CNTM 5706-2 / H-5 A Active 2 18 GA MOH-C KC O/ C FAI DIAG App3 47.306.06 SPRAY TEST ISO MOV ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.381 AT-1 ETC Q 24.204.01 ETO Q 24.204.01 STC Q 24.204.01 E1150F028B RHR DIV2 SUPR POOL CNTM 5706- 1 / F- 5 A Active 2 18 GA MOL-C KC O/ C FAI ETC 2Y 24.204.06 SPRAY/TEST ISO MOV ETO 2Y 24.204.06 STC 2Y 24.204.06 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.380 AT- 1 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 59 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 61 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F047A RHR DIV1 HX "A" INLET ISO MOV 5706-2 / E-4 B Pa ssive 2 20 GA MO KO 0 FAI ovc 2Y 23.205 PF25 ovo 2Y 23.205 PF25 RPI 2Y 24.204.05 E1150F047B RHR DIV2 HX "B" INLET ISO MOV 5706-1 / D-6 B Passive 2 20 GA MO KO 0 FAI ovc 2Y 23.205 PF25 ovo 2Y 23.205 PF25 RPI 2Y 24.204.05 E1150F048A RHR DIV1 HX "A" BYPASS MOV 5706-2 / F-5 B Active 2 24 GL MOL 0 O/C FAI ETC 2Y 24.204.01 ETO 2Y 24.204.01 ovc 2Y 23.205 PF25 ovo 2Y 23.205 PF25 DIAG App3 47.306.06 RPI App3 47.306.06 E1150F048B RHR DIV2 HX "B" BYPASS MOV 5706-1 / E-6 B Active 2 24 GL MOL 0 O/C FAI ETC 2Y 24.204.06 ETO 2Y 24.204.06 ovc 2Y 23.205 PF25 ovo 2Y 23.205 PF25 DIAG App3 47.306.06 RPI App3 47.306.06 E1150F068A RHR DIV1 HX "A" SERVICE WATER 5706-2 I C-4 B Active 3 24 GL MOH C 0 FAI ovc 2Y 24.205.05 OUTLET ISO MOV ovo 2Y 24.205.05 DIAG App3 47.306.06 RPI App3 47.306.06 ETC Q 24.205.05 ETO Q 24.205.05 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 60 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 62 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F068B RHR DIV2 HX "B" SERVICE WATER 5706-1 / B-6 B Active 3 24 GL MOL C 0 FAI ETC 2Y 24.205.06 OUTLET ISO MOV ETO 2Y 24.205.06 ovc 2Y 24.205.06 ovo 2Y 24.205.06 DIAG App3 47.306.06 RPI App3 47.306.06 E1150F073 RHR Div. II RHRSW To RHR 5706-1 / C-7 B Passive 3 12 GA MO C C FAI RPI 2Y 24.204.05 Crosstie Isolation Valve ovc App3 47.306.06 ovo App3 47.306.06 E1150F075 RHR DIVISION 2 RHRSW TO RHR 5706-1 / C-7 B Passive 3 12 GA MO C C FAI RPI 2Y 24.204.05 CROSSTIE ISO MOV ovc App3 47.306.06 ovo App3 47.306.06 E1150F603A RHR DIV1 COOLING TOWER 5706-3 / H-3 B Active 3 16 GA MOL C O/C FAI ETC 2Y 24.205.05 BYPASS MOV ETO 2Y 24.205.05 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 61 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 63 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F603A RHR DIV1 COOLING TOWER 5706-3 / H-3 B Active 3 16 GA MOL C O/ C FAI RPI App3 47.306.06 BYPASS MOV E1150F603B RHR DIV2 COOLING TOWER 5706-3 / H-6 B Active 3 16 GA MOL C O/ C FAI ETC 2Y 24.205.06 BYPASS MOV ETO 2Y 24.205.06 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E1150F604A RHR DIV1 COOLING TOWER 5706- 3 I H-3 B Active 3 18 GA MOL 0 O/ C FAI ETC 2Y 24.205.05 B001A ISO MOV ETO 2Y 24.205.05 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E1150F604B RHR DIV2 COOLING TOWER 5706-3 / H-5 B Active 3 18 GA MOL 0 O/ C FAI ETC 2Y 24.205.06 B002A ISO MOV ETO 2Y 24.205.06 DIAG App3 47.306.06 ovc App3 47. 306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 62 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 64 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F604B RHR DIV2 COOLING TOWER 5706-3 / H-5 B Active 3 18 GA MOL 0 O/ C FAI ovo App3 47.306.06 B002A ISO MOV RPI App3 47.306.06 E1150F605A RHR DIV1 COOLING TOWER 5706-3 I H-3 B Active 3 18 GA MOL 0 O/ C FAI ETC 2Y 24.205.05 B001 B ISO MOV ETO 2Y 24.205.05 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E1150F605B RHR DIV2 COOLING TOWER 5706-3 / H-5 B Active 3 18 GA MOL 0 O/ C FAI ETC 2Y 24.205.06 B002B ISO MOV ETO 2Y 24.205.06 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E1150F608 RHR S/ D COOLING INBD INLET 5706-1 / E- 3 A Active 1 20 GA MOL KC O/ C FAI ETC 2Y 24.204.08 ISO BYPASS MOV ETO 2Y 24.204.08 DIAG App3 47. 306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 63 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 65 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E1150F608 RHR S/0 COOLING INBD INLET 5706-1 / E-3 A Active 1 20 GA MOL KC O/C FAI ovc App3 47.306.06 ISO BYPASS MOV ovo App3 47.306.06 RPI App3 47.306.06 LT AppJ 43.401.512 VRR-003 / AT-10 LTJ AppJ 43.401.307 AT-1 E11F400A RHRSW PUMP E1151C001A MIN 5706-3 / G-4 B Active 3 3 GL AO C C C ETC RO 43.401.701 ROJ-015 FLOWAOV FSC RO 43.401.701 ROJ-015 E11 F400B RHRSW DIV2 PUMP E1151C001 B 5706-3 I G-5 B Active 3 3 GL AO C C C ETC RO 43.401.702 ROJ-015 MIN FLOW AOV FSC RO 43.401.702 ROJ-015 E11F400C RHRSW PUMP E1151C001C MIN 5706-3 I G-4 B Active 3 3 GL AO C C C ETC RO 43.401.701 ROJ-015 FLOWAOV FSC RO 43.401.701 ROJ-015 E11F400D RHRSW PUMP E1151C001D MIN 5706-3 I G-5 B Active 3 3 GL AO C C C ETC RO 43.401.702 ROJ-015 FLOWVLV FSC RO 43.401.702 ROJ-015 E11F412 RHR DIV. II PRIMARY 5706-1 / E-4 A Active 2 1 GL so 0 C FAI LTJ AppJ 43.401.331 AT-1 CONTAINMENT MONITORING ISOLATION VALVE ovc AppJ 43.401.331 VRR-002 ovo AppJ 43.401.331 VRR-002 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 64 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 66 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E11F412 RHR DIV. II PRIMARY 5706-1 / E-4 A Active 2 1 GL so 0 C FAI RPI AppJ 43.401.331 VRR-002 CONTAINMENT MONITORING ISOLATION VALVE ETC cs 24.204.04, CSJ-009 24.204.05 STC cs 24.204.04, CSJ-009 24.204.05 E11F413 RHR DIV. II PRIMARY 5706-1 / F-4 A Active 2 1 GL so 0 C FAI LTJ AppJ 43.401.332 AT-1 CONTAINMENT MONITORING ISOLATION VALVE ovc AppJ 43.401.332 VRR-002 ovo AppJ 43.401.332 VRR-002 RPI AppJ 43.401.332 VRR-002 ETC cs 24.204.04, CSJ-009 24.204.05 STC cs 24.204.04, CSJ-009 24.204.05 E11F414 RHR DIV. I PRIMARY 5706-2 / F-7 A Active 2 1 GL so 0 C FAI LTJ AppJ 43.401.350 AT-1 CONTAINMENT MONITORING ISOLATION VALVE ovc AppJ 43.401.350 VRR-002 ovo AppJ 43.401.350 VRR-002 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 65 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 67 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E11F414 RHR DIV. I PRIMARY 5706-2 / F-7 A Active 2 1 GL so 0 C FAI RPI AppJ 43.401.350 VRR-002 CONTAINMENT MONITORING ISOLATION VALVE ETC cs 24.204.04, CSJ-009 24.204.05 STC cs 24.204.04, CSJ-009 24.204.05 E11 F415 RHR DIV. I PRIMARY 5706-2 I F-8 A Active 2 1 GL so 0 C FAI LTJ AppJ 43.401.351 AT-1 CONTAINMENT MONITORING ISOLATION VALVE ovc AppJ 43.401.351 VRR-002 ovo AppJ 43.401.351 VRR-002 RPI AppJ 43.401.351 VRR-002 ETC cs 24.204.04, CSJ-009 24.204.05 STC cs 24.204.04, CSJ-009 24.204.05 E2100F003A CS DIV1 PUMP C001A 5707 / E-6 C Active 2 12 CK SA SD O/C N/A eve CM 24.203.02 CMJ-04 DISCHARGE CHECK VLV cvo CM 24.203.02 CMJ-04 CVP CM 24.203.02 CMJ-04 E2100F003B CS DIV2 PUMP C001 B DISCHARGE 5707 / F-3 C Active 2 12 CK SA SD O/C N/A eve CM 24.203.03 CMJ-04 CHECK VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 66 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 68 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E2100F003B CS DIV2 PUMP C001 B DISCHARGE 5707 / F-3 C Active 2 12 CK SA SD O/C N/ A cvo CM 24.203.03 CMJ-04 CHECK VLV CVP CM 24.203.03 CMJ-04 E2100F003C CS DIV1 PUMP C001C DISCHARGE 5707 / E-4 C Active 2 12 CK SA SD O/ C N/ A eve CM 24.203.02 CMJ-04 CHECK VLV cvo CM 24.203.02 CMJ-04 CVP CM 24.203.02 CMJ -04 E2100F003D CS DIV2 PUMP C001 D DISCHARGE 5707 / F-2 C Active 2 12 CK SA SD O/ C N/ A eve CM 24.203.03 CMJ-04 CHECK VLV cvo CM 24.203.03 CMJ -04 CVP CM 24.203.03 CMJ -04 E2100F006A CS DIV1 INBD PC CHECK AOV 5707 / F-7 A/C Active 1 12 CK SA C O/ C N/ A LT AppJ 43.401.513 VRR-003 / AT-10 LTJ AppJ 43.401.312 eve CM 43.401.312 CMJ - 17 cvo CM 43.000.010 CMJ-17 ovc CM 43.401.312 CMJ-17 ovo CM 4 3.000.010 CMJ - 17 RPI CM 24.203.04 CMJ-17 E2100F006B CS DIV2 INBD PC CHECK AOV 5707 I G-7 A/C Active 1 12 CK SA C O/ C N/ A LT AppJ 43.401.513 VRR-003 / AT-10 LTJ AppJ 43.401.311 eve CM 43.401.311 CMJ-17 cvo CM 43.000.010 CMJ - 17 ovc CM 43.401.311 CMJ-17 ovo CM 43.000.010 CMJ-17 RPI CM 24.203.04 CMJ - 17 E2100F011A CS DIV1 PUMPS DISCHARGE 5707 / F-5 C Active 2 3 RV SA C O/ C N/ A RV 10Y 43.000.020 PRESS RELIEF VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 67 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 69 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E2100F011B CS DIV2 PUMPS DISCHARGE 5707 / G-4 C Active 2 3 RV SA C O/C N/A RV 10Y 43.000.020 PRESS RELIEF VLV E2100F012A CS DIV1 PUMPS DISCHARGE 5707 / F-5 C Active 2 3 RV SA C O/C N/A RV 10Y 43.000.020 PRESS RELIEF VLV E2100F012B CS DIV2 PUMPS DISCHARGE 5707 I G-4 C Active 2 3 RV SA C O/C N/A RV 10Y 43.000.020 PRESS RELIEF VLV E2100F029A CS DIV1 DISCHARGE HEADER 5707 / F-5 C Active 2 3 CK SA SD C N/A BDO Q 24.203.01 PRIMING SPLY CHECK VLV eve Q 24.203.02 E2100F029B CS DIV2 DISCHARGE HEADER 5707 / G-5 C Active 2 3 CK SA SD C N/A BDO Q 24.203.01 PRIMING SPLY CHECK VLV eve Q 24.203.03 E2100F030A CS DIV1 DISCHARGE HEADER 5707 / F-5 C Active 2 3 CK SA SD C N/A BDO Q 24.203.01 PRIMING SPLY CHECK VLV eve Q 24.203.02 E2100F030B CS DIV2 DISCHARGE HEADER 5707 / G-5 C Active 2 3 CK SA SD C N/A BDO Q 24.203.01 PRIMING SPLY CHECK VLV eve Q 24.203.03 E2100F032A CS DIV1 PUMPS SUCT PRESS 5707 / C-5 C Active 2 1.50 TRV SA C O/C N/A RV 10Y 43.000.020 THERMAL RELIEF VLV E2100F032B CS DIV2 PUMPS SUCT PRESS 5707 / C-3 C Active 2 1.50 TRV SA C O/C N/A RV 10Y 43.000.020 THERMAL RELIEF VLV E2100F038A CS DIV1 PUMP C001A MIN 5707 / E-5 C Active 2 3 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-05 FLOW/R ECIRC CHECK VLV cvo CM 43.000.010 CMJ-05 E2100F038B CS DIV2 PUMP C002B MIN 5707 / E- 3 C Active 2 3 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-05 FLOW/R ECIRC CHECK VLV cvo CM 43.000.010 CMJ-05 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 68 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 70 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E2100F038C CS DIV1 PUMP C001C MIN 5707 / E-5 C Active 2 3 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-05 FLOW/R ECIRC CHECK VLV cvo CM 43.000.010 CMJ-05 E2100F038D CS DIV2 PUMP C001 D MIN 5707 / E-3 C Active 2 3 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-05 FLOW/R ECIRC CHECK VLV cvo CM 43.000.010 CMJ-05 E2150F004A CS DIV1 OTBD ISO MOV 5707 / E-6 B Passive 2 12 GA MO 0 0 FAI ovc 2Y 47.306.06 ovo 2Y 47.306.06 RPI 2Y 24.203.04 E2150F004B CS DIV2 OTBD ISO MOV 5707 / G-6 B Passive 2 12 GA MO 0 0 FAI ovc 2Y 47.306.06 ovo 2Y 47.306.06 RPI 2Y 24.203.04 E2150F005A CS DIV1 INBD ISO MOV 5707 / E-6 A Active 1 12 GA MOL C O/C FAI ETC 2Y 24.203.04 ETO 2Y 24.203.04 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LT AppJ 43.401.513 VRR-003 / AT-10 LTJ AppJ 43.401.312 AT-1 E2150F005B CS DIV2 INBD ISO MOV 5707 / G-6 A Active 1 12 GA MOL C O/C FAI ETC 2Y 24.203.04 ETO 2Y 24.203.04 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LT AppJ 43.401.513 VRR-003 / AT-10 LTJ AppJ 43.401.311 AT-1 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 69 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 71 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E2150F015A CS DIV1 PUMP FLOW TEST ISO 5707 / E-6 B Active 2 10 GL MOL-C C C FAI ETC 2Y 24.203.02 MOV ETO 2Y 24.203.02 ovc 2Y 24.203.02 ovo 2Y 24.203.02 STC 2Y 24.203.02 DIAG App3 47.306.06 RPI App3 47.306.06 E2150F015B CS DIV2 PUMP FLOW TEST ISO 5707 / F-6 B Active 2 10 GL MOL-C C C FAI ETC 2Y 24.203.03 MOV ETO 2Y 24.203.03 ovc 2Y 24.203.03 ovo 2Y 24.203.03 STC 2Y 24.203.03 DIAG App3 47.306.06 RPI App3 47.306.06 E2150F031A CS DIV1 MIN FLOW/R ECIRC ISO 5707 / D-6 B Active 2 3 GA MOL 0 O/C FAI ETC 2Y 24.203.02 MOV ETO 2Y 24.203.02 DIAG App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 70 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 72 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E2150F031A CS DIV1 MIN FLOW/R ECIRC ISO 5707 / D-6 B Active 2 3 GA MOL 0 O/C FAI ovc App3 47.306.06 MOV ovo App3 47.306.06 RPI App3 47.306.06 E2150F031B CS DIV2 MIN FLOW/REC IRC ISO 5707 / E-4 B Active 2 3 GA MOL 0 O/C FAI ETC 2Y 24.203.03 MOV ETO 2Y 24.203.03 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E2150F036A CS DIV1 SUCT FROM SUPR 5707 / B-7 B Active 2 20 GA MOL KO O/C FAI ETC 2Y 24.203.02 CHAMBER ISO MOV ETO 2Y 24.203.02 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E2150F036B CS DIV2 SUCT FROM SUPR 5707 / B-7 B Active 2 20 GA MOL KO O/C FAI ETC 2Y 24.203.03 CHAMBER ISO MOV ETO 2Y 24.203.03 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 71 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 73 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E2150F036B CS DIV2 SUCT FROM SUPR 5707 / B-7 B Active 2 20 GA MOL KO O/C FAI DIAG App3 47.306.06 CHAMBER ISO MOV ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E21 F500A CS HEADER "A" TO SPARGER V13- 5707 / H-7 A/C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.112 VRR-001 2377 EXCESS FLOW CHECK VLV eve 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ovc 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 E21 F500B CS HEADER "B" TO SPARGER V13- 5707 / H-7 A/C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.115 VRR-001 2378 EXCESS FLOW CHECK VLV eve 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ovc 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 E4100F005 HPCI MAIN PUMP DISCHARGE 5708-1 / D-6 A/C Active 2 14 CK SA SD O/C N/A LT 2Y 43.401.514 CHECK VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 72 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 74 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4100F005 HPCI MAIN PUMP DISCHARGE 5708-1 / D-6 A/C Active 2 14 CK SA SD O/C N/A eve Q 24.202.01, CHECK VLV 24.202.08 cvo Q 24.202.01, 24.202.08 E4100F019 HPCI BOOSTER PUMP SUCT FROM 5708-1 / F-4 C Active 2 16 CK SA SD O/C N/A eve CM 43.000.010 CMJ-06 CST CHECK VLV cvo CM 24.202.01, CMJ-06 24.202.08 E4100F020 HPCI BOOSTER PMP INLET PRESS 5708-1 / E-4 C Active 2 1.50 RV SA C O/C N/A RV 10Y 43.000.020 VRR-005 RELIEF VLV E4100F025 HPCI BARO CNDR CONDENSATE 5708-1 / B-4 B Active 2 1 GL AO C C C ovc 2Y N/A TP-1 8 OUTLET TO FD OTBD ISO AOV ovo 2Y N/A TP - 18 RPI 2Y 24.202.05 ETC Q 24.202.01 ,

24.202.08 FSC Q 24.202.01 ,

24.202.08 STC Q 24.202.01 ,

24.202.08 E4100F026 HPCI BARO CNDR CONDENSATE 5708-1 / B-4 B Active 2 1 GL AO C C C ovc 2Y N/A TP - 18 OUTLET TO FD INBD ISO AOV ovo 2Y N/A TP-1 8 RPI 2Y 24.202.05 ETC Q 24.202.01 ,

24.202.08 FSC Q 24.202.01, 24.202.08 STC Q 24.202.01, 24.202.08 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 73 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 75 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4100F028 HPCI TURB SPLY DRAIN POT TO 5708-1 / 0-1 B Active 2 1 GL AO 0 O/C C ovc 2Y N/A TP-18 MAIN CNDR DRAIN LINE ISO AOV ovo 2Y N/A TP-18 RPI 2Y 24.202.05 ETC Q 24.202.01, 24.202.08 ETO Q 24.202.01 ,

24.202.08 FSC Q 24.202.01, 24.202.08 STC Q 24.202.01, 24.202.08 STO Q 24.202.01, 24.202.08 E4100F029 HPCI TURB SPLY DRAIN POTTO 5708-1 / C-1 B Active 2 1 GL AO 0 O/C C ovc 2Y N/A TP-18 MAIN CNDR DRAIN LINE ISO AOV ovo 2Y N/A TP - 18 RPI 2Y 24.202.05 ETC Q 24.202.01 ,

24.202.08 ETO Q 24.202.01 ,

24.202.08 FSC Q 24.202.01, 24.202.08 STC Q 24.202.01 ,

24.202.08 STO Q 24.202.01, 24.202.08 E4100F040 HPCI TURB EXHAUST 5708-1 / C-6 C Active 2 2 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-09 CONDENSATE DRAIN POT OUTLET VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 74 of 178

.. Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 76 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4100F040 HPCI TURB EXHAUST 5708-1 / C-6 C Active 2 2 CK SA SD 0 N/ A cvo CM 24.202.01, CMJ-09 CONDENSATE DRAIN POT OUTLET 24.202.08 VLV E4100F045 HPCI BOOSTER PUMP SUCT 5708-1 / B-5 C Active 2 16 CK SA SD 0 N/ A BDC CM 43.000.010 CMJ-06 FROM SUPR POOL CHECK VLV cvo CM 43.000.010 CMJ -06 E4100F048 HPCI BARO CNDR CONDENSATE 5708-1 / B-4 C Active 2 2 CK SA SD O/ C N/ A eve CM 43.000.010 CMJ-09 PUMP RETURN LINE CHECK VLV cvo CM 24.202.01 , CMJ -09 24.202.08 E4100F049 HPCI TURB EXHAUST CHECK VLV 5708-1 / C-6 C Active 2 20 CK SA SD 0 N/ A BDC CM 43.000.010 CMJ-10 cvo CM 24.202.01 , CMJ - 10 24.202.08 E4100F050 HPCI LUBE OIL COOLER INLET 5708- 1 / B-4 C Active 2 3 RV SA C O/ C N/ A RV 10Y 43.000.020 VRR-005 PRESS RELIEF VLV E4100F052 HPCI BARO CNDR CONDENSATE 5708-1 / B-3 C Active 2 2 CK SA SD C N/ A BDO Q 24.202.01 ,

PUMP RETURN LINE CHECK VLV 24.202.08 eve Q 24.202.01 ,

24.202.08 E4100F053 HPCI TURB EXHAUST DRAIN POT 5708-1 / C-3 B Active 2 1 GL AO C O/ C C ovc 2Y N/ A TP-18 CONDENSATE DRAIN AOV ovo 2Y N/ A TP - 18 RPI 2Y 24.202.05 ETC Q 24.202.01 ,

24.202.08, 24.202.05 ETO Q 24.202.01 ,

24.202.08, 24.202.05 FSC Q 24.202.01 ,

24.202.08 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 75 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 77 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4100F053 HPCI TURB EXHAUST DRAIN POT 5708-1 / C-3 B Active 2 1 GL AO C O/C C STC Q 24.202.01, CONDENSATE DRAIN AOV 24.202.08 STO Q 24.202.01, 24.202.08 E4100F057 HPCI LUBE OIL COOLER OUTLET 5708-1 / B-3 C Active 2 2 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-09 CHECK VLV cvo CM 24.202.01, CMJ-09 24.202.08 E4100F076 HPCI TURB EXHAUST LINE 5708-1 / D-7 C Active 2 4 CK SA SD O/C N/A eve cs 24.202.07 CSJ-020 VACUUM BREAKER CHECK VLV cvo cs 24.202.07 CSJ-020 E4100F077 HPCI TURB EXHAUST LINE 5708-1 / D-8 C Active 2 4 CK SA SD O/C N/A eve cs 24.202.07 CSJ-020 VACUUM BREAKER CHECK VLV cvo cs 24.202.07 CSJ-020 E4100F220 HPCI KEEP FILL OTBD CHECK VLV 5708-1 / C-6 C Active 2 0.75 CK SA 0 C N/A eve cs 24.202.05 CSJ-019 BDO Q 24.202.03 E4100F221 HPCI KEEP FILL INBD CHECK VLV 5708-1 / C-6 C Active 2 0.75 CK SA 0 C N/A eve cs 24.202.05 CSJ-019 BDO Q 24.202.03 E4150D003 HPCI TURBINE EXHAUST LINE 5708-1 / E-3 D Active 2 16 RD SA C O/C N/A RD SY E316 RUPTURE DISC E4150D004 HPCI TURBINE EXHAUST LINE 5708-1 / E-3 D Active 2 16 RD SA C O/C N/A RD SY E316 RUPTURE DISC E4150F001 HPCI TURB STM SPLY ISO MOV 5708-1 / E- 1 B Active 2 10 GA MOH C O/C FAI DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 ETC Q 24.202.01, 24.202.08, 24.202.05 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 76 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 78 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4150F001 HPCI TURB STM SPLY ISO MOV 5708-1/E-1 B Active 2 10 GA MOH C O/C FAI ETO Q 24.202.01, 24.202.08, 24.202.05 E4150F002 HPCI TURBINE STEAM SUPPLY 5708-1 / F-7 A Active 1 10 GA MOH-C KO O/C FAI DIAG App3 47.306.06 INBOARD CONTAINMENT ISO MOV ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.306 AT-1 , AT-4 ETC cs 24.202.05 CSJ-010 ETO cs 24.202.05 CSJ-010 STC cs 24.202.05 CSJ-010 E4150F003 HPCI TURB STM SPLY OTBD CNTM 5708-1/F-7 A Active 1 10 GA MOH- C O/C FAI DIAG App3 47.306.06 ISO MOV oc ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 77 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 79 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4150F003 HPCI TURB STM SPLY OTBD CNTM 5708-1 / F-7 A Active 1 10 GA MOH- C O/C FAI LTJ AppJ 43.401.306 AT-1, AT-4 ISO MOV oc ETC Q 24.202.01, 24.202.08, 24.202.05 ETO Q 24.202.01 ,

24.202.08, 24.202.05 STC Q 24.202.01 ,

24.202.08, 24.202.05 STO Q 24.202.01, 24.202.08, 24.202.05 E4150F004 HPCI BOOSTER PUMP SUCT 5708-1 / F-4 B Active 2 16 GA MOL 0 O/ C FAI ETC 2Y 24.202.05, FROM CST ISO MOV 24.202.08, 24.202.01 ETO 2Y 24.202.05, 24.202.08, 24.202.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E4150F006 HPCI MAIN PUMP OUTLET TO FW 5708-1 / D-7 A Active 1 14 GA MOH C O/ C FAI DIAG App3 47.306.06 ISO MOV ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 78 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 80 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4150F006 HPCI MAIN PUMP OUTLET TO FW 5708-1 / 0-7 A Active 1 14 GA MOH C O/C FAI LT AppJ 43.401.514 VRR-003 / AT-10 ISO MOV LTJ AppJ 43.401.303 AT-1, AT-4 ETC cs 24.202.05 CSJ-004 ETO cs 24.202.05 CSJ-004 E4150F007 HPCI MAIN PUMP DISCHARGE 5708-1 / D-6 B Passive 2 14 GA MO 0 0 FAI ovo 2Y 24.202.08 ISO MOV RPI 2Y 24.202.05 ovc AppJ 43.401.514 VRR-003 / VRR-004 E4150F008 HPCI MAIN PUMP TEST LINE ISO 5708-1 / E-5 B Passive 2 10 GL MO C C FAI ovc 2Y 24.202.08 MOV ovo 2Y 24.202.08 RPI 2Y 24.202.05 E4150F012 HPCI MAIN PUMP E4101C001A 5708-1 / D-5 B Active 2 4 GL MOH- C O/C FAI ovo 2Y 24.202.08 MIN FLOW TO SUPR CHAMBER oc ISO MOV DIAG App3 47.306.06 ovc App3 47.306.06 RPI App3 47.306.06 ETC Q 24.202.01, 24.202.08, 24.202.05 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 79 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 81 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4150F012 HPCI MAIN PUMP E4101C001A 5708-1 / 0-5 B Active 2 4 GL MOH- C O/ C FAI ETO Q 24.202.01, MIN FLOW TO SUPR CHAMBER oc 24.202.08, ISO MOV 24.202.05 STC Q 24.202.01, 24.202.08, 24.202.05 STO Q 24.202.01 ,

24.202.08, 24.202.05 E4150F021 HPCI TURB EXHAUST STOP GLOBE 5708- 1 / C-7 B/ C Active 2 16 MOH/ SC MO/ SA KO O/ C FAI ETC 2Y 24.202.05, MOV K 24.202.08 ETO 2Y 24.202.05, 24.202.08 ovo 2Y N/A TP - 18 DIAG App3 47.306.06 ovc App3 47.306.06 RPI App3 47.306.06 eve Q 24.202.01 ,

24.202.08, 24.202.05 cvo Q 24.202.01 ,

24.202.08, 24.202.05 E4150F022 HPCI TURB EXH CONDENSATE 5708-1 / C-6 B/ C Active 2 2 MO/ SA KO O/ C FAI ETC 2Y 24.202.05, DRAIN TO SUPR POOL STOP MOL/ SCK 24.202.08, CHECK MOV 24.202.01 ETO 2Y 24.202.05, 24.202.08, 24.202.01 ovo 2Y N/A TP - 18 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 80 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table , Rev.4 , Page 82 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4150F022 HPCI TURB EXH CONDENSATE 5708-1 / C-6 B/C Active 2 2 MO/SA KO O/C FAI DIAG App3 47.306.06 DRAIN TO SUPR POOL STOP MOL/SCK CHECK MOV ovc App3 47.306.06 RPI App3 47.306.06 eve Q 24.202.01 ,

24.202.08, 24.202.05 cvo Q 24.202.01 ,

24.202.08, 24.202.05 E4150F041 HPCI BOOSTER PUMP SUCT FROM 5708-1 / F-4 B Active 2 16 GA MOL C O/C FAI ETC 2Y 24.202.05, SUPR POOL ISO MOV 24.202.08, 24.202.01 ETO 2Y 24.202.05, 24.202.08, 24.202.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E4150F042 HPCI BOOSTER PUMP SUCT 5708-1 / B-6 B Active 2 16 GA MOL-C C O/C FAI ETC 2Y 24.202.05, FROM SUPR POOL ISO MOV 24.202.08, 24.202.01 ETO 2Y 24.202.05, 24.202.08, 24.202.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 81 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 83 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4150F042 HPCI BOOSTER PUMP SUCT 5708-1 / B-6 B Active 2 16 GA MOL-C C O/C FAI STC 2Y 24.202.05, FROM SUPR POOL ISO MOV 24.202.08, 24.202.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E4150F059 HPCI LUBE OIL COOLING WATER 5708-1 / D-4 B Active 2 2 GL MOH C O/C FAI ovo 2Y 24.202.08 SPLY ISO MOV DIAG App3 47.306.06 ovc App3 47.306.06 RPI App3 47.306.06 ETC Q 24.202.01, 24.202.08, 24.202.05 ETO Q 24.202.01 ,

24.202.08, 24.202.05 E4150F075 HPCI TURB EXHAUST LINE 5708-1 / D-7 A Active 2 4 GA MOL-C 0 O/C FAI ETC 2Y 24.202.05, VACUUM BREAKER ISO MOV 24.202.08, 24.202.01 ETO 2Y 24.202.05, 24.202.08, 24.202.01 STC 2Y 24.202.05, 24.202.08, 24.202.01 DIAG App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 82 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 84 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4150F075 HPCI TURB EXHAUST LINE 5708-1 / 0-7 A Active 2 4 GA MOL-C 0 O/C FAI ovc App3 47.306.06 VACUUM BREAKER ISO MOV ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.382 AT-1 E4150F079 HPCI TURB EXHAUST LINE 5708-1 / C-8 A Active 2 4 GA MOL-C 0 O/C FAI ETC 2Y 24.202.05, VACUUM BREAKER ISO MOV 24.202.08, 24.202.01 ETO 2Y 24.202.05, 24.202.08, 24.202.01 STC 2Y 24.202.05, 24.202.08, 24.202.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.382 AT-1 E4150F600 HPCI TURB STM SPLY LINE 5708-1/F-7 A Active 1 1 GL MOL-C KO O/C FAI ETC 2Y 24.202.05 E4150F003 BYPASS MOV ETO 2Y 24.202.05 ovo 2Y 24.202.08 STC 2Y 24.202.05 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 83 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 85 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E4150F600 HPCI TURB STM SPLY LINE 5708-1/F-7 A Active 1 1 GL MOL-C KO O/C FAI DIAG App3 47.306.06 E4150F003 BYPASS MOV ovc App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.306 AT-1, AT-4 E41F011 HPCI TEST LINE ISO / PRESS CTRL 5708-1 / G-5 B Active 2 8 GL AO C C C ovc 2Y 24.202.08 AOV ovo 2Y 24.202.08 RPI 2Y 24.202.05 ETC Q 24.202.01, 24.202.08 FSC Q 24.202.01 ,

24.202.08 STC Q 24.202.01 ,

24.202.08 E41F400 HPCI PCM - SUPR POOL 5741 I D-4 A Active 2 1 GL so 0 O/C FAI LTJ AppJ 43.401.379 AT-1 SOLENOIDVLV ovc AppJ 43.401.379 VRR-002 ovo AppJ 43.401.379 VRR-002 RPI AppJ 43.401.379 VRR-002 ETC Q 24.408.03 ETO Q 24.408.03 STC Q 24.408.03 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 84 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 86 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E41F400 HPCI PCM - SUPR POOL 5741 I D-4 A Active 2 1 GL so 0 O/C FAI STO Q 24.408.03 SOLENOIDVLV E41F401 HPCI PCM - SUPR POOL 5741 I C-4 A Active 2 1 GL so 0 O/C FAI LTJ AppJ 43.401.401 AT-2 SOLENOIDVLV ovc AppJ 43.401.401 VRR-002 ovo AppJ 43.401.401 VRR-002 RPI AppJ 43.401.401 VRR-002 ETC Q 24.408.03 ETO Q 24.408.03 STC Q 24.408.03 STO Q 24.408.03 E41 F402 HPCI PCM - SUPR POOL 5741 / D-5 A Active 2 1 GL so 0 O/C FAI LTJ AppJ 43.401.378 AT-1 SOLENOIDVLV ovc AppJ 43.401.378 VRR-002 ovo AppJ 43.401.378 VRR-002 RPI AppJ 43.401.378 VRR-002 ETC Q 24.408.04 ETO Q 24.408.04 STC Q 24.408.04 STO Q 24.408.04 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 85 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 87 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E41 F403 HPCI PCM - SUPR POOL 5741 / C-5 A Active 2 1 GL so 0 O/C FAI LTJ AppJ 43.401.400 AT-2 SOLENOIDVLV ovc AppJ 43.401.400 VRR-002 ovo AppJ 43.401.400 VRR-002 RPI AppJ 43.401.400 VRR-002 ETC Q 24.408.04 ETO Q 24.408.04 STC Q 24.408.04 STO Q 24.408.04 E41 F500 MAIN STM TO HPCI TURB V13- 5708-1/G-7 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.112 VRR-001 2379 EXC ESS FLOW CHECK VLV cvo 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ovc 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 E41 F501 MAIN STM TO HPCI TURB V13- 5708-1 / G-7 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.112 VRR-001 2380 EXC ESS FLOW CHECK VLV cvo 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 86 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 88 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E41 F501 MAIN STM TO HPCI TURB V13- 5708-1 / G-7 A/C Active 1 1 XCK SA 0 O/C N/A ovc 10Y 44.220.112 VRR-001 2380 EXC ESS FLOW CHECK VLV ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 E41 F502 MAIN STM TO HPCI TURB V13- 5708-1/F-7 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.115 VRR-001 2381 EXC ESS FLOW CHECK VLV cvo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ovc 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 E41 F503 MAIN STM TO HPCI TURB V13- 5708-1 / E-7 A/C Active 1 1 XCK SA 0 O/C N/A eve 10Y 44.220.115 VRR-001 2382 EXC ESS FLOW CHECK VLV cvo 10Y 44.220.115 VRR-001 LT 10Y 44.220.115 VRR-001 ovc 10Y 44.220.115 VRR-001 ovo 10Y 44.220.115 VRR-001 RPI 10Y 44.220.115 VRR-001 E5100F011 RCIC PUMP SPLY FROM CST 5709-1 / G-5 C Active 2 6 CK SA SD O/C N/A eve Q 24.206.01 CHECK VLV cvo Q 24.206.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 87 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 89 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E5100F014 RCIC PUMP DISCHARGE CHECK 5709-1 / E-6 A/C Active 2 6 CK SA SD O/C N/A LT 2Y 43.401.515 VLV eve CM 43.000.010 CMJ-16 cvo CM 24.206.01 CMJ-16 E5100F017 RCIC PUMP INLET PRESS RELIEF 5709-1 / F-4 C Active 2 1 RV SA C O/C N/A RV 10Y 43.000.020 VLV E5100F01 8 RCIC LUBE OIL COOLER COOLING 5709-1 / D-5 C Active 2 1.50 RV SA C O/C N/A RV 10Y 43.000.020 WATER SPLY PRESS RELIEF VLV E5100F020 RCIC TURB EXHAUST DRAIN POT 5709-1 / D-4 B Active 2 3 GA MA 0 C N/A ETC 2Y 24.206.02 THROTTLR VLV INLET ISO VLV ETO 2Y 24.206.02 E5100F021 RCIC PUMP MIN FLOW/R ECIRC 5709-1 / D-6 C Active 2 2 CK SA SD O/C N/A eve CM 43.000.010 CMJ-09 BYPASS CHECK VLV cvo CM 43.000.010 CMJ-09 E5100F027 RCIC TURB EXHAUST DRAIN POT 5709-1 / D-4 B Active 2 0.75 GA MA 0 C N/A ETC 2Y 24.206.02 THROTTLR VLV OUTLET ISO VLV ETO 2Y 24.206.02 E5100F030 RCIC PUMP SPLY FROM SUPR 5709-1 / B-6 C Active 2 6 CK SA SD O/C N/A eve CM 43.000.010 CMJ-07 CHAMBER CHECK VLV cvo CM 43.000.010 CMJ-07 E5100F040 RCIC TURB EXHAUST LINE CHECK 5709-1 / C-7 C Active 2 10 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-10 VLV cvo CM 24.206.01 CMJ-10 E5100F047 RCIC BARO CNDR CONDENSATE 5709-1 / C-4 C Active 2 2 CK SA SD C N/A BDO Q 24.206.01 PUMP RETURN LINE CHECK VLV eve Q 24.206.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 88 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 90 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E5100F056 RCIC TURB EXHAUST DRAIN POT 5709-1 / 0-4 B Active 2 0.75 GA MA 0 C N/A ETC 2Y 24.206.02 THROTTLE VLV ETO 2Y 24.206.02 E5100F063 RCIC TURB EXHAUST LINE 5709-1 / C-8 C Active 2 3 CK SA SD 0/C N/A eve cs 27.206.01 CSJ-020 VACUUM BREAKER CHECK VLV cvo cs 27.206.01 CSJ-020 E5100F064 RCIC TURB EXHAUST LINE 5709-1 / C-8 C Active 2 3 CK SA SD 0/C N/A eve cs 27.206.01 CSJ-020 VACUUM BREAKER CHECK VLV cvo cs 27.206.01 CSJ-020 E5100F148 RCIC BARO CNDR CONDENSATE 5709-1 / C-3 Aug- Active NC 1.25 CK SA C C N/A BDO Q 24.206.01 PUMP E5101C003 DISCHARGE C LINE CHECK VLV eve Q 24.206.01 E5150D001 RCIC SAFETY HEAD RUPTURE 5709-1 / D-6 D Active 2 1 RD SA C 0/C N/A RD SY E315 DISC D001 E5150D002 RCIC SAFETY HEAD RUPTURE DISC 5709-1 / D-6 D Active 2 1 RD SA C 0/C N/A RD SY E315 D002 E5150F001 RCIC TURB EXHAUST LINE ISO 5709-1 / C-7 B/C Active 2 10 MO/SA KO 0/C FAI ETC 2Y 24.206.02, MOV MOL/SCK 24.206.01 ETO 2Y 24.206.02, 24.206.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo 2Y N/A TP-1 8 RPI App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 89 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 91 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E5150F001 RCIC TURB EXHAUST LINE ISO 5709-1 / C-7 B/ C Active 2 10 MO/ SA KO O/ C FAI eve Q 24.206.01, MOV MOL/ SCK 24.206.02 cvo Q 24.206.01, 24.206.02 E5150F002 RCIC BARO CNDR VACUUM PUMP 5709-1 / B-6 B/ C Active 2 2 MOL/ SCK MO/ SA KO C FAI ETC 2Y 24.206.02, DISCHARGE STOP CHECK MOV 24.206.01 ETO 2Y 24.206.02, 24.206.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo 2Y N/A TP - 18 RPI App3 47.306.06 eve Q 24.206.01 ,

24.206.02 cvo Q 24.206.01 ,

24.206.02 E5150F004 RCIC DIV1 BARO CNDR 5709-1 / C-4 B Active 2 1 GL AO C C C ovc 2Y N/ A TP-18 CONDENSATE PUMP TO CRW INBD DRAIN ISO AOV ovo 2Y N/ A TP-1 8 RPI 2Y 24.206.02 ETC Q 24.206.01 FSC Q 24.206.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 90 of 178

.. Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 92 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E5150F004 RCIC DIV1 BARO CNDR 5709-1 / C-4 B Active 2 1 GL AO C C C STC Q 24.206.01 CONDENSATE PUMP TO CRW INBD DRAIN ISO AOV E5150F005 RCIC DIV2 BARO CNDR 5709-1 / C-4 B Active 2 1 GL AO 0 C C ovc 2Y N/ A TP-18 CONDENSATE PUMP TO CRW OTBD DRN ISO AOV ovo 2Y N/ A TP - 18 RPI 2Y 24.206.02 ETC Q 24.206.01 FSC Q 24.206.01 STC Q 24.206.01 E5150F007 RCIC TURB STM SPLY INBD CNTM 5709-1 / G-7 A Active 1 4 GA MOH-C KO O/ C FAI DIAG App3 47.306.06 ISO MOV ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.305 AT- 1, AT-4 ETC cs 24.206.02 CSJ-023 ETO cs 24.206.02 CSJ -023 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 91 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 93 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E5150F007 RCIC TURB STM SPLY INBD CNTM 5709-1 / G-7 A Active 1 4 GA MOH-C KO O/ C FAI STC cs 24.206.02 CSJ-023 ISO MOV E5150F008 RCIC TURB STM SPLY OTBD CNTM 5709-1 / G-6 A Active 1 4 GA MOL-C KO O/ C FAI ETC 2Y 24.206.02 ISO MOV ETO 2Y 24.206.02 STC 2Y 24.206.02 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.305 AT-1, AT-4 E5150F010 RCIC PUMP SPLY FROM CST ISO 5709-1 / G-4 B Active 2 6 GA MOL 0 O/ C FAI ETC 2Y 24.206.02, MOV 24.206.01 ETO 2Y 24.206.02, 24.206.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E5150F013 RCIC PUMP SPLY TO FEEDWATER 5709-1 / E-7 A Active 1 6 GA MOL-OC C O/ C FAI ETC 2Y 24.206.02 HEADER ISO MOV ETO 2Y 24.206.02 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 92 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 94 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E5150F013 RCIC PUMP SPLY TO FEEDWATER 5709-1 / E-7 A Active 1 6 GA MOL-OC C O/C FAI STC 2Y 24.206.02 HEADER ISO MOV STO 2Y 24.206.02 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LT AppJ 43.401.515 VRR-003 / AT-10 LTJ AppJ 43.401.304 AT-1 , AT-4 E5150F019 RCIC PUMP MIN FLOW RECIRC 5709-1 / 0-6 B Active 2 2 GA MOL- C O/C FAI ETC 2Y 24.206.02 BYPASS MOV oc ETO 2Y 24.206.02 STC 2Y 24.206.02 STO 2Y 24.206.02 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E5150F022 RCIC SPL Y TO CST TEST ISO MOV 5709-1 / D-7 B Passive 2 4 GL MO C C FAI ovc 2Y 24.206.01 ovo 2Y 24.206.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 93 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 95 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E5150F022 RCIC SPL Y TO CST TEST ISO MOV 5709-1 / 0 -7 B Pa ssive 2 4 GL MO C C FAI RPI 2Y 24.206.02 E5150F025 RCIC DIV1 STM HEADER DRAIN 5709-1 / D-2 B Active 2 1 GL AO C 0/C C ovc 2Y N/A TP-1 8 POT TO CNDR INBD DRAIN ISO AOV ovo 2Y N/A TP-18 RPI 2Y 24.206.02 ETC Q 24.206.01 ETO Q 24.206.01 FSC Q 24.206.01 STC Q 24.206.01 STO Q 24.206.01 E5150F026 RCIC DIV2 STM HEADER DRAIN 5709-1 / D-2 B Active 2 1 GL AO C 0/C C ovc 2Y N/A TP-18 POT TO CNDR OTBD DRAIN ISO AOV ovo 2Y N/A TP-1 8 RPI 2Y 24.206.02 ETC Q 24.206.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 94 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 96 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E5150F026 RCIC DIV2 STM HEADER DRAIN 5709-1 / D-2 B Active 2 1 GL AO C O/C C ETO Q 24.206.01 POT TO CNDR OTBD DRAIN ISO AOV FSC Q 24.206.01 STC Q 24.206.01 STO Q 24.206.01 E5150F029 RCIC PUMP SPLY FROM TORUS 5709-1 / F-5 B Active 2 6 GA MOL C O/C FAI ETC 2Y 24.206.02, ISO MOV 24.206.01 ETO 2Y 24.206.02, 24.206.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E5150F031 RCIC PUMP SPLY FROM TORUS 5709-1 / B-6 B Active 2 6 GA MOL C O/C FAI ETC 2Y 24.206.02, ISO MOV 24.206.01 ETO 2Y 24.206.02, 24.206.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 95 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 97 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E5150F031 RCIC PUMP SPLY FROM TORUS 5709-1 / B-6 B Active 2 6 GA MOL C O/C FAI RPI App3 47.306.06 ISO MOV E5150F045 RCIC TURB STM INLET ISO MOV 5709-1 / E-3 B Active 2 4 GA MOL- C O/C FAI ETC 2Y 24.206.02, oc 24.206.01 ETO 2Y 24.206.02, 24.206.01 STC 2Y 24.206.02, 24.206.01 STO 2Y 24.206.02, 24.206.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 E5150F046 RCIC LUBE OIL COOLER COOLING 5709-1 / E-4 B Active 2 2 GL MOL C O/C FAI ETC 2Y 24.206.02, WATER SPLY ISO MOV 24.206.01 ETO 2Y 24.206.02, 24.206.01 ovc 2Y 24.206.02 ovo 2Y 24.206.02 DIAG App3 47.306.06 RPI App3 47.306.06 E5150F062 RCIC TURB EXHAUST LINE 5709-1 / C-7 A Active 2 3 GA MOL-C 0 O/C FAI ETC 2Y 24.206.02, VACUUM BREAKER ISO MOV 24.206.01 ETO 2Y 24.206.02, 24.206.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 96 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 98 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E5150F062 RCIC TURB EXHAUST LINE 5709-1 / C-7 A Active 2 3 GA MOL-C 0 O/ C FAI STC 2Y 24.206.02, VACUUM BREAKER ISO MOV 24.206.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.382 AT-1 E5150F084 RCIC TURB EXHAUST LINE 5709 - 1 / C-7 A Active 2 3 GA MOL-C 0 O/ C FAI ETC 2Y 24.206.02, VACUUM BREAKER ISO MOV 24.206.01 ETO 2Y 24.206.02, 24.206.01 STC 2Y 24.206.02, 24.206.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.382 AT-1 E5150F095 RCIC WARM - UP BYPASS INLET 5709 - 1 / E-2 B Active 2 1 GL MOL- C O/ C FAI ETC 2Y 24.206.02 MOV oc ETO 2Y 24.206.02 ovc 2Y N/ A PF1 8 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 97 of 178

Fermi Nuclear Plant DSN : 1ST Valve Scope Table, Rev.4 , Page 99 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E5150F095 RCIC WARM-UP BYPASS INLET 5709-1 / E-2 B Active 2 1 GL MOL- C O/C FAI ovo 2Y N/A PF1 8 MOV oc STC 2Y 24.206.02 STO 2Y 24.206.02 DIAG App3 47.306.06 RPI App3 47.306.06 E51F503 RCIC STM FLOW TO TURB V13- 5709-1 / H-8 A/C Active 1 0.75 XCK SA 0 O/C N/A eve 10Y 44.220.111 VRR-001 2383 EXC ESS FLOW CHECK VLV cvo 10Y 44.220.111 VRR-001 LT 10Y 44.220.111 VRR-001 ovc 10Y 44.220.111 VRR-001 ovo 10Y 44.220.111 VRR-001 RPI 10Y 44.220.111 VRR-001 E51F504 RCIC STM FLOW TO TURB V13- 5709-1 / H-8 A/C Active 1 0.75 XCK SA 0 O/C N/A eve 10Y 44.220.111 VRR-001 2384 EXC ESS FLOW CHECK VLV cvo 10Y 44.220.111 VRR-001 LT 10Y 44.220.111 VRR-001 ovc 10Y 44.220.111 VRR-001 ovo 10Y 44.220.111 VRR-001 RPI 10Y 44.220.111 VRR-001 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 98 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 100 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req E51F505 RCIC STM FLOW TO TURB EXC ESS 5709-1 / H-7 A/C Active 1 0.75 XCK SA 0 O/C N/A eve 10Y 44.220.112 VRR-001 FLOW CHECK VLV cvo 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ovc 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 E51F506 RCIC STM FLOW TO TURB EXC ESS 5709-1 / H-7 A/C Active 1 0.75 XCK SA 0 O/C N/A eve 10Y 44.220.112 VRR-001 FLOW CHECK VLV cvo 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ovc 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 G1100D077 RUPTURE DISC FOR DRYWELL 5710-2 / G-7 D Active 2 1 RD SA C O/C N/A RD SY E313 FLOOR DRAINS SUMP CONTAINMENT PENETRATION X-18 G1100D078 RUPTURE DISC FOR DRYWELL 5710-2 / E-7 D Active 2 1 RD SA C O/C N/A RD SY E314 EQUIPMENT DRAINS SUMP CONTAINMENT PENETRATION X-19 G1100F003 RW DW FD AREA SUMP PMP 5710-2 / H-7 A Active 2 3 GA AO 0 C C ovo 2Y N/A PF19 C001A & C001 B TO FD COLL TNK OTBD CNTM ISO AOV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 99 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 101 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req G1100F003 RW DW FD AREA SUMP PMP 5710-2 / H-7 A Active 2 3 GA AO 0 C C RPI 2Y 24.702.01 C001A & C001 B TO FD COLL TNK OTBD CNTM ISO AOV LTJ AppJ 43.401.314, AT-1, AT-4 43.401.511 ovc AppJ 43.401.314 VRR-004 ETC Q 24.702.01 FSC Q 24.702.01 STC Q 24.702.01 G1100F019 RW DW EQUIP DRN AREA SUMP 5710-2 / D-7 A Active 2 3 GA AO 0 C C ovo 2Y N/ A PF1 9 PMP C006A & C006B COLL TNK OTBD CNTM ISO AOV RPI 2Y 24.702.01 LTJ AppJ 43.401.315, AT-1 , AT-4 43.401.511 ovc AppJ 43.401.315 VRR-004 ETC Q 24.702.01 FSC Q 24.702.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 100 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 102 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req G1100F019 RW DW EQUIP DRN AREA SUMP 5710-2 / D-7 A Active 2 3 GA AO 0 C C STC Q 24.702.01 PMP C006A & C006B COLL TNK OTBD CNTM ISO AOV G1154F018 RW DW EQUIP DRN AREA SUMP 5710-2 / D-7 A Active 2 3 GA MOL-C 0 C FAI ETC 2Y 24.702.01 PMP C006A & C006B WC TNK INBOARD CNTM ISO MOV ETO 2Y 24.702.01 STC 2Y 24.702.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.315, AT-1 , AT-4 43.401.511 G1154F600 RW DW FD AREA SUMP PMP 5710-2 / H-7 A Active 2 3 GA MOL-C 0 C FAI ETC 2Y 24.702.01 C001A & C001 B TO FD COLL TNK INBOARD CNTM ISO MOV ETO 2Y 24.702.01 STC 2Y 24.702.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 101 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 103 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req G1154F600 RW DW FD AREA SUMP PMP 5710-2 / H-7 A Active 2 3 GA MOL-C 0 C FAI DIAG App3 47.306.06 C001A & C001 B TO FD COLL TNK INBOARD CNTM ISO MOV ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.314, AT-1 , AT-4 43.401.511 G3352F001 RWCU RX VESSEL PRIMARY CNTM 5711-1 / G-7 A Active 1 6 GA MOH-C 0 C FAI DIAG App3 47.306.06 DRN LINE RECIRC MOV ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.348 AT-1 ETC RO 24.707.01 ROJ-006 ETO RO 24.707.01 ROJ-006 STC RO 24.707.01 ROJ-006 G3352F004 RWCU OTBD CNTM ISO MOV 5711-1 / G-6 A Active 1 6 GA MOH-C 0 C FAI DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 102 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table , Rev.4 , Page 104 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req G3352F004 RWCU OTBD CNTM ISO MOV 5711-1 / G-6 A Active 1 6 GA MOH-C 0 C FAI LTJ AppJ 43.401.348 AT-1 ETC RO 24.707.01 ROJ-006 ETO RO 24.707.01 ROJ-006 STC RO 24.707.01 ROJ-006 G3352F220 RWCU DIV2 CNTM ISO MOV 5711-1 / H-5 A Active 1 4 GA MOL-C 0 C FAI ETC 2Y 24.707.01 ETO 2Y 24.707.01 STC 2Y 24.707.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.304 AT-1, AT-4 G33F583 RWCU BOTTOM HEAD DRN 5711-1 / E-6 A/C Active 1 1 XCK SA 0 C N/A BDO 10Y 44.220.113 VRR-001 FLOW V13-2387 EXC ESS FLOW CHK VLV eve 10Y 44.220.113 VRR-001 LT 10Y 44.220.113 VRR-001 ovc 10Y 44.220.113 VRR-001 ovo 10Y 44.220.113 VRR-001 RPI 10Y 44.220.113 VRR-001 G5100F600 TWM TORUS DRN AZ-112-30 5713 / F-7 A Active 2 6 GA MOL-C C C FAI ETC 2Y 24.144.01 INBOARD ISO MOV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 103 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 105 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req G5100F600 TWM TORUS DRN AZ-112-30 5713 / F-7 A Active 2 6 GA MOL-C C C FAI ETO 2Y 24.144.01 INBOARD ISO MOV STC 2Y 24.144.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.407 AT-2 G5100F601 TWM TORUS DRN AZ-112-30 5713 / F-7 A Active 2 6 GA MOL-C 0 C FAI ETC 2Y 24.144.01 OTBD ISO MOV ETO 2Y 24.144.01 STC 2Y 24.144.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.407 AT-2 G5100F602 TWM TORUS DRN AZ-292-30 5713 / E-5 A Active 2 6 GA MOL-C C C FAI ETC 2Y 24.144.01 INBOARD ISO MOV ETO 2Y 24.144.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 104 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table , Rev.4 , Page 106 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req G5100F602 TWM TORUS DRN AZ-292-30 5713 / E-5 A Active 2 6 GA MOL-C C C FAI STC 2Y 24.144.01 INBOARD ISO MOV DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.408 AT-2 G5100F603 TWM TORUS DRN AZ-292-30 5713 / E-5 A Active 2 6 GA MOL-C 0 C FAI ETC 2Y 24.144.01 OTBD ISO MOV ETO 2Y 24.144.01 STC 2Y 24.144.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.408 AT-2 G5100F604 TWM TO RESIDUAL HEAT 5713 / G-5 A Active 2 4 GA MOL-C C C FAI ETC 2Y 24.144.01 REMOVAL (RHR) TEST LINE INBOARD ISO MOV ETO 2Y 24.144.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 105 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 107 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req G5100F604 TWM TO RESIDUAL HEAT 5713 / G-5 A Active 2 4 GA MOL-C C C FAI STC 2Y 24.144.01 REMOVAL (RHR) TEST LINE INBOARD ISO MOV DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.405 AT-2 G5100F605 TWM TO RESIDUAL HEAT 5713 / G-5 A Active 2 4 GA MOL-C 0 C FAI ETC 2Y 24.144.01 REMOVAL (RHR) TEST LINE OTBD ISO MOV ETO 2Y 24.144.01 STC 2Y 24.144.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 106 of 178

.. Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 108 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req G5100F605 TWM TO RESIDUAL HEAT 5713 / G-5 A Active 2 4 GA MOL-C 0 C FAI RPI App3 47.306.06 REMOVAL (RHR) TEST LINE OTBD ISO MOV LTJ AppJ 43.401.405 AT-2 G5100F606 TWM TO CORE SPRAY (CS) TEST 5713 / D-8 A Active 2 4 GA MOL-C C C FAI ETC 2Y 24.144.01 LINE INBOARD ISO MOV ETO 2Y 24.144.01 STC 2Y 24.144.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.420 AT-2 G5100F607 TWM TO CORE SPRAY (CS) TEST 5713 / D-8 A Active 2 4 GA MOL-C 0 C FAI ETC 2Y 24.144.01 LINE OTBD ISO MOV ETO 2Y 24.144.01 STC 2Y 24.144.01 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 107 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 109 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req G5100F607 TWM TO CORE SPRAY (CS) TEST 5713 / D-8 A Active 2 4 GA MOL-C 0 C FAI RPI App3 47.306.06 LINE OTBD ISO MOV LTJ AppJ 43.401.420 AT-2 N21F539A FEEDWATER ENTERING RPV 5715-1 / E-2 A/C Active 1 1 XCK SA 0 C N/ A BDO 10Y 44.220.112 VRR-001 EXCESS FLOW CHECK VLV eve 10Y 44.220.112 VRR-001 LT 10Y 44.220.112 VRR-001 ovc 10Y 44.220.112 VRR-001 ovo 10Y 44.220.112 VRR-001 RPI 10Y 44.220.112 VRR-001 N21F539B FEEDWATER ENTERING RPV 5715-1 / E-1 A/C Active 1 1 XCK SA 0 C N/ A BDO 10Y 44.220.110 VRR-001 EXCESS FLOW CHECK VLV eve 10Y 44.220.110 VRR-001 LT 10Y 44.220.110 VRR-001 ovc 10Y 44.220.110 VRR-001 ovo 10Y 44.220.110 VRR-001 RPI 10Y 44.220.110 VRR-001 P1100F126 CSAT DEMIN SW RISER DW SPLY 5721 -2 / D-3 A Passive 2 6 GA MA LC C N/ A LTJ AppJ 43.401.316 AT- 1 HDR INBOARD CONTAINMENT ISOVLV P34F401A PASS RX COOLANT SAMP FROM 5725 / H-7 A Active 1 0.75 GA so C C C LTJ AppJ 43.401. 329, AT- 1, AT-4 JET PUMP #5 SAMP ISO VLV 43.401.511 ovc AppJ 43.401.329 VRR-002 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 108 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 110 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P34F401A PASS RX COOLANT SAMP FROM 5725 / H-7 A Active 1 0.75 GA so C C C ovo AppJ 43.401.329 VRR-002 JET PUMP #5 SAMP ISO VLV RPI AppJ 43.401.329 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F401B PASS RX COOLANT SAMP FROM 5725 / F-7 A Active 1 0.75 GA so C C C LTJ AppJ 43.401.346, AT-1, AT-4 JET PUMP #15 SAMP ISO VLV 43.401.511 ovc AppJ 43.401.346 VRR-002 ovo AppJ 43.401.346 VRR-002 RPI AppJ 43.401.346 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F402A PASS V13- 7363 SOV 5725 / D-7 B Active 2 0.75 GA so C C C ovc 2Y 78.000.17 ovo 2Y 78.000.17 RPI 2Y 78.000.17 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F402B PASS V13-7362 SOV 5725 / E-7 B Active 2 0.75 GA so C C C ovc 2Y 78.000.17 ovo 2Y 78.000.17 RPI 2Y 78.000.17 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 109 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 111 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P34F402B PASS V13-7362 SOV 5725 / E-7 B Active 2 0.75 GA so C C C ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F403A PASS V13- 7364 SOV 5725 / H-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401.324, AT-1, AT-4 43.401.511 ovc AppJ 43.401.324 VRR-002 ovo AppJ 43.401.324 VRR-002 RPI AppJ 43.401.324 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F403B PASS V13-7365 SOV 5725 / G-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401.359, AT-1 , AT-4 43.401.511 ovc AppJ 43.401.359 VRR-002 ovo AppJ 43.401.359 VRR-002 RPI AppJ 43.401.359 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F404A PASS V13-7374 SOV 5725 / H-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401.324, AT-1 , AT-4 43.401.511 ovc AppJ 43.401.324 VRR-002 ovo AppJ 43.401.324 VRR-002 RPI AppJ 43.401.324 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F404B PASS V13-7375 SOV 5725 / F-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401.359, AT-1 , AT-4 43.401.511 ovc AppJ 43.401.359 VRR-002 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 110 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 112 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P34F404B PASS V13-7375 SOV 5725 / F-4 A Active 2 0.75 GA so C C C ovo AppJ 43.401.359 VRR-002 RPI AppJ 43.401.359 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F405A PASS V13- 7366 SOV 5725 / E-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401.387, AT-1, AT-4 43.401.511 ovc AppJ 43.401.387 VRR-002 ovo AppJ 43.401.387 VRR-002 RPI AppJ 43.401.387 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F405B PASS V13-7367 SOV 5725 / D-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401.386, AT-1 , AT-4 43.401.511 ovc AppJ 43.401.386 VRR-002 ovo AppJ 43.401.386 VRR-002 RPI AppJ 43.401.386 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F406A PASS V13- 7376 SOV 5725 / E-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401.387, AT-1, AT-4 43.401.511 ovc AppJ 43.401.387 VRR-002 ovo AppJ 43.401.387 VRR-002 RPI AppJ 43.401.387 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 111 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 113 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P34F406B PASS V13-7377 SOV 5725 / D-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401.386, AT-1, AT-4 43.401.511 ovc AppJ 43.401 .386 VRR-002 ovo AppJ 43.401.386 VRR-002 RPI AppJ 43.401.386 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F407 PASS V13- 7368 SOV 5725 / C-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401.405 AT-2 ovc AppJ 43.401.405 VRR-002 ovo AppJ 43.401.405 VRR-002 RPI AppJ 43.401.405 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F408 PASS V13-7369 SOV 5725 / B-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401 .383, AT-1 , AT-4 43.401.511 ovc AppJ 43.401.383 VRR-002 ovo AppJ 43.401.383 VRR-002 RPI AppJ 43.401.383 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P34F409 PASS V13- 7378 SOV 5725 / C-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401.405 AT-2 ovc AppJ 43.401.405 VRR-002 ovo AppJ 43.401.405 VRR-002 RPI AppJ 43.401.405 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 112 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 114 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P34F410 PASS V13-7379 SOV 5725 / B-4 A Active 2 0.75 GA so C C C LTJ AppJ 43.401.383, AT-1, AT-4 43.401.511 ovc AppJ 43.401 .383 VRR-002 ovo AppJ 43.401.383 VRR-002 RPI AppJ 43.401.383 VRR-002 ETC Q 24.714.01 FSC Q 24.714.01 STC Q 24.714.01 P4200F037 RBCCW SPLY HDR TO EECW DIV2 5727 / B-6 Aug Active NC 10 CK SA SD C N/A BDO CM 43.000.010 CMJ - 14 CHECK VLV -C eve CM 43.000.010 CMJ-14 P4200F049 RBCCW SPL Y TO EECW DIV1 5727 / B-5 Aug- Active NC 8 CK SA SD C N/ A BDO CM 43.000.010 CMJ-14 CHECK VLV C eve CM 43.000.010 CMJ - 14 P4200F105 RBCCW M/ U TANK RLF VLV 5727 / F-8 Aug Active NC 1 RV SA C 0 N/ A RV 10Y 43.000.020

-C P4400F003A EECW DIV1 PUMP C001A DISCH 5729-1 / C-6 C Active 3 8 CK SA SD O/ C N/A eve CM 43.000.010 CMJ-08 CHECK VLV cvo CM 24.207.08 CMJ -08 P4400F003B EECW DIV2 PUMP C001 B DISCH 5729-2 / F-6 C Active 3 8 CK SA SD O/ C N/ A eve CM 43.000.010 CMJ-08 CHECK VLV cvo CM 24.207.09 CMJ-08 P4400F038 EECW DIV1 BATT ROOM SPACE 5729 - 1 / F- 5 C Active 3 1.50 CK SA SD C N/A BDO CM 43.000.010 CMJ - 11 COOLER T4100B033 RTRN CHECK VLV eve CM 24.207.08 CMJ-11 P4400F051 EECW DIV1 ESSENTIAL EQUIP 5729-1 / G-4 C Active 3 6 CK SA SD 0 N/ A BDC CM 43.000.010 CMJ-07 RTRN CHECK VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 113 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 115 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P4400F051 EECW DIV1 ESSENTIAL EQUIP 5729-1 / G-4 C Active 3 6 CK SA SD 0 N/A cvo CM 24.207.08 CMJ-07 RTRN CHECK VLV P4400F077A EECW DIV1 PUMP A SPLY TO 5729-1 / B-6 C Active 3 8 CK SA SD O/C N/A eve CM 43.000.010 CMJ-08 ESSENTIAL EQUIP CHECK VLV cvo CM 24.207.08 CMJ-08 P4400F077B EECW DIV2 PUMP B SPLY TO 5729-2 / G-6 C Active 3 8 CK SA SD O/C N/A eve CM 43.000.010 CMJ-08 ESSENTIAL EQUIP CHECK VLV cvo CM 24.207.09 CMJ-08 P4400F 1033A EECW DIV1 EECW PLATE FRAME 5729-1 / H-6 C Active 3 1 TRV SA C O/C N/A RV 10Y 43.000.020 HX B001A THERMAL RELIEF VLV P4400F1033B EECW DIV2 EECW PLATE FRAME 5729-2 / C-6 C Active 3 1 TRV SA C O/C N/A RV 10Y 43.000.020 HX B001 B THERMAL RELIEF VLV P4400F1033( EECW DIV1 EECW PLATE FRAME 5729-1 / G-6 C Active 3 1 TRV SA C O/C N/A RV 10Y 43.000.020 BACKUP HX B001C THERMAL RELIEF VLV P4400F1033 D EECW DIV2 EECW PLATE FRAME 5729-2 / A-6 C Active 3 1 TRV SA C O/C N/A RV 10Y 43.000.020 BACKUP HX B001 D THERMAL RELIEF VLV P4400F111A EECW DIV1 RB EQUIP SUMP HX 5729-1 / D-3 C Active 3 2 CK SA SD C N/A BDO CM 43.000.010 CMJ-11 G1101 B002A RTRN CHECK VLV eve CM 24.207.08 CMJ-11 P4400F111B EECW DIV2 RB EQUIP SUMP HX 5729-2 / E-3 C Active 3 1.50 CK SA SD C N/A BDO CM 43.000.010 CMJ-11 G1101 B002B RTRN CHECK VLV eve CM 24.207.09 CMJ-11 P4400F116A EECW DIV1 RTRN HDR CHECK VLV 5729-1 / H-4 C Active 3 6 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-07 cvo CM 24.207.08 CMJ-07 P4400F116B ECW DIV2 RTRN HDR CHECK VLV 5729-2 / B-5 C Active 3 8 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-07 cvo CM 24.207.09 CMJ-07 P4400F126A EECW DIV1 M/U TANK A001 RLF 5729-1 / D-6 C Active 3 1 RV SA C O/C N/A RV 10Y 43.000.020 VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 114 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 116 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P4400F126B EECW DIV2 M/U TANK A002 RLF 5729-2 / E-6 C Active 3 1 RV SA C O/C N/A RV 10Y 43.000.020 VLV P4400F165 EECW DIV2 COOLERS RTRN 5729-2 / C-6 C Active 3 6 CK SA SD 0 N/A BDC CM 43.000.010 CMJ-07 CHECK VLV cvo CM 24.207.09 CMJ-07 P4400F182 EECW DIV2 CRD PUMPS 5729-2 / C-4 C Active 3 2 CK SA SD C N/A BDO CM 43.000.010 CMJ-11 C1106C001A/B RTRN CHECK VLV eve CM 24.207.11 CMJ-11 P4400F245A EECW DIV1 SPLY HDR SAFTEY 5729-1 / D-2 C Active 3 1.50 TRV SA C O/C N/A RV 10Y 43.000.020 THERMAL RLF VLV P4400F245B EECW DIV2 SPLY HDR SAFTEY 5729-2 / D-2 C Active 3 1.50 TRV SA C O/C N/A RV 10Y 43.000.020 THERMAL RLF VLV P4400F246 EECW DIV1 DW PENETRATION 5729-1 / E- 1 C Active 3 2 CK SA SD C N/A BDO CM 43.000.010 CMJ-11 COOLERS RTRN CHECK VLV eve CM 24.207.04 CMJ-11 P4400F274 EECW DIV2 DW SUMP HX RTRN 5729-2 / D-1 C Active 3 2.50 CK SA SD C N/A BDO CM 43.000.010 CMJ-07 CHECK VLV eve CM 24.207.11 CMJ-07 P4400F282A EECW DIV1 SPLY TO DW EQUIP 5729-1 / G-2 A/C Active 2 6 CK SA SD C N/A LTJ AppJ 43.401.319, AT- 1, AT-4 CHECK VLV 43.401.511 BDO Q 24.207.08 eve RO 43.401.319 ROJ-002 P4400F282B EECW DIV2 SPLY TO DW EQUIP 5729-2 / E-2 A/C Active 2 6 CK SA SD C N/A LTJ AppJ 43.401.335, AT-1 , AT-4 CHECK VLV 43.401.511 BDO Q 24.207.09 eve RO 43.401.335 ROJ-002 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 115 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 117 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P4400F387A EECW DIV1 N2 SPL Y TO EECW 5729-1 / E-7 C Active 3 1 RV SA C O/ C N/ A RV 10Y 43.000.020 M/ U TANK A001 RLF VLV P4400F387B EECW DIV2 N2 SPL Y TO EECW 5729-2 / E-7 C Active 3 1 RV SA C O/ C N/ A RV 10Y 43.000.020 M/ U TANK A002 RLF VLV P4400F504A EECW DIV1 M/ U PUMP DISCH 5729-1 / C-7 B Active 3 1.50 GA AO C 0 0 ETO Q 24.208.02 AOV FSO Q 24.208.02 STO Q 24.208.02 P4400F504B EECW DIV2 M/ U PUMP DISCH 5729-2 / B-8 B Active 3 1.50 GA AO C 0 0 ETO Q 24.208.03 AOV FSO Q 24.208.03 STO Q 24.208.03 P4400F601A RBCCW DIV1 RTRN ISO MOV 5729-1 / H-5 B Active 3 8 GA MOH 0 C FAI DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 ETC Q 24.207.08 ETO Q 24.207.08 P4400F601B RBCCW DIV2 RTRN ISO MOV 5729-2 / B-6 B Active 3 10 GA MOL 0 C FAI ETC 2Y 24.207.09 ETO 2Y 24.207.09 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 P4400F602A EECW DIV1 M/ U WTR TANK A001 5729-1 / D-6 B Active 3 4 GA MOL C 0 FAI ETC 2Y 24.207.08 OUTLET ISO MOV ETO 2Y 24.207.08 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 116 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 118 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P4400F602A EECW DIV1 M/U WTR TANK A001 5729-1 / D-6 B Active 3 4 GA MOL C 0 FAI DIAG App3 47.306.06 OUTLET ISO MOV ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 P4400F602B EECW DIV2 M/U WTR TANK A002 5729-2 / E-6 B Active 3 4 GA MOL C 0 FAI ETC 2Y 24.207.09 OUTLET ISO MOV ETO 2Y 24.207.09 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 P4400F603A RBCCW DIV1 SPL Y ISO MOV 5729-1 / B-6 B Active 3 8 GA MOH 0 C FAI DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 ETC Q 24.207.08 ETO Q 24.207.08 P4400F603B RBCCW DIV2 SPL Y ISO MOV 5729-2 / G-6 B Active 3 10 GA MOL 0 C FAI ETC 2Y 24.207.09 ETO 2Y 24.207.09 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 117 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 119 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P4400F604 EECW DIV2 SPLY TO CRD PUMPS 5729-2 / E-4 B Active 3 2 GL MOL 0 C FAI ETC 2Y 24.207.11, ISO MOV 24.207.09 ETO 2Y 24.207.11, 24.207.09 ovc 2Y 24.207.11 ovo 2Y 24.207.11 DIAG App3 47.306.06 RPI App3 47.306.06 P4400F605A EECW DIV1 SPLY TO RB EQUIP 5729-1 / C-3 B Active 3 2 GL MOL 0 C FAI ETC 2Y 24.207.04, SUMP HX G1101 B002A ISO MOV 24.207.08 ETO 2Y 24.207.04, 24.207.08 ovc 2Y 24.207.04 ovo 2Y 24.207.04 DIAG App3 47.306.06 RPI App3 47.306.06 P4400F605B EECW DIV2 SPLY TO RB EQUIP 5729-2 / F-3 B Active 3 1.50 GL MOL 0 C FAI ETC 2Y 24.207.11 ,

SUMP HX G1101 B002B ISO MOV 24.207.09 ETO 2Y 24.207.11 ,

24.207.09 ovc 2Y 24.207.11 ovo 2Y 24.207.11 DIAG App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 118 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 120 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P4400F605B EECW DIV2 SPLY TO RB EQUIP 5729-2 / F-3 B Active 3 1.50 GL MOL 0 C FAI RPI App3 47.306.06 SUMP HX G1101 B002B ISO MOV P4400F606A EECW DIV1 DW SPL Y OUTBOARD 5729-1 / G-2 A Active 2 6 GA MOL 0 C FAI ETC 2Y 24.207.04 ISO MOV ETO 2Y 24.207.04 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.319, AT-1 , AT-4 43.401.510 P4400F606B EECW DIV2 SPLY TO DW EQUIP 5729-2 / E-2 A Active 2 6 GA MOL 0 C FAI ETC 2Y 24.207.11 OUTBOARD ISO MOV ETO 2Y 24.207.11 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.335, AT- 1, AT-4 43.401.511 P4400F607A EECW DIV1 DW RTRN OUTBOARD 5729-1 / H-2 A Active 2 6 GA MOL 0 C FAI ETC 2Y 24.207.04 ISO MOV ETO 2Y 24.207.04 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 119 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 121 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P4400F607A EECW DI V 1 DW RTR N OU TBOARD 5729 - 1 / H-2 A Active 2 6 GA MOL 0 C FAI DI AG App3 47.306.06 ISO MOV ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.40 1.320, AT- 1, AT-4 43.40 1.5 11 P4400F607B EECW DI V2 DW EQUIP OU TBOARD 5729 -2 / E-2 A Active 2 6 GA MOL 0 C FAI ETC 2Y 24.207.11 RTRN ISO MOV ETO 2Y 24.207.1 1 DI AG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401 .336, AT- 1, AT-4 43.40 1. 511 P4400F608 EECW DI V 2 SPLY TO DW SUM P 5729 -2 / D-2 B Active 3 2.50 GA MOL 0 C FAI ETC 2Y 24.207.11 ,

HX ISO MOV 24.207.09 ETO 2Y 24.207.1 1, 24.207.09 DI AG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 Jan 8, 2021 6:20 AM Iddeal Suite V. 9. 35.2.1 Page 120 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 122 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P4400F608 EECW DIV 2 SPLY TO DW SUMP 5729-2 / D-2 B Active 3 2.50 GA MOL 0 C FAI RPI App3 47.306.06 HX ISO MOV P4400F613 EECW DIV1 SPL Y TO BA TT ROOM 5729-1 / F-5 B Active 3 1.50 GL MOL 0 C FAI ETC 2Y 24.207.04, SPACE COOLER T41 00B033 ISO 24.207.08 MOV ETO 2Y 24.207.04, 24.207.08 ovc 2Y 24.207.11 ovo 2Y 24.207.11 DIAG App3 47.306.06 RPI App3 47.306.06 P4400F614 EECW DIV1 SPL Y TO DW 5729-1 / F-2 B Active 2 2 GL MOL 0 C FAI ETC 2Y 24.207.04, PENETRATION COOLERS ISO MOV 24.207.08 ETO 2Y 24.207.04, 24.207.08 ovc 2Y 24.207.04 ovo 2Y 24.207.04 DIAG App3 47.306.06 RPI App3 47.306.06 P4400F615 EECW DIV2 DW EQUIP INBOARD 5729-2 / E-2 A Active 2 6 GA MOL KO C FAI ETC 2Y 24.207.11 RTRN ISO MOV ETO 2Y 24.207.11 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 121 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 123 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P4400F615 EECW DIV2 DW EQUIP INBOARD 5729-2 / E-2 A Active 2 6 GA MOL KO C FAI DIAG App3 47.306.06 RTRN ISO MOV ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.336, AT-1 , AT-4 43.401.511 P4400F616 EECW DIV1 DW EQUIP INBOARD 5729-1 / H-2 A Active 3 6 GA MOL KO C FAI ETC 2Y 24.207.04 RTRN ISO MOV ETO 2Y 24.207.04 DIAG App3 47.306.06 ovc App3 47.306.06 ovo App3 47.306.06 RPI App3 47.306.06 LTJ AppJ 43.401.320, AT- 1, AT-4 43.401.511 P4400F625A EECW DIV1 M/U PUMP DISCH 5729-1 / C-7 C Active 3 1 CK SA SD 0 N/A BDC Q 24.208.02 CHECK VLV cvo Q 24.208.02 P4400F625B EECW DIV2 M/U PUMP DISCH 5729-2 / B-8 C Active 3 1 CK SA SD 0 N/A BDC Q 24.208.03 CHECK VLV cvo Q 24.208.03 P4400F972A EECW DIV1 DEMIN WTR TO M/U 5729-1 / E-7 C Active 3 4 CK SA SD C N/A BDO Q 24.207.08 TANK A001 CHECK VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 122 of 178

.. Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 124 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P4400F972A EECW DIV1 DEMIN WTR TO M/ U 5729-1 / E-7 C Active 3 4 CK SA SD C N/ A eve Q 24.207.08 TANK A001 CHECK VLV P4400F972B EECW DIV2 DEMIN WTR TO M/U 5729-2 / E-7 C Active 3 4 CK SA SD C N/ A BDO Q 24.207.09 TANK A002 CHECK VLV eve Q 24.207.09 P4400F973A EECW DIV1 N2 SPL Y TO EECW 5729-1 / D-8 Aug- Active NC 1 CK SA O/ C C N/ A BDO Q 24.207.08 M/ U TANK A001 CHECK VLV C eve Q 24.207.08 P4400F973B EECW DIV2 N2 SPL Y TOEECW 5729-2 / E-8 Aug Active NC 1 CK SA O/ C C N/ A BDO Q 24.207.09 M/ U TANK A002 CHECK VLV -C eve Q 24.207.09 P4400F974A EECW DIV1 N2 SPL Y TO EECW 5729 - 1 / D-7 C Active 3 1 CK SA SD C N/ A BDO Q 24.207.08 M/ U TANK A001 CHECK VLV eve Q 24.207.08 P4400F974B EECW DIV2 N2 SPL Y TO EECW 5729 -2 / E-7 C Active 3 1 CK SA SD C N/ A BDO Q 24.207.09 M/ U TANK A002 CHECK VLV eve Q 24.207.09 P4400F978A EECW DIV1 ALT N2 SPL Y TO EECW 5729 - 1 / D-7 C Active 3 0.75 CK SA SD O/ C N/ A eve Q 24.207.08 M/ U TANK A001 CHECK VLV cvo Q 24.207.08 P4400F979A EECW DIV1 ALT N2 SPL Y TO 5729-1 / D-7 C Active 3 0.75 CK SA C O/ C N/ A eve Q 24.207.08 EECW M/ U TANK A001 CHECK VLV cvo Q 24.207.08 P4400F985A EECW DIV1 ALT N2 SPL Y TO EECW 5729-1 / C-8 Aug- Active NC 0.375 RV SA C O/ C N/ A RV 10Y 43.000.020 M/ U TANK A001 RLF VLV C P44F400A EECW DIV1 HX B001A/ B001C SW 5729 - 1 / H-7 B Active 3 10 GL AO 0 0 0 ETO Q 24.208.02 OUTLET TEMP CTRL AOV TEMP CRTL VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 123 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 125 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P44F400A EECW DIV1 HX B001A/B001C SW 5729-1/H-7 B Active 3 10 GL AO 0 0 0 FSO Q 24.208.02 OUTLET TEMP CTRL AOV TEMP CRTL VLV P44F400B EECW DIV2 HX B001 B/B001 D SW 5729-2 / D-7 B Active 3 10 GL AO 0 0 0 ETO Q 24.208.03 OUTLET TEMP CTRL AOV TEMP CRTL VLV FSO Q 24.208.03 P4500F002A EESW PUMP C002A DISCH CHECK 5706-3 / F-3 C Active 3 10 CK SA SD O/C N/A eve Q 24.205.05 VLV cvo Q 24.208.02 P4500F002B EESW PUMP C002B DISCH CHECK 5706-3 / F-6 C Active 3 10 CK SA SD O/C N/A eve Q 24.205.06 VLV cvo Q 24.208.03 P4500F1 81A EESW DIV1 EECW PLATE FRAME 5729-1/G-7 C Active 3 1 TRV SA C O/C N/A RV 10Y 43.000.020 HX P4400B001A THERMAL RELIEF VLV P4500F181B EESW DIV2 HX P4400B001 B 5729-2 / C-7 C Active 3 1 TRV SA C O/C N/A RV 10Y 43.000.020 THERMAL RELIEF VLV P4500F181C EESW DIV1 EECW PLATE FRAME 5729-1 / G-6 C Active 3 1 TRV SA C O/C N/A RV 10Y 43.000.020 BACKUP HX P4400B001C THERMAL RELIEF VLV P4500F1 81D EESW DIV2 EECW PLATE FRAME 5729-2 / B-7 C Active 3 1 TRV SA C O/C N/A RV 10Y 43.000.020 BACKUP HX P4400B001 D THERMAL RELIEF VLV P45F400 EESW DIV2 SERV WTR PUMP 5706-3 I G-6 C Active 3 2 CK SA C O/C N/A eve CM 24.208.03 CMJ-15 C002B MIN FLOW BACK PRESS LIMITING VLV cvo CM 24.208.03 CMJ-15 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 124 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 126 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P45F400 EESW DIV2 SERV WTR PUMP 5706-3 / G-6 C Active 3 2 CK SA C O/C N/A D& I CM B929 CMJ-15, DI per C002B MIN FLOW BACK PRESS B929 LIMITING VLV P45F401 EESW DIV1 SERV WTR PUMP 5706-3 / G-3 C Active 3 2 CK SA C O/C N/A eve CM 24.208.02 CMJ-15 C002A MIN FLOW BACK PRESS LIMITING VLV cvo CM 24.208.02 CMJ-15 D&I CM A473 CMJ-15, DI per A473 P5000F207A NIAS NORTH CONTROL AIR 5730-3 I H-4 Aug Active NC 0.75 RV SA C O/C N/A RV 10Y 43.000.020 COMP D001 AFTERCOOLER RELIEF -C VLV P5000F207B NIAS SOUTH CONTROL AIR COMP 5730-3 I H-6 Aug- Active NC 0.75 RV SA C O/C N/A RV 10Y 43.000.020 D002 AFTERCOOLER DRAIN TRAP C INLETVLV P5000F208A NIAS NORTH CONTROL AIR 5730-3 / H-4 C Active 3 3 CK SA SD 0 N/A BDC Q 24.129.01 ,

COMP D001 AFTERCOOLER DISCH 24.129.04 CHECK VLV cvo Q 24.129.01, 24.129.04 P5000F208B NIAS SOUTH CONTROL AIR COMP 5730-3 / H-7 C Active 3 3 CK SA SD 0 N/A BDC Q 24.129.01 ,

D002 AFTERCOOLER DISCH CHECK 24.129.04 VLV cvo Q 24.129.01, 24.129.04 P5000F219A NIAS DEHYD UNIT DISCH CHECK 5730-3 I F-2 A/C Active 3 3 CK SA SD O/C N/A LT 2Y 24.129.05 AT-3 VLV eve Q 24.129.01 ,

24.129.04 cvo Q 24.129.01 ,

24.129.04 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 125 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 127 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P5000F219B NIAS DEHYD UN IT DI SCH CHECK 5730-3 / E-4 A/C Active 3 3 CK SA SD O/ C N/ A LT 2Y 24.1 29.06 AT- 3 VLV eve Q 24.1 29.01, 24.1 29.04 cvo Q 24.129.01, 24.1 29.04 P5000F223A CONTROL AIR DI V I NON- IAS 5730-3 / E- 2 C Active 3 0.75 RV SA C O/ C N/A RV 10V 43.000.020 SU PPLY RECEI VER P5002A00 1 RELIEF VLV P5000F223B NIAS CONTROL AIR RECEIVER 5730-3 / E-5 C Active 3 0.75 RV SA C O/ C N/A RV 10Y 43.000.020 P5002A002 RE LI EF VLV P5000F403 NIAS ISO AOV 5730-3 / D-6 B Active 3 2 GL AO C O/ C C ovc 2Y 24. 129.04 ovo 2Y 24.1 29.04 RPI 2Y 24.129.04 ETC Q 24. 129.01 ,

24.1 29.04 ETO Q 24.129.01 ,

24.129.04 FSC Q 24.1 29.01, 24.1 29.04 STC Q 24.129.01,

24. 129.04 STO Q 24. 129.01, 24.1 29.04 P5000F440 NIAS STATI ON AIR TO CON TROL 5730-3 I G-6 A Active 3 3 GA AO 0 O/ C C LT 2Y 24.1 29.04 AT-3 AIR ISOAOV ovc 2Y 24.1 29.04 ovo 2Y N/A TP- 16 RPI 2Y 24.1 29.04 ETC Q 24.1 29.01 ,

24.1 29.04 Jan 8, 2021 6:20 AM Iddeal Suite V. 9. 35.2.1 Page 126 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 128 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P5000F440 NIAS STATION AIR TO CONTROL 5730-3 / G-6 A Active 3 3 GA AO 0 O/C C ETO Q 24.129.01, AIR ISOAOV 24.129.04 FSC Q 24.129.01, 24.129.04 STC Q 24.129.01, 24.129.04 STO Q 24.129.01, 24.129.04 P5000F441 NIAS STATION AIR TO CONTROL 5730-3 I F-7 A Active 3 3 GA AO 0 O/C C LT 2Y 24.129.04 AT-3 AIR ISOAOV ovc 2Y 24.129.04 ovo 2Y N/A TP - 16 RPI 2Y 24.129.04 ETC Q 24.129.01, 24.129.04 ETO Q 24.129.01, 24.129.04 FSC Q 24.129.01, 24.129.04 STC Q 24.129.01, 24.129.04 STO Q 24.129.01, 24.129.04 P5000F541A CTRL AIR NON-INTERRUPTABLE N 5730-3 / G-2 Aug- Active NC 0.50 RV SA C O/C N/A RV 10Y 43.000.020 CTRL AIR DRYER W CHAMBER C RELIEF VLV P5000F541B CTRL AIR NON-INTERRUPTABLE S 5730-3 / F-4 Aug Active NC 0.50 RV SA C O/C N/A RV 10Y 43.000.020 CTRL AIR DRYER E CHAMBER -C RELIEF VLV P5000F542A CTRL AIR NON-INTERRUPTABLE N 5730-3 I G-3 Aug- Active NC 0.50 RV SA C O/C N/A RV 10Y 43.000.020 CTRL AIR DRYER E CHAMBER C RELIEF VLV Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 127 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 129 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req P5000F542B CTRL AIR NON-INTERRUPTABLE S 5730-3 / F-5 Aug Active NC 0.50 RV SA C O/C N/A RV 10Y 43.000.020 CTRL AIR DRYER W CHAMBER -C RELIEF VLV R3000F018A EDG 11 JC HEATER DISCH 5734 / B-7 Aug- Active NC 1 RV SA C O/C N/A RV 10Y 43.000.020 THERMAL RELIEF VALVE C R3000F018B EDG 13 JC HEATER DISCH 5734 / B-7 Aug Active NC 1 RV SA C O/C N/A RV 10Y 43.000.020 THERMAL RELIEF VALVE -C R3000F018C EDG 12 JC HEATER DISCH 5734 / B-7 Aug- Active NC 1 RV SA C O/C N/A RV 10Y 43.000.020 THERMAL RELIEF VALVE C R3000F018D EDG 14 JC HEATER DISCH 5734 / B-7 Aug Active NC 1 RV SA C O/C N/A RV 10Y 43.000.020 THERMAL RELIEF VALVE -C R3000F031A EDG 11 W STARTING AIR 5734 / B-4 A/C Active 3 0.75 CK SA SD O/C N/A LT 2Y 24.307.34 AT-3, CMJ-18 RECEIVER A011 INLET CHK VLV eve CM 24.307.34 CMJ-18 cvo CM 24.307.34 CMJ-18 R3000F031B EDG 13 W STARTING AIR 5734 / B-4 A/C Active 3 0.75 CK SA SD O/C N/A LT 2Y 24.307.36 AT-3, CMJ-18 RECEIVER A015 IN LET CH K VL V eve CM 24.307.36 CMJ-18 cvo CM 24.307.36 CMJ-18 R3000F031C EDG 12 W STARTING AIR 5734 / B-4 A/C Active 3 0.75 CK SA SD O/C N/A LT 2Y 24.307.35 AT-3, CMJ-18 RECEIVER A012 IN LET CH K VL V eve CM 24.307.35 CMJ-18 cvo CM 24.307.35 CMJ-18 R3000F031D EDG 14 W STARTING AIR 5734 / B-4 A/C Active 3 0.75 CK SA SD O/C N/A LT 2Y 24.307.37 AT-3, CMJ-18 RECEIVER A016 IN LET CH K VL V eve CM 24.307.37 CMJ-18 cvo CM 24.307.37 CMJ-18 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 128 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 130 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req R3000F032A EDG 11 E STARTING AIR RECEIVER 5734 / B-3 A/C Active 3 0.75 CK SA SD O/ C N/ A LT 2Y 24.307.34 AT-3, CMJ-18 A009 INLET CHK VLV eve CM 24.307.34 CMJ-18 cvo CM 24.307.34 CMJ-18 R3000F032B EDG 13 E STARTING AIR RECEIVER 5734 / B-3 A/C Active 3 0.75 CK SA SD O/ C N/ A LT 2Y 24.307.36 AT-3, CMJ-18 A013 INLET CHK VLV eve CM 24.307.36 CMJ - 18 cvo CM 24.307.36 CMJ-18 R3000F032C EDG 12 E STARTING AIR RECEIVER 5734 / B-3 A/ C Active 3 0.75 CK SA SD O/ C N/ A LT 2Y 24.307.35 AT-3, CMJ - 18 A010 INLET CHK VLV eve CM 24.307.35 CMJ - 18 cvo CM 24.307.35 CMJ-18 R3000F032D EDG 14 E STARTING AIR RECEIVER 5734 / B-3 A/ C Active 3 0.75 CK SA SD O/ C N/ A LT 2Y 24.307.37 AT-3, CMJ - 18 A014 INLET CHK VLV eve CM 24.307.37 CMJ-1 8 cvo CM 24.307.37 CMJ - 18 R3000F035A EDG 11 W STARTING AIR 5734 / C-4 Aug- Active NC 0.75 RV SA C O/ C N/ A RV 10Y 43.000.020 RECEIVER A011 PRESS RELIEF VLV C R3000F035B EDG 13 W STARTING AIR 5734 / C-4 Aug Active NC 0.75 RV SA C O/ C N/ A RV 10Y 43.000.020 RECEIVER A015 PRESS RELIEF VLV -C R3000F035C EDG 12 W STARTING AIR 5734 / C-4 Aug - Active NC 0.75 RV SA C O/ C N/ A RV 10Y 43.000.020 RECEIVER A012 PRESS RELIEF VLV C R3000F035D EDG 14 W STARTING AIR 5734 / C-4 Aug Active NC 0.75 RV SA C O/ C N/ A RV 10Y 43.000.020 RECEIVER A016 PRESS RELIEF VLV -C R3000F036A EDG 11 E STARTING AIR RECEIVER 5734 / C-3 Aug - Active NC 0.75 RV SA C O/ C N/ A RV 10Y 43.000.020 A009 PRESS RELIEF VLV C Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 129 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 131 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req R3000F036B EDG 13 E STARTING AIR RECEIVER 5734 / C-3 Aug Active NC 0.75 RV SA C O/C N/A RV 10Y 43.000.020 A013 PRESS RELIEF VLV -C R3000F036C EDG 12 E STARTING AIR RECEIVER 5734 / C-3 Aug- Active NC 0.75 RV SA C O/C N/A RV 10Y 43.000.020 A010 PRESS RELIEF VLV C R3000F036D EDG 14 E STARTING AIR RECEIVER 5734 / C-3 Aug Active NC 0.75 RV SA C O/C N/A RV 10Y 43.000.020 A014 PRESS RELIEF VLV -C R3000F048A EDG 11 ENGINE AIR COOLANT 5734 / C-4 Aug- Active NC 0.50 RV SA C O/C N/A RV 10Y 43.000.020 CTRL HEADER RELIEF VLV C R3000F048B EDG 13 ENGINE AIR COOLANT 5734 / C-4 Aug Active NC 0.50 RV SA C O/C N/A RV 10Y 43.000.020 CTRL HEADER RELIEF VLV -C R3000F048C EDG 12 ENGINE AIR COOLANT 5734 / C-4 Aug- Active NC 0.50 RV SA C O/C N/A RV 10Y 43.000.020 CTRL HEADER RELIEF VLV C R3000F048D EDG 14 ENGINE AIR COOLANT 5734 / C-4 Aug Active NC 0.50 RV SA C O/C N/A RV 10Y 43.000.020 CTRL HEADER RELIEF VLV -C R3000F083A EDG 11 TRANS PMP C001 DISCH 5734 / F-8 C Active 3 1.50 CK SA SD O/C N/A eve Q 24.307.34 CHKVLV cvo Q 24.307.34 R3000F083B EDG 13 TRANS PMP C009 DISCH 5734 / F-8 C Active 3 1.50 CK SA SD O/C N/A eve Q 24.307.36 CHKVLV cvo Q 24.307.36 R3000F083C EDG 12 TRANS PMP C002 DISCH 5734 / F-8 C Active 3 1.50 CK SA SD O/C N/A eve Q 24.307.35 CHK VLV cvo Q 24.307.35 R3000F083D EDG 14 TRANS PMP C010 DISCH 5734 / F-8 C Active 3 1.50 CK SA SD O/C N/A eve Q 24.307.37 CHKVLV cvo Q 24.307.37 R3000F084A EDG 11 TRANS PMP C003 DISCH 5734 / E-8 C Active 3 1.50 CK SA SD O/C N/A eve Q 24.307.34 CHK VLV cvo Q 24.307.34 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 130 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 132 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req R3000F084B EDG 13 TRANS PMP C0 11 DI SCH 5734 / E-8 C Active 3 1. 50 CK SA SD O/ C N/ A eve Q 24.307.36 CHKVLV cvo Q 24.307.36 R3000F084C EDG 12 TRANS PMP C004 DI SCH 5734 / E-8 C Active 3 1.50 CK SA SD O/C N/A eve Q 24.307.35 CHK VLV cvo Q 24.307.35 R3000F084D EDG 14 TRANS PMP C0 12 DI SCH 5734 / E-8 C Active 3 1. 50 CK SA SD O/C N/A eve Q 24.307.37 CHK VLV cvo Q 24.307.37 R3000F142A EDG DGSW PMP COOS OUTLET 5706-3 I F-2 C Active 3 8 CK SA SD O/C N/A eve Q 24.307.35, CHK VLV 24.307.49 cvo Q 24.307.34, 24.307.49 R3000 F1 42 B EDG DGSW PMP C007 OU TLET 5706-3 / F-6 C Active 3 8 CK SA SD O/ C N/ A eve Q 24.307.37, CHKVLV 24.307.49 cvo Q 24.307.36, 24.307.49 R3000F142C EDG DGSW PM P C006 OU TLET 5706-3 / F-3 C Active 3 8 CK SA SD O/ C N/ A eve Q 24.307.34, CHKVLV 24.307.49 cvo Q 24.307.35, 24.307.49 R3000F142D EDG DGSW PMP COOS OU TLET 5706-3 / F-7 C Active 3 8 CK SA SD O/ C N/ A eve Q 24.307.36, CHK VLV 24.307.49 cvo Q 24.307.37, 24.307.49 R3000F200A EDG 11 STARTI NG AIR 5734 / C- 1 Aug- Active NC 0.75 GL MA 0 O/ C N/A ETC 2Y 24.307.34 COMPRESSOR AIR DRYER D077 B ISOVLV ETO 2Y 24.307.34 Jan 8, 2021 6:20 AM Iddeal Suite V. 9. 35.2.1 Page 131 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 133 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req R3000F200B EDG 13 STARTING AIR 5734/C-1 Aug Active NC 0.75 GL MA 0 O/C N/A ETC 2Y 24.307.36 COMPRESSOR AIR DRYER D079 -B ISOVLV ETO 2Y 24.307.36 R3000F200C EDG 12 STARTING AIR 5734/C-1 Aug- Active NC 0.75 GL MA 0 O/C N/A ETC 2Y 24.307.35 COMPRESSOR AIR DRYER D078 B ISOVLV ETO 2Y 24.307.35 R3000F200D EDG 14 STARTING AIR 5734 / D-1 Aug Active NC 0.75 GL MA 0 O/C N/A ETC 2Y 24.307.37 COMPRESSOR AIR DRYER D080 -B ISOVLV ETO 2Y 24.307.37 R3000F201A EDG 11 STARTING AIR 5734/C-1 Aug- Active NC 0.75 GL MA C O/C N/A ETC 2Y 24.307.34 COMPRESSOR AIR DRYER D077 B CROSS CONNECTION VLV ETO 2Y 24.307.34 R3000F201B EDG 13 STARTING AIR 5734/C-1 Aug Active NC 0.75 GL MA C O/C N/A ETC 2Y 24.307.36 COMPRESSOR AIR DRYER D079 -B CROSS CONNECTION VLV ETO 2Y 24.307.36 R3000F201C EDG 12 STARTING AIR 5734/C-1 Aug- Active NC 0.75 GL MA C O/C N/A ETC 2Y 24.307.35 COMPRESSOR AIR DRYER D078 B CROSS CONNECTION VLV ETO 2Y 24.307.35 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 132 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 134 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req R3000F201D EDG 14 STARTING AIR 5734 / D-1 Aug Active NC 0.75 GL MA C O/ C N/ A ETC 2Y 24.307.37 COMPRESSOR AIR DRYER D080 -B CROSS CONNECTION VLV ETO 2Y 24.307.37 R3000F996A EDG 11 AIR START SYS CYL 7- 12 5734 / C-2 B Active 3 1.50 BA MA LC O/ C N/ A ETC 2Y 24.307.14, SOV FA04A MAN BYPASS VALVE 24.307.01 ETO 2Y 24.307.14, 24.307.01 R3000F996B EDG 13 AIR START SYS CYL 7-12 5734 / C-2 B Active 3 1.50 BA MA LC O/ C N/ A ETC 2Y 24.307.16, SOV FA04B MAN BYPASS VALVE 24.307.03 ETO 2Y 24.307.16, 24.307.03 R3000F996C EDG 12 AIR START SYS CYL 7- 12 5734 / C-2 B Active 3 1.50 BA MA LC O/ C N/A ETC 2Y 24.307.15, SOV FA04C MAN BYPASS VALVE 24.307.02 ETO 2Y 24.307.15, 24.307.02 R3000F996D EDG 14 AIR START SYS CYL 7-12 5734 / B-2 B Active 3 1.50 BA MA LC O/ C N/ A ETC 2Y 24.307.17, SOV FA04D MAN BYPASS VALVE 24.307.04 ETO 2Y 24.307.17, 24.307.04 R3000F997A EDG 11 AIR START SYS CYL 1-6 5734 / C-2 B Active 3 1.50 BA MA LC O/ C N/ A ETC 2Y 24.307.14, SOV FA05A MAN BYPASS VALVE 24.307.01 ETO 2Y 24.307.14, 24.307.01 R3000F997B DG 13 AIR START SYS CYL 1-6 5734 / C-2 B Active 3 1.50 BA MA LC O/ C N/ A ETC 2Y 24.307.16, SOV FA05B MAN BYPASS VALVE 24.307.03 ETO 2Y 24.307.16, 24.307.03 R3000F997C EDG 12 AIR START SYS CYL 1-6 5734 / C-2 B Active 3 1.50 BA MA LC O/ C N/ A ETC 2Y 24.307.15, SOV FA05C MAN BYPASS VALVE 24.307.02 ETO 2Y 24.307.15, 24.307.02 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 133 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 135 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req R3000F997D EDG 14 AIR START SYS CYL 1-6 5734 / B-2 B Active 3 1.50 BA MA LC O/ C N/ A ETC 2Y 24.307.17, SOV FA05D MAN BYPASS VALVE 24.307.04 ETO 2Y 24.307.17, 24.307.04 R3000F998A EDG 11 AIR START SYS CYL 7-12 5734 / C-2 B Active 3 1.50 BA MA LO O/ C N/ A ETC 2Y 24.307.14, SOV FA04A MANUAL VENT VALVE 24.307.01 ETO 2Y 24.307.14, 24.307.01 R3000F998B EDG 13 AIR START SYS CYL 7-12 5734 / C-2 B Active 3 1.50 BA MA LO O/ C N/A ETC 2Y 24.307.16, SOV FA04B MANUAL VENT VALVE 24.307.03 ETO 2Y 24.307.16, 24.307.03 R3000F998C EDG 12 AIR START SYS CYL 7-12 5734 / C-2 B Active 3 1.50 BA MA LO O/ C N/ A ETC 2Y 24.307.15, SOV FA04C MANUAL VENT VALVE 24.307.02 ETO 2Y 24.307.15, 24.307.02 R3000F998D EDG 14 AIR START SYS CYL 7-12 5734 / B-2 B Active 3 1.50 BA MA LO O/ C N/ A ETC 2Y 24.307.17, SOV FA04D MANUAL VENT VALVE 24.307.04 ETO 2Y 24.307.17, 24.307.04 R3000F999A EDG 11 AIR START SYS CYL 1-6 5734 / C-2 B Active 3 1.50 BA MA LO O/ C N/ A ETC 2Y 24.307.14, SOV FA05A MANUAL VENT VALVE 24.307.01 ETO 2Y 24.307.14, 24.307.01 R3000F999B EDG 13 AIR START SYS CYL 1-6 5734 / C-2 B Active 3 1.50 BA MA LO O/ C N/ A ETC 2Y 24.307.16, SOV FA05B MANUAL VENT VALVE 24.307.03 ETO 2Y 24.307.16, 24.307.03 R3000F999C EDG 12 AIR START SYS CYL 1-6 5734 / C-2 B Active 3 1.50 BA MA LO O/C N/ A ETC 2Y 24.307.15, SOV FA05C MANUAL VENT VALVE 24.307.02 ETO 2Y 24.307.15, 24.307.02 R3000F999D EDG 14 AIR START SYS CYL 1-6 5734 / B-2 B Active 3 1.50 BA MA LO O/ C N/ A ETC 2Y 24.307.17, SOV FA05D MANUAL VENT VALVE 24.307.04 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 134 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 136 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req R3000F999D EDG 14 AIR START SYS CYL 1-6 5734 / B-2 B Active 3 1.50 BA MA LO O/C N/A ETO 2Y 24.307.17, SOV FA05D MANUAL VENT VALVE 24.307.04 R30F400 EDG DGSW PMP MIN FLOW V15- 5706-3 / G-6 B Active 3 2 GL AO C C C ETC RO 43.401.705 ROJ-015 2069 PRESS CTRL VLV FSC RO 43.401.705 ROJ-015 R30F401 EDG DGSW PMP MIN FLOW V15- 5706-3 / G-7 B Active 3 2 GL AO C C C ETC RO 43.401.706 ROJ-015 2076 PRESS CTRL VLV FSC RO 43.401.706 ROJ-015 R30F402 EDG DGSW PMP MIN FLOW V15- 5706-3 / G-2 B Active 3 2 GL AO C C C ETC RO 43.401.703 ROJ-015 2094 PRESS CTRL VLV FSC RO 43.401.703 ROJ-015 R30F403 EDG DGSW PMP MIN FLOW V15- 5706-3 I G-3 B Active 3 2 GL AO C C C ETC RO 43.401.704 ROJ-015 2100 PRESS CTRL VLV FSC RO 43.401.704 ROJ-015 T2 300F400A PC VAC BKR CHECK AOV 5739-1 / D-2 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 ovc 2Y N/A TP-16 ovo 2Y N/A TP-16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ-024 cvo cs 24.402.01 CSJ-024 T2300F400B PC VAC BKR CHECK AOV 5739-1 / D-2 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 ovc 2Y N/A TP - 16 ovo 2Y N/A TP - 16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ-024 cvo cs 24.402.01 CSJ-024 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 135 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 137 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T2300F400C PC VAC BKR CHECK AOV 5739-1 / D-2 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 ovc 2Y N/A TP-16 ovo 2Y N/A TP-16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ-024 cvo cs 24.402.01 CSJ-024 T2300F400D PC VAC BKR CHECK AOV 5739-1 / D-2 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 ovc 2Y N/A TP-16 ovo 2Y N/A TP-16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ-024 cvo cs 24.402.01 CSJ-024 T2300F400E PC VAC BKR CHECK AOV 5739-1 / D-4 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 ovc 2Y N/A TP - 16 ovo 2Y N/A TP - 16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ -024 cvo cs 24.402.01 CSJ-024 T2300F400F PC VAC BKR CHECK AOV 5739-1 / D-4 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 ovc 2Y N/A TP-16 ovo 2Y N/A TP - 16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ-024 cvo cs 24.402.01 CSJ-024 T2300F400G PCVACBKRCHECKAOV 5739-1 / D-4 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 Jan 8, 2021 6:20 AM Iddeal Suite V. 9.35.2.1 Page 136 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table , Rev.4 , Page 138 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T2300F400G PC VAC BKR CHECK AOV 5739-1 / D-4 A/C Active 2 18 VRV SA SD O/C N/A ovc 2Y N/A TP-16 ovo 2Y N/A TP-16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ-024 cvo cs 24.402.01 CSJ-024 T2300F400H PC VAC BKR CHECK AOV 5739-1 / D-4 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 ovc 2Y N/A TP - 16 ovo 2Y N/A TP-16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ-024 cvo cs 24.402.01 CSJ-024 T2 300F400J PC VAC BKR CHECK AOV 5739-1 / D-4 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 ovc 2Y N/A TP-16 ovo 2Y N/A TP - 16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ-024 cvo cs 24.402.01 CSJ -024 T2 300F400K PC VAC BKR CHECK AOV 5739-1 / E-4 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 ovc 2Y N/A TP-16 ovo 2Y N/A TP-16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ-024 cvo cs 24.402.01 CSJ-024 T2 300F400L PC VAC BKR CHECK AOV 5739-1 / D-2 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 ovc 2Y N/A TP-16 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 137 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 139 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T2300F400L PC VAC BKR CHECK AOV 5739-1 / D-2 A/C Active 2 18 VRV SA SD O/C N/A ovo 2Y N/A TP-16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ-024 cvo cs 24.402.01 CSJ-024 T2300F400M PC VAC BKR CHECK AOV 5739-1 / D-2 A/C Active 2 18 VRV SA SD O/C N/A LT 2Y 24.402.06 AT-11 ovc 2Y N/A TP-16 ovo 2Y N/A TP - 16 RPI 2Y 44.220.203 VBSP 2Y 44.220.203 eve cs 24.402.01 CSJ-024 cvo cs 24.402.01 CSJ-024 T2300F409 PC SUPR CHAMBER-RB VAC BKR 5739-1 / D-4 A Active 2 20 BF AO C O/C 0 RPI 2Y 24.406.02 AOV LTJ AppJ 43.401.375 AT-1 , AT-1S ovc AppJ 43.401.375 VRR-004 ovo AppJ 43.401.375 VRR-004 ETC Q 24.402.01 ETO Q 24.402.01 FSO Q 24.402.01 STC Q 24.402.01 STO Q 24.402.01 T2300F410 PC SUPR CHAMBER-RB VAC BKR 5739-1 / E-3 A Active 2 20 BF AO C O/C 0 RPI 2Y 24.406.02 AOV Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 138 of 178

.. Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 140 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T2300F410 PC SUPR CHAMBER-RB VAC BKR 5739-1 / E-3 A Active 2 20 BF AO C O/ C 0 LTJ AppJ 43.401.374 AT-1 , AT- 1S AOV ovc AppJ 43.401 .374 VRR-004 ovo AppJ 43.401.374 VRR-004 ETC Q 24.402.01 ETO Q 24.402.01 FSO Q 24.402.01 STC Q 24.402.01 STO Q 24.402.01 T2 300F450A PC SUPR CHAMBER-RB VAC BKR 5739-1 / D-3 A/C Active 2 20 VRV SA SD O/ C N/ A ovc 2Y N/ A TP-16 CHECKAOV ovo 2Y N/ A TP - 16 RPI 2Y 44.220.204 VBSP 2Y 44.220.204 LTJ AppJ 43.401.375 AT-1 eve Q 24.402.01 cvo Q 24.402.01 T2 300F450B PC SUPR CHAMBER-RB VAC BKR 57 39-1 / D-3 A/C Active 2 20 VRV SA SD O/ C N/ A ovc 2Y N/ A TP-16 CHECK AOV ovo 2Y N/ A TP - 16 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 139 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 141 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T2300F450B PC SUPR CHAMBER-RB VAC BKR 5739-1 / D-3 A/C Active 2 20 VRV SA SD O/ C N/ A RPI 2Y 44.220.204 CHECKAOV VBSP 2Y 44.220.204 LTJ AppJ 43.401.374 AT-1 eve Q 24.402.01 cvo Q 24.402.01 T23F400A PRIMARY CONTAINMENT (PC) 5739-1 / D-2 A Passive 2 0.25 GL so C C N/ A LT AppJ 43.401.362 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE T23F400B PRIMARY CONTAINMENT (PC) 5739-1 / D-2 A Passive 2 0.25 GL so C C N/ A LT AppJ 43.401.363 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE T23F400C PRIMARY CONTAINMENT (PC) 5739-1 / D-2 A Passive 2 0.25 GL so C C N/ A LT AppJ 43.401.364 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE T23F400D PRIMARY CONTAINMENT (PC) 5739-1 / D-2 A Passive 2 0.25 GL so C C N/ A LT AppJ 43.401.365 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE T23F400E PRIMARY CONTAINMENT (PC) 5739 - 1 / B-4 A Passive 2 0.25 GL so C C N/ A LT AppJ 43.401.366 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE T23F400F PRIMARY CONTAINMENT (PC) 5739-1 / D-4 A Passive 2 0.25 GL so C C N/ A LT AppJ 43.401.367 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE T23F400G PRIMARY CONTAINMENT (PC) 5739-1 / D-4 A Passive 2 0.25 GL so C C N/ A LT AppJ 43.401.368 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE T23F400H PRIMARY CONTAINMENT (PC) 5739-1 / D-4 A Passive 2 0.25 GL so C C N/ A LT AppJ 43.401.369 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 140 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 142 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T23F400J PRIMARY CONTAINMENT (PC) 5739-1 / D-4 A Passive 2 0.25 GL so C C N/A LT AppJ 43.401.370 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE T23F400K PRIMARY CONTAINMENT (PC) 5739-1 / E-2 A Passive 2 0.25 GL so C C N/A LT AppJ 43.401.371 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE T23F400L PRIMARY CONTAINMENT (PC) 5739-1 / D-2 A Passive 2 0.25 GL so C C N/A LT AppJ 43.401.372 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE T2 3F400M PRIMARY CONTAINMENT (PC) 5739-1 / D-2 A Pa ssive 2 0.25 GL so C C N/A LT AppJ 43.401.373 VRR-008 / AT-3 VACUUM BREAKER SOLENOID VALVE T4100F008 RBHVAC EXH AIR ISO DAMPER 2707-1 / G-5 Aug- Active NC 72 BF AO 0 C C ovc 2Y 24.404.04 B

ovo 2Y 24.404.04 RPI 2Y 24.404.04 ETC Q 24.404.04 FSC Q 24.404.04 STC Q 24.404.04 T4100F009 RBHVAC EXH AIR ISO DAMPER 2707-1/F-5 Aug Active NC 72 BF AO 0 C C ovc 2Y 24.404.02

-B ovo 2Y 24.404.02 RPI 2Y 24.404.02 ETC Q 24.404.02 FSC Q 24.404.02 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 141 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 143 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4100F009 RBHVAC EXH AIR ISO DAMPER 2707-1/F-5 Aug Active NC 72 BF AO 0 C C STC Q 24.404.02

-B T4100F010 RBHVAC SPLY AIR ISO DAMPER 2707-1 I G-6 Aug- Active NC 72 BF AO 0 C C ovc 2Y 24.404.04 B

ovo 2Y 24.404.04 RPI 2Y 24.404.04 ETC Q 24.404.04 FSC Q 24.404.04 STC Q 24.404.04 T4100F011 RBHVAC SPLY AIR ISO DAMPER 2707-1 / F-6 Aug Active NC 72 BF AO 0 C C ovc 2Y 24.404.02

-B ovo 2Y 24.404.02 RPI 2Y 24.404.02 ETC Q 24.404.02 FSC Q 24.404.02 STC Q 24.404.02 T4100F 352A RBHVAC DIV1 CHILLED WTR 5736-2 / F-7 C Active 3 4 CK SA SD O/C N/A eve CM 43.000.010 CMJ-14 PUMP C041 DISCH CHECK VLV cvo CM 24.413.01 CMJ-14 T4100F352B RBHVAC DIV2 CHILLED WTR 5736-2 / F-3 C Active 3 4 CK SA SD O/C N/A eve CM 43.000.010 CMJ-14 PUMP C040 DISCH CHECK VLV cvo CM 24.413.01 CMJ-14 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 142 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 144 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4600F400 SGTS SUPR CHAMBER PURGE ISO 5737 /C-7 A Active 2 20 BF AO C C C ovc 2Y 23.406 PF22 AOV ovo 2Y 23.406 PF22 RPI 2Y 24.404.03 LT 6M 43.401.510 AT-8, AT-8S LTJ AppJ 43.401.377 AT-1 ETC Q 24.404.03 FSC Q 24.404.03 STC Q 24.404.03 T4600F401 SGTS SUPR CHAMBER PURGE 5737 / C-7 A Active 2 20 BF AO C C C ovc 2Y 23.406 PF22 LINE ISO AOV ovo 2Y 23.406 PF22 RPI 2Y 24.404.03 LT 6M 43.401.510 AT-8 LTJ AppJ 43.401.377 AT-1 ETC Q 24.404.03 FSC Q 24.404.03 STC Q 24.404.03 T4600F402 SGTS DW PURGE ISO AOV 5737 / E-7 A Active 2 24 BF AO C C C ovc 2Y 23.406 PF22 ovo 2Y 23.406 PF22 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 143 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 145 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4600F402 SGTS DW PURGE ISO AOV 5737 / E-7 A Active 2 24 BF AO C C C RPI 2Y 24.404.03 LT 6M 43.401.510 AT-8 LTJ AppJ 43.401.321 AT-1 ETC Q 24.404.03 FSC Q 24.404.03 STC Q 24.404.03 T4600F407 SGTS FROM RB EXH SYS ISO AOV 5737 / F-6 Aug Active NC 24 BF AO C 0 0 RPI 2Y 24.404.03

-B ovc 3C 47.000.94 TP - 17 ovo 3Y 24.405.03 TP-17 ETO Q 24.404.03 FSO Q 24.404.03 STO Q 24.404.03 T4600F408 SGTS SC TO DIV2 SGTS ISO AOV 5737 / E-6 Aug- Active NC 24 BF AO C O/C C RPI 2Y 24.404.03 B

ovc 3C 47.000.94 TP - 17 ovo 3Y 24.405.03 TP-17 ETC Q 24.404.03 ETO Q 24.404.03 FSC Q 24.404.03 STC Q 24.404.03 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 144 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 146 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4600F408 SGTS SC TO DIV2 SGTS ISO AOV 5737 / E-6 Aug- Active NC 24 BF AO C O/C C STO Q 24.404.03 B

T4600F409 SGTS SC TO DIV1 SGTS ISO AOV 5737 / F-7 Aug Active NC 24 BF AO C O/C C RPI 2Y 24.404.03

-B ovc 3C 47.000.94 TP-17 ovo 3Y 24.405.03 TP-17 ETC Q 24.404.03 ETO Q 24.404.03 FSC Q 24.404.03 STC Q 24.404.03 STO Q 24.404.03 T4600F410 SGTS FROM AIR INLET REFUELING 5737 / F-7 Aug- Active NC 20 BF AO C 0 0 ovc 3C 47.000.94 TP - 17 AREA ISOAOV B ovo 3Y 43.404.01 TP-17 RPI 2Y 24.404.03 ETO Q 24.404.03 FSO Q 24.404.03 STO Q 24.404.03 T4600F411 SGTS DW PURGE LINE ISO BYP 5737 / D-7 A Active 2 6 BF AO C C C ovc 2Y 23.406 PF22 AOV ovo 2Y 23.406 PF22 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 145 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 147 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4600F411 SGTS DW PURGE LINE ISO BYP 5737 / D-7 A Active 2 6 BF AO C C C RPI 2Y 24.404.03 AOV LT 6M 43.401.510 AT-8 LTJ AppJ 43.401.321 AT-1 ETC Q 24.404.03 FSC Q 24.404.03 STC Q 24.404.03 T4600F412 SGTS SUPR CHAMBER PURGE LINE 5737 / C-7 A Active 2 6 BF AO C C C ovc 2Y 23.406 PF22 ISO BYPAOV ovo 2Y 23.406 PF22 RPI 2Y 24.404.03 LT 6M 43.401.510 AT-8 LTJ AppJ 43.401.377 AT-1 ETC Q 24.404.03 FSC Q 24.404.03 STC Q 24.404.03 T4600F420 SGTS DIV1 TORUS HARD VENT SC 5737 / F-7 Aug Passive NC 10 BF AO LC C N/ A RPI 2Y 27.404.01 INBD ISO AOV -B ovc 3C 47.000.94 VRR-004 ovo 3C 47.000.94 VRR-004 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 146 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 148 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4600F421 SGTS DIV2 TORUS HARD VENT SC 5737 / G-7 Aug- Passive NC 10 BF AO LC C N/A RPI 2Y 27.404.01 OTBD ISOAOV B ovc 3C 47.000.94 VRR-004 ovo 3C 47.000.94 VRR-004 T4800F404 CAC N2 IN ERTi NG SUPR POOL N2 5739-1 / E-4 A Active 2 20 BF AO C C C ovc 2Y 23.406 PF21 SPLY ISO AOV ovo 2Y 23.406 PF21 RPI 2Y 24.406.02 LT 6M 43.401.510 AT-8, AT-8S LTJ AppJ 43.401.376 AT-1 ETC Q 24.406.01 FSC Q 24.406.01 STC Q 24.406.01 T4800F405 CAC N2 IN ERTi NG SUPR POOL 5739-1 / E-4 A Active 2 20 BF AO KC C C ovc 2Y 23.406 PF21 VENT AOV ovo 2Y 23.406 PF21 RPI 2Y 24.406.02 LT 6M 43.401.510 AT-8 LTJ AppJ 43.401.376 AT-1 ETC Q 24.406.01 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 147 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 149 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4800F405 CAC N2 IN ERTi NG SUPR POOL 5739-1 / E-4 A Active 2 20 BF AO KC C C FSC Q 24.406.01 VENT AOV STC Q 24.406.01 T4800F407 CAC N2 INERTING DW AIR PURGE 5739-1 / E-4 A Active 2 24 BF AO KC C C ovc 2Y 23.406 PF21 INLET SPLY VENT AOV ovo 2Y 23.406 PF21 RPI 2Y 24.406.02 LT 6M 43.401.510 AT-8 LTJ AppJ 43.401.322 AT-1 ETC Q 24.406.01 FSC Q 24.406.01 STC Q 24.406.01 T4800F408 CAC N2 INERTING DW N2 SPLY 5739-1 / E-4 A Active 2 10 BF AO C C C ovc 2Y 23.406 PF21 ISOAOV ovo 2Y 23.406 PF21 RPI 2Y 24.406.02 LT 6M 43.401.510 AT-8 LTJ AppJ 43.401.322 AT-1 ETC Q 24.406.01 FSC Q 24.406.01 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 148 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 150 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4800F408 CAC N2 INERTING DW N2 SPLY 5739-1 / E-4 A Active 2 10 BF AO C C C STC Q 24.406.01 ISOAOV T4800F409 CAC N2 IN ERTi NG SUPR POOL N2 5739-1 / E-4 A Active 2 6 BF AO C C C ovc 2Y 23.406 PF21 SPLY ISO AOV ovo 2Y 23.406 PF21 RPI 2Y 24.406.02 LT 6M 43.401.510 AT-8 LTJ AppJ 43.401.376 AT-1 ETC Q 24.406.01 FSC Q 24.406.01 STC Q 24.406.01 T4800F410 CAC N2 IN ERTi NG N2 SPLY TO 5739-1 / E-2 A Active 2 6 BF AO C C C ovc 2Y 23.406 PF21 STANDBY GAS TREATEMENT (SGT) ovo 2Y 23.406 PF21 RPI 2Y 24.406.02 LT 6M 43.401.510 AT-8 LTJ AppJ 43.401.377 AT-1 ETC Q 24.406.01 FSC Q 24.406.01 STC Q 24.406.01 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 149 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 151 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4800F416 CAC N2 INERTING TO VAC BKR 5739-1 / D-2 A Pa ssive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP-16 VLV T23-F400A N2 SPLY ISO AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.362 AT-1 ovc AppJ 43.401.362 VRR-004 T4800F417 CAC N2 IN ERTi NG TO VAC BKR 5739-1 / D-2 A Passive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP - 16 VLV T23 - F400B N2 SPL Y ISO AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.363 AT-1 ovc AppJ 43.401.363 VRR-004 T4800F41 8 CAC N2 IN ERTi NG TO VAC BKR 5739-1 / C-2 A Passive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP-16 VLV T23-F400C N2 SPLY ISO AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.364 AT-1 ovc AppJ 43.401.364 VRR-004 T4800F419 CAC N2 IN ERTi NG TO VAC BKR 5739-1 / C-2 A Passive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP-16 VLV T2 3- F400D N2 SPLY ISO AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.365 AT-1 ovc AppJ 43.401.365 VRR-004 T4800F420 CAC N2 INERTING TO VAC BKR 5739-1 / C-5 A Passive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP - 16 VLV T23-F400E N2 SPL Y ISO AOV Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 150 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 152 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4800F420 CAC N2 INERTING TO VAC BKR 5739-1 / C-5 A Pa ssive 2 1 GL AO LC C C RPI 2Y 24.406.02 VLV T23-F400E N2 SPLY ISO AOV LTJ AppJ 43.401.366 AT-1 ovc AppJ 43.401.366 VRR-004 T4800F421 CAC N2 IN ERTi NG TO VAC BKR 5739-1 / C-5 A Passive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP-16 VLV T23-F400F N2 SPL Y ISO AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.367 AT-1 ovc AppJ 43.401.367 VRR-004 T4800F422 CAC N2 INERTING TO VAC BKR 5739-1 / D-5 A Passive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP - 16 VLV T23 - F400G N2 SPLY ISO AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.368 AT-1 ovc AppJ 43.401.368 VRR-004 T4800F42 3 CAC N2 IN ERTi NG TO VAC BKR 5739-1 / D-5 A Passive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP - 16 VLV T23-F400H N2 SPLY ISO AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.369 AT-1 ovc AppJ 43.401.369 VRR-004 T4800F424 CAC N2 INERTING TO VAC BKR 5739-1 / D-5 A Passive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP-16 VLV T23 -F400J N2 SPL Y ISO AOV RPI 2Y 24.406.02 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 151 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 153 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4800F424 CAC N2 INERTING TO VAC BKR 5739-1 / D-5 A Pa ssive 2 1 GL AO LC C C LTJ AppJ 43.401.370 AT-1 VLV T2 3- F400J N2 SPL Y ISO AOV ovc AppJ 43.401 .370 VRR-004 T4800F425 CAC N2 IN ERTi NG TO VAC BKR 5739-1 / D-5 A Passive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP-16 VLV T23 - F400K N2 SPLY ISO AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.371 AT-1 ovc AppJ 43.401.371 VRR-004 T4800F426 CAC N2 INERTING TO VAC BKR 5739-1 / D-2 A Passive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP - 16 VLV T23-F400L N2 SPL Y ISO AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.372 AT-1 ovc AppJ 43.401.372 VRR-004 T4800F427 CAC N2 IN ERTi NG TO VAC BKR 5739-1 / D-2 A Passive 2 1 GL AO LC C C ovo 2Y 24.402.01 TP-16 VLV T23-F400M N2 SPL Y ISO AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.373 AT-1 ovc AppJ 43.401.373 VRR-004 T4800F453 CAC N2 IN ERTi NG DW PRESS 5739-1 / E-4 A Active 2 1 GL AO C C C ovc 2Y 23.406 PF21 CTRL VENT AOV ovo 2Y 23.406 PF21 RPI 2Y 24.406.02 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 152 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 154 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4800F453 CAC N2 IN ERTi NG DW PRESS 5739-1 / E-4 A Active 2 1 GL AO C C C LTJ AppJ 43.401.334 AT-1 CTRL VENT AOV ETC Q 24.406.01 FSC Q 24.406.01 STC Q 24.406.01 T4800F454 CAC N2 INERTING DW N2 M/U 5739-1 / E-4 A Active 2 1 GL AO C C C ovc 2Y 23.406 PF21 OTBD ISOAOV ovo 2Y 23.406 PF21 RPI 2Y 24.406.02 LTJ AppJ 43.401.334 AT-1 ETC Q 24.406.01 FSC Q 24.406.01 STC Q 24.406.01 T4800F455 CAC N2 INERTING DW N2 M/U 5739-1 / E-4 A Active 2 1 GL AO C C C ovc 2Y 23.406 PF21 INBD ISO AOV ovo 2Y 23.406 PF21 RPI 2Y 24.406.02 LTJ AppJ 43.401.334 AT-1 ETC Q 24.406.01 FSC Q 24.406.01 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 153 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 155 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4800F455 CAC N2 IN ERTi NG DW N2 M/U 5739-1 / E-4 A Active 2 1 GL AO C C C STC Q 24.406.01 INBD ISO AOV T4800F456 CAC N2 IN ERTi NG TO SGTS N2 5739-1 / F-1 A Active 2 1 GL AO 0 C C RPI 2Y 24.406.02 SPL Y BYP ISO AOV LTJ AppJ 43.401.377 AT-1 ovc AppJ 43.401.377 VRR-004 ovo AppJ 43.401.377 VRR-004 ETC Q 24.406.01 FSC Q 24.406.01 STC Q 24.406.01 T4800F457 CAC N2 IN ERTi NG TO SGTS N2 5739-1 / F-1 A Active 2 1 GL AO 0 C C RPI 2Y 24.406.02 SPLY BYP AOV LTJ AppJ 43.401.377 AT-1 ovc AppJ 43.401.377 VRR-004 ovo AppJ 43.401.377 VRR-004 ETC Q 24.406.01 FSC Q 24.406.01 STC Q 24.406.01 T4800F458 CAC N2 IN ERTi NG TO SGTS N2 5739-1 / F-2 A Active 2 1 GL AO 0 C C RPI 2Y 24.406.02 SPLY BYP AOV LTJ AppJ 43.401.377 AT-1 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 154 of 178

.. Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 156 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4800F458 CAC N2 IN ERTi NG TO SGTS N2 5739-1 / F-2 A Active 2 1 GL AO 0 C C ovc AppJ 43.401.377 VRR-004 SPLY BYP AOV ovo AppJ 43.401 .377 VRR-004 ETC Q 24.406.01 FSC Q 24.406.01 STC Q 24.406.01 T4803F601 CAC N2 IN ERTi NG DW AIR PURGE 5739-1 / E-4 A Active 2 24 BF MOL-C C C FAI ETC 2Y 24.406.01 INLET SPLY MOV ETO 2Y 24.406.01 STC 2Y 24.406.01 LT 6M 43.401.510 AT-8 DIAG App3 47.306.06 VRR-006 ovc App3 23.406 PF20 ovo App3 23.406 PF20 RPI App3 47.306.06 LTJ AppJ 43.401.322 AT-1 T4803F602 CAC N2 IN ERTi NG DW INBD EXH 5737 / D-7 A Active 2 24 BF MOL-C C C FAI ETC 2Y 24.406.01 ISO MOV ETO 2Y 24.406.01 STC 2Y 24.406.01 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 155 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 157 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4803 F602 CAC N2 IN ERTi NG DW INBD EXH 5737 / D-7 A Active 2 24 BF MOL-C C C FAI LT 6M 43.401.510 AT-8 ISO MOV DIAG App3 47.306.06 VRR-006 ovc App3 23.406 PF20 ovo App3 23.406 PF20 RPI App3 47.306.06 LTJ AppJ 43.401.321 AT-1 T4804F016A CAC H2 RECOMB RTRN LINE FOR 5739-2 / G-7 A/C Active 2 2 RV SA C C N/A RV 10Y 43.000.020 DIV1 F601A AND F604A BYP RELIEF VLV LTJ AppJ 43.401.384 AT-1 T4804F016B CAC H2 RECOMB RTRN LINE FOR 5739-2 / D-7 A/C Active 2 2 RV SA C C N/A RV 10Y 43.000.020 DIV2 F601 BAND F604B BYP RELIEF VLV LTJ AppJ 43.401.384 AT-1 T4804F601A CAC H2 RECOMB TO TORUS DIV1 5739-2 / G-7 A Passive 2 8 BF MA LC LC LC LTJ AppJ 43.401.384 AT-1, AT-1S H2 CTRL RTRN ISO VLV T4804F60 1B CAC H2 RECOMB TO TORUS DIV2 5739-2 / D-6 A Passive 2 8 BF MA LC LC LC LTJ AppJ 43.401.384 AT-1, AT-1S H2 CTRL RTRN ISO VLV T4804F602A CAC H2 RECOMB DIV1 H2 CTRL 5739-2 / F-7 A Passive 2 4 BF MA LC LC LC LTJ AppJ 43.401.383 AT-1 , AT-1S TORUS SUCT ISO VLV T4804F602B CAC H2 RECOMB DIV2 H2 CTRL 5739-2 / C-7 A Passive 2 4 BF MA LC LC LC LTJ AppJ 43.401.385 AT-1 , AT-1S TORUS SUCT ISO VLV T4804F603A CAC H2 RECOMB DIV1 H2 CTRL 5739-2 / F-7 A Passive 2 4 BF MA LC LC LC LTJ AppJ 43.401.310 AT-1 , AT-1S DW SUCT ISO VLV Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 156 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 158 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4804F603B CAC H2 RECOMB DIV2 H2 CTRL 5739-2 / B-7 A Passive 2 4 BF MA LC LC LC LTJ AppJ 43.401.349 AT-1, AT-1S DW SUCT ISO VLV T4804F604A CAC H2 RECOMB DIV1 H2 CTRL 5739-2 / G-6 A Pa ssive 2 8 BF MA LC LC LC LTJ AppJ 43.401.384 AT-1 RTRN OTBD ISO VLV T4804F604B CAC H2 RECOMB DIV2 H2 CTRL 5739-2 I D-6 A Passive 2 8 BF MA LC LC LC LTJ AppJ 43.401.384 AT-1 RTRN OTBD ISO VLV T4804F605A CAC H2 RECOMB DIV1 DW OTBD 5739-2 / F-6 A Passive 2 4 BF MA LC LC LC LTJ AppJ 43.401.310 AT-1 SUCT ISO VLV T4804F605B CAC H2 RECOMB DIV2 DW OTBD 5739-2 I B-6 A Passive 2 4 BF MA LC LC LC LTJ AppJ 43.401.349 AT-1 SUCT ISOVLV T4804F606A CAC H2 RECOMB DIV1 TORUS 5739-2 / F-7 A Passive 2 4 BF MA LC LC LC LTJ AppJ 43.401.383 AT-1 OTBD SUCT ISO VLV T4804F606B CAC H2 RECOMB DIV2 TORUS 5739-2 I C-7 A Passive 2 4 BF MA LC LC LC LTJ AppJ 43.401.385 AT-1 OTBD SUCT ISO VLV T4901F001 PC PNEU DIV1 INST N2 INERTING 5740 / F-8 C Active 3 1.50 CK SA SD C N/A BDO CM 43.000.010 CMJ-12 SPL Y TO OTBD (PC) ISO VLV V4-2079 CHECK VLV eve CM 43.000.010 CMJ-12 T4901F004 PC PNEU DIV1 INST N2 IN ERTi NG 5740 / E-8 C Active 3 1.50 RV SA C O/C N/A RV 10Y 43.000.020 SPL Y TO OTBD (PC) ISO VLV V4-2079 RELi EF VL V T4901F005 PC PNEU DIV1 N2 INERTING 5740 / E-8 B Active 3 1 GL MA C O/C N/A ETC 2Y 24.406.02 BOTTLE SPLY ISO VLV ETO 2Y 24.406.02 T4901F006 PC PNEU DIV1 N2 INERTING 5740 / E-8 C Active 3 1 CK SA SD O/C N/A eve CM 43.000.010 CMJ-12 BOTTLE SPLY CHECK VLV cvo CM 43.000.010 CMJ-12 T4901F007 PC PNEU DIV1 SPLY OTBD PC ISO 5740/E-7 A Active 2 1.50 GL MA LC O/C N/A ETC 2Y 24.406.02 VLV V4-2079 BY-PASS VLV ETO 2Y 24.406.02 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 157 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 159 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4901F007 PC PNEU DIV1 SPLY OTBD PC ISO 5740/E-7 A Active 2 1.50 GL MA LC O/C N/A LTJ AppJ 43.401.318 AT-1 VLV V4-2079 BY-PASS VLV T4901F010 PC PNEU DIV2 INST N2 IN ERTi NG 5740 / D-8 C Active 3 1.50 CK SA SD C N/A BDO CM 43.000.010 CMJ-12 SPL Y TO OTBD (PC) ISO VLV V4-2187 CHECK VLV eve CM 43.000.010 CMJ-12 T4901F011 PC PNEU DIV2 N2 INERTING 5740 / D-8 B Active 3 1 GL MA C O/C N/A ETC 2Y 24.406.02 BOTTLE SPLY ISO VLV ETO 2Y 24.406.02 T4901F012 PC PNEU DIV2 N2 INERTING 5740 / D-8 C Active 3 1 CK SA SD O/C N/A eve CM 43.000.010 CMJ-12 BOTTLE SPLY CHECK VLV cvo CM 43.000.010 CMJ-12 T4901F015 PC PNEU DIV2 INST N2 INERTING 5740 / D-7 C Active 3 1.50 RV SA C O/C N/A RV 10Y 43.000.020 SPL Y TO OTBD (PC) ISO VLV V4-2187 RELIEF VLV T4901F016 PC PNEU DIV2 SPLY OTBD PC ISO 5740 / D-7 A Active 2 1.50 GL MA LC O/C N/A ETC 2Y 24.406.02 VLVV4-2187 BYP VLV ETO 2Y 24.406.02 LTJ AppJ 43.401.343 AT-1 T4901F019 PC PNEU DIV1 SPLY TO 5740 / F-6 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 ACCUMULATOR TNK B2104A003A INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 T4901F021 PC PNEU DIV1 ACCUMULATOR 5740 / F-6 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 TNK B2104A003A RELIEF VLV Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 158 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 160 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4901F022 PC PNEU DIV1 SPLY TO 5740 / F-5 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 ACCUMULATOR TNK B2104A003E INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 T4901F024 PC PNEU DIV1 ACCUMULATOR 5740 / F-5 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 TNK B2104A003E RELIEF VLV T4901F025 PC PNEU DIV1 SPLY TO 5740 / F-5 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 ACCUMULATOR TNK B2104A003D INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 T4901F027 PC PNEU DIV1 ACCUMULATOR 5740 / F-4 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 TNK B2104A003D RELIEF VLV T4901F028 PC PNEU DIV1 SPLY TO 5740 I F-4 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 ACCUMULATOR TNK B2104A003B INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 T4901F030 PC PNEU DIV1 ACCUMULATOR 5740 / F-4 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 TNK B2104A003B RELIEF VLV T4901F031 PC PNEU DIV1 SPLY TO 5740 / F-4 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 ACCUMULATOR TNK B2104A003C INLET CHECK VLV Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 159 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 161 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4901F031 PC PNEU DIV1 SPLY TO 5740 / F-4 A/C Active 3 1 CK SA SD O/C N/A eve RO 24.137.02 ROJ-003 ACCUMULATOR TNK B2104A003C INLET CHECK VLV cvo RO 24.137.02 ROJ-003 T4901F033 PC PNEU DIV1 ACCUMULATOR 5740 / F-3 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 TNK B2104A003C RELIEF VLV T4901F034A PC PNEU DIV1 SPLY TO 5740 / H-5 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 ACCUMULATOR TNK B2103A001C INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 T4901F034B PC PNEU DIV1 SPLYTO 5740 / H-5 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 ACCUMULATOR TNK B2103A001D INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 T4901F034C PC PNEU DIV1 SPLY TO 5740 / H-5 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 ACCUMULATOR TNK B2103A001A INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 160 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 162 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4901F034D PC PNEU DIV1 SPLYTO 5740 / H-5 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 ACCUMULATOR TNK B2103A001B INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 T4901F036A PC PNEU DIV1 ACCUMULATOR 5740 / G-5 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 TNK B2103A001C RELIEF VLV T4901F036B PC PNEU DIV1 ACCUMULATOR 5740 / G-5 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 TNK B2103A001D RELIEF VLV T4901F036C PC PNEU DIV1 ACCUMULATOR 5740 / G-5 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 TNK B2103A001A RELIEF VLV T4901F036D PC PNEU DIV1 ACCUMULATOR 5740 / G-5 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 TNK B2103A001 B RELIEF VLV T4901F037 PC PNEU DIV1 ACCUMULATOR 5740 / E-4 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 TNK B2104A004B RELIEF VLV T4901F038 PC PNEU DIV2 ACCUMULATOR 5740 / E-3 C Active 3 0.75 RV SA C O/C N/A RV 10Y 43.000.020 TNK B2104A004C RELIEF VLV T4901F039 PC PNEU DIV1 SPLY TO 5740 / E-4 A/C Active 3 1 CK SA SD O/C N/A LT 2Y 24.137.02 AT-3 ACCUMULATOR TNK B2104A004B INLET CHECK VLV eve RO 24.137.02 ROJ-003 cvo RO 24.137.02 ROJ-003 T4901F040 PC PNEU DIV2 SPLY TO 5740 / E-3 A/C Active 3 1 CK SA SD O/C N/ A LT 2Y 24.137.02 AT-3 ACCUMULATOR TNK B2104A004C INLET CHECK VLV eve RO 24.137.02 ROJ-003 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 161 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 163 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4901F040 PC PNEU DIV2 SPLYTO 5740 / E-3 A/C Active 3 1 CK SA SD O/C N/A cvo RO 24.137.02 ROJ-003 ACCUMULATOR TNK B2104A004C INLET CHECK VLV T4901F465 PC PNEU DIV1 SPLY OTBD PC ISO 5740 / E-7 A Active 2 1.50 GL AO 0 O/C C ovo 2Y 23.406 PF26 AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.318 AT-1 ovc AppJ 43.401.318 VRR-004 ETC cs 24.406.01 CSJ-021 ETO cs 24.406.01 CSJ-021 FSC cs 24.406.01 CSJ-021 STC cs 24.406.01 CSJ-021 STO cs 24.406.01 CSJ-021 T4901F466 PC PNEU DIV1 N2 SPLY ISO AOV 5740 / F-7 B Active 3 1.50 GL AO 0 C C ovc 2Y 23.406 PF26 ovo 2Y 23.406 PF26 RPI 2Y 24.406.02 ETC Q 24.406.01 FSC Q 24.406.01 STC Q 24.406.01 T4901F467 PC PNEU DIV1 NIAS ISO AOV 5740 / E-8 B Active 3 1 GL AO C O/C C ovc 2Y 23.406 PF26 ovo 2Y 23.406 PF26 RPI 2Y 24.406.02 ETC Q 24.406.01 ETO Q 24.406.01 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 162 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 164 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4901F467 PC PNEU DIV1 NIAS ISO AOV 5740 / E-8 B Active 3 1 GL AO C O/C C FSC Q 24.406.01 STC Q 24.406.01 STO Q 24.406.01 T4901F468 PC PNEU DIV2 SPLY OTBD PC ISO 5740 / D-7 A Active 2 1.50 GL AO 0 O/C C ovo 2Y 23.406 PF26 AOV RPI 2Y 24.406.02 LTJ AppJ 43.401.343 AT-1 ovc AppJ 43.401.343 VRR-004 ETC cs 24.406.01 CSJ-021 ETO cs 24.406.01 CSJ-021 FSC cs 24.406.01 CSJ-021 STC cs 24.406.01 CSJ-021 STO cs 24.406.01 CSJ-021 T4901F469 PC PNEU DIV2 N2 SPLY ISO AOV 5740 / D-8 B Active 3 1.50 GL AO 0 C C ovc 2Y 23.406 PF26 ovo 2Y 23.406 PF26 RPI 2Y 24.406.02 ETC cs 24.406.01 CSJ-021 FSC cs 24.406.01 CSJ-021 STC cs 24.406.01 CSJ-021 T4901F601 PC PNEU DIV1 INST N2 IN ERTi NG 5740 / E-6 A Active 2 1.50 GL MOL-C 0 O/C FAI ETC 2Y 24.406.01 SPLY INBD PC ISO MOV ETO 2Y 24.406.01 STC 2Y 24.406.01 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 163 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 165 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T4901F601 PC PNEU DIV1 INST N2 IN ERTi NG 5740 / E-6 A Active 2 1.50 GL MOL-C 0 O/C FAI DIAG App3 47.306.06 SPLY INBD PC ISO MOV ovo App3 23.406 PF26 RPI App3 47.306.06 LTJ AppJ 43.401.318 AT-1 ovc AppJ 43.401.318 VRR-004 T4901F602 COM PR AIR PC PNEU DIV2 INST 5740 / D-6 A Active 2 1.50 GL MOL-C 0 O/C FAI ETC 2Y 24.406.01 N2 IN ERTi NG SPY INBRD PC ISO MOV ETO 2Y 24.406.01 STC 2Y 24.406.01 DIAG App3 47.306.06 ovo App3 23.406 PF26 RPI App3 47.306.06 LTJ AppJ 43.401.343 AT-1 ovc AppJ 43.401.343 VRR-004 T5000F401A PCAM T50L400A CT OTBD SAMPLE 5741 / H-4 A Active 2 1 BA AO 0 O/C C ovc 2Y 43.408.01 AOV Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 164 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 166 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T5000F401A PCAM T50L400A CT OTBD SAMPLE 5741 / H-4 A Active 2 1 BA AO 0 O/C C ovo 2Y 24.000.02 PF17 AOV RPI 2Y 24.408.03 LTJ AppJ 43.401.354 AT-1 ETC Q 24.408.03 ETO Q 24.408.03 FSC Q 24.408.03 STC Q 24.408.03 STO Q 24.408.03 T5000F401B PCAM T50L400B CT OTBD 5741 / H-5 A Active 2 1 BA AO C O/C C ovc 2Y 43.408.02 SAMPLEAOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.04 LTJ AppJ 43.401.323 AT-1 ETC Q 24.408.04 ETO Q 24.408.04 FSC Q 24.408.04 STC Q 24.408.04 STO Q 24.408.04 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 165 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 167 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T5000F402A PCAM T50L402A CT OTBD SAMPLE 5741 / G-4 A Active 2 1 BA AO 0 O/C C ovc 2Y 43.408.01 AOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.03 LTJ AppJ 43.401.354 AT-1 ETC Q 24.408.03 ETO Q 24.408.03 FSC Q 24.408.03 STC Q 24.408.03 STO Q 24.408.03 T5000F402B PCAM T50L402B CT OTBD 5741 / G-5 A Active 2 1 BA AO C O/C C ovc 2Y 43.408.02 SAMPLEAOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.04 LTJ AppJ 43.401.324 AT-1, AT-4 ETC Q 24.408.04 ETO Q 24.408.04 FSC Q 24.408.04 STC Q 24.408.04 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 166 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 168 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T5000F402B PCAM T50L402B CT OTBD 5741 / G-5 A Active 2 1 BA AO C O/C C STO Q 24.408.04 SAMPLEAOV T5000F403A PCAM T50L403A CT OTBD SAMPLE 5741 / G-4 A Active 2 1 BA AO 0 O/C C ovc 2Y 43.408.01 AOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.03 LTJ AppJ 43.401.354 AT-1 ETC Q 24.408.03 ETO Q 24.408.03 FSC Q 24.408.03 STC Q 24.408.03 STO Q 24.408.03 T5000F403B PCAM T50L403B CT OTBD 5741 / G-5 A Active 2 1 BA AO C O/C C ovc 2Y 43.408.02 SAMPLEAOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.04 LTJ AppJ 43.401.323 AT-1 ETC Q 24.408.04 ETO Q 24.408.04 FSC Q 24.408.04 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 167 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 169 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T5000F403B PCAM T50L403B CT OTBD 5741 / G-5 A Active 2 1 BA AO C O/C C STC Q 24.408.04 SAMPLEAOV STO Q 24.408.04 T5000F404A PCAM T50L404A CT OTBD SAMPLE 5741 / G-4 A Active 2 1 BA AO 0 O/C C ovc 2Y 43.408.01 AOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.03 LTJ AppJ 43.401.354 AT-1 ETC Q 24.408.03 ETO Q 24.408.03 FSC Q 24.408.03 STC Q 24.408.03 STO Q 24.408.03 T5000F404B PCAM T50L404B CT OTBD 5741 / G-5 A Active 2 1 BA AO C O/C C ovc 2Y 43.408.02 SAMPLEAOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.04 LTJ AppJ 43.401.323 AT-1 ETC Q 43.401.383 ETO Q 24.408.04 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 168 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 170 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T5000F404B PCAM T50L404B CT OTBD 5741 / G-5 A Active 2 1 BA AO C O/C C FSC Q 24.408.04 SAMPLEAOV STC Q 24.408.04 STO Q 24.408.04 T5000F405A PCAM T50L405A CT OTBD SAMPLE 5741 / G-4 A Active 2 1 BA AO 0 O/C C ovc 2Y 43.408.01 AOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.03 LTJ AppJ 43.401.354 AT-1 ETC Q 24.408.03 ETO Q 24.408.03 FSC Q 24.408.03 STC Q 24.408.03 STO Q 24.408.03 T5000F405B PCAM T50L405B CT OTBD 5741 / G-5 A Active 2 1 BA AO C O/C C ovc 2Y 43.408.02 SAMPLEAOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.04 LTJ AppJ 43.401.323 AT-1 ETC Q 24.408.04 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 169 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 171 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T5000F405B PCAM T50L405B CT OTBD 5741 / G-5 A Active 2 1 BA AO C O/C C ETO Q 24.408.04 SAMPLEAOV FSC Q 24.408.04 STC Q 24.408.04 STO Q 24.408.04 T5000F407A PCAM T50L410A CT OTBD SAMPLE 5741 / D-3 A Active 2 1 BA AO C O/C C ovc 2Y 43.408.01 AOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.03 LTJ AppJ 43.401.386 AT-1 ETC Q 24.408.03 ETO Q 24.408.03 FSC Q 24.408.03 STC Q 24.408.03 STO Q 24.408.03 T5000F407B PCAM T50L41 OB CT OTBD 5741 / D-6 A Active 2 1 BA AO 0 O/C C ovc 2Y 43.408.02 SAMPLEAOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.04 LTJ AppJ 43.401.387 AT-1 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 170 of 178

.. Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 172 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T5000F407B PCAM T50L41 OB CT OTBD 5741 / D-6 A Active 2 1 BA AO 0 O/C C ETC Q 24.408.04 SAMPLEAOV ETO Q 24.408.04 FSC Q 24.408.04 STC Q 24.408.04 STO Q 24.408.04 T5000F408A PCAM T50L411A CT OTBD SAMPLE 5741 / D-3 A Active 2 1 BA AO 0 O/C C ovc 2Y 43.408.01 RTRN AOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.03 LTJ AppJ 43.401.383 AT-1 ETC Q 24.408.03 ETO Q 24.408.03 FSC Q 24.408.03 STC Q 24.408.03 STO Q 24.408.03 T5000F408B PCAM T50L411 B CT OTBD 5741 / D-6 A Active 2 1 BA AO 0 O/C C ovc 2Y 43.408.02 SAMPLE RTRN AOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.04 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 171 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 173 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T5000F408B PCAM T50L411 B CT OTBD 5741 / D-6 A Active 2 1 BA AO 0 O/C C LTJ AppJ 43.401.385 AT-1 SAMPLE RTRN AOV ETC Q 24.408.04 ETO Q 24.408.04 FSC Q 24.408.04 STC Q 24.408.04 STO Q 24.408.04 T5000F420A PCAM PC PRESS MON T50L406A 5741 / F-4 A Active 2 1 BA AO 0 O/C C ovo 2Y 24.000.02 PF17 PT OTBD SAMPLE AOV RPI 2Y 24.408.03 LTJ AppJ 43.401.353 AT-1 ovc AppJ 43.401.353 VRR-004 ETC Q 24.408.03 ETO Q 24.408.03 FSC Q 24.408.03 STC Q 24.408.03 STO Q 24.408.03 T5000F420B PCAM PC PRESS MON T50L406B 5741 / F-5 A Active 2 1 BA AO 0 O/C C ovo 2Y 24.000.02 PF17 PT OTBD SAMPLE AOV RPI 2Y 24.408.04 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 172 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 174 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T5000F420B PCAM PC PRESS MON T50L406B 5741 / F-5 A Active 2 1 BA AO 0 O/C C LTJ AppJ 43.401.333 AT-1 PT OTBD SAMPLE AOV ovc AppJ 43.401.333 VRR-004 ETC Q 24.408.04 ETO Q 24.408.04 FSC Q 24.408.04 STC Q 24.408.04 STO Q 24.408.04 T5000F421A PCAM PC TORUS WTR LVL MON 5741 / B-3 B Passive 2 1 BA AO 0 0 C ovc 2Y AF53 DIV1 TORUS LVL INST LINE ISO AOV ovo 2Y AF53 RPI 2Y 24.408.03 T5000F421B PCAM PC TORUS WTR LVL MON 5741 / B-6 B Passive 2 1 BA AO 0 0 C ovc 2Y AF55 DIV2 TORUS LVL INST LINE ISO AOV ovo 2Y AF55 RPI 2Y 24.408.04 T5000F422A PCAM PC TORUS WTR LVL MON 5741 / B-3 B Passive 2 1 BA AO 0 0 C ovc 2Y AF54 DIV1 TORUS LVL INST LINE ISO AOV Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 173 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 175 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T5000F422A PCAM PC TORUS WTR LVL MON 5741 / B-3 B Pa ssive 2 1 BA AO 0 0 C ovo 2Y AF54 DIV1 TORUS LVL INST LINE ISO AOV RPI 2Y 24.408.03 T5000F455 PCAM PC RAD MON RACK 5741 / D-1 A Active 2 1 BA AO 0 C C ovo 2Y 24.000.02 PF17 H21P284 OUTLET SECONDARY ISO AOVDIV2 RPI 2Y 24.408.03 LTJ AppJ 43.401.383 AT-1 ovc AppJ 43.401.383 VRR-004 ETC Q 24.408.03 FSC Q 24.408.03 STC Q 24.408.03 T5000F45 6 PCAM PC RAD MON RACK 5741 / E- 3 A Active 2 1 BA AO 0 C C ovc 2Y 43.408.01 H21P284 INLET SECONDARY ISO AOV ovo 2Y 24.000.02 PF17 RPI 2Y 24.408.03 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 174 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 176 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T5000F456 PCAM PC RAD MON RACK 5741 / E-3 A Active 2 1 BA AO 0 C C LTJ AppJ 43.401.354 AT-1 H21P284 INLET SECONDARY ISO AOV ETC Q 24.408.03 FSC Q 24.408.03 STC Q 24.408.03 T50F412A PRIMARY CONTAINMENTTORUS 5741 / C-4 A Active 2 1 GL so 0 O/C FAI LTJ AppJ 43.401.402 AT-2 LEVEL MONITORING DIVISION 1 SOLENOID VALVE ovc AppJ 43.401.402 VRR-002 ovo AppJ 43.401.402 VRR-002 RPI AppJ 43.401.402 VRR-002 ETC Q 24.408.03 ETO Q 24.408.03 STC Q 24.408.03 STO Q 24.408.03 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 175 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table , Rev.4 , Page 177 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T50F412B PRIMARY CONTAINMENT TORUS 5741 / C-5 A Active 2 1 GL so 0 O/C FAI LTJ AppJ 43.401.403 AT-2 LEVEL MONITORING DIVISION 2 SOLENOID VALVE ovc AppJ 43.401.403 VRR-002 ovo AppJ 43.401.403 VRR-002 RPI AppJ 43.401.403 VRR-002 ETC Q 24.408.04 ETO Q 24.408.04 STC Q 24.408.04 STO Q 24.408.04 T50F450 PRIMARY CONTAINMENT 5741 / E-3 A Active 2 0.75 GL so 0 C C LTJ AppJ 43.401.354 AT-1 RADIATION MONITORING SYSTEM INLET ISOLATION VALVE ovc AppJ 43.401.354 VRR-002 ovo AppJ 43.401.354 VRR-002 RPI AppJ 43.401.354 VRR-002 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 176 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 178 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req T50F450 PRIMARY CONTAINMENT 5741 / E-3 A Active 2 0.75 GL so 0 C C ETC Q 24.408.03 RADIATION MONITORING SYSTEM INLET ISOLATION VALVE FSC Q 24.408.03 STC Q 24.408.03 T50F451 PRIMARY CONTAINMENT 5741/D-1 A Active 2 0.75 GL so 0 C C LTJ AppJ 43.401.383 AT-1 RADIATION MONITORING SYSTEM OUTLET ISOLATION VALVE ovc AppJ 43.401.383 VRR-002 ovo AppJ 43.401.383 VRR-002 RPI AppJ 43.401.383 VRR-002 ETC Q 24.408.03 FSC Q 24.408.03 STC Q 24.408.03 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 177 of 178

Fermi Nuclear Plant DSN: 1ST Valve Scope Table, Rev.4, Page 179 of 183 Part 5 - 1ST Program Valve Tables Valve ID Comp Drawing/ Cat Active/ Class Size Type Act Position Test Freq Procedure Notes Description Coor. Passive Normal Safe Fail Req TS0F458 PCAM DIV2 PENT X-27F REMOTE 5741 / G-5 A Active 2 1 GL so 0 O/ C FAI LTJ AppJ 43.401.389 AT-1 MANUAL ISO SOV ovc AppJ 43.401 .389 VRR-002 ovo AppJ 43.401.389 VRR-002 RPI AppJ 43.401.389 VRR-002 ETC Q 24.408.04 ETO Q 24.408.04 STC Q 24.408.04 STO Q 24.408.04 Jan 8, 2021 6:21 AM Iddeal Suite V. 9.35.2.1 Page 178 of 178

DSN: 1ST Valve Scope Table, Rev.4 , Page 180 of 183 Jeffrey D Auler From: Craig E Shepherd Sent: Friday, January 8, 2021 12:38 PM To: Jeffrey D Auler

Subject:

Approvals, 1ST Valve Scope Table To: Jeff Auler, 1ST Program Manager I have reviewed and approved the following OTC DSN Revision Approval TM PLAN 1ST Valve Scope Table 4 Reviewer:

Craig Shepherd I also authorize any page renumbering required by inclusion of this email within the overall document as required per NSI P-20-0005.

Regards, Craig Shepherd

DSN: 1ST Valve Scope Table, Rev.4 , Page 181 of 183 Jeffrey D Auler From: Jeffrey D Auler Sent: Friday, January 8, 2021 1:17 PM To: Jeffrey D Auler

Subject:

1ST Valve Scope Table I have prepared and approve the following:

OTC DSN Revision Approval TM PLAN 1ST Valve Scope Table 4 Preparer:

Jeffrey D. Auler /s/

I also authorize any page renumbering required by inclusion of this email within the overall document as required per NSI P-20-0005.

Regards, Jeffrey D. Auler

DSN: 1ST Valve Scope Table, Rev.4 , Pag e 182 of 183 Jeffrey D Auler From: James D Wines Sent: Tuesday, January 12, 2021 4:07 PM To: Jeffrey D Auler Cc: Randy D Breymaier

Subject:

Valve Scope Table Attachments: FERMI PART 5 - 1ST Program Plan for Valves+ADOBE.pdf I have reviewed and approve the following as the Supervisor, Programs Engineering OTC DSN Revision Approval TMPLAN 1ST Valve Scope Table 4 Reviewed by:

James D Wines /s/

I also authorize any page renumbering required by inclusion of this email within the overall document as required per NSIP-20-0005.

James Wines I Supervisor - Nuclear Engineering (Programs)

Phone: 734.586.1701 I Text: 734.625.3154 I Pager: 734.227.0076 I eMail : James.Wines@dteenergy.com

DSN: 1ST Valve Scope Table, Rev.4 , Page 183 of 183 Jeffrey D Auler From: Randy D Breymaier Sent: Friday, January 15, 2021 1:47 PM To: Jeffrey D Auler

Subject:

Approval of valve scope (part 5)

I have reviewed and approve the following as Manager, Engineering Programs:

OTC DSN Revision Approval TM PLAN 1ST Valve Scope Table 4 Manager Approval Randy Breymaier /s/

I also authorize any page renumbering required by inclusion of this email within the overall document as required per NSI P-20-0005.

Randy Breymaier Manager Performance Engineering 734 586-1811