Acceptance of National Institute of Standards and Technology License Renewal Application Dated August 8, 2023
ML23271A220
Person / Time
Site: 07000398
Issue date: 10/06/2023
From: Osiris Siurano-Perez
NRC/NMSS/DFM/FFLB
To: Mackey E
US Dept of Commerce, National Institute of Standards & Technology (NIST)
References
EPID L-2023-RNW-0017
Download: ML23271A220 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 6, 2023 Dr. Elizabeth A. Mackey, Ph.D.

Chief Safety Officer U.S. Department of Commerce National Institute of Standards and Technology 100 Bureau Drive Gaithersburg, MD 20889

SUBJECT:

U.S. DEPARTMENT OF COMMERCE, NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY: ACCEPTANCE OF APPLICATION FOR RENEWAL OF SPECIAL NUCLEAR MATERIALS LICENSE NUMBER 362 (ENTERPRISE PROJECT IDENTIFICATION NUMBER L-2023-RNW-0017)

Dear Dr. Mackey:

By letter dated August 8, 2023 (Agencywide Documents Access and Management System

[ADAMS] Accession No. ML23220A398), the U.S. Department of Commerce, National Institute of Standards and Technology (NIST), in Gaithersburg, Maryland, submitted an application, with enclosures, to the U.S. Nuclear Regulatory Commission (NRC) for renewal of special nuclear materials license number 362 (SNM-362), for the NIST. The NRC received your submittal on August 10, 2023.

Following receipt, the NRC staff conducted a review of the application to determine whether there were any administrative omissions or deficiencies that would prevent us from accepting it and proceeding with a detailed technical review. During this review, the NRC staff identified information within certain technical areas that needed clarification. These areas were:

transportation security, physical security, and waste management. As such, on September 21, 2023, the NRC staff conducted a conference call with NIST staff to discuss the identified issues and obtain clarification of the information related to these three areas. Based on the discussions during the call, the NIST staff identified non-public documents that would provide additional information to address the NRC staff concerns. Following the call, the NRC staff conducted a virtual audit of the documents and determined that they included sufficient information to proceed with the detailed technical review.

We have completed our acceptance review of your submittal and have identified no administrative omissions or deficiencies that would prevent us from proceeding with a detailed technical review. Your submittal has been assigned Enterprise Project Identification Number L-2023-RNW-0017. Please reference this number and Docket No. 07000398 in any future correspondence associated with this matter.

E. Mackey 2 Please note that the NRC staffs technical review of your submittal may identify issues that could require you to provide additional information. Based on our preliminary evaluation and projection of current review schedules, we anticipate completing our formal review by July 2024.

This schedule includes the issuance, if needed, of a request for additional information (RAI) by December 14, 2023, and receiving your responses to the RAI by January 23, 2024. Please note that these dates could change depending on the findings of our technical review, urgent assignments, or other factors. Within 30 days after completion of the NRC staff review of your application, a notice will be published in the Federal Register to inform the general public of the NRC staffs decision regarding the application. We will promptly communicate any significant changes to the schedule. The NRC staff estimates that completing the review of the SNM-362 license renewal application will require approximately 820 staff hours which corresponds to about $246,000.00 ($300.00/hour). We will promptly communicate significant schedule or cost changes, if any.

The NIST filed its license renewal application at least 30 days before the licenses expiration date of September 9, 2023. Therefore, pursuant to the timely renewal provisions in Title 10 of the Code of Federal Regulations (10 CFR) Paragraph 70.38(a), NIST is permitted to continue using its SNM in accordance with the existing SNM-362 license, pending final decision by the Commission on the license renewal application.

In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records component of the NRCs ADAMS. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The PDR is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays.

If you have any questions regarding this communication, please contact me at my office at 301-415-7827, cell phone 301-820-8246, or via email to Osiris.Siurano-Perez@nrc.gov.

Sincerely, Signed by Siurano-Perez, Osiris on 10/06/23 Osiris Siurano-Pérez, Project Manager Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 07000398 License No.: SNM-362 cc: Manny Mejias, Radiation Safety Officer NIST

ML23271A220 OFFICE NMSS/DFM/FFLB/PM NMSS/DFM/FFLB/LA NMSS/DFM/FFLB/BC NMSS/DFM/FFLB/PM NAME OSiurano JGoodridge SLav OSiurano DATE 10/02/2023 10/03/2023 10/03/2023 10/06/2023