1 to Updated Safety Analysis Report, Drawing 729E589BB, Functional Control Diagram High Pressure Coolant Injection System, Sheet 1
ML23129A443
Person / Time
Site: Cooper 
Issue date: 04/20/2023
From:
Nebraska Public Power District (NPPD)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23129A261 List: ... further results
References
NLS2023022
Download: ML23129A443 (1)


Text

A B

C D

E F

G H

J ci

z 1

2 3

I,;:- REQUIRES COINCIDENT r: -- -- -- -- -- -- :-i, TRIP OF SWITCH 2-3-72A OR 2-3-728 I

REACTOR REACTOR I

AND 2-3-72C OR VESSEL VESSEL 2-3-72D TO START LEVEL LOW LEVEL LOW SYSTEM I LIS LIS r

SIT *cc, _, =

2-3-72A LP 2-3-728 LP ADDITlONAL FUNCTIONS I

PERFORMED BY THIS SET OF SWITCHES REF. 2 I

I I

I REACTOR REACTOR I

VESSEL VESSEL LEVEL LOW LEVEL LOW I

I LIS LP LIS LP 2-3-72C 2-3-72D 4

(I)

START L..: -

.J REACTOR WATER LEVEL OR HIGH r
  • ~*,,,m= '",~

I DRYWELL PRESSURE I

r:-- -- -- -- --

CONTROL EXCESS TEMP EXCESS TEMP 5

6 I,;:- REQUIRES COINCIDENT r: -- -- -- -- -- -- :-i, TRIP OF SWITCH 10-101A OR 10-1018 I

DRYWELL DRYWELL I

& 10-101C OR PRESSURE PRESSURE 10-101 D TO START "HIGH" "HIGH" SYSTEM I PSH PSH 10-101A LP 10-1018 LP ADDITIONAL FUNCTIONS I

r= *ITHrn*

PERFORMED BY THIS SET OF SWITCHES REF. B I

I I

DRYWELL DRYWELL I

PRESSURE PRESSURE "HIGH" "HIGH" I

I PSH LP PSH LP 10-101C 10-101D LEVEL SWITCHES LSL 74A-8 &

L..: -

.J 75A-8 SHALL BE TYPE THAT CLOSES ON LOW LEVEL 7l\\

I ir ONE SET OF STEAM LEAK

7 DETECTORS SEE NOTE 5 I

CONDENSATE 8

9 10 1 1 12 N06 REV DCN 96-0112 RAC JAC KG 4-19-99 N05 REV PER DCN 97-081 9 RAC JAC ACG 8 20 97 MANUAL ISOLATION N04 REV PER DCN 96-1532 CRW JAC JRF 10 9 96 PUSHBUTTON N03 REV & REDRAWN PER APA DCN C93-1781 DR JAC BAM 12 01 03 NO.

REVISIONS OFT CKD APP DATE PB CR 9-3 DCN REVISIONS BY N.P.P.D.

CHANNEL "8" ONLY NOTE 11 FOR PREVIOUS REVISIONS, SEE SUPERSEDED CARDS.

PERMISSIVE WHEN IT\\

INITlATION SIGNAL JS PRESENT PMIS INPUT

\\

AUX I

POINT N700 CR DEVICE

\\

r:- - -

7 CONDENSATE HPCI STEAM HPCI STEAM
,, ;,, ;,, /2'\\

I SWITCH STEAM LINE STEAM LINE r

"'°"°~ ro"cm= IB,e 0, s.~,

STORAGE TANK STORAGE TANK IN OPEN LEVEL SWITCHES LSH I SUPPLY I SUPPLY I f COINCIDENT TRIP OF SWITCH SBA AND 68C ACTUATES M023-15 CLOSURE AND TURBINE TRIP. COINCIDENT TRIP OF SWITCH 688 AND 68D ACTUATES CHANNEL "8".

POSITlON SPACE SPACE 101A OR 102A AND 103A OR 104A TO LOW LEVEL WW\\:.b'~

I ACTUATE ISOLATION VALVF. CLOSURE RMS CR TS LOCAL TS LOCAL LSL 101A 102A r-NOTE6&11 74A 9-3 I NOTE 3 TYP

£. NOTE 6, 9 & 11 I

I r= CHANNEL -=s::-

=-i TYPICAL FOR LOGIC A I CHANNEL"A"--

I' ISOLATION I

EXESS TEMP EXCESS TEMP I I STEAM LINE I

STEAM LINE I

CONDENSATE SIGNAL LOGIC 8 STEAM LINE STEAM LINE HIGH DP HIGH DP STORAGE TANK RESET SWITCH SPACE SPACE LOW LEVEL PB CR I

TS LOCAL TS LOCAL I I DPIS LP I DPIS LP I LSL LOCAL 103A 104A 76 77 748 9-3 L..: --,__ -- --- -

.J t...=_ ---- _I_ -

7=.J

,cR; AUTO ISOLATION _J LINE BREAK DETECTION ~:.____/

A AUTO SI REQUIRES TRIP OF SWITCH UNTIL VALVE M058

'9-3' 76 OR 77 TO ACTUATE SEAL IN NOT REQUIRED ON M023-15 SEAL IN 3 PCSITION "CLOSE"
\\

- "AUTO" - "OPEN" SPRING RETURN TO "AUTO" FROM "CLOSE"-"OPEN"(TYPICAL UNLESS OTHERWISE SPECIFIED)

CONTROL SWITCH IN "OPEN" POSITION RMS CR 9-3 PMIS INPUT POINT CHANNEL "A" N785 r:'\\

CHANNEL "8" N786 I

VALVE LIMIT \\ \\j:;/ j CONTROL SWITCH SWITCH IN CLOSED PERMISSIVE POSITION WHILE OPENING DO NOT SEAL IN

\\

LIMIT SWITCH ON

/

VALVF.

RMS CR

/K\\

/

NOT PERMISSIVE \\___ '<lY I VALVF. TORQUE

~

WITH AUTO SWITCH PERMISSIVE ISOLATION SIGNAL WHILE CLOSING

\\

AUX DEVICE LP I {E\\

\\

TORQUE SWITCH ON

/

VALVE

~

I (PMIS TABLE 1)

I SHEET 2 OPEN I

CLOSE DC REVERSING CONTACTOR (72)

  • 125 voe HPCI STR RACK VALVE MO 23-16 STEAM SUPPLY LINE ISOLATION VALVE (DC OPERATED) FOR MO 23-15 IDENTICAL EXQEET AQ BEVEBSING QQNTAQTQB (1:2)*

NOTES 2 & 4 HPCI FLOW LOW FSL 78 LP HPCI FLOW

~

HIGH PERMISSIVE \\ I PRESSURE \\

FSH WHEN INITIATION 78 SWITCH SIGNAL PRESENT PERMISSIVE AUX DEVICE LP NOT PERMISSIVE WITH AUTO CLOSE SIGNAL AUX DEVICE VALVE LIMIT LP SWITCH PERMISSIVE WHILE OPENING LIMIT SWITCH ON VALVF.

OPEN PSH 85 LP TURBINE TRIP SIGNAL DC CONTACTOR (72)

  • 250 voe HPCI STR RACK VALVE TORQUE SWITCH PERMISSIVE WHILE CLOSING TORQUE ON SWITCH VALVE CLOSE LP 9-3 SEAL IN SIGNAL NOTE 1 CONTROL SWITCH IN "CLOSED" POSITION RMS CR 9-3 MINIMUM FLOW BYPASS TO SUPPRESSION CHAMBER VALVE MO 23-25 NOTES 2 & 4 1

2 3

4 ISOLATION CLOSURE FULLY OPEN CONTROL CONTROL SWITCH SWITCH LIMIT ON IN "OPEN" IN "CLOSE" SWITCH VALVF.

POSITION POSITION RMS CR RMS CR 9-3 9-3 7

i

/tLVc. LIMIT

\\

/:ALVE TORQUE

\\

SWITCH PERMISSIVE SWITCH PERMISSIVE WHILE OPENING WHILE CLOSING

\\

LIMIT SWITCH ON

/

VALVE

\\

TORQUE SWITCH ON

/

VALVF.

SEAL IN NOT REQUIRED SEAL ON MO 23-21 IN I

(PMIS TABLE 1)

I SHEET 2 OPEN I

CLOSE DC REVERSING CONTACTOR (72) '

VALVE MO 23-21 TEST BYPASS TO CONDENSATE STORAGE TANK (EXCEPT AS NOTED)

(TYPICAL FOR VALVE MO 23-24 REDUNDANT SHUT -OFF TO CNDS STORAGE TANK)

NOTES 2 & 4 CONTROL CONTROL SWITCH IN "OPEN" POSITION RMS CR 9-3 VALVF. LIMIT SWITCH PERMISSIVE WHILE OPENING LIMIT SWITCH ON VALVE HPCI INITIATION SIGNAL SWITCH IN "CLOSED" POSITION RMS CR 9-3 VALVF. TORQUE SWITCH PERMISSIVE WHILE CLOSING TORQUE ON SWITCH VALVE

.----- (PMIS TABLE 1) ----,

SHEET 2 OPEN CLOSE DC REVERSING CONTACTOR (72)

  • 250 voe H PCI STR RACK PUMP DISCHARGE VALVE MO 23-19 (TYPICAL FOR PUMP DISCHARGE VALVE MO 23-20)

NOTES 2 & 4 5

6 SEAL IN LOW LEVEL LOCAL LSL 75A

/

CONDENSATE STORAGE TANK LOW LEVEL LSL LOCAL 758 8

91A & B SHALL BE TYPE THAT CLOSES ON HIGH I

LOCAL LEVEL I

I SUPPRESSION SUPPRESSION I

CHAMBER CHAMBER HIGH LEVEL HIGH LEVEL PRESS LOW I

PSL LP SBA I

I HPCI STEAM I

SUPPLY PRESS LOW PRESS LOW PSL 688 HPCI STEAM SUPPLY PRESS LOW LP I

I I

VALVE M058 FULLY OPEN LSH LOCAL LSH LOCAL I

PSL LP I

PSL LP I

91A 918 68C 68D L..: --,__ _1 __ -- :.J NOTE6&11

_J CONTROL SWITCH IN "OPEN" POSITION RMS CR r:'\\

9-3

\\j:;)

CONTROL SWITCH IN "CLOSE" I

VALVE LIMIT E\\

POSITION SWITCH PERMISSIVF.

WHILE OPENING RMS CR

\\

LIMIT SWITCH ON

/

VALVE 9-3

/

NOT PERMISSIVE L I

VALVE TORQUE

~

WITH AUTO ISOLATION SWITCH PERMISSIVE SIGNAL PRESENT WHILE CLOSING

\\

AUX DEVICE LP I

\\

TORQUE SWITCH ON

/

VALVE SEAL SEAL IN I

(PMIS TABLE 1)

I IN SHEET 2 OPEN CLOSE DC REVERSING CONTACTOR (72)

  • 125 voe HPCI STR RACK NOT PERMISSIVE WHEN VALVE CLOSURE SIGNAL IS PRESENT AUX DEVICE LP CONTROL SWITCH IN "OPEN" POSITION RMS VALVE LIMIT SWITCH PERMISSIVF.

WHILE OPENING LIMIT ON SWITCH VALVE OPEN CR 9-3 CONTROL SWITCH IN "CLOSE" POSITION RMS LIMIT ON SWITCH VALVE CR 9-3 VALVE TORQUE SWITCH PERMISSIVE WHILE CLOSING TORQUE ON SWITCH VALVF.

CLOSE DC REVERSING CONTACTOR (72)

  • 125 voe HPCI STR RACK E!.!ME S!.!CTIQN EBQM S!.!EEBESSIQN Ql::lAMElEB YALYE MQ 23-~8 E!.!M e S!.!QJIQN EBQM QQNPENSAIE STQBAGE JANK YALYE MQ 23-17 NOTES 2 & 4 NOTES 2 & 4

.l'lQIES;

1.
2.
3.
4.
5.

THE HPCI SYS IS ARRANGED FOR TEST OF PUMP AT FULL FLOW AND ALL VALVES FOR OPEN AND CLOSE CAPACITY AT ANY TIME EXCEPT WHEN INITIATION SIGNAL OR AUTO ISOLATION SIGNAL JS ACTIVATED. IN EVENT THE INITlATION SIGNAL OCCURS WHILE TEST IS UNDERWAY THE SYS AUTOMATICALLY RETURNS TO START-UP MODE.

ALL POWER FOR OPERATION OF DC VALVE MOTORS SHALL ORIGINATE FROM A PLANT DC BUS. POWER FOR AC OPERATED VALVES SHALL ORIGINATE FROM ANY EMERGENCY AC BUS.

ALL PART NO'S PREFIXED BY 23 UNLESS OTHERWISE SHOWN.

AUXILIARY RELAYS & DEVICES NOT SHOWN ON FUNCTIONAL CONTROL DIAGRAMS EXCEPT WHERE REQUIRED TO CLARIFY FUNCTION.

FIVE IDENTICAL SETS OF STEAM LEAK DETECTORS COMPRISE CHANNEL A, WITH ONLY ONE SET BEING SHOWN FOR CLARITY. CHANNELS B, C, & D SHALL BE CONNECTED THE SAME WAY WITH EACH CHANNEL GIVING AN INDEPENDENT ISOLATION CLOSURE SIGNAL TO CHANNELS "A" AND "B". THREE STEAM LEAK DETECTOR SETS PER CHANNEL SERVF. HPCI EQUIPMENT AND ITS STEAM PIPING, WITH THE REMAINING MONITORING THE STEAM PIPING SERVING RHR.

BEEE

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

BENCE PBAWINGS*

729E261BC 719E415B8 209A4756 730E149B8 730E14088 729E402BB 729E517BC 729E128BB 718E833BA 791E271 P&ID HIGH PRESSURE COOLANT INJECTION SYSTEM P&ID NUCLEAR BOILER VESSEL INSTRUMENTATION LOGIC SYMBOLS FCD NUCLEAR BOILER MISC. SYSTEM FCD RHR SYSTEM FCD CORE SPRAY SYSTEM FCD RCIC SYSTEM P&ID RHR SYSTEM P&ID REACTOR WATER CLEAN-UP SYSTEM HPCI ELEMENTARY DIAGRAM

6.

ISOLATION SIGNAL SWITCHES SHALL BE OF THE TYPE THAT CLOSE CONTACTS FOR SPECIFIED ISOLATION EVENT. WHERE AUX RELAYS ARE USED IN THE ISOLATION CHANNELS, THEY SHALL BE POWERED FROM THE STATION BAmRIES.

__w.w*;_

-SWITCHGEAR DEVICE FUNCTION NO ASA SPEC C37.2

+

-FURNISHED WITH TURBINE SEE REF DWG 10

7.

FOR LOCATION AND IDENTIFICATION OF INSTRUMENTS, SEE INSTRUMENT DATA SHEET LISTED IN MPL FOR EACH INSTRUMENT.

8.

THE HPCI SYSTEM SHALL BE DESIGNATED IN ACCORDANCE WITH PROPOSED CRITERIA FOR NUCLEAR POWER PLANT PROTECTION SYSTEM IEEE 279 INSOFAR AS PRACTICABLE.

9.

OPERATION OF HIGH STEAM FLOW SWITCHES DPIS-76 & 77 ARE DELAYED 3 SECONDS BY TDR-K33 & K45.

10.

RHR STEAM CONDENSING IS NO LONGER AN OPERATIONAL MODE.

11. ACTUATION OF CHANNEL "A" CLOSES M023-15, A023-70, A023-71, AND PRODUCES TURBINE TRIP.

ACTUATION OF CHANNEL "B" CLOSES M023-16, M023-5B, A023-70, A023-71 AND PRODUCES TURBINE TRIP.

INFORMATION

    • THIS DRAWING GENERATED BY NPPD SIGNIFICANT NUMBER GROUP HIGH 2

3 COOPER NUCLEAR FUNCTIONAL CONTROL PRESSURE COOLANT 9

10 4

5 STATION DIAGRAM INJECTION 1 1 6

SYS A -

SIGNAL B -

SH NO C -

COORDINATES 452005102 ONLY CADD DRAWING DRAWN DR CHECKED JAC APPROVF.D BAM DATE 10-19-93 DATE 10-29-93 DATE 12/01/93 DO NOT REVISE MANUALLY GENERAL ELECTRICt 0

0

~ (.)

t--FILM-ED ----r---7-2 9~E5-8 9-8 B_S_H _. 1---r-N-R 000----i I6 i 12 A

B C

D E

F G

H J