Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23129A3882023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2072, General Arrangement, Augmented Radwaste Building Plans, Withheld ML23129A4132023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2028, Flow Diagram Reactor Building & Drywell Equipment Drain System ML23129A4122023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2053, Withheld ML23129A4112023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2035, Flow Diagram Condensate Filter Demineralizer System, Sheet 4 ML23129A4102023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2010, Sheet 3, Flow Diagram Service Air ML23129A4092023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2035, Flow Diagram Condensate Filter Demineralizer System, Sheet 2 ML23129A4082023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2073, General Arrangement, Augmented Radwaste Building Sections, Withheld ML23129A4072023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2060 General Arrangement, Reactor Building, Plant at Elevation 903'-6, Withheld ML23129A4062023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2066, General Arrangement, Reactor Building, Section B-B, Withheld ML23129A4052023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2018, Flow Diagram Turbine Generator Bldg & Control Bldg Heating & Ventilating ML23129A4042023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2038, Flow Diagram Reactor Building Floor & Roof Drain Systems, Sheet 1 ML23129A4032023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2031, Flow Diagram Reactor Building - Closed Cooling Water System, Sheet 3 ML23129A4022023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 197R567, Piping and Instrument Symbols, Sheet 1 ML23129A4012023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2054, General Arrangement, Turbine Building, Section B-B, Withheld ML23129A4002023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3002, Auxiliary One Line Diagram MCC Z, SWGR Bus 1A, 1B, 1E, & Critical SWGR Bus 1F 1G, Sheet 1 ML23129A3992023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2050, General Arrangement, Turbine Building, Basement Floor Plan, Withheld ML23129A3982023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2002, Flow Diagram Main, Exhaust & Auxiliary Steam Systems, Sheet 2 ML23129A3972023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2045, Rev. 58, Sheet 1, Flow Diagram Core Spray System ML23129A3962023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 117C3346, Installation Penetration Seal-Medium Voltage Power ML23129A3952023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2039, Flow Diagram Control Rod Drive Hydraulic System ML23129A3942023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2051, General Arrangement, Turbine Building Mezzanine Floor Plan - Withheld ML23129A3932023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2020, Flow Diagram Reactor Building Heating and Ventilating ML23129A3922023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2032, Flow Diagram High Conductivity (Floor Drains, Chemical and Laundry Waste) Process, Sheet 2 ML23129A3912023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2010, Flow Diagram Instrument Air Reactor Building, Sheet 2 ML23129A3902023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2010, Sheet 1A, Flow Diagram Instrument Air Control & Turbine Buildings ML23129A3892023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2062, General Arrangement, Reactor Building, Plan at Elevation 958'-3, Withheld ML23129A3752023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2033, Flow Diagram Low Conductivity (Equipment Drains) Processing, Sheet 2 ML23129A3652023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2035, Revision 13, Flow Diagram Condensate Filter Demineralizer System, Sheet 3 ML23129A3662023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2065, General Arrangement, Reactor Building, Section A-A, Withheld ML23129A3672023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2056 General Arrangement, Intake Structure Plan and Sections ML23129A3682023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2032, Flow Diagram High Conductivity (Floor Drains Chemical and Laundry Waste) Process, Sheet 1 ML23129A3692023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2006, Flow Diagram Circulating, Screen Wash & Service Water Systems, Sheet 3 ML23129A3702023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2032, Flow Diagram High Conductivity (Floor Drains, Chemical and Laundry Wastes) Process, Sheet 4 ML23129A3712023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2044, Flow Diagram - High Pressure Coolant Injection and Reactor Feed Systems ML23129A3722023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2033, Flow Diagram Low Conductivity (Equipment Drains) Processing Sheet 4 ML23129A3732023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2069, General Arrangement, Radwaste Building Sections, Withheld ML23129A3742023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2019, Flow Diagram Main Control Rm. Cable Rm. & Computer RM Heating, Ventilating & Air Condition, Sheet 1 ML23129A3842023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2010, Sheet 1, Flow Diagram Instrument Air Control & Turbine Building ML23129A3802023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2027, Flow Diagram - Loop B Reactor Recirculation & Suppression Chamber Vent Systems & Connections, Sheet 2 ML23129A3812023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2042, Revision AB/16, Flow Diagram Reactor Water Clean Up System, Sheet 2 ML23129A3832023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 161F282BC, Sheet 1, Process Diagram Core Spray System ML23129A3862023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 2040, Sheet 2, Flow Diagram Residual Heat Removal System Loop B 2023-04-20
[Table view]Some use of "" in your query was not closed by a matching "". |