ML23067A135

From kanterella
Jump to navigation Jump to search
Site Addendum, Chapter 17, Quality Assurance
ML23067A135
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/29/2022
From:
Union Electric Co, Ameren Missouri
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23067A139 List: ... further results
References
ULNRC-06782
Download: ML23067A135 (1)


Text

CALLAWAY - SA

TABLE OF CONTENTS

CHAPTER 17.0

QUALITY ASSURANCE

Section Page

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE.................. 17.2-1

17.0-i CALLAWAY - SA

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE

The Operational Quality Assurance Program for the Union Electric Company Callaway Plant is described in the Operating Quality Assurance Manual (OQAM). The Quality Assurance Program description, formerly also maintained in this section of the FSAR, is now maintained solely in the OQAM as a separate licensing document. The OQAM will be maintained in accordance with the requirements of 10 CFR 50.54.

17.2-1 Rev. OL-13 5/03