ML23067A122

From kanterella
Jump to navigation Jump to search
Site Addendum, Chapter 4, Reactor
ML23067A122
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/29/2022
From:
Union Electric Co, Ameren Missouri
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23067A139 List: ... further results
References
ULNRC-06782
Download: ML23067A122 (1)


Text

CALLAWAY - SA CHAPTER 4.0 REACTOR 4.1

SUMMARY

DESCRIPTION "Core A" has been chosen as the first core for the Callaway Plant, Unit 1. Therefore, the enrichments for Cycle 1 at Callaway are 2.10 (Region 1), 2.60 (Region 2) and 3.10 (Region 3) weight percent. Beginning with Cycle 2, reload fuel incorporates the Westinghouse Optimized Fuel Assembly (OFA) design. The enrichments for Cycle 2 reload fuel at Callaway are 3.40 and 3.80 weight percent.

4.1-1 Rev. OL-13 5/03