MONTHYEARML21035A0742021-01-29029 January 2021 Framatome, Inc. Request for Review and Approval of ANP-10353P, Revision 0, Increased Enrichment for PWRs Project stage: Request ML21061A2132021-03-0202 March 2021 Acceptance for Framatome Topical Report ANP-10353P - Increased Enrichment for PWRs Project stage: Acceptance Review ML21217A1012021-08-10010 August 2021 September 13, 2021, Regulatory Audit Plan for Framatome Inc. Topical Report, ANP-10353, Revision 0, Increased Enrichment for PWRs Project stage: Other ML21258A3402021-09-21021 September 2021 Letter-Request for Additional Information Regarding Framatome Topical Report, ANP-10353P, Revision 0, Increased Enrichment for PWRs (Pressurized Water Reactors) Project stage: RAI ML21305A0322021-11-0303 November 2021 Report for September 13, 2021, Regulatory Audit Regarding Framatome Inc. Topical Report, ANP-10353P, Revision 0, Increased Enrichment for PWRs Project stage: Other ML22060A1182022-02-24024 February 2022 Framatome, Inc., Request for Review and Approval of EMF-2310, Revision 1, Supplement 2P, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors Project stage: Request PMNS20220371, Closed Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Framatome Inc. to Discuss Topical Report ANP-10353P, Revision 0 - Increased Enrichment for Pressurized Water Reactors (Pwrs)2022-04-0808 April 2022 Closed Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Framatome Inc. to Discuss Topical Report ANP-10353P, Revision 0 - Increased Enrichment for Pressurized Water Reactors (Pwrs) Project stage: Request ML22098A1852022-04-11011 April 2022 Withholding Determination for Framatome TR EMF-2310, Rev. 1, Supplement 2P, Rev. 0 - NRC 897 Project stage: Other ML22098A1842022-04-11011 April 2022 Transmittal - Completeness and Withholding Determination for Framatome TR EMF-2310, Rev. 1, Supplement 2P, Rev. 0 Project stage: Other ML22098A1832022-04-11011 April 2022 Completeness Determination for Framatome TR EMF-2310, Rev. 1, Supplement 2P, Rev. 0 - NRC 898 Project stage: Other ML22129A0032022-05-31031 May 2022 Letter - August 17, 2022, Regulatory Audit Plan for Framatome Inc. Topical Report, ANP-10353P, Revision 0, Increased Enrichment for PWRs Project stage: Other ML22137A2712022-06-0101 June 2022 June 13-17, 2022, Audit Plan for Framatome Inc. TR, ANP-10311P-A, Rev. 1, Supplement 1P, Rev. 0, Cobra-FLX: ORFEO-HMP Critical Heat Flux Correlation and EMF-2310, Rev. 1, Supplement 2P, Rev. 0 (Epids L-2021-TOP-0004 & L-2022-TOP-0008) Project stage: Other ML22158A1472022-06-14014 June 2022 NRCs Revised Schedule for the Review of Framatomes Topical Reports, ANP-10353P, Rev. 0, Increased Enrichment for Pwrs and ANP-10340P, Rev. 0, Suppl. 1, Rev. 0, Incorporation of Chromia-Doped Fuel Properties in Framatome PWR Methods Project stage: Approval ML22174A4032022-07-0101 July 2022 Transmittal - U.S. NRC Requests for Additional Information Regarding Framatome Topical Report, EMF-2310, Revision 1 Supplement 2P, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors Project stage: RAI ML22245A0972022-08-31031 August 2022 Framatome, Inc., Response to Request for Additional Information for EMF-2310, Revision 1, Supplement 2P, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors Project stage: Supplement ML22252A2522022-09-15015 September 2022 Report Regarding August 17, 2022, Regulatory Audit for Framatome Inc. Topical Report, ANP-10353P, Revision 0, Increased Enrichment for PWRs - Letter - Project stage: Other ML22353A6042022-12-22022 December 2022 Audit Report Regarding Framatome TR, ANP-10311P-A, Rev. 1, Supplement 1P, Rev. 0, COBRA-FLX: ORFEO-HMP CHF Correlation & EMF-2310, Rev. 1, Supplement 2P, Rev. 0, SRP Chpt. 15 Non-LOCA Methodology for PWR (EPIDs L-2021-TOP-0004 & L-2022-TOP- Project stage: Other ML23010A0422023-01-0505 January 2023 Framatome, Inc., Response to Request for Comment on Draft Safety Evaluation for EMF-2310, Revision 1, Supplement 2P, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors Project stage: Request ML23012A1322023-01-20020 January 2023 Transmittal - Withholding Determination for Response to Request for Comment on Draft SE Regarding Framatome Topical Report, EMF-2310, Revision 1, Supplement 2P, Revision 0 Project stage: Draft Approval ML23012A1182023-01-20020 January 2023 Withholding Determination Regarding Response to Request for Comment on Draft Safety Evaluation for Framatome Topical Report, EMF-2310, Revision 1, Supplement 2P, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors Project stage: Draft Approval ML23023A2662023-01-26026 January 2023 Withholding Determination Regarding Request for Comment on Draft Safety Evaluation for ANP-10353P, Revision 0, Increased Enrichment for PWRs (EPID L-2021-TOP-0004) - Transmittal Project stage: Draft Approval ML23023A2732023-01-26026 January 2023 Withholding Determination Regarding Response to Request for Comment on Draft Safety Evaluation for Framatome Topical Report, ANP-10353P, Revision 0, Increased Enrichment for PWRs (EPID L-2021-TOP-0004) - Form 897 Project stage: Draft Approval ML23023A1162023-02-0909 February 2023 Final Safety Evaluation for Framatome Topical Report EMF-2310, Revision 1 Supplement 2P, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors (EPID L-2022-TOP-0008) Letter Project stage: Approval ML23109A0872023-02-28028 February 2023 Framatome, Inc., EMF-2310, Revision 1, Supplement 2NP-A, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors Project stage: Supplement ML23053A0532023-03-22022 March 2023 Final Safety Evaluation for Framatome Topical Report ANP-10353P, Revision 0, Increased Enrichment for PWRs (Letter) Project stage: Approval ML23109A0862023-04-10010 April 2023 Framatome, Inc., Approved EMF-2310, Revision 1, Supplement 2P-A, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors Project stage: Supplement ML23165A1882023-06-16016 June 2023 Withholding Determination for Publication of Approved Framatome Topical Report, ANP-10353P-A, Revision 0, Increased Enrichment for PWRs (EPID L-2021-TOP-0004) (Transmittal) Project stage: Other ML23165A1902023-06-16016 June 2023 Withholding Determination for Publication of Approved Framatome Topical Report, ANP-10353P-A, Revision 0, Increased Enrichment for PWRs (Form 897) Project stage: Other ML23167A0032023-06-28028 June 2023 Verification for Publication of Approved Framatome Topical Report, ANP-10353P-A, Revision 0, Increased Enrichment for PWRs EPID L-2021-TOP-0004 Project stage: Other ML23167A0022023-06-28028 June 2023 Verification for Publication of Approved Framatome Topical Report, ANP-10353P-A, Revision 0, Increased Enrichment for PWRs Project stage: Other 2022-06-14
[Table View] |
Audit Report Regarding Framatome TR, ANP-10311P-A, Rev. 1, Supplement 1P, Rev. 0, COBRA-FLX: ORFEO-HMP CHF Correlation & EMF-2310, Rev. 1, Supplement 2P, Rev. 0, SRP Chpt. 15 Non-LOCA Methodology for PWR (EPIDs L-2021-TOP-0004 & L-2022-TOP-| ML22353A604 |
| Person / Time |
|---|
| Site: |
99902041 |
|---|
| Issue date: |
12/22/2022 |
|---|
| From: |
Jonathan Evans Licensing Processes Branch |
|---|
| To: |
Peters G Framatome |
|---|
| References |
|---|
| EPID L-2021-TOP-0004, EPID L-2022-TOP-0008 |
| Download: ML22353A604 (1) |
|
Text
December 22, 2022 Mr. Gary Peters, Director Licensing and Regulatory Affairs Framatome Inc.
3315 Old Forest Road Lynchburg, VA 24501
SUBJECT:
REPORT FOR JUNE 13-16, 2022, REGULATORY AUDITS REGARDING FRAMATOME INC. TOPICAL REPORTS, ANP-10311P-A, REVISION 1, SUPPLEMENT 1P, REVISION 0, COBRA-FLX: ORFEO-HMP CRITICAL HEAT FLUX CORRELATION AND EMF-2310, REVISION 1, SUPPLEMENT 2P, REVISION 0, SRP CHAPTER 15 NON-LOCA METHODOLOGY FOR PRESSURIZED WATER REACTORS (EPIDS L-2021-TOP-0004 AND L-2022-TOP-0008)
Dear Mr. Peters:
By letters dated December 16, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21356A051) and February 24, 2022 (ADAMS Accession No. ML22060A118), Framatome, Inc., submitted Topical Reports (TRs) ANP-10311P, Revision 1, Supplement 1P, Revision 0, COBRA-FLX: ORFEO-HMP Critical Heat Flux Correlation, and EMF-2310, Revision 1, Supplement 2P, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors, to the U.S. Nuclear Regulatory Commission (NRC) for review and approval. TRs ANP-10311P, Revision 1, Supplement 1P, Revision 0, and EMF-2310, Revision 1, Supplement 2P, Revision 0, focuses on critical heat flux (CHF) models.
The NRC staff conducted a joint audit of the two CHF related TRs, ANP-10311P, Revision 1, Supplement 1P, Revision 0, and EMF-2310, Revision 1, Supplement 2P, Revision 0, June 13-16, 2022, to establish a better understanding of the CHF models described in the TRs. The audit supported the NRC staffs efforts in establishing a clear understanding of the CHF models.
At the conclusion of the audits, the NRC staff and Framatome representatives discussed draft open items. The results of the audit provided additional information to support the NRC staff safety evaluations on the TRs. Enclosed for your information is a copy of the audit report.
Please contact Ngola Otto at 301-415-6695 or via e-mail at Ngola.Otto@nrc.gov with any questions you may have regarding this letter.
Sincerely,
/RA/
Jonathan E. Evans, Acting Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 99902041
Enclosure:
Audit Report (Non-Proprietary)
Enclosure REGULATORY AUDIT PLAN REPORT FOR FRAMATOME, INC.
TOPICAL REPORTS ANP-10311P-A, REVISION 1, SUPPLEMENT 1P, REVISION 0, COBRA-FLX: ORFEO-HMP CRITICAL HEAT FLUX CORRELATION, AND EMF-2310, REVISION 1, SUPPLEMENT 2P, REVISION 0, SRP CHAPTER 15 NON-LOCA METHODOLOGY FOR PRESSURIZED WATER REACTORS PROJECT NO. 728 (EPIDS L-2021-TOP-0004 and L-2022-TOP-0008)
1.0 BACKGROUND
By letters dated December 16, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21356A051) and February 24, 2022 (ADAMS Accession No. ML22060A118), Framatome, Inc., submitted critical heat flux related Topical Reports (TRs)
ANP-10311P-A, Revision 1, Supplement 1P, Revision 0, COBRA-FLX: ORFEO-HMP Critical Heat Flux Correlation, and EMF-2310, Revision 1, Supplement 2P, Revision 0, SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors, to the U.S. Nuclear Regulatory Commission (NRC) for review and approval. The NRC staff proposed a joint audit in an effort to increase efficiency in the review.
2.0 REGULATORY AUDIT OBJECTIVES The objectives of the audits were to increase review process efficiency through direct interaction with Framatomes technical experts. More specifically, the audits allowed the NRC staff to have extended discussions on the TRs, examine supportive documentation, and identify those areas of the review that need additional focus.
The NRC and Framatome audit participants are provided below.
NRC Participants Name Affiliation Santosh Bhatt U.S. Nuclear Regulatory Commission (NRC)
Ngola Otto NRC Joshua Kaizer NRC Framatome Participants Name Affiliation John Adams Framatome Inc. (Framatome)
Mihea Anghelescu Framatome Tony Attard Framatome Buck Barner Framatome Morris Byram Framatome Marc Dziuba Framatome 3.0 REGULATORY AUDIT BASES Regulatory guidance for the review of fuel system materials and designs and adherence to Title 10 of the Code of Federal Regulations, Appendix A to Part 50, General Design Criteria (GDC)-10, Reactor Design, is provided in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (SRP), Section 4.4, Thermal and Hydraulic Design. In accordance with SRP Section 4.4, the objectives of the thermal and hydraulic designs safety review is to provide reasonable assurance that there should be a 95-percent probability at the 95-percent confidence level that a hot fuel rod in the reactor core will not experience a departure from nucleate boiling or a transition condition during normal operation or anticipated operational occurrences.
4.0 DISCUSSION The NRC conducted an in-person audit at the Framatome facilities in Lynchburg, VA beginning June 13, 2022, and exiting June 16, 2022. The audit focused on ensuring the NRC staff had the appropriate understanding of the material presented in the TRs. No regulatory decisions were made. Any information exchanged that the NRC staff believed was necessary to achieve their regulatory conclusion was formally requested in a Request for Additional Information (RAI).
5.0 CONCLUSION
The audit accomplished the objectives listed in Section 2.0 by allowing direct interaction with Framatomes technical experts. The NRC staff participants were able to obtain clarification on multiple questions and examine calculation notes and supporting documentation. The NRC staff issued RAIs on the open items discussed at the audit, where information was needed on the docket to support the NRC staffs safety evaluations.
ML22353A604 (Audit Plan)
OFFICE NRR/DORL/LLPB/PM NRR/DORL/LLPB/LA NRR/DSS/SFNB/BC NAME NOtto DHarrison SKrepel DATE 12/19/2022 12/20/2022 12/21/2022 OFFICE NRR/DORL/LLPB/BC (A)
NRR/DORL/LLPB/PM NAME JEvans NOtto DATE 12/22/2022 12/22/2022