UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ENTERGY NUCLEAR OPERATIONS, INC., Docket Nos. 50-255-LT-2 ENTERGY NUCLEAR PALISADES, LLC, 50-155-LT-2 HOLTEC INTERNATIONAL, AND 72-007-LT HOLTEC DECOMMISSIONING 72-043-LT-2 INTERNATIONAL, LLC (Palisades Nuclear Plant and Big Rock Point Site)

NOTIFICATION OF MI ATTORNEY GENERAL INITIAL DISCLOSURES AND WITNESS IDENTIFICATION Consistent with 10 C.F.R. § 2.336 and the Atomic Safety and Licensing Boards August 31, 2022 Mandatory Disclosure Order, the Attorney General provides the following:

1. The following persons are likely to have discoverable information that the State may use in this proceeding:
a. Mr. Nicholas J. Capik; President and Managing Director, Four Points Group, Inc. c/o Michigan AG.

4451 Brookfield Corp. Dr., Suite 107, Chantilly, VA 20151. Telephone: (703) 631-7402

b. Mr. Capik may have knowledge as to the four approved challenges to the Holtec application for license transfer for Palisades, including acceptance of spent nuclear fuel, historical decommissioning costs, the NRC decommissioning formula amount and derivation, use of contingency, and financial assurance for decommissioning.
2. Documents that the Attorney General deems relevant and may use in this proceeding include:
a. Declaration of Nicholas J. Capik dated February 24, 2021 (attachment to the State of Michigan Petition)

(https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML21055A888)

b. Holtec Decommissioning International letter to U.S. NRC dated December 23, 2020, Subject Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Palisades Nuclear Plant, ML20358A075 (https://www.nrc.gov/docs/ML2035/ML20358A075.pdf)
c. DOW/RW-0146, Annual Capacity Report, June 1987, Office of Civilian Radioactive Waste Management (http://fourpointsgroupinc.com/Palisades/1987ACR.pdf)
d. DOE/RW-0567, Acceptance Priority Ranking & Annual Capacity Report, U.S.

Department of Energy, Office of Civilian Radioactive Waste Management, July 2004 (http://fourpointsgroupinc.com/Palisades/2004apr_acr.pdf)

e. U.S Energy Information Administration, Today in Energy, December 8, 2015 (https://www.eia.gov/todayinenergy/detail.php?id=24052)
f. Case No. U-14150, September 20, 2005, MPSC Order; January 3, 2005 Settlement Agreement and attachments (http://fourpointsgroupinc.com/Palisades/2005 15%20Michigan%20Rate%20Settlement.pdf)
g. GAO-12-258, United States Government Accountability Office, Report to the Honorable Edward J. Markey, House of Representatives, NRCs Oversight of Nuclear Power Reactors Decommissioning Funds Could Be Further Strengthened (https://www.gao.gov/assets/gao-12-258.pdf)
h. NUREG/CR-0130 Technology, Safety and Costs of Decommissioning a Reference Pressurized Water Reactor Power Station (including appendices and addendums)
1. (http://fourpointsgroupinc.com/Palisades/NUREGCR-0130%20-

%20Technology,%20Safety%20and%20Costs%20of%20Decommissioning%20 a%20Reference%20Pressurized%20Water%20Reactor%20(PWR)%20Power%

20Station%20Volume%201%20-%20JUN%201978.pdf)

2. (http://fourpointsgroupinc.com/Palisades/NUREGCR-0130%20-

%20Technology,%20Safety%20and%20Costs%20of%20Decommissioning%20 a%20Reference%20Pressurized%20Water%20Reactor%20(PWR)%20Power%

20Station%20Volume%202%20(Appendices)%20-%20JUN%201978.pdf)

3. (http://fourpointsgroupinc.com/Palisades/NUREGCR-0130%20-

%20Addendum%201%20-%20AUG%201979.pdf)

4. (http://fourpointsgroupinc.com/Palisades/NUREGCR-0130%20-

%20Addendum%202%20-

%20Effects%20on%20Decommissioning%20of%20Interim%20Inability%20to%

20Dispose%20of%20Wastes%20Offsite%20%20JUL%201983.pdf)

5. (http://fourpointsgroupinc.com/Palisades/NUREGCR-0130%20-

%20Addendum%203%20-

%20Classification%20of%20Decommissioning%20Wastes%20%20SEP%2019 84.pdf)

6. (http://fourpointsgroupinc.com/Palisades/NUREGCR-0130%20-

%20Addendum%204%20-

%20Technical%20Support%20for%20Decommissioning%20Matters%20Relate d%20to%20Preparation%20of%20the%20Final%20Decommissioning%20Rule

%20%20JUL%201988.pdf)

i. Crystal River Nuclear Generating Station Unit 3 Site Specific Decommissioning Cost Estimate (May 2018), Appendix C (ML18178A181)

(https://www.nrc.gov/docs/ML1817/ML18178A181.pdf)

j. Decommissioning Cost Analysis for the Monticello Nuclear Generating Plant (Oct.

2014) (ML16005A105) (https://www.nrc.gov/docs/ML1600/ML16005A105.pdf)

k. EPRI Report 1013511, Connecticut Yankee Decommissioning Experience Report, Detailed Experiences 1996-2006 (http://fourpointsgroupinc.com/Palisades/CY%20EPRI%20Decommissioning%20Experi ence%20Report.pdf)
l. EPRI Report, Maine Yankee Decommissioning Experience Report, Detailed Experiences 1997-2004 (http://fourpointsgroupinc.com/Palisades/MY%20EPRI%20Decommissioning%20Exper ience%20Report.pdf)
m. NUREG-0586 (including supplements), Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities (Nov. 2002) (ML18057B048 and ML023500395)
1. (https://www.nrc.gov/docs/ML1805/ML18057B048.pdf)
2. (https://www.nrc.gov/docs/ML0235/ML023500395.pdf)
n. Safety Evaluation by the Office of Nuclear Regulatory Regulation Application for Indirect Transfer of Facility Operations Licenses Due to Entergy Corporation Restructuring (ML081080352) (https://www.nrc.gov/docs/ML0810/ML081080352.pdf)
o. Entergy letter to U.S. NRC dated March 31, 2011, Status of Decommissioning Funding, ML110940051 (https://www.nrc.gov/docs/ML1109/ML110940051.pdf)
p. Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20358A075
q. Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations: https://www.nrc.gov/docs/ML2009/ML20091M858.pdf
r. Holtec Decommissioning International Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations: https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNum ber=ML21090A336
s. Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations- Holtec Decommissioning International, LLC (HDI): https://www.nrc.gov/docs/ML2208/ML22084A059.pdf
t. Any documents produced by the Applicants in this proceeding.
u. Any expert report and its basis will be provided at the date assigned and the disclosures will be updated.

Respectfully submitted,

/s/ Michael E. Moody (electronically)

Michael E. Moody Assistant Attorney General MI Attorney General P.O. Box 30755 Lansing, MI 48909 Telephone: (517) 335-7627 Dated October 14, 2022 Email: MoodyM2@michigan.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ENTERGY NUCLEAR OPERATIONS, INC., Docket Nos. 50-255-LT-2 ENTERGY NUCLEAR PALISADES, LLC, 50-155-LT-2 HOLTEC INTERNATIONAL, AND 72-007-LT HOLTEC DECOMMISSIONING 72-043-LT-2 INTERNATIONAL, LLC (Palisades Nuclear Plant and Big Rock Point Site)

AFFIDAVIT OF MICHAEL E. MOODY CONCERNING DISCLOSURE REQUIREMENTS I, Michael E. Moody, do hereby state as follows:

1. I am employed as an Assistant Attorney General in the Michigan Attorney Generals Office. I serve as Division Head Chief for the Special Litigation Division.
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R.

§ 2.336 as modified by the Atomic Safety and Licensing Boards August 31, 2022 Mandatory Disclosures Order in this proceeding, have been disclosed, and that the disclosures are accurate and complete as of October 14, 2022.

3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information, and belief.

Respectfully submitted,

/s/ Michael E. Moody (electronically)

Michael E. Moody Assistant Attorney General MI Attorney General P.O. Box 30755 Lansing, MI 48909 Telephone: (517) 335-7627 Dated October 14, 2022 Email: MoodyM2@michigan.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ENTERGY NUCLEAR OPERATIONS, INC., Docket Nos. 50-255-LT-2 ENTERGY NUCLEAR PALISADES, LLC, 50-155-LT-2 HOLTEC INTERNATIONAL, AND 72-007-LT HOLTEC DECOMMISSIONING 72-043-LT-2 INTERNATIONAL, LLC (Palisades Nuclear Plant and Big Rock Point Site)

Certificate of Service Pursuant to 10 C.F.R. § 2.305, I hereby certify that copies of the foregoing notification, dated October 14, 2022, have been served upon the Electronic Information Exchange (the NRCs E-Filing System), in the captioned proceeding, this 14th day of October 2022.

/s/ Michael E. Moody (electronically)

Michael E. Moody Assistant Attorney General MI Attorney General P.O. Box 30755 Lansing, MI 48909 Telephone: (517) 335-7627 Email: MoodyM2@michigan.gov Dated October 14, 2022