8 7 6 5 4 3 2 1
SH. 1 A1254 A2254 A1384 A2384 A1385 A2385 8031-M-11 OF A1251 A2251 NOTES:
(CONT. FROM BELOW)
TE TE C867B TE TE TE TE 15.XA-001 CORRESPONDS TO DIVISION 2 ESW PUMP OUT OF TE A1253 003C 001C A1255 A1387 001B 003B A1386 A1388 003D 001D A1389 SERVICE ALARM.
A1250 001A TE XA
TE A1252003A C201 A2253 TE A2255 001 A2387 TE A2386 A2388 TE A2389 16.HSS-095 SWITCHED TO EMERGENCY ENABLES TEST SWITCH A2250 PI 152-11708/CST TO OPERATE OCP548.
002A 002C NOTE 15 002B 002D A2252 003A-2 DIESEL-GENERATOR DIESEL-GENERATOR DIESEL-GENERATOR DIESEL-GENERATOR 17.XA-002 CORRESPONDS TO DIVISION 3 ESW PUMP OUT OF 1A 0R 2A START C201 C667A 1C OR 2C START 1B 0R 2B START C667B 1D OR 2D START SERVICE ALARM.
H VENT TO HSS PI VENT TO PI 18. ASME BOUNDARIES SHOWN ON THIS DRAWING ARE FOR H AC C667A C201 PUMP WETWELL VENT 51-196 VENT C667B KEYLOCK VENT VENT AC C667D REFERENCE ONLY. SEE ASME PIPING SPECIFICATIONS 003A-1 VENT TO A116 PUMP WETWELL 003B VENT TO FOR ADDITIONAL INFORMATION.
HS HSS PUMP WETWELL AC HS HSS AC PUMP WETWELL HS
001A-1 091 001B 094 001D 19.CONTACT PIPING ENGINEERING PRIOR TO REMOVAL OF PI PT PI NOTE 14 PI PT PI SPACER PLATE.
C201 SS 002A 003A 002C SS SS 002B 003B 002D SS C867A HS XA 20.THESE VALVE MOTOR OPERATORS HAVE BEEN DE-ENERGIZED 001A-2 20" N N 20" 20" N N 20" PER ECR 01-00816. THE NORMAL VALVE POSITIONS SHOWN 16" 20" HBC-81 20" 20" 20" HBC-81 16" 002 16" 20" HBC-82 20" 20" 20" HBC-82 16" FOR D-G 1A APPLY ALSO TO D-G 1C, 2A, AND 2C. THE NORMAL VALVE POSITIONS SHOWN FOR D-G 2D APPLY 0001A 0002A 0002C 0001C NOTE 17 0001B 0002B 0002D 0001D ALSO TO D-G 1B, 1D, AND 2B.
LO LO LO LO PSL PSL KEYLOCK C667C PSL PSL C867B VENT HYDRO TEST 002A 002C HSS A117 HS 002B 002D PAL
095 001C 002D
C867A C867A NOTE 16 C867B 0AP548 0CP548 0BP548 RHRSW 0DP548 PAL HCC PAL PAL LOOP B HCC C667D C667B 002A HCC 002C 002B CROSS TIE HCC KEYLOCKED HS HS KEYLOCKED 24" HBC-81 LC 20" HBC-509 LO M-12 24" HBC-82 207 205
PSD (SH.1 E,3) PSD G G C667A C667C TO PSD 0090A 0090B PSD HV HV TURBINE ENCLOSURE HS HS 0091A EMERGENCY SERVICE WATER PUMPS LC 0091B 207 AC AC 205 COOLING WATER KEYLOCKED KEYLOCKED LO HEAT EXCHANGERS 105 107 (SEE NOTES 3 & 6) TO & FROM TO & FROM M M UNIT 2 TO 4" HBC-246 4" 4" 4" 4" JBD-279 TURBINE ENCLOSURE HV HV RCIC PUMP LOOP "B" M-10 COMPT COOLERS EQUIPMENT 2003 COOLING WATER 105 AC AC 107 UNIT 2 UNIT 2 (SH.8 E,1)
HEAT EXCHANGERS M M HYDRO HBC JBD S-I UNIT 1 4" JBD-179 4" 4" 4" 4" HBC-146 VALVE PIT UNIT 1 UNIT 2 VALVE PIT TEST HBC IIAII
M-10 S-IIIA (SH.3 E,1) JBD HBC 1003 2" HBC-82 TO & FROM TO & FROM TO & FROM TO & FROM
IIAS-I HPCI PUMP LOOP "A" LOOP "B" LOOP "A" IIIIA EQUIPMENT EQUIPMENT INTERNALLY WELDED PIPE PLUG COMPARTMENT COOLERS EQUIPMENT UNIT 1 UNIT 1 UNIT 1 UNIT 2
HBC VENT DRAIN C667A C667B HRC
VENT DRAIN TI TE FT FY HRCHCCHBC E2518 E1518 007A 060B 007A 060B 20" HRC-002 20" HBC-509 M-12 20" HRC-002 DRAIN DRAIN PSD C667B (SH.1 F,4)
M-12 C667A FE 060B HBC HRCHCCHRC 0093B FY (SH.01 F,5) TT PIPE TUNNEL LC HCC 013B F F FI C667A 007A LO 12" HBC-81 12" HBC-82 FT E1548 E2548 12" HRC-001 013B 013A HCC HRC E2547 E1547 E1517 E2517 PSD PSD 20x12 0094A REMOVABLE SPACER FE 2" SEE NOTE 19 0094B C667B C667B C667B C667B C667A C867A C667A HRC HBC REMOVABLE L.O. EBC EBC 013B SPACER TT TI FI FY FDS FDA FY 0101A NOTE 19 81 292 007B 007B HRC HBC 013B 061B 012A C667A 012A 013A IIAS-I HCC DRAIN LOOP "A" DRAIN DRAIN TE
DRAIN LO 20" HBC-81 SUPPLY 12" HBC-81 10" HBC-81 007B FDI
012A FT PSD 667A FO 013A HRC HBC 0095A BLANK 007B FY 667A FY FT FE IF IF PLATE 011A 013A REMOVABLE HBCHCC HBC 14582 LOOP "B" C201 C667C 012A 011A DRAIN SUPPLY 1" SBD-11 SPACER 6" HBC-82 10" HBC-82 12" HBC-82 20" HBC-82 HS SEE NOTE 19 HSS KEYLOCKED C667A C-201 4" HYDRO TEST 093 015A AC FE IIAS-I BLANK TO C-201 HS HSS 011A SBD PSD PLATE KEYLOCKED RHR SERVICE 091 M HCC AC WATER RETURN 011A-1 HYDRO TEST 1" 1427 M HV HS N.O. LOOP "A" 015A HEADER 011A-2 20" SS 20" DISCHARGE 20" 20" LOOP "B" 20" 0003B 20" HBC-83 20" HBC-83 M-12 M-12 (F,7) NO HV 2" SS 0125A 2" SS19483 0064A PSD 0065A NO (SH.1 E,2) TO IIAS-I IIAIIAS-I 011A LO 10" HBC-83 12" 0123A 8" HBC-83 8" 2" RHR SERVICE E E 2" 2" HCC WATER RETURN HV DRAIN HEADER DRAIN 011B 20" LOOP "B" 20" 0468 20" 20" 20" HBC-84 20" LOOP "B" 0465 20" HBC-84 DISCHARGE M-12 M-12 TO (F,7) NO 0125B 3" 0064B PSD 0065B NO (SH.1 E,1)
RHR SERVICE LO 8" HBC-84 REMOVEABLE 0123B 10" 8" 8" HBC-84 6" HV WATER RETURN AC FE SS SPACER AC 015B HEADER M 011B 1391 NOTE 19 M
LOOP "A"
DRAIN DRAIN KEYLOCKED C667D C667B DRAIN FT VENT DRAINS HYDRO HS HS 011B TEST HYDRO
011B DRW TEST 015B C667B 3" HRC-1013" HBC KEYLOCKED FY -151 8" HBC-84
C667B 011B
FY
012B REMOVABLE
SPACER PLATE NOTES:
M-12 REMOVABLE 1.THE EMERGENCY SERVICE WATER SYSTEM IS SEISMIC CLASS I
(SH.1 E,1) SPACER PLATE EXCEPT AS NOTED. SEISMIC CLASS I CLASSIFICATION SHALL D D HV EXTEND UP TO THE FIRST WALL PENETRATION BEYOND THE C667B 133A REMOVABLE HV POINT INDICATED AND SHALL INCLUDE THE FIRST ANCHOR SPACER PLATE 231D POINT IN OR BEYOND THIS WALL.
FDI DIESEL AC AC 2.THE OPERATORS OF THESE VALVES WILL BE CAPABLE OF 012B DIESEL M M GENERATOR HV HV HV HV CLOSING THE VALVES AGAINST NORMAL FLOW. INLET AND CLOSING THE VALVES AGAINST NORMAL FLOW. INLET AND C867B C667B GENERATOR 132A 134A 232D 234D OUTLET VALVES WILL BE NORMALLY OPEN TO ACCOMMODATE KEYLOCKED HEAT EXCHANGERS SUPPLY FROM THE SAME LOOP INTERTIE LINE. THE NORMAL VALVE FDA FDS HEAT EXCHANGERS REMOVABLE HV AC AC HS HV SPACER PLATE AC AC (DETAIL SHOWN IN "D" CELL POSITIONS SHOWN FOR D-G 1A APPLY ALSO TO D-G 1C, 2A, 2C.
012B 012B (DETAIL SHOWN IN "A" HV HV HV 231B IS TYPICAL OF FOUR FOR D-G 1A APPLY ALSO TO D-G 1C, 2A, AND 2C. THE NORMAL CELL IS TYPICAL OF M M 133A 132C HV 132B HV 132D HV 232A M M FOR UNIT 2 ONLY) VALVE POSITIONS SHOWN FOR D-G 2D APPLY ALSO TO FOUR FOR UNIT 1 133C 131B 131D D-G 1B, 1D, AND 2B.
ONLY). C667A HV HV HV HV HV 134C 134B 134D 232C 232B HV 3.THE PUMP SUCTION ARRANGEMENT FOR THE ESW PUMPS WILL BE REMOVABLE HV 234A HV HV C667D THE SAME AS SHOWN ON P&ID 8031-M-12 FOR THE RHR SERVICE SPACER PLATE 233A HV 234C234B WATER PUMPS.
M-12 233C HS
(SH.1 E,2) 233D 4.HEAVY ACCENTED PIPING REPRESENTS ESW LOOP A AND DOES C667A C667D 3/4" HBC-292 NOT NECESSARILY INDICATE NORMAL FLOW PATH.
HS 3/4" HBC-192 HS KEYLOCKED IIAS-I 5. ALL VENDOR SUPPLIED VENTS AND DRAINS NOT SHOWN ARE 131A 231D MANIFOLDED WITH THIS SBD-111 DRAIN (FOR UNIT 1 ONLY).
PI PSV KEYLOCKED 3/4" PI KEYLOCKED 207D 207D 6.THIS EQUIPMENT IS BEING MONITORED BY THE VIBRATION 107A PSV IIA MONITORING SYSTEM (VMS). FOR THE TYPE OF SENSORS BEING VENT 107A S-I USED, SEE THE VMS I/O
SUMMARY
, V.P. 8031-M-247-108.
1049A 3/4" 7.DELETED.
SS C C TW TW 8.FOR ALL NON-SEISMIC CATEGORY I VENTS, DRAINS & TEST
107A 2049D 207D 6" CONNECTIONS: DESIGN, FABRICATION, MATERIAL PROCUREMENT, TEST ERECTION & TESTING FOR ALL PIPING DOWNSTREAM OF THE CONN. NW LAST ISOLATION VALVE MAY BE IN ACCORDANCE WITH DESIGN NW CLASS D.
XJ XJ 101A 201D 9.DELETED.
10.DELETED.
AIR COOLER COOLANT 1AE586 2DE586 AIR COOLER COOLANT 11.DELETED.
HEAT EXCHANGER HEAT EXCHANGER 12.THE NW FLOOR DRAIN IN EACH OF THE UNIT 2 DIESEL-GENERATOR CELLS SHALL BE LOCATED NEAR HEAT EXCHANGERS 2(A/B/C/D)E586 AND 2(A/B/C/D)E506.
TI TI 13.ALL HBC CLASS PIPING ON THIS P&ID IS INCLUDED IN THE 108A 208D SCOPE OF NUCLEAR PIPING DESIGN SPECIFICATION 8031-M-511-2
S-IIIA EXCEPT AREA COVERED BY NOTE 8 OR AS NOTED OTHERWISE.
LUBE OIL 1AE506 2DE506 S-IIIA 14.HSS-094 SWITCHED TO EMERGENCY ENABLES TEST SWITCH LUBE OIL 152-11608/CST TO OPERATE OBP 548.
COOLER COOLER 3/4" (NOTES CONT. ABOVE)
PI PI 3/4" HBC-446
108A 208D SS 3 INCORP. EC 635991 REV. 0.
2050D 18 AN RSM GAY IIA S-I S-IIIA 3/4" 96 22RELOCATE PIPE TUNNEL ENCLOSURE REGION 3/4" HBC-346 TO INCLUDE INLET FROM M-0011, SHEET 2. [F,7] B B HBC SBD IIAS-I S-IIIA 1 INCORP. EC 625439 REV. 2.
1050A 95 29CORRECT ADMINISTRATIVE ERROR PER IR 04371461. JMT KJH KDS 3/4" 3/4" 3/4" 3/4" SBD 21 3/4" SBD-111 SS [E,1]
9 INCORP. EC 628755 REV. 5.
1389A 2051D 2389D 94 11ADDED MISSING 6" HBC-292 AND 6" HBC-293 PIPE LINE AN RSM BTB 1051A S-IIIA 20 BACK ON DRAWING. [D-F,4]
5" SBD 5" REFERENCE DRAWINGS PP 8 INCORP. EC 624541 REV. 2 PER WO 04822830-12.
PP OW S-IIIA 93 21CHANGED ESW AND RHRSW SYSTEM BOUNDARIES TO AEA RML DPO 8031-M-71-49 (3) 120A 220D 20 8031-M-71-49 (4) VENT VENT VALVE HV-011-015A/B. [E,1-2&C,8&D,8]
8031-M-71-49 (5) 3/4" SS DESCRIPTION
VENT 2053D
1053A TABLE OF ADDITIONS & CHANGES USE ONLY PRINTS SHOWING LATEST DATE JACKET WATER 1AE507 2DE507 JACKET WATER HBC-346 MECHANICAL HEAT EXCHANGER HEAT EXCHANGER
FO PP C861D 1A 1C 1B 1D 2A 2C 2B 2D 209B,C,D 209D LAH P&ID FO PP LSH EMERGENCY SERVICE WATER 109A 109A 208D 208D XJ (UNIT 1, UNIT 2 AND COMMON)
FO COMPARTMENT C861A 209A 202D A A FLOOD ALARM LIMERICK GENERATING STATION
LSH LAH DRAIN EXELON NUCLEAR CORP.
108A 108A DIESEL-GENERATOR ENCLOSURE REFERENCE DRAWINGS SCALE DRAWN IGDS CHECKED INSPECTED APPROVED DATE 8031-M-71-49 (3) NONE BECHTEL BECHTEL BECHTEL BECHTEL BECH BECH 03/12/90 COMPARTMENT XJ 8031-M-71-49 (4)
FLOOD ALARM 102A 8031-M-71-49 (5)
APPROVED BECHTEL APPROVED
R SHEET 1 OF 8031-M-11 E 96 V
8 7 6 5 4 3 2 $FILE$ 1 CATEGORY A1