ML24150A217

From kanterella
Jump to navigation Jump to search
Kairos Power, LLC - Request for Documents Related to Non-Power Security
ML24150A217
Person / Time
Site: Hermes, 99902069  File:Kairos Power icon.png
Issue date: 05/28/2024
From: Hastings P
Kairos Power
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24150A216 List:
References
KP-NRC-2405-003
Download: ML24150A217 (1)


Text

KP-NRC-2405-003 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 5201 Hawking Dr SE Albuquerque, NM 87106 Charlotte, NC 28211 May 28, 2024 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Request for Documents Related to Non-Power Security Kairos Power is developing the operating license application for the Hermes and Hermes 2 non-power reactors. To facilitate security-by-design for Hermes and Hermes 2, Kairos Power requests access to the list of documents in Enclosure 1. Specifically, these documents will be necessary to inform the physical security elements that may affect local site permits and building design for Hermes and Hermes 2. contains security-related information and Kairos Power requests they be withheld from public disclosure pursuant to 10 CFR 2.390(d)(1).

If you have any questions or need any additional information, please contact Margaret Ellenson at ellenson@kairospower.com or (510) 775-1861, or Darrell Gardner at gardner@kairospower.com or (704)-769-1226.

Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosures:

1)

List of Requested Documents (Security-Related Information)

Enclosures to this letter contain security-related information. Withhold from public disclosure under 10 CFR 2.390. Upon removal of the enclosures, this letter is uncontrolled.

KP-NRC-2405-003 Page 2 xc (w/enclosure):

Joshua Borromeo, Chief, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch