Text
KP-NRC-2403-003 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 March 4, 2024 Docket No. 50-611 Docket No. 50-612 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report
References:
- 1. Letter, Kairos Power LLC to Document Control Desk Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122)
- 2. Nuclear Regulatory Commission, Kairos Power, LLC Hermes 2 Environmental Report Audit Plan, January 5, 2024 (ML23353A069)
- 3. Email, Peyton Doub (Nuclear Regulatory Commission) to Martin Bryan (Kairos Power), RCI Confirmation Message, February 26, 2024 In July 2023, Kairos Power LLC submitted its Environmental Report (ER) (Reference 1) in support of the construction permit application (CPA) for the Hermes 2 non-power reactor. In January 2024, the Nuclear Regulatory Commission provided the Hermes 2 Environmental Audit Plan (Reference 2). As a result of that audit, the Nuclear Regulatory Commission (NRC) provided eight requests for confirmatory information (RCIs) that the staff will use to evaluate the environmental impacts from the proposed action (Reference 3). The enclosure to this letter provides Kairos Powers confirmation of each RCI.
Kairos Power requests NRC review of this information in support of continued review of the Hermes 2 CPA.
If you have any questions or need any additional information, please contact Marty Bryan at bryan@kairospower.com or at (865) 399-1136, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on March 4, 2024 Peter Hastings, PE Vice President, Regulatory Affairs and Quality
KP-NRC-2403-003 Page 2
Enclosures:
- 1) Kairos Power Response to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report xc (w/enclosure):
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Peyton Doub, Environmental Project Manager, NMSS, Environmental Review Branch Mary Richmond, Environmental Project Manager, NMSS, Environmental Review Branch
KP-NRC-2403-003 Kairos Power Response to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report (Non-Proprietary)