|
---|
Category:Code Relief or Alternative
MONTHYEARML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves ML23248A2092023-09-18018 September 2023 – Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve ML23123A4222023-05-16016 May 2023 – Request RR 001 to Use Later Edition of ASME BPV Section XI Code for Cisi Program ML23107A2852023-04-25025 April 2023 Authorization and Safety Evaluation for Alternative Request PR-08 ML23017A2222023-01-13013 January 2023 Verbal Authorization of Proposed Alternative PR-08 Regarding Inservice Testing Requirements of Certain High Pressure Coolant Injection System Components (EPID L-2022-LLR-0088) (Email) ML22314A2162022-11-16016 November 2022 Withdrawal of Alternative Request VR-08 ML22270A2312022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request No. VR-10 ML22208A1952022-08-0303 August 2022 Summary of July 26, 2022, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Alternative Request for Excess Flow Check Valves at Monticello Nuclear Generating Plant ML22126A1052022-06-21021 June 2022 Authorization and Safety Evaluation for Alternative Request No. VR-01 ML22154A5502022-06-0707 June 2022 Authorization and Safety Evaluation for Alternative Request No. PR-02 ML22126A1342022-05-12012 May 2022 Authorization and Safety Evaluation for Alternative Request No. PR-05 ML22130A6562022-05-11011 May 2022 Authorization and Safety Evaluation for Alternative Request No. PR-04 ML22098A1272022-05-0202 May 2022 Authorization and Safety Evaluation for Alternative Request No. VR-02 ML22110A1232022-04-25025 April 2022 Withdrawal of Relief Requests PR-09 and VR-07 (Epids: L 2021 Llr 0095 and L 2022 Llr 0021) ML22018A1772022-01-21021 January 2022 Authorization and Safety Evaluation for Alternative Request No. VR-05 ML20307A0172020-11-0202 November 2020 Request for Alternative for Core Support Structure Weld Examination ML20174A5452020-07-15015 July 2020 Request for Alternative for Pressure Isolation Valve Testing ML20135G9922020-05-29029 May 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML18270A0152018-10-19019 October 2018 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME OM Code L-MT-18-023, 10 CFR 50.55a Request RR-012: Inservice Inspection Impracticality in Accordance with 10 CFR 50 .55a(g)(5)(iii) During the Fifth Ten-Year Interval2018-05-11011 May 2018 10 CFR 50.55a Request RR-012: Inservice Inspection Impracticality in Accordance with 10 CFR 50 .55a(g)(5)(iii) During the Fifth Ten-Year Interval ML17122A1572017-05-15015 May 2017 Request for Alternative to Use Code Case OMN-20 for the Fifth 10-Year Inservice Testing Interval ML16208A4622016-08-0303 August 2016 Safety Evaluation for Request for Alternative Associated with Reactor Pressure Vessel Internals and Components Inspection for the Fifth 10-Year Interval L-MT-15-083, 10 CFR 50.55a Request No. RR-010: Request for Approval of an Alternative to Apply the BWRVIP Guidelines in Lieu of Specific ASME Section XI Code Requirements for Reactor Pressure Vessel Internals and Components Inspection2015-11-20020 November 2015 10 CFR 50.55a Request No. RR-010: Request for Approval of an Alternative to Apply the BWRVIP Guidelines in Lieu of Specific ASME Section XI Code Requirements for Reactor Pressure Vessel Internals and Components Inspection ML15028A1522015-02-19019 February 2015 Relief Request RR-009 Regarding Relief from Examination Coverage Requirements of Section XI of the ASME Code for the Fifth 10-Year Inservice Inspection Program Interval ML15013A0362015-01-23023 January 2015 Relief Request RR-008 Alternative to ASME Code, Section XI, Examination Requirements for the Reactor Pressure Vessel Shroud Support Plate Welds H8 and H9 for the Fifth 10-Year ISI Interval ML14223A5812014-08-27027 August 2014 Alternative Request Vr 05 to the Testing Requirements of the ASME OM Code for the Fifth 10-Year Inservice Inspection Program Interval ML12244A2722012-09-26026 September 2012 Relief from the Requirements of ASME OM Code for the Fifth Ten-Year IST Program Interval (TAC Nos. ME8067, ME8088 Through ME8096) ML12180A5882012-07-12012 July 2012 Approval of ISI Relief Request RR-007 for the Fifth 10-year Interval ML1020006722010-07-28028 July 2010 Approval of Alternative to Use ASME Code Case N-705 to Address Cracks at the Standby Liquid Control Tank L-MT-10-014, Request 10 CFR 50.55a Request 17: Extension of Permanent Relief from Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds for the Renewed Operating License Term2010-03-12012 March 2010 Request 10 CFR 50.55a Request 17: Extension of Permanent Relief from Volumetric Examination of Reactor Pressure Vessel Circumferential Shell Welds for the Renewed Operating License Term ML0617103642006-07-0303 July 2006 Monticello Nuclear Generating Plant, Palisades Nuclear Plant, Point Beach Nuclear Plant Units 1 and 2, Prairie Island Nuclear Generating Plant, Units 1 and 2 - Use of ASME Code Case N-513-2 L-MT-05-074, Request to Use Subsequent Edition and Addenda of ASME Code for Inservice Testing2005-07-29029 July 2005 Request to Use Subsequent Edition and Addenda of ASME Code for Inservice Testing ML0505600492005-03-0808 March 2005 Fourth 10-Year Inservice Inspection Interval Request for Relief to Use Code Case N-661 ML0436300192005-01-0606 January 2005 Relief, Fourth 10-year Inservice Inspection Interval Request for Relief No. 4, MC2222 ML0407004152004-03-25025 March 2004 Third 10-Year Interval Inservice Inspection Request for Relief RR-17, Involving Repair/Replacement Activity on the Topworks of Main Steam Safety Relief Valve (SRV) G ML0401607382004-02-26026 February 2004 Prairie, Units 1 and 2, Kewaunee, Point Beach, Units 1 and 2, Palisades, Re Request for Alternatives to ASME Section XI, Appendix Viii, Supplement 10 ML0320401572003-10-0303 October 2003 Relief Request No. 7, Fourth 10-Year Interval Inservice Inspection Program Plan L-MT-03-045, Request for Approval of Inservice Inspection Program Third 10-Year Interval Relief Request No. 172003-08-27027 August 2003 Request for Approval of Inservice Inspection Program Third 10-Year Interval Relief Request No. 17 ML0320605802003-08-0707 August 2003 Relief, Fourth 10-Year Interval Inservice Testing Program ML0317002092003-07-17017 July 2003 Relief Request, Nos. PR-01, PR-02, PR-03, PR-04, PR-05, and VR-02 Related to the Fourth 10-Year Interval Inservice Testing Program L-MT-03-048, Request for Authorization of Inservice Inspection Program Fourth 10-Year Interval Relief Request No. 82003-06-12012 June 2003 Request for Authorization of Inservice Inspection Program Fourth 10-Year Interval Relief Request No. 8 ML0316008642003-06-0909 June 2003 Relief Request, Fourth 10-Year Interval Inservice Inspection Program Plan Relief Request No. 5, TAC No. MB6956 ML0314001192003-05-19019 May 2003 Relief, Third 10-Year Interval Inservice Inspection Relief Request No 16, Parts a, B, and C L-MT-03-001, Relief Request No. Pr 06 for Fourth 10-Year Inservice Testing Interval - High Pressure Coolant Injection Pump Testing2003-05-0606 May 2003 Relief Request No. Pr 06 for Fourth 10-Year Inservice Testing Interval - High Pressure Coolant Injection Pump Testing 2024-08-27
[Table view] Category:Letter
MONTHYEARML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 ML24115A2902024-04-25025 April 2024 Sec106 Tribal, Jackson-Street, Lonna-Spirit Lake Nation ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A2932024-04-25025 April 2024 Sec106 Tribal, Johnson, Grant-Prairie Island Indian Community ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes 05000263/LER-2024-001, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A3002024-04-25025 April 2024 Sec106 Tribal, Rhodd, Timothy-Iowa Tribe of Kansas and Nebraska ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2982024-04-25025 April 2024 Sec106 Tribal, Reider, Anthony-Flandreau Santee Sioux Tribe ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin 2024-09-26
[Table view] Category:Safety Evaluation
MONTHYEARML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves ML24138A1212024-07-0202 July 2024 Alternative Request RR-002 ML24077A0012024-03-18018 March 2024 Safety Evaluation to the SLRA of Monticello Nuclear Generating Plant, Unit 1 ML23248A2092023-09-18018 September 2023 – Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve ML23107A2852023-04-25025 April 2023 Authorization and Safety Evaluation for Alternative Request PR-08 ML23079A0742023-04-11011 April 2023 Request RR-003 to Use Later Edition of ASME Section XI Code for ISI Code of Record ML22357A1002023-03-31031 March 2023 And Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML23012A1562023-01-13013 January 2023 Issuance of Amendment No. 210 Re Revised Methodologies for Determining the Core Operating Limits (EPID L-2021-LLA-0144) - Non-proprietary ML22318A2152022-12-27027 December 2022 Issuance of Amendment No. 209 Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank ML22264A1062022-10-31031 October 2022 Issuance of Amendment No. 208 Residual Heat Removal Drywell Spray Header and Nozzle Surveillance Frequency ML22270A2312022-09-30030 September 2022 Authorization and Safety Evaluation for Alternative Request No. VR-10 ML22154A5502022-06-0707 June 2022 Authorization and Safety Evaluation for Alternative Request No. PR-02 ML22126A1342022-05-12012 May 2022 Authorization and Safety Evaluation for Alternative Request No. PR-05 ML22098A1272022-05-0202 May 2022 Authorization and Safety Evaluation for Alternative Request No. VR-02 ML22018A1772022-01-21021 January 2022 Authorization and Safety Evaluation for Alternative Request No. VR-05 ML21223A2802021-10-15015 October 2021 Issuance of Amendment No. 207 Adoption of TSTF-564 Safety Limit MCPR ML21148A2742021-07-12012 July 2021 Issuance of Amendment No. 206 TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20352A3492021-01-0808 January 2021 Issuance of Amendment No. 205, Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582, RPV WIC Enhancements, and TSTF-583-T, TSTF-582 Diesel Generator Variation ML20346A0972020-12-21021 December 2020 Request for Alternative for Examination of Reactor Pressure Vessel Threads in Flange ML20336A1602020-12-0909 December 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20307A0172020-11-0202 November 2020 Request for Alternative for Core Support Structure Weld Examination ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20174A5452020-07-15015 July 2020 Request for Alternative for Pressure Isolation Valve Testing ML20153A4012020-06-0101 June 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML20134H9582020-05-29029 May 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML20135G9922020-05-29029 May 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code ML19255F5822019-10-0101 October 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4376; EPID No. L-2014-JLD-0052) ML19162A0932019-07-30030 July 2019 Issuance of Amendment No, 202 Regarding Deletion of the Note Associated with Technical Specification 3.5.1., Erccs - Operating ML19074A2692019-04-22022 April 2019 Non-Proprietary - Issuance of Amendment Revision to Technical Specifications 2.1.2 Safety Limit Minimum Critical Power Ratio ML19052A1422019-03-11011 March 2019 Correction to License Amendment No. 198 Related to Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19065A2002019-03-11011 March 2019 Correction to License Amendment No. 200 Related to Adoption of TSTF-425, Relocated Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19007A0902019-01-28028 January 2019 Issuance of Amendment Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5B ML18291B2142018-11-26026 November 2018 Issuance of Amendment Adoption of TSTF-551 Revise Secondary Containment Surveillance Requirements ML18250A0752018-10-29029 October 2018 Issuance of Amendment Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18270A0152018-10-19019 October 2018 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME OM Code ML17345A0462018-03-0606 March 2018 Issuance of Amendment No. 197 to Adopt Changes to the Emergency Plan (CAC No. MF9560; EPID L-2017-LLA-0184) ML17319A5912017-12-10010 December 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML17310B2392017-11-28028 November 2017 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Unit Staff Qualifications (CAC Nos. MF9545, MF9546, and MF9547; EPID L-2017-LLA-0195) ML17123A3212017-06-16016 June 2017 Issuance of Amendment Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal and Clarify SR Usage Rule Application to Section 5.5 Testing ML17122A1572017-05-15015 May 2017 Request for Alternative to Use Code Case OMN-20 for the Fifth 10-Year Inservice Testing Interval ML17103A2352017-04-25025 April 2017 Issuance of Amendment Technical Specification 5.5.11 Primary Containment Leakage Rate Testing Program ML17013A4352017-02-27027 February 2017 Issuance of Amendment Revision to Technical Specification Surveillance Requirement 3.8.4.2 ML17054C3942017-02-23023 February 2017 Non-Proprietary Issuance of Amendment Extended Flow Window ML16320A0212016-11-28028 November 2016 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Review of Changes to the Northern States Power Company Quality Assurance Topical Report ML16244A1202016-09-0606 September 2016 Generation Plant - Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Vents) ML16208A4622016-08-0303 August 2016 Safety Evaluation for Request for Alternative Associated with Reactor Pressure Vessel Internals and Components Inspection for the Fifth 10-Year Interval ML16196A3032016-08-0101 August 2016 Issuance of Amendment Technical Specifications Surveillance Requirement 3.5.1.3 B to Correct Alternative Nitrogen System Pressure (Cac. No. MF6704) ML16125A1652016-06-21021 June 2016 Issuance of Amendment Technical Specifications Task Force (TSTF) Standard Technical Specifications (STS) Change Traveler TSTF-523, Revision 2 Generic Letter 2008-01, Managing Gas Accumulation 2024-08-27
[Table view] |
Text
October 3, 2003 Mr. Thomas J. Palmisano Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT FOURTH 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN RELIEF REQUEST NO. 7 (TAC NO. MB6897)
Dear Mr. Palmisano:
The Nuclear Management Company, LLCs (NMCs), letter of December 6, 2002, as supplemented March 26, 2003, submitted Relief Request No. 7 (RR-7) to the Nuclear Regulatory Commission (NRC). In RR-7, NMC asked the NRC to authorize an alternative pursuant to 10 CFR 50.55a(a)(3)(ii) allowing NMC to use the 2001 edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, for repair/replacement activities and procedures. RR-7 applies to the fourth 10-year interval of the inservice inspection (ISI) examination plan for the Monticello Nuclear Generating Plant (Monticello).
The NRC staff evaluated NMCs request and concludes that NMC updating two separate repair/replacement programs at Monticello to meet the 2001 edition of the ASME Code,Section XI, including all related requirements, as NMC proposes, and as modified by the NRC staff, provides an acceptable alternative pursuant to 10 CFR 50.55a(a)(3)(ii). Furthermore, the NRC staff concludes that maintaining two separate repair/replacement programs will result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Therefore, the NRC staff authorizes NMCs proposed alternative, as discussed in the enclosed safety evaluation, pursuant to 10 CFR 50.55a(a)(3)(ii) for the fourth 10-year ISI interval at Monticello.
J. Palmisano When the 2001 edition of the ASME Code is incorporated by reference in 10 CFR 50.55a, NMC must comply with all limitations and modifications, if any, regarding the implementation of the 2001 edition of the ASME Code, as applied to RR-7. All other ASME Code,Section XI, requirements for which relief was not specifically requested and authorized herein by the NRC staff remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Enclosed is our safety evaluation.
Sincerely,
/RA/
L. Raghavan, Chief, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-263
Enclosure:
Safety Evaluation cc w/encl: See next page
ML032040157
- Provided SE input by memo **See previous concurrence OFFICE PDIII-1/PM PDIII-1/LA EMCB/SC* OGC** PDIII-1/SC NAME LPadovan RBouling TChan RHoefling LRaghavan DATE 09/25/03 09/25/03 04/29/03 06/05/03 10/02/03 Monticello Nuclear Generating Plant cc:
Jonathan Rogoff, Esquire Commissioner General Counsel Minnesota Department of Commerce Nuclear Management Company, LLC 121 Seventh Place East 700 First Street Suite 200 Hudson, WI 54016 St. Paul, MN 55101-2145 U.S. Nuclear Regulatory Commission Adonis A. Neblett Resident Inspectors Office Assistant Attorney General 2807 W. County Road 75 Office of the Attorney General Monticello, MN 55362 445 Minnesota Street Suite 900 Manager, Regulatory Affairs St. Paul, MN 55101-2127 Monticello Nuclear Generating Plant Nuclear Management Company, LLC John Paul Cowan 2807 West County Road 75 Executive Vice President & Chief Nuclear Monticello, MN 55362-9637 Officer Nuclear Management Company, LLC Robert Nelson, President 700 First Street Minnesota Environmental Control Hudson, WI 54016 Citizens Association (MECCA) 1051 South McKnight Road Nuclear Asset Manager St. Paul, MN 55119 Xcel Energy, Inc.
414 Nicollet Mall, R.S. 8 Commissioner Minneapolis, MN 55401 Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN 55155-4194 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Commissioner Minnesota Department of Health 717 Delaware Street, S. E.
Minneapolis, MN 55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313 August 2003
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FOURTH 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN RELIEF REQUEST NO. 7 NUCLEAR MANAGEMENT COMPANY, LLC MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263
1.0 INTRODUCTION
The Nuclear Management Company, LLCs (NMCs), letter of December 6, 2002, as supplemented March 26, 2003, submitted Relief Request No. 7 (RR-7) to the Nuclear Regulatory Commission (NRC). In RR-7, NMC asked the NRC to authorize an alternative pursuant to 10 CFR 50.55a(a)(3)(ii) allowing NMC to use the 2001 edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, for repair/replacement activities and procedures. The request applies to the fourth 10-year interval of the inservice inspection (ISI) examination plan for the Monticello Nuclear Generating Plant (Monticello).
2.0 REGULATORY EVALUATION
ISI of nuclear power plant components is performed in accordance with the ASME Code,Section XI, and applicable addenda, as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). The regulation at 10 CFR 50.55a(a)(3) states that alternatives to the requirements of paragraph (g) may be used, when authorized by the NRC, if (i) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1, 2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code,Section XI, to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval, and subsequent intervals, comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The ASME Code of record for the Monticellos fourth 10-year ISI interval is the 1995 edition through 1996 addenda.
3.0 TECHNICAL EVALUATION
3.1 NMCs Request for Relief NMCs Relief Request No. 7 requested authorization of an alternative to use the 2001 edition of the ASME Code,Section XI, for repair/replacement activities and procedures in lieu of the 1995 edition with the 1996 addenda of the ASME Code. NMC stated that implementing the 2001 edition of the ASME Code would be for Class 1, 2, 3, and MC components and their supports. RR-7 affects ASME Code Articles IWA-4000, IWA-5000, IWA-6000, IWA-9000, IWB-5000, IWC-5000, IWD-5000, IWE-5000, and IWX-4000.
3.2 NMCs Basis for Requesting Relief NMC states that its current program uses two repair/replacement programs. The repair/replacement program for Class 1, 2, and 3 components meets the requirements of the ASME Code,Section XI, 1995 edition with the 1996 addenda. This Code edition and addenda provide the rules and requirements for the repair/replacement activities associated with pressure-retaining components and their supports, including the following:
- metal containments and their integral attachments
- metallic portions of Class CC containments and their integral attachments The repair replacement program for Article IWE components meets the requirements of ASME Code,Section XI, 1992 edition with the 1992 addenda. This ASME Code edition and addenda provide the rules and requirements for the repair of pressure-retaining components and their supports, including the above list, by welding, brazing, or metal removal. This article also gives the rules and requirements for specifying, constructing, and installing items to be used for replacements.
Meeting both the 1995 edition with the 1996 addenda and the 1992 edition with the 1992 addenda of the ASME Code,Section XI, would require NMC to maintain two separate repair and replacement programs (one for the IWB, IWC, and IWD components, and one for the containment vessel). This would also require NMC to keep duplicate records to demonstrate compliance with the 1996 addenda and the 1992 addenda. Duplicating programs and records increases the man-hours necessary to maintain the Monticello repair/replacement program without providing any increase in the level of quality and safety.
3.3 NMCs Proposed Alternative Examination On September 9, 1996, the NRC revised 10 CFR 50.55a, implementing Articles IWE and IWL (requirements for IWL do not apply to Monticello) of the 1992 edition with the 1992 addenda of Section XI of the ASME Code. This required utilities to develop and implement a program for examining containments by September 9, 2001. Additionally, it required implementation of an IWE/IWL repair/replacement program effective September 9, 1996. The revision to 10 CFR 50.55a requires ASME Code,Section XI, ISI programs (implemented 12 months prior
to the fourth 10-year interval for Monticello) to follow the 1995 edition, as amended by the 1996 addenda of ASME Code,Section XI, for Class 1, 2, and 3 components and the 1992 edition, as amended by the 1992 addenda for Class MC components.
NMCs proposed alternative examination is to use the 2001 edition of the ASME Code,Section XI, to govern repair/replacement procedures (IWX-4000) for Class 1, 2, 3 and MC pressure-retaining components and their supports. NMC is requesting this alternate examination pursuant to 10 CFR 50.55a(a)(3)(ii) on the basis that complying with the specified ASME Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The NRC incorporated, by reference, the ASME Code,Section XI, 1998 edition through the 2000 addenda in Federal Register Notice (67 FR 60520) dated September 26, 2002. In its submittal of December 6, 2002, NMC provided a reconciliation of the changes made, and a comparison of the 2001 edition to the 2000 addenda of the ASME Code,Section XI. NMC prepared this reconciliation to justify allowing the use of the 2001 edition of the ASME Code,Section XI, for Class 1, 2, 3, and MC pressure-retaining components and their supports. NMCs submittal of December 6, 2002, also discussed some general issues as specified below:
- The NRC has reviewed and approved, with some exceptions, the 1998 edition through the 2000 addenda as noticed in the Federal Register (67 FR 60520) on September 26, 2002.
Those specific exceptions made to the rules for repair/replacement activities are included in the implementation of the 2001 edition of the ASME Code.
- The ISI requirements will be based on the 1995 edition, as amended by the 1996 addenda of the ASME Code.
- The periodic pressure-testing requirements will be based on the 1995 edition, as amended by the 1996 addenda of the ASME Code. The pressure-testing requirements for the repair/replacement activities will be based on the 2001 edition of the ASME Code.
- NMCs reconciliation addresses the changes contained within the IWA-4000 paragraphs. In addition, any significant changes identified within any related requirement will be addressed.
In its December 6, 2002, submittal, NMC stated that using the requirements contained in the 2001 edition of the ASME Code,Section XI, for repair/replacements at Monticello will maintain the safety of the plant.
3.4 NRC Staff Evaluation The regulation at 10 CFR 50.55a(g)(4) states that components (including supports) classified as ASME Code Class 1, 2, and 3 shall meet, to the extent practical, the requirements set forth in the ASME Code,Section XI. The applicable requirements are in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) on the date 12 months prior to issuance of the operating license, or on the date 12 months prior to the start of a successive, 120-month interval, subject to the limitations and modifications listed therein. Preservice examination of components shall meet the requirements set forth in the applicable edition and addenda of the ASME Code,Section XI, as specified in 10 CFR 50.55a(g)(2) and 10 CFR 50.55a(g)(3). Preservice and inservice examination of components (including supports) may meet the requirements set forth in subsequent editions
and addenda of the ASME Code incorporated by reference in 10 CFR 50.55a(b), subject to the limitations and modifications listed therein. Portions of editions or addenda may be used provided that all related requirements of the respective editions or addenda are met.
The latest revision of 10 CFR 50.55a (12 months prior to the fourth 10-year interval for Monticello) requires ASME Code,Section XI, ISI programs to follow the 1995 edition as amended by the 1996 addenda of ASME Code,Section XI, for Class 1, 2, and 3 components, and the 1992 edition, as amended by the 1992 addenda for Class MC. NMC stated that the maintenance of two separate repair/replacement programs duplicates the programs and records which increases the man-hours necessary to maintain the Monticello repair/replacement program. This results in a hardship or unusual difficulty (unnecessary burdens) without providing any compensating increase in the level of quality or safety.
Current NRC regulations incorporate, by reference, the 1998 edition through 2000 addenda of the ASME Code. In its December 6, 2002, submittal, NMC provided a Certificate of Reconciliation of the changes made and a comparison between its current repair and replacement program requirements and the 2001 edition to the 2000 addenda of Section XI of the ASME Code. NMCs Certificate of Reconciliation addresses each change that is related to repair/replacement activities to show it will be implemented at Monticello. In addition, in its December 6, 2002, submittal, NMC stated that it would address any significant changes identified within any related requirement.
NMC said it would implement the limitations of the 1998 edition to 2000 addenda of the ASME Code as stated in 10 CFR 50.55a(b)(2) when implementing the 2001 edition of the ASME Code until such time the 2001 edition of the ASME Code is incorporated by reference into 10 CFR 50.55a. NMC also made the following commitment in its supplemental letter of March 26, 2003:
For the MNGP [Monticello] ASME Section XI Repair/Replacement program, the NMC commits to comply with any modifications or changes incorporated into the 2001 edition of the ASME Code when the 2001 edition is incorporated into the rule. This commitment is limited to the IWA-4000 portions or related requirements of the code for the MNGP Repair/Replacement Program. The inspection portions of the MNGP ASME Section XI program will be performed in accordance with the 1995 edition with the 1996 addenda of ASME Section XI.
Incorporating two separate repair/replacement programs will duplicate records and will increase the man-hours necessary to maintain the Monticello repair/replacement program. This will result in hardship or unusual difficulty for NMC without a compensating increase in the level of quality and safety. The NRC staff is currently reviewing the acceptability of the 2001 edition through the 2002 addenda of the ASME Code for incorporation, by reference, into the regulations. Although that review is not yet complete, the NRC staff has identified an issue regarding paragraph IWA-4540(c), which appears in the 1998 edition of the ASME Code, but was eliminated in the 1999 addenda through the 2000 addenda and the 2001 edition.
Paragraph IWA-4540(c) addresses the pressure-testing requirements of Class 1, 2, and 3 mechanical joints associated with repair and replacement activities. The NRC staff has determined that the omission of paragraph IWA-4540(c) results in the ASME Code being silent in regard to pressure testing of mechanical joints that are subject to the repair and replacement rules of Article IWX-4000. This omission would allow individual Owners to specify pressure-
testing requirements on a plant-specific basis. This potentially allows different utility organizations to implement inadequate or inconsistent pressure-testing practices and requirements for the same types of repair and replacement activities. Therefore, the NRC staff requires implementation of paragraph IWA-4540 of the 1998 edition in lieu of that of the 2001 edition when implementing the 2001 edition of ASME Code,Section XI, Article IWX-4000 for repair and replacement activities. The NRC staff recognizes that the 1999 addenda through the 2000 addenda of the ASME Code has been incorporated by reference in 10 CFR 50.55a without referencing a limitation paragraph IWA-4540(c). The NRC staff will address this in an upcoming rulemaking regarding the incorporation by reference of the 2001 edition through the 2002 addenda of the ASME Code into 10 CFR 50.55a.
NMC has committed to implement the limitations and modifications to the 1998 edition through 2000 addenda of the ASME Code,Section XI, as stated in 10 CFR 50.55a(b)(2) when implementing the 2001 edition. NMC has further committed to implement any limitations and modifications to the 2001 edition of the ASME Code for its repair and replacement program when the NRC incorporates, by reference, this edition into the regulations. As a result, updating the two separate repair/replacement programs to meet the 2001 edition of the ASME Code,Section XI, including all the related requirements, as NMC proposed, and including paragraph IWA-4540(c) of the 1998 edition of the ASME Code as discussed above, provides an acceptable alternative. When the 2001 edition of the ASME Code is incorporated by reference in 10 CFR 50.55a, NMC must comply with all limitations and modifications stated in the regulations, if any, regarding the implementation of the 2001 edition of the ASME Code, as applied to Relief Request No. 7.
4.0 CONCLUSION
Based on the above, the NRC staff concludes that updating two separate repair/replacement programs at Monticello to meet the 2001 edition of the ASME Code Section XI, including all related requirements, as NMC proposes and as modified by the staff, provides an acceptable alternative pursuant to 10 CFR 50.55a(a)(3)(ii). Maintaining two separate repair/replacement programs will result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Therefore, the NRC staff authorizes NMCs proposed alternative, and as modified by the NRC staff, pursuant to 10 CFR 50.55a(a)(3)(ii) for the fourth 10-year ISI interval at Monticello. When the 2001 edition of the ASME Code is incorporated by reference in 10 CFR 50.55a, NMC must comply with all limitations and modifications, if any, regarding the implementation of the 2001 edition of the ASME Code, as applied to RR-7. All other ASME Code,Section XI, requirements for which relief was not specifically requested and authorized herein by the NRC staff remain applicable, including third party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: E. Reichelt Date: October 3, 2003