IR 05000250/2021007
| ML21307A137 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/03/2021 |
| From: | David Dumbacher Division Reactor Projects II |
| To: | Coffey B Florida Power & Light Co |
| References | |
| IR 2021007 | |
| Download: ML21307A137 (3) | |
Text
November 3, 2021
SUBJECT:
TURKEY POINT UNIT 3 - FOLLOW-UP ASSESSMENT LETTER REPORT 05000250/2021007
Dear Mr. Coffey:
On October 29, 2021, the NRC completed its quarterly review of performance at Turkey Point Unit 3. The review included performance indicators (PI) and inspection results. This letter informs you of the NRCs assessment of your facility and supplements, but does not supersede, the end of cycle letter issued on March 3, 2021.
The Unplanned Scrams per 7000 Critical Hours PI exceeded the Green-to-White threshold value in the first quarter of 2021. On August 20, 2021 the NRC completed a review of the White PI using Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs" (Ref. ML21274A000). The results of this inspection determined that your staffs evaluation identified the cause of the White performance indicator.
Specifically, Florida Power & Light Company (FPL) appropriately identified the root and contributing causes for all four reactor trips that were an input into the White performance indicator. The NRC concluded that the corrective actions taken were sufficient to meet the inspection objectives.
The NRCs review of Turkey Point Unit 3s performance identified that the Unplanned Scrams per 7000 Critical Hours PI returned to Green in the third quarter of 2021. Therefore, all the findings and performance indicators that input into the Action Matrix are Green. Accordingly, per the guidance in Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program, Turkey Point Unit 3 transitioned to the Licensee Response Column (Column 1) of the NRCs Action Matrix, effective October 1, 2021.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4628 with any questions you have regarding this letter.
Sincerely,
/RA/
David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects
Docket No. 05000250 License No. DPR-31
cc w/ encl: ROPassessment.Resource@nrc.gov
Distribution via LISTSERV
SUNSI Review
X Non-Sensitive Sensitive
X Publicly Available Non-Publicly Available
OFFICE RII/DRP/PB3 RII/DRP/PB3
NAME J. Hamman D. Dumbacher
DATE 11/01/2021 11/03/2021