MONTHYEARML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval ML24079A0062024-04-10010 April 2024 – Proposed Alternative to the Requirements of ASME Code of Operation and Maintenance of Nuclear Power Plants for Pressure Isolation Valve Testing Frequency ML23150A0802023-05-30030 May 2023 Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23095A2962023-04-14014 April 2023 Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds (Vegp 3&4-Isi1- Alt-17) ML22259A1822022-09-22022 September 2022 Request for Proposed Inservice Testing Alternative ALT-VR-01 ML22118A0762022-05-13013 May 2022 Cover Letter for Vogtle Electric Generating Plant, Units 3 and 4 Request for Alternative Requirements for Inservice Test Interval Code Edition (VEGP 3&4-IST-ALT-01R2) ML22021A0012022-01-24024 January 2022 Relief Request for Proposed Alternative Requirements for the Repair of Reactor Vessel Head Penetrations for the Fourth 10-Year Inservice Inspection Interval, VEGP-ISI-ALT-04-05, Version 1.0 ND-21-0392, Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16)2021-06-0303 June 2021 Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16) ML21154A2132021-06-0303 June 2021 Enclosure 2 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14162(VEGP 3-ALT-16) ML21154A2122021-06-0303 June 2021 Enclosure 1 - Vogtle Electric Generating Plant (VEGP) Unit 3 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1): Alternative Requirements for ASME Section III Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16) ML21040A1652021-02-0909 February 2021 (Vegp), Units 3 and 4, Revision to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2): Alternative Requirements for ASME Section XI Examination Coverage of Weldolet Branch Connection Welds ML20352A1552021-01-11011 January 2021 Proposed Relief Request for Alternative VEGP-ISI-ALT-04-04 to the Requirements of the ASME Code ML20307A1412020-11-12012 November 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal NL-20-1262, Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion2020-10-30030 October 2020 Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion ML20216A3992020-08-0606 August 2020 Relief Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20143A2332020-06-0303 June 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) ML20132A1532020-05-14014 May 2020 ASME Code Alternative - May 14, 2020 Presubmittal Technical Exchange for Preservice Inspection (PSI) Alternative ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ND-20-0083, Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1)2020-02-0606 February 2020 Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1) ND-19-1294, Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01)2019-10-31031 October 2019 Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01) ML18320A0192018-11-30030 November 2018 Relief Request Regarding Examination Coverage for Certain ASME Code Class 2 Category Welds (VEGP-ISI-RR-05) ML18296A7172018-10-31031 October 2018 Relief Request Regarding Examination Coverage for Certain Pressurizer and Steam Generator Welds (VEGP-ISI-RR-03) ND-18-1158, Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1)2018-08-30030 August 2018 Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1) NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-12018-04-0909 April 2018 Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 ML18054A0652018-03-0505 March 2018 Cover Letter - Vogtle Electric Generating Plant - Request for Alternative (ALT-9) ML17171A1022017-06-27027 June 2017 Inservice Inspection Alternative Regarding Category B-N-2 and B-N-3 Welds (VEGP ISI ALT 13) ML17061A2022017-03-17017 March 2017 Request for Alternative RR-PR-03 Regarding Nuclear Service Cooling Water Pump Instrument Accuracy ML17037D0502017-02-17017 February 2017 and 2; Request to Use Asme Code Case OMN-18 as an Alternative to Inservice Testing Requirements (CAC Nos. MF8188 and MF8189) NL-17-0101, Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule2017-01-26026 January 2017 Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule ML17006A1092017-01-26026 January 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads Inflange Inspection ML16326A0442016-12-0808 December 2016 Alternative for Pump and Valve Inservice Testing Program ML16264A3212016-10-14014 October 2016 Alternatives for Pumps and Valves Inservice Testing Program ML14030A5702014-03-20020 March 2014 Request for Alternatives VEGP-ISI-ALT-06 ML13123A1602013-05-0707 May 2013 (VEGP) - Safety Evaluation of Relief Request VEGP-ISI-ALT-09, Version 2.0, Regarding Leakage Tests for Reactor Coolant Pressure Boundary Components ML13032A1062013-02-0707 February 2013 Safety Evaluation of Relief Request VEGP-ISI-ALT-08, Version 1, Regarding Installation of a Mechanical Clamp on a Class 1 Valve - Fourth 10-Year Interval ML1009001292010-06-11011 June 2010 Relief Requests VEGP-ISI-ALT-04 (Units 1 and 2) and VEGP-ISI-RR-01 (Unit 2) Inservice Inspection Alternatives for Third and Subsequent Inservice Inspection Intervals (TAC Nos. ME2226, ME2227, and ME1134) ML1012000882010-04-30030 April 2010 Acceptance of Vogtle Relief Request (VEGP-ISI-ALT-03) Dated April 7, 2010 NL-09-1410, VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii)2009-09-0909 September 2009 VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii) ML0731004352007-11-15015 November 2007 Third 10-Year Interval, Inservice Program Relief Request RR-V-1 (Tac Nos. MD5409 and MD5410) ML0627703592006-09-29029 September 2006 Evaluation of Relief Request ISI-GEN-ALT-06-02 NL-06-1713, Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays2006-08-10010 August 2006 Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays ML0510301992005-04-25025 April 2005 RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875) ML0332800372003-11-21021 November 2003 Safety Evaluation Re. Request to Use ASME Code Case N-661 ML0225904572002-09-16016 September 2002 Code Relief, Relief Request for the Second Ten-Year Interval Inservice Testing Program 2024-07-19
[Table view] |
Text
Southern Nuclear Operating Company ND-21-0392 Enclosure 3 Vogtle Electric Generating Plant(VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16)
(This Enclosure consists of 8 pages, including this cover page)
ND-21-0392 Enclosure 3 PROCEDURE QUALIFICATION RECORD CB&I Procedure Qualification Record 14163 VEGP3-ALT-16 To A.S.M.E.Section IX Page 2 of 8 ESSENTIAL VARIABLES PGR No. 14163 Process SMAW Manuail Xl Machinel l Auto.l lSemiauto. [ l Material specification SA738 Gr, B to SA516 Gr. 60/70 Flux or Atmosphere ASME P No, 1, Gp. 3 To ASME P No. 1, Gp. 1/2 Flux trade name N/A Thickness(if pipe, dia and wail thick) 1.125" Inert gas composition N/A Filler metal group no. F 4 Flow rate N/A Weld metai analysis no. A 1 Preheat temperature range 151°F-278°F(IPT)
ASME specification no. SPA _ 5.1 Postweid heat treatment None AWS specification no. A 5.1 Plate edge preparation Oxy Fuel burned WELDING PROCEDURE Single or multiple pass Multiple Single or multiple arc Single Position 2G Mode of transfer for GMAW: Sprayl l Giobularl l Pulsatingl l Short CircuitI l Filler Metal for GTAW or PAW N/A Filler metai diameter N/A Electrode E7018 Electrode diameter 3/32" Type of backing None Welding current Direct Current / Electrode Positive Consult WELDING VARIABLES for joint dimensions and welding current settings. (Reverse Polarity)
TEST RESULTS Reduced Section Tensile Results Dimensions, in. Ultimate Ultimate Unit Character of Failure Specimen No. Area Total Load Stress and Location Width Thickness in ^ Kips ksi MPa P23403 1 0.749 1.020 0.764 59 77.2 532.3 Ductile Weld Metal P23403 2 0.752 0.992 0.746 57.7 77.3 533.0 Ductile Weld Metal Guided Bend Test Type Result Type Result 4 Transverse Side Bends 4 OK Welder's name Scott L. KIrman Welder's symbol SLK Welder's name Welder's symbol Who by virtue of these tests meets welder performance requirements.
Work Order (Grig. WPS) No. P234Q3 Rev. 1 We certify that the statements in this record are correct and that the test weld was prepared, welded and tested in accordance with the requirements of Section iX of the ASME code.
Signed CB&i Date May 13, 2021
'atrick HoMgnton Remarks; Excalibur 7018 MR (E7018) by Lincoln (Lot No. 1443Z)
SA738 Gr. B heat treatment: Quenched & Tempered SA516 Gr. 60/70 heat treatment: Normalized This PGR is qualified using a material which is dual certified as SA516 Gr. 60(P1,Gp.1) and SA516 Gr. 70 (P-1, Gp.2)
Form Number: CMS-830-15-FM-16008
ND-21-0392 Enclosure 3 CB&I Procedure Qualification Record 14163 PROCEDURE QUALIFICATION RECORD VEGP3-ALT-16 To A.S.M.E.Section IX Page 3 of 8 ESSENTIAL VARIABLES Land: 1/8" Scale 1:1 Gap: 1/8" Technique: Stringer Position 2G Electrode T ravel Side Pass Size Amps Volts S peed Heat Input Remarks Type In mm in/min cm/min KJ/in KJ/cm 1 1 E7018 3/32 2.4 102 24.2 3.4 8,6 43.8 17.2 1 2 E7018 3/32 2.4 101 22.6 7.6 19.2 18.1 7.1 1 3 E7018 3/32 2.4 101 22.8 6.4 16.3 21.6 8.5 1 4 E7018 3/32 2.4 101 22.7 5.8 14.8 23.7 9.3 1 5 E7018 3/32 2.4 101 23 5.6 14.1 25.1 9.9 1 6 E7018 3/32 2.4 101 22.3 8.1 20.5 16.8 6.6 1 7 E7018 3/32 2.4 101 22.6 10.4 26.5 13.1 5.2 1 8 E7018 3/32 2.4 101 24.2 8.1 20.5 18.2 7.2 1 9 E7018 3/32 2.4 101 23.6 7.6 19.2 18.9 7.4 1 10 E7018 3/32 2.4 101 23.7 6.4 16.3 22.4 8.8 1 11 E7018 3/32 2.4 101 23 8.1 20.5 17.3 6.8 1 12 E7018 3/32 2.4 101 23.9 10.4 26.5 13.9 5.5 1 13 E7018 3/32 2.4 102 22.1 8.1 20.5 16.8 6.6 W/0 No, P23403 Qualification No. 14163 Date: May 13, 2021 By:
Patrick Hou fiton Form Number: CMS-830-15-FM-16008
ND-21-0392 Enclosure 3 CB&I Procedure Qualification Record 14163 PROCEDURE QUALIFICATION RECORD VEGP3-ALT-16 To A.S.M.E.Section IX Page 4 of 8 ESSENTIAL VARIABLES Electrode Travel Side Pass Size Amps Volts Speed Heat Input Remarks Type in mm in/min cm/min KJ/in KJ/mm 2 1 E7018 3/32 2.4 102 21.1 4.6 11.8 27.9 1.1 2 2 E7018 3/32 2.4 101 23.9 8.1 20.5 18.0 0.7 2 3 E7018 3/32 2.4 101 22.6 5.4 13.8 25.2 1.0 2 4 E7018 3/32 2.4 101 22.2 7.1 18.1 18.8 0.7 2 5 E7018 3/32 2.4 101 21.4 4.9 12.5 26.5 1.0 2 6 E7018 3/32 2.4 101 22.6 6.1 15.5 22.5 0.9 2 7 E7018 3/32 2.4 101 23,3 5.1 13.0 27.7 1.1 2 8 E7018 3/32 2.4 101 23.1 5.3 13.5 26.3 1.0 2 9 E7018 3/32 2.4 102 22.8 6.8 17.2 20.7 0.8 2 10 E7018 3/32 2.4 101 22.2 8.1 20.5 16.7 0.7 2 11 E7018 3/32 2.4 99 25.3 10.0 25.4 15.0 0.6 2 12 E7018 3/32 2.4 101 22.3 8.9 22.7 15.1 0.6 W/0 No. P23403 Qualification No. 14163 By:
Date: May 13, 2021 Patrick Hoi Form Number: CMS-830-15-FM-16008
ND-21-0392 Enclosure 3 PROCEDURE QUALIFICATION RECORD CB&I Procedure Qualification Record 14163 VEGP 3-ALT-16 IMPACT TEST REPORT Page 5 of 8 Type of Notch: Vee Test Spec. Spec. Spec. Notch Temp Energy Lateral Expansion Percent No. Orient Size Location Side Depth Deg F Ft-Lb J Mils mm Shear A1 FULL WM 1 3/8" -30 99.5 135 69 1.753 70 A2 FULL WM 1 3/8" -30 107.63 146 61 1.549 60 A3 FULL WM 1 3/8" -30 99.64 135 65 1.651 65 SA738 Gr. B B1 Long. FULL HAZ 1 1/4T -30 145.97 198 81 2.057 75 82 Long. FULL HAZ 1 1/4T -30 111.77 152 68 1.727 70 B3 Long. FULL HAZ 1 1/4T -30 117.17 159 67 1.702 70 SA516 Gr. 60/70 01 Long. FULL HAZ 1 1/4T -30 42.62 58 34 0.864 35 C2 Long. FULL HAZ 1 1/4T -30 128.7 175 72 1.829 75 C3 Long. FULL HAZ 1 1/4T -30 90.04 122 61 1.549 65 Remarks:
W/0 No. P23403 Qualification No. 14163 By:
Date; May 13, 2021 Patrick Ho Form Number: CMS-830-15-FM-16008
ND-21-0392 Enclosure 3 PROCEDURE QUALIFICATION RECORD CB&I Procedure Qualification Record 14163 VEGP3-ALT-16 VICKERS HARDNESS REPORT Page 6 of 8
( 10 Kg. LOAD)
POSITION 20 Side 1 Side 2 Root
- 1. BM 208 16. BM 209 31. BM 239
- 2. BM 205 17. BM 225 32. BM 240
- 3. BM 202 18. BM 207 33. BM 237
- 4. HAZ 216 19. HAZ 221 34. HAZ' 229
- 5. HAZ 256 20. HAZ 220 35. HAZ" 238
- 6. HAZ 306 21. HAZ 298 36. HAZ" 328
- 7. WM 225 22. WM 237 37. WM " 234
- 8. WM 196 23. WM 232 38. WM " 239
- 9. WM 224 24. WM 236 39. WM " 225
- 10. HAZ" 328 25. HAZ 258 40. HAZ" 409
- 11. HAZ" 208 26. HAZ 209 41. HAZ" 212
- 12. HAZ' 178 27. HAZ 199 42. HAZ' 177
- 13. BM 162 28. BM 160 43. BM 161
- 14. BM 159 29. BM 160 44. BM 154
- 15. BM 161 30. BM 160 45. BM 160 I
-k Im SA5I6 Gr. 60/704^
5A738 Or. 0 Side I W/0 No. P23403 Qualification No. 14163 By:
Date: May 13, 2021 Patrick HougMbn Form Number: CMS-830-15-FM-16008
ND-21-0392 Enclosure 3 PROCEDURE QUALIFICATION RECORD CB&I Procedure Qualification Record 14163 VEGP3-ALT-16 BRINELL SURFACE HARDNESS REPORT Page 7 of 8 (3000 kg LOAD 10mm INDENTER)
POSITION 2G Side 1
- 1. BM 201
- 2. HAZ 213
- 3. WM 208
- 4. HAZ 194
- 5. BM 158 Side 2
- 6. BM 227
- 7. HAZ 228
- 8. WM 220
- 9. HAZ 199
- 10. BM 156 Side 2 W/0 No. P23403 Qualification No. 14163 By:
Date; May 13, 2021 Patrick Houg Form Number: CMS-830-15-FM-16008
ND-21-0392 Enclosure 3 PROCEDURE QUALIFICATION RECORD CB&I Procedure Qualification Record 14163 m METALLOGRAPHY REPORT Macrophotograph VEGP3-ALT-16 Page 8 of 8 SA516 Gr. 60/70 SA738 Gr. B HAZ minimum width; 1.1mm HAZ maximum width; 3.0mm Scale Increment; 0.5mm Etchant: 5% Nital Finish: 1 micron Photomacrograph: Cross-section of an SMAW weld seam.
W/0 No. P23403 Qualification No. 14163 By; Date; May 13, 2021 Form Number; CMS-830-15-FM-16008