|
---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
{{#Wiki_filter:~
8 7 6 0 4 3 2 1 H H M 2010 FRO!VI (h 7)
GENERAL 6" 4222 -.--iD----{><J-------~*1_
f F 435 _ " ________________---1 !--------------=-- - - - - - - - -
1 1*-* - ! -7 --7
,--------==,- ,-r-SERVICE WATER SYSTEM 0) z
_J ' ' <&I I I
I" T- ----
~I~,, . .. - - - !" __ _JJ-21~1 . ,--- - ~I ~0-LO 55 LO I
~ ~
t-J-':ZI~
----------7 I. III 1
I ~I ~-LO ~o <.___ C R P !'!,
4-
'.Z r-JCRPS.
__ L __ --
__J r -
I I --Mo 1Glj)
;f,'
-- - - - - '--'MO>---------* ---!--- -- -- - -
I I E115"1!1='601A E. II 5 5 != WI B__,,.
~.~ I I
G @Bd"
~
i I ___;
rI
'---- -- -~
--~ I G
10 BA~IN I TOB'6\N I,--_/ \_7 I I L5!:: LSI= I r-------i I r K556 K560 I
I 8 B 7
6E'\
I I I I
I
~
*LSE 556 A
\K5A6-o}-
~
--i I. I" P4500 FOCSA ii P4500
'FOOSE
,i .
I" I ~ ~IE --~
I iI I --
I -u-2125 ---~ PUMP ROOM PUMP ROOM -2131
~-- -~R4~"o \ (R411/ ~
I I ~V \_,__~_,, t 1
1* ' II F256
.v,,,.,, I l I
~-en, I
LIE'\
I
~
Ill I </A l~fLw l
;, ~
~
.j M-N-2J52 (C-6)
> ~ 0 5 3 (D--2)
~
f'i':i 7
- * - = ..., i c er- J
~
~
R 411 - i1/4Wl-P33-8'l~
F F I© A I
/Cii,.
I ~'j453 l(c r- - \' N4P"-:_i D
\
~
I ~
I I P4500
//AB ~
P4500 FDG "'12 EDG""l3 I L"-~
~ r- 7N453-Lrn I i ,
t-J--Zl-19 I" ~~~ _ Ill DIES EL GEI\IERATOR ROOM Dl~SEL GENERATOR ROOM F006B I"
;.. -"2 I ':,O I ~89~ '1 N4 53j I I A B I LXE
--j I
f- -
LXE I
{;fil I N452 C
I I - I N452 D
- I ~ I I *~j I
@}- -
_J I --i I
~
f- -./. N\ s2l 00 DIVISION T DIVISION J[ .~ ;~ X_xE I I I \._U I ,--QA 1 N5i) . /Ly'\ * (N559
\ 6 I RE""
I I P4500 SEISMIC [
FIC 1f'ic"-
\\.R802
~
IJ*:Zl".l.1 1:.DG"'ii EDG,..14 R557 }- // II i ! \ i rizss-9 l
!E "". ;}I F007 A ['
B LXE N557 LXE N559 I" DIESEL GENE:.RA.TOR DIESEL GENERAT'OR T
E ROOM ROOM A
LY A SEE DETAIL "7" DWG M-N-2091- 7 T ERIS. PT 83 K 819 !PCS PT, FIC i
I I
A FlC OJ I
(()
~s\--
~
(\J I ~
t
'~
S".'ATIOf~
El1DL1324 I 5TAT!ON I
i
~
I
,_ ~
1~
II l '
R557 -"i AIR AIR A I A
~
D 10 le; 5UPPLY 5UPPLY
-a ,n D D
~ ~
I D (U
0
£ I I I 1~
I z
I 1 101' d:I 1:,: zI I ERIS PT. 82 STATION !PCS PT. STATION AIR EEDL1323 AIR SUPPLY SUPPLY 3/4 3/4' E1156F 434A E1156F 434B QA LEVC:LNQ~
~ QA. LE/~i_NQ hi ~ 14--*-- BUBBLER PIPE lil!<<I D
g
! I I ~,L rr, 'V "-
4" 4" Fl SSA l'--.../1 =d 3/4" ,
191 i SEE DETAIL ' 7" 3/4 F155B F154B
./ ,1 4
6:.t;I, L ITI .1 ii",.~14.,.--l_,Lu,..:.__-:...,
., I IJ EXTENDS INTO RESER\/OIR SEE REFERENCE 3 l
I I D t-,-,------1 Ni'.i 94 DWG M-N-2091-7 N~l'J.5 F154A
.
- F176B i J - - - - - - - ------------~I I" BUBBLER Pl PE ID I VENT FLOOD PROTECTION 4" FLOOD PROTEGT!ON I FL00!7 PROTECTION 4
FLOOl7 PRC)TECTIOl-1 VENT LJ Ii
REFERENCE:
- 1. DESIGN SPECIFICATION 3071-517.
EXTENDS INTO RESERVOIR SEE REFERENCE. 3 Ell.Sl'.oC002
!7ECAJ..ITll-!Gi PUMP r--
I I
___MAKE-UP_ __ _ __ _ _ _ _
T TI -,
z
-~K_)~P _
7 I
1 I
I !
MAK.,E-UP-~
i----f---
,..L l ---------- - - - - - - -
- 1 ci M')KE lJP C I El l5<.oe:003 DECA.NTI\I.IG PUMP I 3. MOUNTING &PIPING DElAILS FOR LE\IEL SYSTEM I--N--2524-03
- 4. SCHEMATIC DIAGRAM-MAKE UP YALVES-J-N-2201-60
- 5. INSTRUMENT LOCATION & TUBING INSTALLATION DIV. :C L---**----- - - - -------- -7 l
I
-i_
4* _J
!:; F157A a'F158A
~i" I 0 l I I "15BB a' 1/\ i"
<r:>o wz 4'
. N I
I I I--N-2854--01
- 6. INSTRLMENT LOCATION & TUBING INSTALLATION DIV. 1[
I l
! TE i
t-12.194
\2"
'::J
;'§ I 2.
!<t, I I
N219.5 ___A F157B
_J 112.* "' (TE'\
_ N-2.195 I
I I--N--2854-04 NOTE:
i ! ~~~J~
I _
F156A,
~
I OVERFLOW jgi 1
!ll:!i I
I i I
,I n~ OVER FLOW . ~
,* 2 l N5,?-1)
--' 2':_
3
~ F156B
~
I I I) UNLES*s OTHERVV!SE SHO\IVN ALL P!PiNG lS rJF~UP o",
, C.:i:"i-C::~AIC iF'."'\'-LNQ I~----_j_-+-- *i
,T.._, --1 "l 1~1 ~~~,,-..))/].-,Al
-,... ,._,'-\::::,;.,) 1 ...... ,_,:: \f !':: 1
* . i ~' ,1
- -- -L- --- - - ---* -- - - - - - - _ _ _j C 1 1 1
-1:L- -
1
-*---* *******"- l_
1 11* - 1
- 2) UNL[SS Tl~ER\JISE SHD\JN, ALL INSTRLME~ T PIS NUMBERS ARC:: P'!EFIXED Ell C
,..-:----. ,, 1J t~
TT"- Al __ l VAi.VE A~D EQUIPMENT PIS NUMBERS ARE PRlf JXE1 EllOO I
! ...L ' ! :l l
('\<A 4 o 4 }---1 fit\_ '
I RHR rol\APLi:)(
... I 3)Lit,," i)[).JOT!'S fR !5 COMPU1ER POINTS.
TI R412 A
- ]
R"-13 A
'-...,../
/
.~
TXE 1<551 - --
I I"'~""
I 'f
- ~
~
I
~l
~
G~ TI R413 B
0 A .~I '"'45 j M--N-2050 (B--8)
-z,, ilJI I ,...
- <- - - - -(B--i>.]~4 M:-N--2050 7
~
~
,.,--*~
"TXE K551 ----- - -
f---EXTENDS INT RESERVOIR---,
ERIS PT.84 I
*4(.
~-----
[M--N*2050 (3--6) :> "
Go, , 8 I I* EXTENDS INTO RESERVOIR-*
~
!PCS PT. SEE DETAIL 'C' 6M721N-2054 SEE DETAIL "C"
& LATEST REVJSION 1 -I EllDT2721 ON I -N-2854-01 **1 l' I ON I-N-2854-04 y
~sis;--7
*rI "14- IM-N~2050. (B-65)- 4-"
~"
(K5er---7 ERIS PT85 "PCS PT,
~11DT2722
~, <e>H!
~HI
<FE-:---20_5_3-(,-,*--2-)]-
I B I L-{ M-N-2052 (G-8) >
MAN WAY 1--------------*;:;,Z..:,.I.,;;G Olt-1 CR' :em E iE-
- '1 RESERVOIR I NUCLEAR SAFETY RELATED B
t 4 QA, L!=VE.L NQ THIS IS A MICROSTATION PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROliGHT TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
THIS DRAWING WAS REFORMATTED BY IDCROSTATION AT REVISION uV". ALL INC.CODE. Detroit Edison Fermi 2 y :nco*s INCORPORATED:
PREVIOUS APPROVAL SIGNATURES ARE ON FILE ON MICROFILM IN DOCUMENT COJ','TROL.
PREPARED BY uDATE I
- TITLE SEI~VICE WATER, NIAKE-UP, DECANT SYSTEM I)IAGRAM A PORTION OF THIS DRAWING IS AF'F'ECTED BY THE FOILDWING:
EDP 37792.B0:3. REV. ¢ AND OVERFLOW SYSTEMS RHR ~OMPLEX I A CHANGE DOCUMENT
" CHECKED BY DATE AP~,1~1~~02:3 1 AND 2 -
A OTHER REVISIONS:
SYS DIAG WTR MKP DEC OVEFL RHR APPROVED BY DA'rE Pl.ANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT #
E1100 P4500 PREPARED BY DATE CHECKED BY DATE DOCUMENT TYPE CODE A. DITTMAN 9/24/18 D. VETRA~ 10/6/19 I *-- o*rHER APPROVALS oATE DDDMEC 1801 I
cq 1\ll'1 I 6M 7 21 N __
2 Q5 4 APPROVED BY DATE EDP POSTING ENTRms REQmRE THE DRAWING NUMBER
- ><'_.~.-- David Kakoczki forT. Murphy III ADDITION OF ~
H:ITHEH AR~MS S'.\',A~ CODI:::
AFc H AsB J . ...., y 8 7 6 5 4 3 ? 1}}