|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A2412021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-09, Logic Diagram Emergency Equipment Cooling Water System Valve - Division I ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A3022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2410, Fire Protection Evaluation Reactor and Auxiliary Buildings Roof Plan El. 697' - 6 and 735' - 6 ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B ML21055A2962021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011, Rev. AP, Diagram Condensate Polishing Demineralizer System ML21055A2952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2046, Reactor Water Clean-Up Reactor Building ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A2922021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2028, Rev. K, Process Flow Diagram Radwate System ML21055A2902021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-4, Rev. B, Logic Diagram Nuclear Boiler System ML21055A2862021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing 6C721-2308, Rev. H, Reactor and Auxiliary Building Foundation Sections & Details Unit 2 ML21055A2842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2034, Diagram Core Spray System C.S.S. Reactor Building ML21055A2832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M271-2550, Flow Diagram of Equipment Drains in Radwaste Building ML21055A2822021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2023, Diagram Feedwater System ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2612021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2400-25, Post Accident Sampling System - P & Id Sh. 1 ML21055A3952021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5878, Reactor Core Isolation Cooling Following Main Condenser Isolation Using Suppression Pool as a Backup Water Source ML21055A2422021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-03, Rev. F, Logic Diagram Nuclear Boiler System ML21055A2432021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-6, Rev. a, Logic Diagram Neutron Monitoring System (Part 6) ML21055A2452021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2086, Diagram Fire Protection System Reactor Building & Auxiliary Building ML21055A2462021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2100-01, Rev. C, Logic Diagram Reactor Recirculation System Part 1 ML21055A2482021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2404, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Tray Area Plan - El. 603' - 6 ML21055A2492021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2511, Side Stream Lrwp System P&ID ML21055A2502021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-03, Logic Diagram Reactor Core Isolation Cooling System ML21055A2522021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-03, Rev. J, Logic Diagram Emergency Equipment Cooling Water System Pumps a & B ML21055A2532021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-05, Logic Diagram Neutron Monitoring System (Part 5) ML21055A2552021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2011-1, Diagram Condensate Polishing Demineralizer System (Sheet 2 of 2) ML21055A2562021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 7M721-2218, Floor & Equipment Drains Sub-Basement Plan Reactor Building ML21055A2582021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2430-01, Logic Diagram Turbine Building Closed Cooling Water Pump North Center & South ML21055A2592021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721-2408, Fire Protection Evaluation Reactor and Auxiliary Buildings Fourth Floor Plan El. 659' - 6 ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
{{#Wiki_filter:8 7 6 5 4 3 2 1 3114 900L8 300L8 4' VENT 3103 36' fl
""11 H NOTE 5 3109 F332 1 4" 14' 3131 l--l
-1 ~ L-483) fen\ 3131 CTT l484 H
_Jr--------., [ F106 r---------7 REF. 5&7 CT L438 S 1A F6041 ,..I., r----- ____ ...J PT PXE I VENT I l
PXE N21 PT N2t >-----I L ------7 N21 I
/J\
LO..\
FTH
,-------jL480 ;---~
A ,_.__,
PT L428
'-----te.- l'
*0 I
I I
~-'-~
,__ _____J N21 L487 A
N21 N802 A
l,..--SEE I
I DH All A l N802 I B L487 B
~~~
N801 I
I
~
I I H21 I A A 36' I H21 I
~I L _____ _____________ P426 J I l P426 ~...-~ I L____ _____..,..---- ______ CJ
~
IE~
R803
""A ,j/
_ l,------ - -
I
- lo\H:6~1----
A A I I 1/2' F617 L-----1 I N2102D006 F047A 30 GPM FTL
~--,L 479 f-~lu I'<'~\
ELBOW TAPS F601 1 114 '
24' 131031
(~
I ~
;,i ~
FRE c 32 STARTREC PNL H11P919 POINT 86 SEE DETAIL A
""-v Q.
,,j I A 3/'," (lYPICAL) +/- r?:=<:-7 I R607 .l r?:=<:-7
)M-2004 1 (D 4) >----_J C32K669 is
§ FTH f-~
C32 F/ E L ______
'---"'....-'~ _JI F/ E it' VENT [~===--c=----:-:::----::------._ F058A
~, =l f Fl 62A FEEDWATER HTR. NO. ti DCS-FI,/ FROM FEEDl4ATER ~ L004 C32 FY C32 FTH c..13114 REF. 5,7 L._ _ _ - VENT R.F.P. DISCHARGE M. . VALVE-NORTH CONTROL SEE I/C REF. 1 VENT F163A NORTH-PLANT IDENT. NO.
3/4' N2101B001 STRAIGHTENING - A R1}_ 4 c32 L RBB0 4
.------l C32 L002 "'
- STRAIGHTENING
-- - * - - - - - - - - - - - - - - 7 DRN, I 6" F331 5° 85I I B
/,- : F043A I 3109 I H F046A .,.
I I
F054 3/',"
~-~
3109 TEI<
N~20 ----u,
;:,.. l---"--N'---------2 FROM SBFW PUMPS FE C32 >--', (
VANE TWT
; REACTOR FEED PUMP-NORTH I PLANT !DENT, ND. N2102C001 3/'," 1
"'T ' , 24' V '< T I M-5083 (H-3) FTL C32 FXE C32 I
I_ - -
FY C32 FY C32 - -
I FXE C32 N001 7 ,,,----; L4548 I
...-".._B~ F168B .._,___,,
F044A F045A F607 I I
..,. F609 1 1/4" ' F159A L003 A
N002 A
I I
K619 A
K619 B
1 I
N002 B/
FTL C32 --.
I /- ru "
>----+------,- ' } "
QAII QAIII I I
/ I ' LOO! VEN1, _
G G )M-2004-1 <F-3)
_ _ _ _ _ _ _J
*OJ I I r-- _ I B _...
(\J TWT
\
\
'-~/
F095A DRAIN - I 1/C LOOP N21-3 I ,-'-7 FOSSA DRAIN TY TEW
~l-------:=-::::c-:::-1 FROM LNC TE IJ C32 I
L__ 1 J I
TE\./
FR H []_NC l~ECT. SKID ~ ~ p-;'--,TY-\~
\ I *a, ,Q,,_.)--;=---j__ 821 INJECT, SKID N006 -,----1 C32K669 t-----,- C32 ,__ PIS# P79P001 1 C32K669 I
\
I
/
1 DCS-FI,/ I N86'b1 A
N041 A
PIS# P79POO!
~,.__::JFUNC. TEST/
A I I L,. ,-J I DCS-FI,/ I I I
N006 B
I ,i
/
821
\ N041 8
821
~io2/
?!<\
' /
r---7 L7 __J &,,_
~ TEW F839A L---t-.---1-'<f-CAL TAP I - -
1 I FUNC TEST/ [:-----I TEW
-/3110 I N -
B21 N041 7 I
I t t I I
CAL TAP F839B
~111- ~
_ _ 821 N041 it, FH/A K858 e--- r--
i _
- ----- 7 FTH
~
M. . ST ART-UP VAL VE -NORTH ra '
=-:.
F611
=l 1 C 3 2K6691 L.;J @
I I
I I
I 36' TY A _hs,;,---t_J 821
~ B21 TEW N041 I'\...
,,.CTT C
(: FB 4 0A11/,t ORN 20 1
F83 A F838A F837A I
1/,"
F836A I
I I
I I
L____
TO STARTREC PNL. H11P919 POINT 92 & 93 r7~Cl
_ _ _ _ _ _ _ _J 1B21DC0490 I
I I
I
~
A I
I F837R r838l!
F836B u
D 11/2i;*FB 4 0B ORN :]
~ t-** I A
/'C_.l_ 408 N602 C " L485 ,__ __,3/4" URE B21DC0489 L _____ - F835B 1---------1 CTT 1
I C32K669 DCS-FI,/
I I
"-' FT L409 A -
I =l ~---__& I1/C LOOP N21-2 I F060 C C7-S7 ' zsv zsv F098A 821
+ A C7""'<7 zsv zsv " L 486 o.l"'
A t:(
_l_
,------- C32 ,.... 821 N477 821 N476 --~
/c, TEST CONN q R809 E/V 821 821 N477 821 N476 3/4 t-*f-TEST CONN. 5 :;b o.. o;; c:,.~'..J L
R620
_J J~;,:,\_ ~ t3 ~
1 114* I
----------~----- 1---..-----!
A A B21DC0488 c.,51c.,5 ::, ,-::---._ F48.3 B B F098B 1
u c/2 ~ z0s2v1 12:o F049A.
10 I zsv s 20*
3103 l'J z B21 <l: <O
-- ---- ---------7 I
I FTH F~
I I
I I
I I N2102D008 13109 24' F603 E/V f{JE F076A B2100 F076A
----- B2100 F584A
<r
- o. ~
N434 B&D N4.32 B&D ,7-s, E/V 7
...__7"">
~~
B2100 F076B I B2100 F584B g;1-
<l:
0 N
I
~
I I
~ ---~~Bt2~1tOO~~D~~ "'
"' C, I L416 L415)
;,. H 3110 ~= ""
F I I
FE'\-,
N415 I
I I
I PXE 10*
, ~ LD 7
I\..A -- B2100 F583A L:l 'zsv zsv 821 F~B 2 --=-';-,
-~~~B2~1100~~t-:]D
,~ji° F583B ::,
u
)
F I I I
&- 1=---1 A N21DC0456 4'
I I
I I
VENT ZXV I
I C"'~
I LE/P VENT)
F164 fJ> FTH N438 B
PT Hr3-1-9-I
;..sos I
*a ZSV
~ F"032A fLJC.
ZSV AD h - - ~
B2100 F582A ro 32 A GROUP A 2
A 14 GROUP D NON-Q HPCI M-2035 (0-7)
N21 Nt~~
FOVC N21 N533 A&B FDVC
'-"'"-"CJ~..,
F032B GROUP A QA I ..
RCIC 20' GROUP D NON-Q ~
I N417 K403
' /4, L4B
( L428 LC F059B NOTE 5 821 N4.34 821 N4.32 v[:--t. .--1. .--J I B2100 N21 F539A N21 F539B B2100 B2100 F581B F582B
- F333 00 '_JI__, . B . B "
.~. F616
,- 14' 3110 R.F.P. BYPASS LINE L.. I 7860 GPM 3/'," I START-UP LINE * - J, F613 T
FXE
/ N490 13109 1 '
A&C A&C
--- *- D l.J~UUP - . Ll~UUr' A F581A CLASS;:i'j 821 WO\&
1 s__LASs A 4 :]v A.1 ,GROUP D
) M-2004-1 (H-3)
FOBO
~
-- '7 II LCV -
F.0, F403 T
~~ B 3115}
B21DC0487 CJ
£- N N-Q QA I o *~ J,XAEO\_ @ URE
~
PXE N443 ~
GROUP_
QA l N N-Q
_::D ~ -
F602 (x-9A) R809, F334 l F081 I # F 403 START-UP
\..1-lJ F539A , - . B .
MB)
C32K669 t 114*F052 N 14 ' - - - t TEI<
I *** :Dl I L'.J L'.J CONTROL VALVE
-& I *** 11 114* F063* - 1 (D)
DCS-FI,/ 1 -@T I CT N421 F058B 1J.1/ "'
~
REF.5&7 L438 B 1 1/4'
... ~s.o~ _
i - ___J
, ___ PXE N407 B
- L40 13 I
I - - - F049B B
.._ 821 00 rn, M '?' PT DRYWELL
'"""'"m - - ---;:--- - - - -
-~" PT B2100 -
u u
3/4" I
I [: I ( L439 O' F079 I VENT F064 ...
--1"'1 B FO!OB I
th M, ,
- c START-UP .--ii;aJ I
I 1/C I 1* Fl 62 B IFEEDWATER HTR. NO, 6 [______.+-.... '
.-J I LOOP N21-2 D '
F606
>--c..l
~
I FB l 2 VAL VE-SOUTH "°l. F163B SOUTH-PLANT IDENT. No,\
__J
)M 2004-1 (D 2) I 314 , N2101B002 fgji~ FB2l00 D B2100 B2100 "' I DRAIN I [: 3110 580A F580B F579B 1'.,..,.1
/ ~
PT I L442 1---1 GRQ!JP A, _GROUP D GROUP D GROUP A
~- ---- -- -- --- ... .. VENT F095B I ru RF.P. DISCHARGE QA I NON-Q NON-Q QA I M. , VAL VE-SOUTH ~
- I -
f---
/
I
/
I F0438 I ~~ MD 3123'-
r 7 1 2336 I E I
/
I REACTOR FEED PUMP-SOUTH I 'I/"
74 I
I 3109 24' 24' F610 3109 TEI<
N~20 --& H2336l B2100F011A _
12~ r 7 "1
12~ -
s21 OOF011 B 1;, E I PLANT !DENT. ND, N2102C002 I F0 448 REACTOR COLD FILL _J
;,. LO C 7. -.J LO - "s-
/-
1 I
I F0458 F608 1 1 /4" F159B (SEE OWG. M-2004 ZONE C-3
& M-2011 ZONE H-2) ;;;. 'a REACTOR *a ;;;.
I N
>---+------,-
i ( " -.-. N PRESSURE
,_ j ~
)M-2004-1 CG 2) ,-------_J I L,. F1 02A 12 1 r 7 12' ORN. 7. _J F1028 1.
,, __.... F055B IL I
i I ~
ro II I
RD I ----[:Xx:] F103A ? 12*
VESSEL 7 12' F103B
\ I 1 1/2' 30 GPM I
-{ _J c.L
/
/
F618 N2102D007 F0478 BY DETROIT I BY GENERAL EDISON -I ELECTRIC PXE N21 N802 A
II I
--------*- --*--*--*--------:[=- r 7
- - - FXE
- - K1002 N21 - - - -
7
>~~<
H21 I I II A P637 Ir-----,
\, P426 I I - - - - ______________ /_ L _
- I I
21 FXE L
I, 7I II
~i,I )
,j I T--- N21 _____ J I I D
*;/} FTH 1 -() 5 UP I ,- K1002 I 1
- -- ~ Lil FH/A I ----- 7
_..I__
FXE N409 FE N408 PT N21 L487 f-L 1-()"
-() 6 UP
---QRTD P1 -ci::
~3DN 1 DN 2 DN
_ _J
--j 11 I
I 8
c.to;lZ.J I I I I II 14" - CONDENSATE/FEEDWATER CLEANUP RETURN-6000 GPM.
£ B B L-------------------------, A 1 7 UP :5 '1 - --J I I K858l~------t I
~ B ,; I I' L -()a UP n. a;" 4 DN _ _J I I I
, I I
-- C32K669 R.F.P.-NRTH ~ ~...l.----~~N:(_J INSTRUMENT __ 8' CONTROL SYSTEM SYSTEM N21 t--- -Q1up
~
8' RECIRC LINE I I DCS-FI,/
Nrl I c==- .,ro ~~ ~~ <$>~
C REFERENCES, I I I - 2 UP 5 DNO __ J : NOTES, I w I I, GE FEEDIJATER CONTROL SYSTEM I-2125-1-05 NO -~J I R,F,P,-SOUTH RECIRC LINE A, DELETED, I---, I 6 DNO -- I :
I ---~----------------------------------------------------------------7 I
~ I '
I ro I PLANE A TRANSDUCERSPLANE L_
B--
- 3 UP 4 UP 1i:
7 a;"8 DNO __ J II I ,
\
\ I I B. DELETED C. LAST INSTRUMENT NUMBERS ASSIGNED F002/F 406-2, 3,
CONDENSATE SYSTEM FEEDIJATER HEATER DRAINS SYSTEM 791E40BTG SHT, 1-5 M-2004 & 2004-01 M-2005 & 2005-01 I,N21~
I I \ / K-406/KB15-L442-N450-R401/R819 CNS00-525),
I I
I I
1 UP FXEN21N803A 2 UP FXEN21N8038 5 UP FXEN21N804A 6 UP FXEN21N8048 N21N801A 1-.!:'1001 - - -& D, L P N21-4AB, N21-5AB, AND N21-6 ARE SH IJN ON M-2004-01 4.
5, TBCCIJ SYSTEM DIAGRAM DIAG, F TURB, BLDG. SAMPLES M-2008 I-2400-03 I 1-i 3109 I I 1-i 3109 I RTD TEN21N807 A RTD TEN21N807B H21 6, FEEDIJATER CONTROL SYSTEM I -2126-01 I I INSTRUMENT DIAGRAM 732E153(Rl-155)
P637 I I 3 UP FXEN21N803C 7 UP FXEN21N804C L.P, TURB. L,P. TURB, L.P, TURB, I I 4 UP FXEN21N803D 8 UP FXEN21NB04D T 7, PLANT SAMPLING I-2400-01 I I NORTH CENTER SOUTH 1 DN FXEN21N803E 5 DN FXEN21N804E
- 8 61<M-N21-5851-17 t~~-}..J ..
I I I I 2 DN FXEN21N803F 6 ON FXEN21N804F NOTES:
C 1...----- r-----.._ v r-----.._ L..--- r-----.._ I 3 ON FXEN27N803G 7 DN FXEN21NB045 C
I F~/P K400 1
2*
r
'1 I F832 I ) M 2012 CF 8) : 4 DN FXEN21N803H 8 DN FXEN21NB04H
- 1. ALL FLO\,'S AND VELOCITIES SH 14N \,'ITH THE EXCEPTION
- - - - ~ RF+~i~-s I . B, / I OF PUMP BY-PASSES ARE AT 1051/. \,'ARRANTED REACTOR FLO\,',
- I (;_32K669 I
I I
- l PXE N21 NB02 B
III
--------- -------------:[=- r 7
FXE N21 - -
K1002 _ 7
- 2. DELETED, 3, FDR LEGEND OF SYMBOLS AND ABBREVIATIONS, SEE I l!!_CS-FI,/ liF833B I I
F833A H21 I I I C I D\,'G, M-2000 AND M-2001.
I - ,- ' P426 I I ,------
I I
- I H21 P637 L1 4, DESIGNATES PIPING ISOMETRIC NUMBER, I
ZIV R815
'--xv N444 FE/~
K400 A
I I
I I
~ ---\ ---
/_ L _ FXE N21 - - - J I
-_-:_:'_J
- 5. VALVES N2100F604 AND N2100F605 ARE TD BE DE-ENERGIZED DURING PLANT PERATI N. THEY ARE OPERA TED NL Y DURING I B B L __
F61 PT N21 1
I I
1 -()sup f-IL
=8 6 "10 UP ID -or:
1 ON 2 ON
----l
_ _JI I ,-
I II K1002 D
H21
-- LONG CLEAN UP CYCLE.
6, DELETED r6M721- 2023 12 2* L487
=8 I\ "-'
8_ I 3 7, UNLESS THER\41SE SH VN, LATEST REVISION 3/4' FO I I 7 UP 'c..5 a11 ON --j I ALL INSTRUMENTS PIS NUMBERS ARE PREFIX N21 F0708 FCV F400
~IV R815 ZXV N444 IL l"'T 8 UP ~
--'4DN
_ _J I
I ALL VALVES AND EQUIPMENT PIS NUMBERS ARE PREFIX N2100.
BP F614 7I I
- B - A II I
A 1--_j I R.F.~.T,-N TRIP r~----~"L~~ L - - - .1r- 1 UP ,,,,
1-....J!.il___, 8. DELETED 3116 I --- 2 UP 5 DNO __ J 9.DELETED 12"H)- ' e--- RIO ~6DN0 __ I r-- <
314'
(
I ~~---rn I
I L - 3 UP J1 w 7 DNO __ J 1RANSDUCERSPLANE s-- ~s c_f _f_f--==---------------- ____ J_ ___ e 8 F070A : C32K669 FCV : 4 ue ec oNO __ J B
I DCS-FI,/ F!oo I PLANE A N21N8018 1 UP FXEN21N805A 5 UP FXEN21N806A 2 UP FXEN21N8058 6 UP FXEN21N8068 NUCLEAR SAFETY RELATED
~~
RTD TEN21N808A RTD TEN21N808B HOT\./ELL HOT\./ELL r:1---------,H,f-- 1,1 FOBS 131141 .3 UP FXEN21N805C 7 UP FXEN21N806C t
JJ NORTH SOUTH I I 14" '
DETAIL A 4 UP FXEN21N8050 8 UP FXEN21N806D N2102D013C N2102D013B I I
F067 114
'1 i F065 1
2 3
ON DN DN FXEN21N805E FXEN21N805F FXEN21N805G 5
6 7
8 DN DN DN DN FXEN21N806E FXEN21N806F FXEN21N806G FXEN21N806H THIS IS A MICROSTATION PRODUCED DRAWING.
CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING 4 DN FXEN21N805H N2102D013A DRAIN DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.
THIS rv~ ',T*- , ,
DRAWING W"'5 REFORMATTED BY MICROSTATION AT REVISION "AT.' ALL INC.CODE Detroit Edison Fermi 2
'"'7'_ "*'\1ffl@lt a , ~ ~ ~ P k 0 ~.*_j.l'Jl'<E$:A'R't"'.,...,,..,,.,,,,,,,.,,~-,-*,,vH-.,__,.,,_,,,,.,=,.""~ ~ ITfTLE' *-** ,O,.J _, ' .. ' ~Y-" £,,
REFERENCES, . d)iu,. "oN '"F1LE otr MICR-F}Li,tiN ciOcllMENT CONTROL.
DIAGRAM M-2039 NOBLE CHEMISTRY INJECTION SKID DIAGRAM ,BPIDCD'S INCORPORATED, A PORTION OF THIS DRAWING PREPARED BY DATE FEEDWATER SYSTEM IS AFFECTED BY THE FOLLOWING:
M-5821 ISi BOUNDARY DRAl,/ING REACTOR FEEDIJATER SYSTEM TC CHANGE DOCUMENT CHECKED BY DATE A M-5715-1 REACTOR FEEDWATER SYSTEM OTHER REVISIONS: APERTURE CARD TITLE A FUNCTIONAL OPERATING SKETCH REVISED DRAl<ING TD SH I< VALVE N2100Fl64 DIAGRAM FEEDWATER SYSTEM AS A 3/4' VENT FDR CLARITY APPROVED BY DATE PLANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT oM<
N2100 PREPARED BY DATE DATE DOCUMENT TYPE CODE NUC OPS FILE NO. DATE ISS',JED ;ro IS ANDRE\/ LEI/ALLEN 1213120 "--"-"'7 ,z/p~ z* DTHER APPROVALS DATE DD DMEC 1001 1.},' L( , ,-,c1 DATE
/,
EDP POSTING ENTRIES REQUIRE THE ADrnT,oN o, rn, Af<MS ST Arns CODE*
EITHER "AFC" OR "ASB" DRAWINC NUMBER 6 M7 21 -
2Q2 3 REV.
BP
"-----lh<I "'""----"-'~"--"CoV "' ,
8 7 6 5 4 3 7 1}}