ML21055A258

From kanterella
Jump to navigation Jump to search
3 to Updated Final Safety Analysis Report, Drawing 4I721-2430-01, Logic Diagram Turbine Building Closed Cooling Water Pump North Center & South
ML21055A258
Person / Time
Site: Fermi, 07200071  
Issue date: 02/02/2021
From:
DTE Electric Company
To:
Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards
Shared Package
ML21055A091 List: ... further results
References
NRC-21-0002
Download: ML21055A258 (1)


Text

4 3

2 1

7 NORTH TBCCW PUMP (CENTER AND SOUTH THE SAME)

ALARM NO

  • SEU RCOR NO.

n*~~~~~Tln"

,ov1~!1N 0

l

0. SETTING DECO DECO CMC CMC DECO DECO 012P43 TBCCW PUMPS 85%

L YE#P43N406A LYE#P43N406B PSE#P43N438A PSE#P43N439A SDI RECIRC.VALVE P43N429 OPEN OFF RUN OPEN l

HEAD TANK

\\

HEAD TAN~

POS POS SUCTION SUCTION TBCCW PUMPS LEVEL 18' LEVEL 18 PRESS PRESS 502 013P43 RECIRC VALVE P43N429 10%

BELOW SET BEJOW SET OPEN POINT P fNT I::,.

I::,.

BELOW 7 PSIG BELOW 7 PSIG CLOSED D

~

II

_/

II D

'- ~ "--

EQUIPMENT 480 VAC, 60 HP

,..J....

.-.,.~,

L YE#P43N406C DECO LYE1tr43N406D DECO PSE#P43N440A DECO PSE#P43N441A DEC.O MOTOR FEEDER PNL ITEM NI PUMP HEAD TANK -

HEAD TANK SUCTION SUCTION CODE NO.

BUS NO.

POS CMC SW.

LEVEL 18" LEVEL 18" PRESS PRESS BELOW SET BELOW SET BELOW 7 PSIG BELOW 7 PSIG NORTH P4300C001 72M 20 5B54

. POI NT POINT CENTER P4300C002

  • 72N
31) 5B56 II I

II l

SOUTH P4300C003 72N

21) 5B58 1~v

~!)

MOTOR GROUND

~!)

~~)

0. L.

FAULT l 75%

I AND I AND I LOCATION SYMBOLS PRESSURE SWITCHES I::,.

IN CONTROL ROOM J l FOR TBCCW CENTER

@ IN CMC SWITCH AND SOUTH PUMPS

~~)

IN PUSHBUTTON SUCTION C

PUMP PRESS SW IN RELAY ROOM C

I CENTER P43N4388 AT CONTROLLED EQUIPMENT CENTER P43N439B P,T SW IT CHG EAR CENTER P43N440B CENTER P43N441 B I\\IQTE TO CENTER AND

~,,

SOUTH P43N438C SOUTH TBCCW PUMP

1.

REFER TO DECO STANDARD DWG 6M-2290 SHT 2, MODE "A" SOUTH P43N439C FOR DESCRIPTION OF MOTOR CONTROL AND ASSOCIATED SOUTH P43N440C FUNCTIONS.

nH 1nr)

ON

<DC)

SOUTH P43N441 C MOTOR MOT OW BREAKER BREA'KER REFERENCE DWGS & DOCUMENTS I 41721-2430-01 OPEN CLOSEO 1-2070-01

.LOGIC SYMBOLS & LEGENDS LATEST REVISION SCHM DIAG TBCCW PUMPS N,C & S D

1-2431-01,02 MOTOR 0. L.

0 M-2008 TBCCW SYSTEM DIAGRAM 115%

I-2022-01,02,03 ARRANGEMENT Of EOUI PMENT ON PANEL i

G OFF G R RUN H11PB05 R

M-2001 LEGEND OF SYMBOLS & INSTR IDENT FOR I FLASHER PLANT SYSTEM DIAGRAMS

~~

  • CECO CENTRAL COMPONENT DATABASE B

DECO DES I GN INSTR #22 REV A. TBCCVI SYSTEM B

CENTER PUMP AND I

0. L. LIGHT

!NON-NUCLEAR RELATED!

l*N AMMETER SOUTH PUMP -

SAFETY YI @

~~

THIS IS A MICROSTATION PRODUCED DRAWING.

TRIPPED CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING ALARM #

NONf ALARM#

5D144 DESIGN GROUP TO ENSURE THAT CONFIGURATION CONTROL IS MAINTAINED.

SEQ RCOR SEO RCDR #OJ4DA~

SEO RCDR #005R20 CENTER 015P43 NORTH MOTOR THIS DRAWING WAS REFORMA'ITED BY Detroit Edison Fermi 2 TBCCW PUMP TR I PPED INC.CODE SOUTH 0161'43 OFF MICROSTATION AT REVISION "C". ALL TITLE I::,.

I::,.

PREVIOUS APPROVAL SIGNATURES ARE u

LOGIC DIAGRAM ON FILE ON MICROFILM IN DOCUMENT CONTROL TURBINE BUILDING CLOSED COOLING lQJ DCD'S INCORPORATED:

PREPARED BY DATE A PORTION OF THIS DRAWING IS AFFECTED BY THE FOLLOWING:

WATER PUMP NORTH, EDP 37709.B009, REV. ¢ TC CHANGE DOCUMENT CENTER, & SOUTH A

CHECKED BY DATE A

OTHER REVISIONS:

APERTURE CARD TITLE LOGIC TBCCW PUMP N.C AND s REF. LCR 16-067-UFS, REV. 0 APPROVED BY DATE PLANT IDENTIFICATION SYSTEM NUMBER ARMS RECIPIENT #

P4300 PREPARED BY DATE Ctli:;{..;JS,1$0 ~y DATE DOCUMENT TYPE CODEDDDINC I NUC OPS FILE NO.

DATE ISSUED TO IS 10-10-20171 :;::-,,-oalt<

tv-tl-17

\\0,1:,\\.:2Dl1 JUSTIN MOSES OTHER APPROVALS DATE 1801 APPROVED BY J:,t.n Moses for Tom DATE EDP POSTING ENTRIES REQUIRE THE DRAWING NUMBER REV.

-~M~

Murphy m per 1 1o/u/o ADDITION OF THE ARMS STATUS CODE:

41721-2430-01 D

TMPE*13*0028 " ~.A EITHER "AFC" OR "ASB" V

I 4

3 2

1

_J