ML21055A258

From kanterella
Jump to navigation Jump to search
3 to Updated Final Safety Analysis Report, Drawing 4I721-2430-01, Logic Diagram Turbine Building Closed Cooling Water Pump North Center & South
ML21055A258
Person / Time
Site: Fermi, 07200071  DTE Energy icon.png
Issue date: 02/02/2021
From:
DTE Electric Company
To:
Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards
Shared Package
ML21055A091 List: ... further results
References
NRC-21-0002
Download: ML21055A258 (1)


Text

4 3 2 1 7 NORTH TBCCW PUMP (CENTER AND SOUTH THE SAME) ALARM NO

  • SEU RCOR NO. n*~~~~~Tln" 0,ov l 1~!1N 0. SETTING

-- CMC CMC , TBCCW PUMPS 85%

DECO DECO DECO DECO SDI 012P43 RECIRC .VALVE P43N429 LYE#P43N406A LYE#P43N406B PSE#P43N438A PSE#P43N439A OPEN OFF RUN OPEN HEAD TANK HEAD TAN~ SUCTION SUCTION l LEVEL 18' BELOW SET POINT \ LEVEL 18 BEJOW SET P fNT POS POS PRESS BELOW 7 PSIG PRESS BELOW 7 PSIG 502 013P43 TBCCW PUMPS RECIRC VALVE CLOSED P43N429 10%

OPEN I::,. I::,.

II _/ II D

~ '- ~

,..J.. .. "---'--

.-.,.~,

DECO DECO DEC.O EQUIPMENT 480 VAC, 60 HP D

DECO LYE#P43N406C HEAD TANK LEVEL 18" BELOW SET

. POI NT LYE1tr43N406D HEAD TANK LEVEL 18" BELOW SET POINT PSE#P43N440A SUCTION PRESS BELOW 7 PSIG PSE#P43N441A SUCTION PRESS BELOW 7 PSIG PUMP NORTH MOTOR CODE NO.

P4300C001 FEEDER BUS NO.

72M POS 20 PNL ITEM NI CMC SW.

5B54 l

II I II

  • *
  • CENTER SOUTH P4300C002 P4300C003
  • 72N 72N 31) 21) 5B56 5B58 1~v ~!) MOTOR
0. L.

GROUND FAULT

~!) ~~)

l 75%

I AND I AND I LOCATION SYMBOLS PRESSURE SWITCHES I::,. IN CONTROL ROOM J l  ;

FOR TBCCW CENTER AND SOUTH PUMPS @ IN CMC SWITCH

~~)

  • IN PUSHBUTTON C I PUMP CENTER SUCTION PRESS SW P43N4388 P43N439B
    • IN RELAY ROOM AT CONTROLLED EQUIPMENT C

CENTER P,T SW IT CHG EAR TO CENTER AND SOUTH TBCCW PUMP

~,, CENTER CENTER SOUTH SOUTH P43N440B P43N441 B P43N438C P43N439C I\IQTE 1.

REFER TO DECO STANDARD DWG 6M-2290 SHT 2, MODE "A" FOR DESCRIPTION OF MOTOR CONTROL AND ASSOCIATED

,, SOUTH P43N440C FUNCTIONS.

nH 1nr) ON <DC) SOUTH P43N441 C MOT OW MOTOR BREAKER BREA'KER REFERENCE DWGS

& DOCUMENTS I 41721-2430-01 OPEN CLOSEO 1-2070-01 .LOGIC SYMBOLS &LEGENDS LATEST REVISION 1-2431-01,02 SCHM DIAG TBCCW PUMPS N,C &S D

MOTOR 0. L.

115%

0 M-2008 TBCCW SYSTEM DIAGRAM I-2022-01,02,03 ARRANGEMENT Of EOUI PMENT ON PANEL H11PB05 i G OFF G R RUN R M-2001 LEGEND OF SYMBOLS & INSTR IDENT FOR PLANT SYSTEM DIAGRAMS I FLASHER @ @

B ~~

  • AND I CECO CENTRAL COMPONENT DATABASE DECO DES I GN INSTR #22 REV A. TBCCVI SYSTEM B

CENTER PUMP

0. L. LIGHT l*N AMMETER SOUTH PUMP - !NON-NUCLEAR SAFETY RELATED!

YI @ THIS IS A MICROSTATION PRODUCED DRAWING.

~~ TRIPPED CHANGES OR REVISIONS MUST BE BROUGHT TO THE ATTENTION OF THE PLANT ENGINEERING ALARM # NONf ALARM# 5D144 DESIGN GROUP TO ENSURE THAT CONFIGURATION SEQ RCOR SEO RCDR #OJ4DA~ SEO RCDR #005R20 CONTROL IS MAINTAINED.

NORTH MOTOR CENTER 015P43 TBCCW PUMP TR I PPED THIS DRAWING WAS REFORMA'ITED BY MICROSTATION AT REVISION "C". ALL INC.CODE Detroit Edison Fermi 2 SOUTH 0161'43 OFF u

PREVIOUS APPROVAL SIGNATURES ARE TITLE I::,. I::,. ON FILE ON MICROFILM IN DOCUMENT LOGIC DIAGRAM CONTROL lQJ DCD'S INCORPORATED: A PORTION OF THIS DRAWING PREPARED BY DATE TURBINE BUILDING CLOSED COOLING IS AFFECTED BY THE FOLLOWING:

EDP 37709.B009, REV. ¢ WATER PUMP NORTH, TC CHANGE DOCUMENT CHECKED BY DATE CENTER, & SOUTH A OTHER REVISIONS: APERTURE CARD TITLE A REF. LCR 16-067-UFS, REV. 0 APPROVED BY DATE LOGIC TBCCW PUMP N.C AND PLANT IDENTIFICATION SYSTEM NUMBER s ARMS RECIPIENT #

P4300 PREPARED BY DATE Ctli:;{..;JS,1$0 ~y DATE DOCUMENT TYPE CODEDDDINC I NUC OPS FILE NO. DATE ISSUED TO IS JUSTIN MOSES 10-10-20171  :;::-,,-oalt< tv-tl-17 EDP POSTING ENTRIES REQUIRE THE OTHER APPROVALS DATE 1801 \0,1:,\.:2Dl1 APPROVED BY J:,t.n Moses for Tom DATE DRAWING NUMBER REV.

ADDITION OF THE ARMS STATUS CODE:

Murphy m per

-~M~ TMPE*13*0028 1 " ~

I

.A 1o/u/o EITHER "AFC" OR "ASB" 41721-2430-01 D V

4 " 3 2 1 _J