|
---|
Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562'-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
{{#Wiki_filter:lj 7 ti b 4 I I l 3 l 2 I 1 e
"E11 aa~ ~K 11 oo" ( REF. 4 C-8 <( - 7 ( B-2 (- 7 DIAGRAMS 9
CLASS B CLASS D TO FXEN007B I TD FXEN007A I REF KEYL CK
--7 QA I QA NQ VNT. TITLE DLC . N . G.E. NO.
( SPARE (-J ( SPARE <(- J N .
~ LC 8" LC r.13_,f' ..,..,3.4 ~ FLEX SYS. I I DIAGRAM - CONTROL ROD DRIVE
'd-- 7f'l I Vl*
,3/4 _3,f' Vl~ *rn 3 8 REF 28 (E-~8) ( ( SPARE (--t ( SPARE (-1 HYDRAULIC SYSTEM <CRD) M-2081 C / '
E11DC039m- _ -- _
I D 8 ,. F619A
~:
F620A F622A : F624A F621A K1100 D001 K1100 F00.3A LC f-T I I 2 DlAGRAM - STAND-BY LlQUJD CONTROL SYSTEM <SLC) M-2082 H * - ~El!DCD397 i
17 I / ' C o p F623A d p F625A ( REF. 4 G-6 ( G-2 f-T DIAGRAM - RESIDUAL HEAT REMOVAL CLASS D .J. CLASS B I
1- -<rsLATIN SIGNAL I F036A I SEE NOTE -r*f- - -. _. DRN.
u TYG~ - - ['f\. __ 3.g,
~ (
T FXEN015B SPARE <( - "T I
(
TD FXEN015A SPARE \ -
I 3
SYSTEM- D!VISl N I <RHR) M-2084 H
DIAGRAM - RESIDUAL HEAT REMOVAL 3/4'1) ISOLATION S!GNALY- ~ F204A F205A TUBE ,'/TUBE I I 4
SYSTEM- DIV!Sl N II <RHR) M-2083 M
I M I I ~ ~ VENT y A[R TEST _ __.~ fL R ~Air.I I/EIS' I/,: 5 DIAGRAM - CORE SPRAY SYSTEM M-2034 CONNECTION 3/4" COIH ON "1-2224 (E-4) E/S <CSS)
-, tV2J K603 K~03 DIAGRAM - HIGH PRESSURE COOLANT voi2 l\,,.B/ 6 M-2035 f"
131461 INJECTION SYSTEM (HPC) 131591 12' 12' E1150 24' H!! Hll C c
~
- s2' u.
[1150 =---- P612 P613 DIAGRAM - HIGH PRESSURE COOLANT D co nee, Im ~-c *c*>,I '"°' *F124A f ,T/
r--zu _L:,
~ 022 PD'w'ER SUPPLY PD\./ER SUPPL y ? INJECTION SYSTEM BAROMETRIC CONDENSER CHPCD ISOLATI N M-2043 1
e~
REACTOR /'j, A,/ I
~
39 DISTR!BUTI N DISTRIBUTION 8 DIAGRAM - REACTOR CORE I KEYLCK PRESSURE ~~C,., ".:_ - - J E11DC0392 CODLING SYSTEM (RCICl M-2044 x-I Ii t VESSEL A F123A F125A p PSEN018 1,,;.1DRN LJ TEST 24' w~ MO , - - - - - - - - - - -< REF. 4 D,E-3 < 9 DIAGRAM REACTOR CORE JS LATl N CO LlNG SYSTEM BAROMETRIC CONDENSER <RC!C) M-2045
+-----~
~-7
- - F127A F126A 3 M-2083 PRIMARY CONTAINMENT 'SEE NOTE 02 I ' CONN 18' VENT[ ~ ~ 14
- I I L - - - __jrs~E~E~N= T~E~.E~'~&-.~,~.I A ~ 10 DIAGRAM - REACTOR \JATER M-2046 j'R \
El150 F611A 18' L - - - - -< !S LATI N SlGNAL< ~008Ell -----------(
PSEN022B REF. 4 G-5 <
11 CLEAN-UP - SYSTEM DIAGRAM -
(R\JCU)
REACTOR \,/ATER CLEAN-UP SYSTEM M-2047 M-2083 FIL TER/DEMINERALIZER <R'w'CU)
"~ I E1150 / -, RHR 161,/M E!!-45981 2' r, 1 -rr' I
\DOllA/ REF 4 <H-5) PT PSI:' DIAGRAM - FUEL POOL CODLING
-- ~'
e F184 FIBS "ru 1M 1iiie)*
I 12 SYSTEM CFPC) M-2048 GRPD 1L416) N445 F192A Fl88A [1150' R801
"- A w D ._. ._. QA GRPB \ A F"027A E j:-,A/ DIAGRAM - FUEL P OL CODLING
,. .. ,..,. H21 , -
13 SYSTEM FILTER DEMINERALIZER M-2049 732E184AB u ~
°' Ill QA l HI!
G "'
L) stI
. /RD'\ w
- i_.. L,_ w )!SOL S!G.)J I I , POIS I P613 14 DIAGRAM-EMERG. EQUIP. COOLING w
ct l,._
o '
""' / I ,, ......n ,
/:.....,,.1.
~5ggeB &_j / 'I L _{) .0. co
~
'I I '-'TR. SYS. mv. 11 M-5444 G
t 9
,c
"' cu C /~--,
I E
'E/V r 416 I E11DC0393 I- - - - - - ~ SEE NTE 'E'& 'F' I I
i~-r----- 15 DIAGRAM - DEMINERALIZED SERVICE M-2678 D
~
u "-
w
' /
+ A I RD _r---
L---SEE NOTE G3
, / w w
z w
z z w w
§- 1 ,.- - - - -< !S LATI N SIGNAL< ,.
g 059E1~
- --7\ -------< H-2 EIS K603A = VATER RISERS SYSTEM DIAGRAM - NUCLEAR BOILER Q /
I I MD .. 16 M-2089
<(
w "'
SD 1---'i E1150 ...,...... C/'- SYSTEM
)Q, C l viww "' v, w ~
=3
°' Ell50 F050A
,A-( DE D013A.
--~-+J L._
v, I I
/Y,c I
I ~~m~
o<t 11 I I B
RE11DF1065 DIAGRAM - REACTOR VATER CLEAN-UP SYSTEM
~
~ FL'-' @
M-2088
'o-/ + ~ ~
F192C F188C PHASE SEPARATORS (R\JCU) zsv
-t--_lI aE FTL II HR L P A E-J r:_--
I -] I Iy;I/ *l- . V ~ ~ I £ L417 9
/ @--
A t;'!; :il ,,,-1-s- I I DIAGRAM - CONDENSATE STORAGE
[/ ' ~
N506
! A r - - 18 M-2006
~
A D ..__.,
' F188D E[!DC0388 18' MD M
;'~!;
=:o MD £ El!DC0405
,- I'>. /1/,s' N021A
~o1~
A
.i i; ry'
, K600 l,r-J
- Fl
- s~~
A 19 SYSTEMS
~
VENT F192D -~ \ c_ _ __J El1DC0389 I DIAGRAM - STATION AIR SYSTEM M-2085 0
'd-/ ' _- --- L:\ I zsv \ 1 III w F116A j2298I ~
H21 FTH FTH H21 A N506 SEE E1150 1 I POIS HI!
P613 Ic _ _ A _ _ _ FIE, 20 DIAGRAM - FEED\JATER SYSTEM M-2023 B POIS L418 L420 NOTE ~
.§) I A A I C35 w
L--1~::---- C FOSOA l r-r:-1* , X-13B N410 ZSV S-1150 Cl §os9I I - L ~-
- - REF R005 21 DIAGRAM - REACTOR RECIRCULATl N M-2833 n u Jt 4 *1 3/4' I 015A J..24" T\JMS 26) H21 SYSTEM CRRC) 1-2106-01 ,02
~zsv j3146j 4* I P!OO
/y, C F058A. REF 25 (F-5)
< DIAGRAM - RESIDUAL HEAT REMOVAL L
_ _:y.____ I 22 M-N-2052 F060A ZSV B 3 Fl20A 'st SERVICE \,/ATER SYSTEM I I cu
~-~
I N410 F059At §0051 150tt_1_300tt DJAGRAM - NUCLEAR B ILER
,..1. 'F121A 23 M-2090 zsv n" Fl31 , ---~~----, I 057E11 SYSTEM PT N434 y
I ---. A 3/4"
~ N431 I B
L406 C
/y, C F114AI S A TEST w TEST CONN /VENT 1. I ~IN:ER~:~;
4 2 (D- ) RHR < : lT 1-2400-10 ZONE: C-4 24 DIAGRAM - HYDROGEN REC MBINER SYSTEM M-2087
_.'t9 KEYLCK I J. CONN
~ __ r -/
zsv (((]5())-_:=- REMOVED F039A l4251j 2 112* I ~025A zsv T-X471o F '"'
I
~ CT 25 DIAGRAM - TORUS VATER MANAGEMENT SYSTEM M-4100 N431 , I N430 I D
8' 0 A Q B F115Al '---..___ SEE CLASS A CLASS B INTERNALS I
I P34
_L408_
26 S/D ERIS SIGNAL POINT #72 8. 80 F Cl::'.
D
~
U
<(
{1J o
s0
,n 00 o
,n 0
z ~
zsv N430 A
~47~ L406 PT A
E/V I i::i, u "'
- E, NOTE H 24' REMOVED 131601 I 4*
I/ 27 DIAGRAM - PRIMARY CONTAINMENT PNEUMATIC SUPPLY SYSTEM 1-2174-28 M-5007 F610A w - -
- , - - - - - - , "I - - - - - - ' PUMP E1102C002A AND C002D cu' "u V,
V,
<(
W
<C V,
M FPCU REF, 12 <H-6) 8' E1100F211 TE"')-
NO 27 - A
___i5:_'., SEAL RECIRCULATION LINE PlPING 28 DIAGRAM - FLEX SYSTEM M-2021 f
<(
LO u-' u-' u-'
r -- A A703 I ~ FA! [618C FL!~BA 13669 1 1
1 131581 - - - _J 24' 1 1/2" RHR HT EXH A OUTLET TEMP HEAT EXCHANGER I
I E/V 1/:TY"'\ CYCLONE S e--
r-'7:,-- X-211B 131601 6' SEPARATOR EEC'-'
FA! F4!4 C r- - ~ SEE NOTE 'Ej [SEE NOTE 'F' j- 7 l~~o.';,, G M-5444 DIE-4 CPUMPS A & C) TRANSMITTER DIV PO'wER TRIP UNIT NUMBER I ' SUPPLY
,i X-210B G
~ Hll CLASS MC 131601 :;l <1i * - - ~SEE NOTE *r* I RHR TEST LINE 18' I PXE-1/pxE B21 MYE' B21 L"MYE B21
{?XE' B2l r
) 11
'\I CLASLD+
[1150 RD J
J_ T l ' CLASS B CLA 150,,300* I SS B s- I I
-~
wE
~- I MD ro:s e
1 K0EYLOCK:
-+-
MD E1150 I 1
~613 G
B21N094A,C,E,G PXE-II B21K6!0A, K610C B21K610B, K6100 B21N694A,C,E,G 821N694B,D,F,H
)\..,_N0_(4 N6c94 j N~94 _,N~,(4 . .i D
...D01!'.IA ¥:wco.;,:.:;.1 ' F003A B21N094B,D.F,H
~Ti1
,, "'\ I P.JtJIP f1/4 ,-
!?;
~
o_
"' <l: f c PUMP H21 P004 H21 P082 H21 P082 ~
a:: A~ Fl! I -+- F035A
[NTERNALS I I
cY r i SEE N TE *r*]
[J-6/ I OUTLET'-\ lNLET K603A
~ cu- -"
18"¢ CAP J_ ... I REMOVED c/ ' C/ ' I U O U 'w'/10~¢ HOLE , ,., D I I I VENT I
PXE 821 MY['-\
B21 1/MYE B21 PXE\
B21
<C w "'
"' ,n
' : - SUP~~
DOO!C POOL DOO!A
[§] ,,
F082A~~ 1- .. n
,Y,c~
I r-1 J ~'
4* I I
KEYL CK I I
r-----------7 I I
~
F085A F084A I
L __ _
K603B
~
cu N694 N094 6 :::_-:::_-:::_-:::_-:::_-:::_ _--__-_-_-_-_-__ _ _ _ _ _ _ _ ,,-- ~006E11 K603A I
N094 G
N594 G E E '
CLASS B 1*
) FLUSH CONN.)....
wE MO *- 0 I I I-TY L __________________ _
E H21 P004 H21 P082 H21 P082 H21 P004 L--1:'.:J------C:J :::::tJCJLJA!jS~S X-223C CLASS B MC TYP n11
.;F096 ....
F082B I
I L "1 KEYL CK SEE N TE *r* I I
I I ' ,. I I
I I KE),07 I H!!
I 404Ell K603B K604 E
_JI /Q"-f---'
( REF 4 D-2 ( 4' j3152I
. *- r1 -- ----
_______ C I P613 j\ : PXE-B2!K609A,K609C N655A,C I ~A706 I N055A,C CLASS B~CLASS D 1 MD RHR HT.[XH A I PXE-lNLET TEMP I II B21K609B,K609D N655B,D I N055B,D RHR 24' I 4
< REF. 4 D 4 ( @8]J I
I
[1150
,------J I 131581 PXE-N056A,C B21K609A,K609C N656A,C I ' '
9 ~5r PXE-RHR V"I F047A 11 B21K609B,K6090 KEYLCK HI NE,56B,D
~~ ___
20* ' ,., D - -1 SEE NOTE 'E' I 20* N056B,D
> REF 4 D-2 M-2083 131521
§-~* w IIMn I}~:\ C i-E:98 § i t-"M'=-+---"s?'E:
- :, . :iJ i;
20*
~ ~
~O!E!! FXE-N007A K603A
~ ~
*st
.cu '1,--M-OI ' :c: MD I * - -*
KEYLOCK ----
~ --L----------------------<
0
- 146121 <\J F432 F433 FXE-CE II NTE w __ "1 SEE NOTE *r* I ru 0 isl 6' I N001 ) - - -
1(-;:'",J 2 8 RE~~ ~ ~-8 < N007B K603B I SEE *r~
-A '\I 17 '\I 1 * * *_!_AS FXE-0 = -
CT 314' 17 C!S-ROOlB K603A Cf
,-- 20* 20*
P34 L402
--~'~l-~2~4°00~-~1°0 ZONE D-7/8 G:Qill CT L413 A/
H21 POIS I I 11' S.S.
/ ,,
S.S.
~~
EJ. i"DE VENT(
~
,'-(r;~ j NOlSA FXE-ll K603B F030C
~ I H21 H21 N0158 F030A F431 FXE-1' 131541 1* 131541 ~ IAS I POIS POIS ABANDONED IN PLACE---+-- II N0!3
~ /yl ::a~: 1 D
_J 131521 ['
0 VEN:~
Y - - - - - " j S E E NOTE 'Fj ~T 140031 112*-0<-I FOO!A "'
,. ~!+E D I I SEE NOTE 'E' f- - -- Y REF 24 G-8 THERMAL 0
E/V ,--7 r-7 r--,
/ A l) 0 I
/~
,o/ M 1 "\. RELIEF F079 ) AD I
*I -D ~
1 ,., C' j317Bj VALVE
- F079A 080A /C __ c-,. / 'C 1m"'
-o WC.
o I
.l M
I MD I 0~
m"'
-0
-o Wlc.
*st
~
LT L!OOA
]
j3146I
- s::
CT L426
~-r--' ~--,~
1/2 zsv N423
- A 1/4' I-2400-04 <D-2> PROCESS SAMPLING SEE NOTE [i5 .., I f-~--SEE NOTE G4 j3/4'~ F095A LT A r.c. r.c. SYSTEM P33P405A
]
'-r' 24'-AA-B 24"-AA-B F094A M VENT 131571 L!O!A NOTES, 131781 "'w C,
GROUP 'B' GROUP 'D' SEE REFERENCE NO. 4 ABOVE FOR RHR DIV. II
~<C ru
( N!21 - 'o 300 ,cs.
' 3'-BA-B LC P,
fl E6100F011 I-Ug ' INSTR 8. CONTROL
~
-'r' xm
~
w- ZSV\ C/ '
~-- 0 1 1/2'
@097J
( N421 B
NOTES,
~
ww A. 'UNLESS THER1,1JSE SHO\,IN, 10* !SEE NOTE
- r * ~ - - - - 7 I ALL INSTRUMENT PIS N s. ARE PREFIXED Ell r----------------------- -- - ,
~ f- - - - -.
~
I SEE NOTE 'E' ALL VALVE AND EQUIPMENT PIS NOs. ARE PREFIXED E!!OO e!
1 F112A I B. (N TE REMOVED>
I 20' 131571 I/" TY'\
' CN TE C RD ~ I I K6b9 / RHR HX 'F113A C. REMOVED)
[1150 DOOlC -r PYE K420 MYE'-
N656 I/MYE' ~ PYE MYE' 1/MYE'\ 'd- ,._ _ _J I~
H!! /
I #!GS\J OUT TEMP CR\,/
D. <NOTE REMOVED)
C N655 *st N655 P613 I I ~- K~20 N6l6 C/ " I E. PEN 8. CLOSE BACKLIGHTED PUSHBUTTONS \./ITH 131541 C C I'>. C/ ru ',,.A/ I
~~~1 RED & GREEN INDICATING LIGHTS AT REMOTE H21 H21 H21 I / V SHUTDD\JN PANEL H21P100.
131841 4' H21 H21 H21 MO rot8C:$LO P080 POBO POBO F. PEN & CLOSE BACKL!GHTED PUSHBUTTONS l,IJTH
.~*
P080 POSO P080 ORN
._. -,- -,-- -,- -,- TE FO~A 2
- c147A 2
- F065A RED & GREEN INDICATING LIGHTS AT DEDICATED
~
~
1
~
CT . -'- -'- , ' SHUTDD\./N PANEL H21P625: FOR MD F003A,F004C,F006A,F006C,F047A,F048A &
@ill] F106A F105A I~ llpxi:\ li'pxE' LO Z,o34C L431
'"' I/pr'\ l/pxE'- 1/exE'\ LO Z,o34A
.. L[1J50 LO I I C] I L I l3185j I F057A 24' j4217I RHR SI,/.
F068A.
H21P626:F R MD F004A,F024A, F028A & F611A.
= CT L431 R003 I\.__ C . / ~/
N056 N055 j',. C / .
A Pl R002
~ ~
R003 I'-.. A./
N056 l\,,.A, /
N055 I'>. A/
,.....F068A Jv1 vs r
, [X],Ol4A I I r--'----+---------- REF-22 B-7 H21P627,FOR MO Fot0,F015A & F017A, B ~MC@
A F002A l'c.!2."J
- C st .,032A 112~ CLASS C F069A "f'L H21 H21 H21 150* _ ,. H2[ H21 H21 VENT ~
~ P018 POIS POIS J2734I VENT ru'i:""7CLASS PT '¢7F018A I' F056A
~ REACT R F046C L409 JI u
...J - POIS P018 PO!B F107A 11 ~ -~
lSOtl Bf 131571 300# A I R613 F071A r T iro33A
.,.. Fl09A CLASS D ..._F077A
,- - --< < I6M721-2084 l
F102C CLASS F102A' '.. / U D VENT SECONDARY H-2 I' DRN B - - - - - _JI I CONTAINMENT I EIS K603A
- &i1 CLASS A " LATEST REVISION 3 ooo - .\_)
jV)
V) Ml o ~r
,{046A PT F013C CLASS B jJl 7 Bj C
F128C F129C F013A* 1 L_ / T \'-
u L4t1 Fli;BA FJ.29A
" F!OBA T F!!OA I BQ o
cu 16' 20' t:---(J----'------~-::':-:-1"-)---'--,---__J
~ ~ ORN +"' ru 16' 20' TYP, F" R PUMPS C002A AND C002D 131571 A
___,__ cJ - ORN / RT f 011 f---<1 L 41 0 i
I y
TD DR\,/
y y TD DRV FTL FTH I
I REFERENCES,
- 1. PIPING i INSTRUMENT SYMBOLS GE 197R567, R!-25.
- -=~ ,,---. 2
~~~=-~ - ,_A_, I L423 L422H-------------~ I 2. LEGEND OF SYMBOLS 8. INSTRUMENT IDENT. DECO
\.V \.V
[ M-4099 I 6\,IM~E!!-4098-1 I [E'.J "I
L~69 C
r----.-
0'-BA-B F031C I SEE N TE -_,.TEI,/ TEI,/
F031A
"' -R \ A FE N006 ,---._
A I FXE I
I M-2001 FDR PLANT SYSTEM DIAGRAMS.
3 ,----, -DENOTES ISOMETRIC 01,1G NO.
"If nuf M 1* ~,.__., 1* N150 N151 (
r
- j EEC'w F072C A /RT'-.. FTL A FTH I N007 - R602 I__J <PREFIXED \./ITH 6M721-)
B - u E1102C002C F044C ,::::----, E1102C002A F044A A 0 0
<l:
-' f---i Dll \
\ t.1105')
'-..DOOl F042A' ( L421 L424 I A I A g' DETAIL AT F-2 F071C ~7341 F045C TE Ntc52 ___,,,
CLASS CLASS C B
EEC\J
<REF DETAIL AT F-2)
I I ~7341 F045A TE ,
\ N1~2
' ,:;;. 4' F072A:;
'"' u I Li!! /
' - _ / F020A F041A* VENT A A H21 POIS I
c - - -)REF 26)
B
~ - A 01" " ~
131851 24' 142181 RHR S\J.
M
~
u-'
DRAIN TD CR\J l31BOI l2734I I
DRAIN TD CR\,/
~ -- -
SEAL LEAKAGE CR\,/ z F!O!A 0
M "'
u-' F037A! DRN I
REF-22 B-6 )
NUCLEAR SAFETY RELATED f
NOTES CONT':
1 COVER DRAIN CRV G. THESE LOCATIONS ARE REQUIRED TO HAVE FD38A
~7341
- THIS IS A MICROSTATION PRODUCED DRAWING.
A UT EXAMINATION PERFORMED FOLLD\JING no1c CR\,/ SEAL I 4* 131801 DRAINING AND FlLL AND VENT TD VERIFY THAT NO VOIDS ARE PRESENT. THE F LLD\.'ING CHANGES OR REVISIONS MUST BE BROUGHT L EAKAGE u PST EVENTS APPLY. SEE THE PST EVENT FOR TO THE ATTENTION OF THE PLANT ENGINEERING THE SPECIFIC AREAS TO BE EXAMINED.
COVER j2734I M DESIGN GROUP TO ENSURE THAT CONFIGURATION CR\,/ V, 1. UPSTREAM OF E1150F017A- PST EVENT 2903 DRAIN <(
- 2. UPSTREAM OF E1150D011A- PST EVENT 2903 CONTROL IS MAINTAINED.
u-'
->---- :t F070A
- 3. UPSTREAM OF E1150D013A- PST EVENT 2903
- 4. DO\JNSTREAM OF E1150F006A- PST EVENT 2903 THIS DRAWING WAS REFORMA'ITED BY Detroit Edison A 5. D 'w'NSTREAM OF E1150F006C- PST EVENT 2903 MICROSTATION AT REVISION "BH': ALL PREVIOUS APPROVAL SIGNATURES ARE INC.CODE Fermi 2 w TITLE
,, CR\J T
V, THERE ARE Tl.JD KEYL CK SVJTCHES FOR VAL VE El1F610A.
_J u
H, NE S\r/ITCH (IB212) JS LOCATED IN THE MAIN CONTROL ON FILE ON MICROf[LM IN DOCUMENT CONTROL DIAGRAM ROOM ON Hl1P60l. THE OTHER ([11MOOIA> rs LOCATED ON THE 1ST FLOOR OF THE REACTOR BUILD[NG IN BOX El!P404A, THE LOCAL S\r/lTCH PROVIDES A PERMISSIVE BQjDCD'S INCORPORATED, A PORTION OF THIS DRAWING PREPARED BY DATE RESIDUAL HEAT REMOVAL (R.H. R)
TSR 38268, REV. ¢ IS AF'F'ECTED BY THE FOLLOWING:
FUNCTION TO PEN THE VAL VE \,/HEN PLACED IN THE
'"OPERATE' POSITION. THE LOCAL S\./ITCH HAS ND DIVISION I A ANNUNCIATION. TC CHANGE DOCUMENT CHECl(ll=_p BY DATE OTHER REVISIONS:
APERTURE CARD TITLE A APPROVED BY DIAG RESIDUAL HEAT RMVL RHR OATE PLANT IOENTIFICATIOl-{ SYSTEM NUMBBR ARMS RECIPIENT #
PREP.A.RED BY - *1*DATE CHECKED Bl DATE E1100. E1102. E1150 DOCUMENT TYPE CODE NUC OPS FILE NO. DATE ISSUED TO IS A. DITTMAN 6/11/20 6~r0vif ?-f-a,2-0 OTHER APPROVALS DATE DDDMEC 1801 - ) - / C, -- ;;;,.0 C/,p~",°rJ.~eJ ,/ 7 4 ) ~ DATE EDP POSTING ENTRrES REQUIRI!: THE ADDITION OF THE ARMS STATUS CODE: DRAWING NUMBER REV.
rl/wJ~ EITHER ~ AFC" OR ~ ASB" 6M721-2084 BQ 8 7 6 5 4 3 2 1}}