Category:Drawing
MONTHYEARNRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) ML21055A3012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2512, Side Stream Lrwp System P&ID ML21055A3382021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-3045, Diagram Main Steam Isolation Valve Leakage Control System ML21055A3372021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-01, Rev. AC, One Line Diagram, 120VAC Inst. & Cont., Power Feeders Division 1 & 2 Reactor Building ML21055A3352021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4953, Radwaste Building Heating Ventilating and Air Conditioning Flow Diagram ML21055A3342021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-3, Technical Support Center Miscellaneous Diagrams of HVAC Systems ML21055A3332021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2050, P & Id Equipment Drains & Floor Drains Divisions I & II R.H.R Complex ML21055A3322021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5861, Process Diagram Core Spray System ML21055A3302021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-10, One Line Diagram 260/130V Ess Dual Battery 2PA Distribution - Division I ML21055A3292021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-11, One Line Diagram 260/130V. Ess. Dual Battery 2PB Distribution - Division II ML21055A3282021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4945, Piping & Instrumentation Diagram Fill Station Auxiliaries, Cooling Water Booster Pumps ML21055A3272021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-01, One Line Diagram Plant 4160V. & 480V. System Service ML21055A3262021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5875, High Pressure Coolant Injection System-Simplified Drawing Test Mode During Plant Operation ML21055A3252021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2402, Fire Protection Evaluation Reactor and Auxiliary Buildings Basement - Plan - El. 562'-0 ML21055A3242021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2833, Diagram Reactor Re Circulation System Nuclear Boiler System ML21055A3232021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5668, Core Spray - Accident Condition ML21055A3222021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5007, Diagram Primary Containment Pneumatic Supply System ML21055A3202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2711, Flow Diagram Air Conditioning & Ventilation Radwaste Control Room & Health Physics Lab ML21055A3192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4100, Diagram Torus Water Management System ML21055A3182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2510-01, Rev. BC, One Line Diagram 480V E.S.S. Bus 72B, 72C, 72E, & 72F ML21055A3172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5538, System Diagram Nuclear Boiler System Instrument Information Tables ML21055A3142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721N-2047, P&ID Diesel Generator System Division II R.H.R Complex ML21055A3132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-4127, Reactor Drywell Cooling System Flow Diagram (P&Id) ML21055A3122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2500-08, One Line Diagram 4160V Diesel Gen. Buses L1EA, 12EB, 13EC & 14ED Diesel Generator Building ML21055A3112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5871, Core Spray System Minimum Flow Bypass Mode Suction from Suppression Pool ML21055A3102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5M721-2756, Diagram - Steam Tunnel Cooling System Reactor Building ML21055A3092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721TS-2002-1, Technical Support Center Diagram of HVAC Systems ML21055A3082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6SD721-2530-12, One Line Diagram 260/130 BOP Battery 2PC Distribution ML21055A3052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4M721-5866, Low Pressure Coolant Injection System Test Mode During Plant Operation ML21055A3032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2110-03, Logic Diagram Control Rod Drive Hydraulic System Part 3 ML21055A2812021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2263, Evaporator Feed Diagram Radwaste System ML21055A2682021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6C721-2361, Reactor Building Framing Section 40-40 Upper Area ML21055A2692021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2089, System Diagram Nuclear Boiler System ML21055A2702021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2220-06, Rev. D, Logic Diagram High Pressure Coolant Injection System ML21055A2712021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2017-1A, Diagram Off Gas Process System and Vacuum System Sheet 1A Vacuum System and Recombiner Chains ML21055A2722021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2215, Chemical Waste System Diagram Radwaste System ML21055A2732021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-05, Rev. a, Logic Diagram Nuclear Boiler System ML21055A2742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2003, Diagram - Main Turbine Extraction Steam System ML21055A2752021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Figure 6C271-2539, Rev. Q, Steam Tunnel Upper Pipe Whip Restraint Structure Plan and Section ML21055A2762021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing M-2240-1, Rev. Aq, (Zone B/C-8) ML21055A2772021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2005, Diagram Feedwater Heater Drains, Emergency Drains and Heater Air System ML21055A2782021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 5I721-2440-06, Logic Diagram Emergency Equipment Cooling Water System Valves Div. I Auto Open ML21055A2792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2007-01, Arrangement of Equipment on Combination Operating Panel H11P603 ML21055A2802021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2271, Heating Flow Diagram for Turbine-Radwaste & Reactor Buildings ML21055A2942021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2008-1, Rev. Ak, Diagram - Turbine Building Closed Cooling Water System ML21055A3392021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-5743, Biocide Injection/Dehalogenation Systems Functional Operational Sketch and Diagram ML21055A3002021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2349, Reactor Building Framing Plan Elevation 684' - 6 North West Area ML21055A2982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-05, Logic Diagram Emergency Equipment Cooling Water System Valves - Auto Open Division II ML21055A2972021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A72IN-2044, Fire Protection Evaluation Residual Heat Removal Complex Section A-A and B-B 2023-10-12
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML22325A1242022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix a, Applicable Regulatory Guides ML22325A1252022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22325A1262022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22325A1272022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML22325A1292022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Main Page ML22325A1302022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22325A1312022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22325A1322022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML22325A1332022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22325A1342022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22325A1352022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22325A1362022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities ML22325A1382022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22325A1392022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML22325A1422022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML22325A1432022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22325A1442022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22325A1452022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22325A1462022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22325A1472022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures ML22325A1542022-11-17017 November 2022 4 to Updated Final Safety Analysis Report, Figures (for Public Use) NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 20222022-11-17017 November 2022 Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 ML21055A2202021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-04, Rev. E, Logic Diagram Reactor Core Isolation Cooling System ML21055A1742021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2796-01, Rev. F, Remote Shutdown System Division I System Diagram ML21055A2192021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6A721-2411, Fire Protection Evaluation Reactor and Auxiliary Buildings Section D-D ML21055A2182021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2431, Reactor Support Sections & Details ML21055A2172021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-4, Rev. D, Logic Diagram Residual Heat Removal System ML21055A2162021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2043, Diagram High Press Coolant Injection System Barometric Cndr (HPCI) Reac Building ML21055A2152021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2313, Reactor & Auxiliary Building Foundation Reinforcing Plan ML21055A2142021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2196-01, Area Radiation Monitor System Diagram Sht 1 of 2 ML21055A2132021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2090-6, Logic Diagram Nuclear Boiler System Document Control No. B21-00 ML21055A2122021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6A721TS-2002, Onsite Technical Support Center Grade Floor Plan ML21055A2112021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721Y-2003, Rev. G, Condensate Storage Tanks Retaining Barrier Details ML21055A2102021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2004-1, Diagram Condensate System ML21055A2092021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2140-01, Rev. B, Logic Diagram Neutron Monitoring System Part 1 ML21055A2082021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6C721-2441, Reactor Drywell Framing Plan El. 646-91516 Unit 2 ML21055A2072021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2200-09, Rev. B, Logic Diagram Residual Heat Removal System ML21055A2062021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-08, Logic Diagram Emergency Equipment Cooling Water System Valve - Auto Close Division II ML21055A2052021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2181-06, Rev. O, Diagram Process Radiation Monitoring Subsystems ML21055A2042021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 4I721-2440-07, Logic Diagram Emergency Equipment Cooling Water System Valve - Division II ML21055A2032021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2570-01, Functional Logic Diagram Operation of Power Line Feed & Tie Breakers 4160V Buss 64B & 11EA ML21055A2022021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6I721-2230-01, Logic Diagram Reactor Core Isolation Cooling System ML21055A2012021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2513, Side Stream Lrwp System P&ID ML21055A2002021-02-0202 February 2021 3 to Final Safety Analysis Report, Drawing No. 6A721-2406, Fire Protection Evaluation Reactor and Auxiliary Buildings Cable Spreading Area Plan El. 630'-6 ML21055A1992021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6I721-2400-03, Diagram of Samples in Turbine Bldg ML21055A1982021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2035, Diagram High Pressure Coolant Injection System (HPCI) Reactor Building ML21055A1792021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2010-1, Rev. a, Diagram General Service Water System ML21055A1852021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2551, Flow Diagram of Floor Drains in the Radwaste Building ML21055A1842021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing No. 6M721-2007, Diagram Circulating Water System ML21055A1832021-02-0202 February 2021 3 to Updated Final Safety Analysis Report, Drawing 6M721-2029, Rev. H, Process Diagram Information Tables Sheet 1 Radwaste System 2022-11-17
[Table view] |
Text
8 7 6 5 4 3 2 1 H --~-AUXILIARY 9UiLDING roAMPER SrUTOFF
/
r -
SUPPLY FANS
- ACH 50% CAPACITY 6> IT4100B0011
,I"l M-284/
4320 JI
.......,......f_
,-=T,---_4_-10,--,o=-=
...~c:c~cc24"'I_Q_
Q T4100C0011 ::,
c;S~
~ I FILl'ER~
T4100D001 z
f- I 111
"'/HEA"ING COIL~ l6)2l JIVISION I SGTS ROOM 580 DIVISION *I SC"CS ROOM SUPPLY FAN ROOM JAO
!T4100F025I T4100C0021 .,Y 1
Al~ INTAKE
,_.._..,.....:+/-:__ - - ' \ , -
f --* --* -*--
,v,--44.,, ,, u 1 *- -",
,_...,,. SHU10,F ~
96,060 p ~ r,:.,-c-::c:=~ -=c-:-:c:=-=:-==
a) 0 N :+/-: IT4'.QOF026I T4100C003I p ::::, 1~1T_4_10-=-=Fcco""2,,.,91 M-2707-1 u] '.;?1 72,760 f FACE & BYPAS DAMPERS ::::CS:
IT4100F021 I 12,460 5th FLOOR
-w MOlllcl.ATING INLET VANES \
C:XHAUST Fil.NS EACH 50% CA?ACiTY G 3' (Y
{ 17'110..oi:'oosJ I'41 o~coo41 I lx.+/-1g2fo.1zl i G
(/';
-'( J ,c' 7 STACK 6520 I I c-5/lJ - - - -
_ ... - - 7 I I 41 OOC005] ~ ---- . /Rf',,
NO-rES:
EXHAUST FAN 6520 1_ IT4100F006I 1 -- :+/-: T4100F013I 99 640 6J1 !
(1) REACTOR WELL :s EXHAUSTED ONLY DURING REFUELING WITH ROOM I q: ' f 'eY SHIELD PLUG REMOVED. THE SAME AIR QUA~TITY IS EXHAUSTED FROM ABOVE THE FLOOR BY OPENING TWO MANUAL DAMPERS WHEN REACTOR B_DG, VENT EXH. RADN, MONS.
01E IT41OOF146A:
t [T4100cOci71 L4 " o~coo 6J I 'f4ioo'l""ciLJ N REACTOR BLJG.
,'.. EXH. PLENLM
~ RAD'\I. MON'TOR THE PLL;G IS REPLACED.
(2) BATT:cRY ROOM 'ANS OPERATE ON,.Y WHEN NOf,MA~ AIR SUPPLY FROM A/C UNIT IS LNAVAII.ABI.C:.
( o 1 q:: N
. N4C8, 0 0
ro F*RE DAM?ER f S"IU'OFF DAMPERS 2 I
75,760 SEE NOT= 3 (3) 3000 CFM ADDED 'OR SECONDARY CONT.~INMENT INFILTRATION.
~
(() . RE (5) FO~ INSTRUMENT/\' ON & CONTROLS, SEE DWG.'S 1-2615-01 THROUGH 1-2615-07, I / D" 1 I 60
~
'N410, ~--**-*- _,,.._, __ ------. -*- ---*---~- -*--*-**-*-*. -*------
,, , .,,.,,, ___ _ *-*-**"""- ~-- . "-"~--**"--.,--,- *- .., --
4th FLOOR (5) FO'l LEGEND & SYMBOLS, SEE DWG. M--2001.
F' I
.*,I I
--~---
F' "CURBINE ----* -*------~- ***-**--*---*---
i 0 .,,,
N BUILDING I >
2 IT41OOF152'
,.400 DIV** 2 l!\!21 A CHARGER
- t
- -, 550 I ' 0 0
10 f 0 f-
-¥, rr@jT4 1 00F172iJ 0 0 0 -¥, tt**Ell [T4100F1671 N
<" z 0
(()
N
(() N
<D
' ~
0 800
> REF __ Rt. NCE DRAv\/1 NGS PASSAGEWAY ::, DIVISION 11 MOTOR CONTROL 400 TO TURBINE BUILDING 0
Oe0 et: n
~ ' SWITCH GEAR ROOM CENTE, AREA &
DIV-1 Cc!ARGER M.. 2251 VE\ITILATION-DUCTWCRK SUB-BASEMENT EL. 540' --0" REACTOR BUILDI\IG M--2252 1/E\ITILATION--DUCTWORK BASEMENT EL. 562' --0" REACTOR BUILDING M--2253 VC:NTII.ATION--DUCTWORK 1st FLOOR EL. 583' --6" REACTOR BUiLD*NG 3rd FLOOR
>- m 0
Ct'. 0 wo -*-
= ___
o' > 0 M-2254 VENTILATION-DUCTWORK 2nd FLOOR EL, 613' -6" REACTOR BUiLDING UNIT #2 M--2255 VENTILAT!Or-;-DUCTWORK 3rd FLOOR REAc~oR BUILJiNG UNIT #2 t::- 0 -q-r,:
j N L._ 0 a M--2256 VENTILATION--DUCTWOF,K 4th FLOOR EL. 659'-6" REACTOC: BUILDING UNII' #2 E
Oi "N!.
<( st-mr-0 g LD '
(0 IT41 OOF1 641 -
N N
0
(()
'°
'°'°
- s <
l,41OOF151: .
Ii-ill M--2257 VENTILATIOf.;--DUCTWCRK 5th f'LOOR EL. 584' --6" REACTOR BUil.DiNG UNIT #2 M-J. 126 "IEACTOR BUILDING VENTILATION EXHAUST FANS LAYOUT - AUXIUARY BUILDI\IG UNIT #2 E jl ! -I\ \\I ,_
1550 J IA-4316 REACTOR BUILDING VE\ITILATION SUPPLY FANS '.AYOUT AUXILIARY BUILDING
- -21 S1 --01 -06 PROCESS C::ADIATION MONITORING SYSTEM Dlt,GRAM 0 0
---~---** f
~
N 0
"' IT4100F166I o 1f4100F'i-i3s] .__ I >
m 0 -
N
~ ~ 1***4100F168 l 0, o: 0 0
~~
0 0)
-'fl ~ -
-¥, \-\-@] w 'n-~
N g0 (()' 0 co a
(()
0 "c\
'e's@
IT4100F149I DIVSION II BA-,, ERY ROOM 0
WEST l,PS MCCOR
' EAST RPS MOTOR GENERATOR
~
GENERATC"<
DIVISION I BATTERY ROCM r1 0 st SET ROOM SET ROOM
.. 0 , END OF DUCT7 AR F~OW, CFM st -
0
- l: IT41 OOC0071 -(_r 'I
> ,> 300
" .-+0--1\r-*
0
> T4100C009 , V UNOUCTEJ)
DUCTED I
-nl*rr~ IT4100F150I 3rd FL_OOR
~ L( 7---'\,--- T41OOF153 IT4100F169I -¥, \\-@]
D :ti T41 OOC0.08 ]T4100001 ol D i . V I\ ~
3rd TO 4:h Fl..OOR DUCT CHASE
-;:, _.,/ ' .,
[T41OOF17.Q] El ESSENTIAL I STAIRWELL A7 H-10 V
3ATTERY ROOM FANS. '
EACH 1 00% CAPACITY SEE NOTE 2 800
'V 5440 0 0 ¥
,...0 0
RI IT4100F147I "" ~tTT" "' I , 41OOF155 I U) "c\trrl'@
0 TURBINE EiLDG.
0 PE,,SONNEL 2nd FLOOR Cl PASSAGEWAY 0
n CHANCE ROOM CABLE TRAY "' TO TURBINE ___J\~-----1 2nd Fl~OOR AREA ~ I, 440 ELDG. 2nd FLOOR V C IT41OOF1481 162}-ntlcc C I oi
~----~~i V I.
0
~1 2rd :--_OOR SC IT4100F154j r-lEZZANINE CABL~
'RA.Y AREA ' 2440
~----------....1...-~-
0
~t ~
a)
C0 I 0
[6M721- 2707 7
U'] LATF.ST REVISION p
380 WELJING DIVISION V EQUIPMENT SWITCHGEA~
AREA ROOM
~ d ~*-'~
L'.n =; OOR B B 0 NUCLEAR SAFETY RELATED 0 n C0 N
LS"' THIS DRAWING CABLE AREA THIS IS A MICROSTATION PRODUCED DRAWING.
NORTH OF RBCCW R00.\1 SOUTH RBCCW H-X OE 1st FLOOR
- MEZZANINE CABLE IN CONJUNCTION WITf-1 CHANGES OR REVISIONS MUST BE BROUGHT H-X R00\1 ROOM TRAY AREA ~~-2707-1 TO THE ATTENTION OF THE PLANT ENGINEERING DESIGN GROUP TO ENSURE THAT CONFIGURATION
0 c-.
0 0)
N THIS DRAWING WAS REFORMATTED BY MICROSTATION AT REVISION "M". ALL 1NC.CODE CONTROL IS MAINTAINED.
Detroit Edison Fermi 2
~* ! -- 1st FLOOR PREVIOUS APPROVAL SIDNATURES ARE ON FILE ON MlCROFD..M IN DOCUMENT T
TITLE FLO~¥ DIAGRAM CONTROL.
p IDCD'S INCORPORATED, A PORTION OF THIS DRAWlNG PREPARED :SY DATE j REACTOR & AUXILIARY BUILDING IS AFFECTED BY THE FOLlOWTNG:
BASE~,ENT VENTILATION SYSTEM 2430 CABLE AREA 2L3Q TC i CHANGE DOCUYENT I___ - - __cm;:c::rg:~ _Ef( - _j__ OAJE ll OTHER REVISIONS:
i APERTURE CARD TITLE ---------1 lJ,,
AtDED & REVISED D\IG, C NTINUATICN REFERENCES .FLOW DIAG REAC AUX BLDG VENTIL BASErvlENT AT ZONES G-7 & H-5, PER '.>1ES09 S':"EP 3,1.2.4.
REF, LCR 13-oas-uF*s, ,Ev ¢ APPROVED :sY " PLANTIDi:NTIFlCATION SYSTEM Nl.."MBER T4100
] "',,_,,"'"~R"E*c-,P~,=E-N"CT"'#
PREPARED BY DATE ~ DATE DOCUMENT TYPE CODE I NUC OPS FILE NO. DATE IBSU!D TO IS c, BLAIR 911311: H';;d;:".(~,es q/to/ (3 oTHER APPRov= ""TE DD DMEC I 1so1 "'i I :)..7 1]
APPROVED BY
/J, / n?~
Jolf,(,} /.-(c,,,ftF3 Hit.
7[:,,-,
- J.TF.J' J'fJ3/4/(t.,f!/i/'#1- 9/1.!fJP/3
,Jg[n:b~b~~~~ :~~EC~:
EITHER "AFC" OR 'ASS" I DRAWJNG NUMBER 6 M?
l 21 - 2 7 Q r--J( REV.
p
(__y" 8 7 6 b 4 3 2 1