ML20366A182

From kanterella
Jump to navigation Jump to search
Federal Register Notice - December COVID-19 Group Exemption
ML20366A182
Person / Time
Issue date: 01/13/2021
From: James Danna
NRC/NRR/DORL/LPL1
To:
Ronewicz, Lynn, 301-415-1927
References
86 FR 5269-5280; 1/19/2021, NRC-2020-0110 86 FR 5269-5280; 1/19/2021, NRC-2020-0110
Download: ML20366A182 (33)


Text

[7590-01-P]

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-334, 50-412, 50-456, 50-457, 50-259, 50-260, 50-296, 50-325, 50-324, 50-454, 50-455, 50-317, 50-318, 50-413, 50-414, 50-461, 50-397, 50-445, 50-446, 50-298, 50-346, 50-275, 50-323, 50-315, 50-316, 50-237, 50-249, 50-321, 50-366, 50-341, 50-354, 50-272, 50-311,50-003, 50-247, 50-286, 50-333, 50-348, 50-364, 50-261, 50-373, 50-374, 50-352, 50-353, 50-369, 50-370, 50-245, 50-336, 50-423, 50-263, 50-220, 50-410, 50-338, 50-339, 50-269, 50-270, 50-287, 50-243, 50-255, 50-528, 50-529, 50-530, 50-277, 50-278, 50-440, 50-266, 50-301, 50-282, 50-306, 50-254, 50-265, 50-244, 50-458, 50-335, 50-389, 50-443, 50-400, 50-498, 50-499, 50-280, 50-281, 50-387, 50-388, 50-395, 50-424, 50-425, 50-382, 50-390, 50-391; NRC-2020-0110]

Issuance of Multiple Exemptions in Response to COVID-19 Public Health Emergency AGENCY: Nuclear Regulatory Commission.

ACTION: Exemptions; issuance.

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) issued 68 exemptions in response to requests from 26 licensees. The exemptions afford these licensees temporary or permanent relief from certain requirements under NRC regulations. The exemptions are in response to the licensees requests for relief due to the coronavirus disease 2019 (COVID-19) public health emergency (PHE). The NRC is issuing a single notice to announce the issuance of the exemptions.

DATES: During the period from December 1, 2020, to December 28, 2020, the NRC granted 68 exemptions in response to requests submitted by licensees from September 30, 2020, to December 23, 2020.

ADDRESSES: Please refer to Docket ID NRC-2020-0110 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods:

  • Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2020-0110. Address questions about NRC Docket IDs in Regulations.gov to Jennifer Borges; telephone: 301-287-9127; e-mail:

Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.

  • NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov.
  • Attention: The PDR, where you may examine and order copies of public documents, is currently closed. You may submit your request to the PDR via e-mail at pdr.resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8:00 a.m. and 4:00 p.m. (EST), Monday through Friday, except Federal holidays.

For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the Availability of Documents section.

FOR FURTHER INFORMATION CONTACT: James Danna, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-7422, e-mail: James.Danna@nrc.gov.

2

SUPPLEMENTARY INFORMATION:

I. Introduction During the period from December 1, 2020, to December 28, 2020, the NRC granted 68 exemptions in response to requests submitted by licensees from September 30, 2020, to December 23, 2020. These exemptions allow the licensees to deviate from certain requirements (as cited in this notice) of various parts of chapter I of title 10 of the Code of Federal Regulations (10 CFR).

The exemptions from certain requirements of 10 CFR part 26, Fitness for Duty Programs, for Exelon Generation Company, LLC (for Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Clinton Power Station, Unit No. 1; LaSalle County Station, Units 1 and 2; and Quad Cities Nuclear Power Station, Units 1 and 2); for Vistra Operations Company LLC (for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2); for Arizona Public Service Company (for Palo Verde Nuclear Generating Station, Units 1, 2, and 3); for PSEG Nuclear LLC (for Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2); and for Indiana Michigan Power Company (for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2), afford these licensees temporary relief from the work-hour controls under 10 CFR 26.205(d)(1) through (d)(7).

The exemptions from 10 CFR 26.205(d)(1) through (d)(7) ensure that the control of work hours and management of worker fatigue do not unduly limit licensee flexibility in using personnel resources to most effectively manage the impacts of the COVID-19 PHE on maintaining the safe operation of these facilities. Specifically, these licensees have stated that their staffing levels are affected or are expected to be affected by the COVID-19 PHE, and they can no longer meet or likely will not meet the work-hour controls of 10 CFR 26.205(d)(1) through (d)(7). These licensees have committed to 3

effecting site-specific administrative controls for COVID-19 PHE fatigue management for personnel specified in 10 CFR 26.4(a).

The exemptions from certain requirements of 10 CFR part 50, appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities, section IV.F., Training, for Energy Northwest (for Columbia Generating Station); for DTE Electric Company (for Fermi-2); for PSEG Nuclear LLC (for Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2); for Entergy Nuclear Operations, Inc. (for Indian Point Nuclear Generating Station, Unit Nos. 1, 2, and 3; and Palisades Nuclear Plant); for Virginia Electric and Power Company (for North Anna Power Station, Unit Nos. 1 and 2); for Exelon Generation Company, LLC (for LaSalle County Station, Units 1 and 2); for Oregon State University (for the Oregon State TRIGA Reactor); for Entergy Operations, Inc. (for River Bend Station, Unit 1); for NextEra Energy Seabrook, LLC (for Seabrook Station, Unit No. 1), grant temporary exemptions from the biennial emergency preparedness exercise requirement. The exemptions allow a temporary exemption from the requirements of 10 CFR part 50, appendix E, regarding the conduct of the biennial emergency preparedness exercise. These exemptions will not adversely affect the emergency response capability of the facilities because affected licensee personnel are currently qualified, and the licensees proposed compensatory measures will enable their staff to maintain their knowledge, skills, and abilities without the conduct of the biennial emergency preparedness exercise during the exemption term.

The exemptions from certain requirements of 10 CFR part 73, appendix B, General Criteria for Security Personnel, section VI, Nuclear Power Reactor Training and Qualification Plan for Personnel Performing Security Program Duties, for Energy Harbor Nuclear Corp. (for Beaver Valley Power Station, Units 1 and 2; Davis-Besse 4

Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1); for Exelon Generation Company, LLC (for Braidwood Station, Units 1 and 2; Byron Station, Unit Nos. 1 and 2; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Clinton Power Station, Unit No. 1; Dresden Nuclear Power Station, Units 2 and 3; James A. FitzPatrick Nuclear Power Plant; LaSalle County Station, Units 1 and 2; Limerick Generating Station, Units 1 and 2; Nine Mile Point Nuclear Station, Units 1 and 2; Peach Bottom Atomic Power Station, Units 2 and 3; Quad Cities Nuclear Power Station, Units 1 and 2; and R. E. Ginna Nuclear Power Plant); for Tennessee Valley Authority (for Browns Ferry Nuclear Plant, Units 1, 2, and 3; and Watts Bar Nuclear Plant, Units 1 and 2); for Duke Energy Progress, LLC (for Brunswick Steam Electric Plant, Units 1 and 2; Shearon Harris Nuclear Power Plant, Unit 1; and H. B. Robinson Steam Electric Plant, Unit No. 2); for Nebraska Public Power District (for Cooper Nuclear Station); for Duke Energy Carolinas, LLC (for Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Unit Nos. 1 and 2; and Oconee Nuclear Station, Units 1, 2, and 3); for Energy Northwest (for Columbia Generating Station); for Vistra Operations Company LLC (for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2); for Pacific Gas and Electric Company (for Diablo Canyon Nuclear Power Plant, Units 1 and 2); for Indiana Michigan Power Company (for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2); for Southern Nuclear Operating Co., Inc. (for Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2; Joseph M.

Farley Nuclear Plant, Units 1 and 2; and Vogtle Electric Generating Plant, Units 1 and 2);

for DTE Electric Company (for Fermi-2); for Entergy Nuclear Operations, Inc. (for Indian Point Nuclear Generating Unit Nos. 2 and 3; and Palisades Nuclear Plant); for Dominion Energy Nuclear Connecticut, Inc. (for Millstone Power Station, Unit Nos. 1, 2, and 3); for Northern States Power Company (for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2); for Virginia Electric and Power 5

Company (for North Anna Power Station, Unit Nos. 1 and 2; and Surry Power Station, Unit Nos. 1 and 2); for NextEra Energy Point Beach, LLC (for Point Beach Nuclear Plant, Units 1 and 2); for Florida Power & Light Company (for St. Lucie Plant, Unit Nos. 1 and 2); for NextEra Energy Seabrook, LLC (for Seabrook Station, Unit No. 1); STP Nuclear Operating Company (for South Texas Project, Units 1 and 2); for Susquehanna Nuclear LLC (for Susquehanna Steam Electric Station, Units 1 and 2), for Dominion Energy South Carolina, Inc. (for Virgil C. Summer Nuclear Station, Unit No. 1); and Entergy Operations, Inc. (for Waterford Steam Electric Station, Unit 3), will help to ensure that these regulatory requirements do not unduly limit licensee flexibility in using personnel resources in a manner that most effectively manages the impacts of the COVID-19 PHE on maintaining the safe and secure operation of these facilities and the implementation of the licensees NRC approved security plans, protective strategy, and implementing procedures. These licensees have committed to certain security measures to ensure response readiness and for their security personnel to maintain performance capability.

The NRC is providing compiled tables of exemptions using a single Federal Register notice for COVID-19 related exemptions instead of issuing individual Federal Register notices for each exemption. The compiled tables in this notice provide transparency regarding the number and type of exemptions the NRC has issued.

Additionally, the NRC publishes tables of approved regulatory actions related to the COVID-19 PHE on its public Web site at https://www.nrc.gov/about-nrc/covid-19/reactors/licensing-actions.html.

II. Availability of Documents The tables in this notice provide the facility name, docket number, document description, and ADAMS accession number for each exemption issued. Additional details on each exemption issued, including the exemption request submitted by the 6

respective licensee and the NRCs decision, are provided in each exemption approval listed in the tables in this notice. For additional directions on accessing information in ADAMS, see the ADDRESSES section of this document.

Beaver Valley Power Station, Units 1 and 2 Docket Nos. 50-334 and 50-412 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Beaver Valley Power Station, Units 1 and 2 -

Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection ML20303A213 C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated October 28, 2020 Beaver Valley Power Station, Units 1 and 2 -

Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20324A089 General Criteria for Security Personnel, subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0171

[COVID-19]), dated December 15, 2020 Braidwood Station, Units 1 and 2 Docket Nos. 50-456 and 50-457 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding 2020 Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 Braidwood Station, Units 1 and 2 - Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, General Criteria for ML20322A338 Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0198) [COVID-19], dated December 10, 2020 Braidwood Station, Units 1 and 2 Docket Nos. 50-456 and 50-457 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Braidwood Station, Units 1 and 2 - COVID-19 ML20323A008 Related Request for Exemption from 7

10 CFR part 26 Work Hours Requirements, dated November 17, 2020 Braidwood Station, Units 1 and 2 - Response to Request for Additional Information Related to ML20328A215 Exemption from 10 CFR part 26 Requirements, dated November 23, 2020 Braidwood Station, Units 1 and 2 - Exemption from Select Requirements of 10 CFR part 26 (EPID L-ML20324A002 2020-LLE-0207 [COVID-19]), dated December 1, 2020 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Docket Nos. 50-259, 50-260, and 50-296 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Browns Ferry Nuclear Power Plant, Units 1, 2, and 3 - Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection ML20343A214 C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 8, 2020 Browns Ferry Nuclear Plant, Units 1, 2, and 3 -

Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20343A363 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0233

[COVID-19]), dated December 15, 2020 Brunswick Steam Electric Plant, Units 1 and 2 Docket Nos. 50-325 and 50-324 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Duke Energy - Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, non-public, withheld pursuant to subsection C.3.(I)(1) Regarding Annual Force-on-10 CFR 2.390 Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 Duke Energy - Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Pandemic, dated November 19, 2020 Brunswick Steam Electric Plant, Units 1 and 2 ML20338A329 Exemption from Annual Force-On-Force Exercise 8

Requirements of 10 CFR part 73, appendix B, General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0180

[COVID-19]), dated December 17, 2020 Byron Station, Unit Nos. 1 and 2 Docket Nos. 50-454 and 50-455 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding 2020 Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 Byron Station, Unit Nos. 1 and 2 - Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, General Criteria for ML20323A393 Security Personnel, subsection VI.C.3(l)(1) (EPID L-2020-LLE-0199) [COVID-19], dated December 10, 2020 Byron Station, Unit Nos. 1 and 2 Docket Nos. 50-454 and 50-455 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Byron Station, Unit Nos. 1 and 2 - Subsequent Request for Exemption from 10 CFR part 26 Work ML20329A533 Hours Requirements, dated November 24, 2020 Byron Station, Unit Nos. 1 and 2 - Response to Request for Additional Information Related to ML20336A341 Subsequent Exemption from 10 CFR part 26 Requirements, dated December 1, 2020 Byron Station, Unit Nos. 1 and 2 - Exemption from Select Requirements of 10 CFR part 26 (EPID L-ML20332A017 2020-LLE-0218 [COVID-19]), dated December 2, 2020 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Docket Nos. 50-317 and 50-318 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection ML20318A288 C.3.(I)(1) Regarding 2020 Annual Force-on-Force 9

Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 -

Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20321A243 General Criteria for Security Personnel, subsection VI.C.3(l)(1) (EPID L-2020-LLE-0194

[COVID-19]), dated December 11, 2020 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Duke Energy - Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, non-public, withheld pursuant to subsection C.3.(I)(1), Regarding Annual Force-on-10 CFR 2.390 Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 Duke Energy - Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Pandemic, dated November 19, 2020 Catawba Nuclear Station, Units 1 and 2 - Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, ML20337A128 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0180

[COVID-19]), dated December 17, 2020 Clinton Power Station, Unit No. 1 Docket No. 50-461 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding 2020 Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 Clinton Power Station, Unit No. 1 - Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, General Criteria for ML20323A434 Security Personnel, subsection VI.C.3(l)(1) (EPID L-2020-LLE-0200 [COVID-19]), dated December 11, 2020 10

Clinton Power Station, Unit No. 1 Docket No. 50-461 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Clinton Power Station, Unit No. 1. - COVID-19 Related Request for Exemption from ML20339A318 10 CFR part 26 Work Hours Requirements, dated December 3, 2020 Clinton Power Station, Unit No. 1 - Exemption from Select Requirements of 10 CFR part 26 (EPID L-ML20339A538 2020-LLE-0232 [COVID-19]), dated December 16, 2020 Columbia Generating Station Docket No. 50-397 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Columbia Generating Station - Exemption Request from 10 CFR part 50, appendix E due to COVID-19 ML20303A348 Pandemic, dated October 29, 2020 Columbia Generating Station - Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of ML20336A183 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0173 [COVID-19]),

dated December 17, 2020 Columbia Generating Station Docket No. 50-397 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Columbia Generating Station - Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) regarding Annual ML20303A286 Force-On-Force Exercises due to COVID-19 Pandemic, dated October 29, 2020 Columbia Generating Station - Response to Request for Additional Information Related to Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection ML20338A541 C.3.(I)(1) Regarding Annual Force-On-Force Exercises due to COVID-19, dated December 3, 2020 11

Columbia Generating Station - Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, General Criteria for ML20342A211 Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0172 [COVID-19]), dated December 17, 2020 Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 Docket Nos. 50-445 and 50-446 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection ML20345A341 C.3.(I)(l) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 10, 2020 Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR part 73, ML20350B666 appendix B, General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0235 [COVID-19]), dated December 22, 2020 Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 Docket Nos. 50-445 and 50-446 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Request for Exemption from Specific ML20346A565 Requirements of 10 CFR part 26, Fitness for Duty Programs, dated December 11, 2020 Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Supplement to Request for Exemption from ML20350B830 Specific Requirements of 10 CFR part 26, Fitness for Duty Programs, dated December 15, 2020 Comanche Peak, Unit Nos. 1 and 2 - Exemption from Selection from Requirements of ML20349A038 10 CFR part 26 (EPID L-2020-LLE-0236 [COVID-19]), dated December 16, 2020 Cooper Nuclear Station Docket No. 50-298 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

12

Cooper Nuclear Station - Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) Regarding Annual ML20309A663 Force-on-Force Exercises due to COVID-19 Pandemic, dated October 27, 2020 Cooper Nuclear Station - Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, General Criteria for ML20323A237 Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0178 [COVID-19]), dated December 11, 2020 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Davis-Besse Nuclear Power Station, Unit No. 1 -

Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection ML20304A046 C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated October 29, 2020 Davis-Besse Nuclear Power Station, Unit No. 1 -

Response to Request for Additional Information Regarding Request for Exemption - 10 CFR part 73 ML20342A199 Force-on-Force Exercises (EPID L-2020-LLE-0175),

dated December 7, 2020 Davis-Besse Nuclear Power Station, Unit No. 1 -

Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20345A205 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0175

[COVID-19]), dated December 15, 2020 Diablo Canyon Nuclear Power Plant, Units 1 and 2 Docket Nos. 50-275 and 50-323 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Diablo Canyon Nuclear Power Plant, Units 1 and 2 -

Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Pandemic, dated October 14, 2020 Diablo Canyon Nuclear Power Plant, Units 1 and 2 - non-public, withheld pursuant to Response to Request for Additional Information 10 CFR 2.390 13

Regarding Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 3, 2020 Diablo Canyon Nuclear Power Plant, Units 1 and 2 -

Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20346A024 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0166

[COVID-19]), dated December 17, 2020 Diablo Canyon Nuclear Power Plant, Units 1 and 2 Docket Nos. 50-275 and 50-323 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Diablo Canyon Power Plant, Units 1 and 2 -

Request for a One-Time Exemption from non-public, withheld pursuant to 10 CFR part 73, appendix B, section VI, subsection 10 CFR 2.390 F.5.(a) Regarding Firearms Requalification due to COVID-19 Pandemic, dated October 14, 2020 Diablo Canyon Nuclear Power Plant, Units 1 and 2 -

Response to Request for Additional Information Regarding Request for a One-Time Exemption from non-public, withheld pursuant to 10 CFR part 73, appendix B, section VI, subsection 10 CFR 2.390 F.5.(a) Regarding Firearms Requalification due to COVID-19 Pandemic, dated December 3, 2020 Diablo Canyon Nuclear Power Plant, Units 1 and 2 -

Exemption from Annual Firearms Tactical Qualification Course Requirement of 10 CFR part 73, appendix B, General Criteria for ML20346A120 Security Personnel, subsection VI.F.5.(a) (EPID L-2020-LLE-0167 [COVID-19]), dated December 18, 2020 Donald C. Cook Nuclear Plant, Units Nos. 1 and 2 Docket Nos. 50-315 and 50-316 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 -

Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection ML20318A034 C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 14

Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 -

Exemption from Certain Requirements of 10 CFR part 73, appendix B, General Criteria for ML20324A003 Security Personnel, section VI (EPID L-2020-LLE-0182 [COVID-19]), dated December 8, 2020 Donald C. Cook Nuclear Plant, Units Nos. 1 and 2 Docket Nos. 50-315 and 50-316 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 -

Request for a One-Time Exemption from ML20338A324 10 CFR 26.205(d) due to COVID-19 Pandemic, dated November 30, 2020 Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 -

Exemption from Select Requirements of ML20336A111 10 CFR part 26 (EPID L-2020-LLE-0221 [COVID-19]), dated December 3, 2020 Dresden Nuclear Power Station, Units 2 and 3 Docket Nos. 50-237 and 50-249 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding 2020 Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 Dresden Nuclear Power Station, Units 2 and 3 -

Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, ML20322A303 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0203

[COVID-19]), dated December 14, 2020 Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 Docket Nos. 50-321 and 50-366 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force ML20311A662 Exercises due to COVID-19 Pandemic, dated November 6, 2020 15

Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 -

Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20329A488 General Criteria for Security Personnel, subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0215

[COVID-19]), dated December 4, 2020 Fermi-2 Docket No. 50-341 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Fermi Request for One-Time Exemption from 10 CFR part 50, appendix E, Biennial Emergency ML20317A203 Preparedness Exercise Requirements, due to COVID-19 Pandemic, dated November 12, 2020 Fermi Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, appendix E, ML20332A179 sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0188 [COVID-19]), dated December 8, 2020 Fermi-2 Docket No. 50-341 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Fermi Request for Exemption from the Annual Force-on-Force Training Requirements of 10 CFR part 73, appendix B, section VI due to the ML20318A383 COVID-19 Public Health Emergency, dated November 13, 2020 Fermi Response to Request for Additional Information Regarding Exemption from the Annual Force-on-Force Training Requirements of ML20338A333 10 CFR part 73, appendix B, section VI due to the COVID-19 Public Health Emergency, dated December 3, 2020 Fermi Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, General Criteria for Security ML20343A350 Personnel, subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0204 [COVID-19]), dated December 18, 2020 16

Hope Creek Generating Station Docket No. 50-354 Salem Nuclear Generating Station, Unit Nos. 1 and 2 Docket Nos. 50-272 and 50-311 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Hope Creek Generating Station and Salem Generating Station, Units Nos. 1 and 2 - Exemption Request from 10 CFR part 50, appendix E, Biennial ML20287A628 Emergency Preparedness Exercise Requirements, due to COVID-19 Pandemic, dated October 13, 2020 Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Temporary Exemption from the Exercise Requirements of ML20315A434 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0164 [COVID-19]),

dated December 7, 2020 Hope Creek Generating Station Docket No. 50-354 Salem Nuclear Generating Station, Unit Nos. 1 and 2 Docket Nos. 50-272 and 50-311 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Hope Creek Generating Station and Salem Generating Station, Unit Nos. 1 and 2 - Request for Exemption from Specific Requirements of ML20358A186 10 CFR part 26, Fitness for Duty Programs, dated December 23, 2020 Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Exemption from Select Requirements of 10 CFR part 26 (EPID ML20358A281 L-2020-LLE-0239 [COVID-19]), dated December 28, 2020 Indian Point Nuclear Generating Station, Unit Nos. 1, 2, and 3 Docket Nos.50-003, 50-247, and 50-286 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Indian Point Nuclear Generating Station, Unit Nos.

1, 2, and 3 - One-time Scheduler Exemption ML20282A612 Request from 10 CFR part 50, appendix E, Biennial 17

Emergency Preparedness Exercise Requirements, due to COVID-19 Public Health Emergency, dated October 8, 2020 Indian Point Nuclear Generating Station, Unit Nos.

1, 2, and 3 - Supplement to One-Time Exemption Request from 10 CFR part 50, appendix E, Biennial ML20317A344 Emergency Preparedness Exercise Requirements (EPID L-2020-LLE-0160 [COVID-19]), dated November 12, 2020 Indian Point Nuclear Generating Station, Unit Nos.

1, 2, and 3 - Temporary Exemption from Exercise Frequency Requirements of 10 CFR part 50, ML20320A000 appendix E, section IV.F.2.B (EPID L-2020-LLE-0160 [COVID-19]), dated December 8, 2020 Indian Point Nuclear Generating Unit Nos. 2 and 3 Docket Nos. 50-247 and 50-286 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Indian Point Nuclear Generating Unit Nos. and 3 -

Request for a One-Time Exemption from 10 CFR 73, appendix B, section VI, subsection ML20317A299 C.3.(I)(1) Regarding Annual Force-on-Force (FOF)

Exercises, Due to COVID 19 Pandemic, dated November 12, 2020 Indian Point Nuclear Generating Unit Nos. 2 and 3 -

Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20321A121 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0189

[COVID-19]), dated December 14, 2020 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force ML20318A288 Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 James A. Fitzpatrick Nuclear Power Plant -

Exemption from Annual Force-On-Force Exercise ML20337A004 Requirements of 10 CFR part 73, appendix B, General Criteria for Security Personnel, 18

subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0197

[COVID 19]), dated December 8, 2020 Joseph M. Farley Nuclear Plant, Units 1 and 2 Docket Nos. 50-348 and 50-364 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force ML20311A662 Exercises due to COVID-19 Pandemic, dated November 6, 2020 Joseph M. Farley Nuclear Plant, Units 1 and 2 -

Exemption from Certain Requirements of 10 CFR part 73, appendix B, General Criteria for ML20315A374 Security Personnel, subsection VI C.3.(I)(1) (EPID L-2020-LLE-0183 [COVID-19]), dated December 4, 2020 H. B. Robinson Steam Electric Plant, Unit No. 2 Docket No. 50-261 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Duke Energy - Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, non-public, withheld pursuant to subsection C.3.(I)(1) Regarding Annual Force-on-10 CFR 2.390 Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 Duke Energy - Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Pandemic, dated November 19, 2020 H. B. Robinson Steam Electric Plant, Unit No. 2 -

Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, ML20339A521 General Criteria for Security Personnel, subsection VI.C.3.(I)(1), dated December 17, 2020 LaSalle County Station, Units 1 and 2 Docket Nos. 50-373 and 50-374 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

19

LaSalle County Station, Units 1 and 2 - Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in ML20328A292 10 CFR part 50, appendix E, section IV.F.2.b, dated November 23, 2020 LaSalle County Station, Units 1 and 2 -

Supplemental Information Regarding Request for Exemption from the Biennial Emergency ML20342A259 Preparedness Exercise Requirements of 10 CFR part 50, appendix E, section IV.F.2.b, dated December 7, 2020 LaSalle County Station, Units 1 and 2 - Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of ML20346A014 10 CFR part 50, appendix E, section IV.F.2.b (EPID-L-2020-LLE-0223 [COVID-19]), dated December 18, 2020 LaSalle County Station, Units 1 and 2 Docket Nos. 50-373 and 50-374 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding 2020 Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 LaSalle County Station, Units 1 and 2 - Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, ML20324A104 General Criteria for Security Personnel, subsection VI.C.3(l)(1) (EPID L-2020-LLE-0191

[COVID-19]), dated December 9, 2020 LaSalle County Station, Units 1 and 2 Docket Nos. 50-373 and 50-374 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

LaSalle County Station, Units 1 and 2- COVID-19 Related Request for Exemption from ML20329A301 10 CFR part 26 Work Hours Requirements, dated November 24, 2020 LaSalle County Station, Units 1 and 2 - Exemption from Select Requirements of 10 CFR part 26 (EPID ML20330A326 L-2020-LLE-0217 [COVID-19]), dated December 1, 2020 20

Limerick Generating Station, Units 1 and 2 Docket Nos. 50-352 and 50-353 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Limerick Generating Station, Units 1 and 2 - Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection ML20318A288 C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 Limerick Generating Station, Units 1 and 2 -

Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20330A295 General Criteria for Security Personnel, subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0201

[COVID-19]), dated December 10, 2020 McGuire Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50-369 and 50-370 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Duke Energy - Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, non-public, withheld pursuant to subsection C.3.(I)(1) Regarding Annual Force-on-10 CFR 2.390 Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 Duke Energy - Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Pandemic, dated November 19, 2020 McGuire Nuclear Station, Unit Nos. 1 and 2 -

Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, ML20330A321 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0180)

[COVID-19], dated December 9, 2020 Millstone Power Station, Unit Nos. 1, 2, and 3 Docket Nos. 50-245, 50-336, and 50-423 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

21

Millstone Power Station, Unit Nos. 1, 2, and 3 -

Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(1)(1) Regarding Annual Force-On-Force 10 CFR 2.390 Exercises due to COVID-19 Pandemic, dated December 3, 2020 Millstone Power Station, Unit Nos. 1, 2, and 3 -

Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20338A552 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0227

[COVID-19]), dated December 16, 2020 Monticello Nuclear Generating Plant Docket No. 50-263 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Monticello and Prairie Island - Request for a One-Time Exemption from 10 CFR part 73, appendix B, non-public, withheld pursuant to section VI, subsection C.3(l)(1) Regarding Annual 10 CFR 2.390 Force-on-Force Exercises due to COVID-19 Pandemic, dated October 30, 2020 Response to Request for Additional Information Regarding Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3(l)(1) Regarding Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Pandemic, dated December 14, 2020 Monticello Nuclear Generating Plant - Exemption from Certain Requirements of 10 CFR part 73, appendix B, General Criteria for Security ML20317A136 Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0174 [COVID-19]), dated December 22, 2020 Nine Mile Point Nuclear Station, Units 1 and 2 Docket Nos. 50-220 and 50-410 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force ML20318A288 Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 Nine Mile Point Nuclear Station, Units 1 and 2 -

Exemption from Annual Force-on-Force Exercise ML20321A290 Requirement of 10 CFR part 73, appendix B, 22

General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0195

[COVID-19]), dated December 14, 2020 North Anna Power Station, Unit Nos. 1 and 2 Docket Nos. 50-338 and 50-339 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

North Anna Power Station, Unit Nos. 1 and 2 -

Request for One-Time Schedular Exemption from Offsite Biennial Emergency Preparedness Exercise ML20317A162 Requirement in 10 CFR part 50, appendix E, section IV.F.2.c, dated November 10, 2020 North Anna Power Station, Unit Nos. 1 and 2 -

Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of ML20324A222 10 CFR part 50, appendix E, section IV.F.2.C (EPID L-2020-LLE-0184 [COVID-19]), dated December 8, 2020 North Anna Power Station, Unit Nos. 1 and 2 Docket Nos. 50-338 and 50-339 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

North Anna Power Station, Unit Nos. 1 and 2 -

Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding Annual Force-On-Force 10 CFR 2.390 Exercises due to COVID-19 Pandemic, dated December 3, 2020 North Anna Power Station, Units Nos. 1 and 2 -

Exemption from Annual Force-On Force Exercise Requirement of 10 CFR part 73, appendix B, ML20342A293 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0231

[COVID-19]), dated December 15, 2020 Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, and 50-287 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Duke Energy - Request for One-Time Exemption non-public, withheld pursuant to from 10 CFR part 73, appendix B, section VI, 10 CFR 2.390 subsection C.3.(I)(1) Regarding Annual Force-on-23

Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 Duke Energy - Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Pandemic, dated November 19, 2020 Oconee Nuclear Station, Units 1, 2, and 3 -

Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, ML20344A004 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0180

[COVID-19]), dated December 17, 2020 Oregon State University Docket No. 50-243 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Oregon State University - Extension of Timeframe Required to Complete Biennial Emergency Exercise ML20318A035 per Oregon State TRIGA Reactor Emergency Response Plan, dated November 3, 2020 Oregon State University - Extension of Timeframe required to Complete Biennial Emergency Exercise ML20350B726 per Oregon State TRIGA Reactor Emergency Response Plan, dated December 10, 2020 Oregon State University - Temporary Exemption from the Requirements of 10 CFR part 50, appendix E, section IV.F.2.b Related to Biennial ML20318A380 Emergency Exercise [COVID-19], dated December 18, 2020 Palisades Nuclear Plant Docket No. 50-255 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Palisades Nuclear Plant - Request for One-Time Exemption from 10 CFR part 50, appendix E, Biennial Emergency Preparedness Exercise ML20275A110 Requirements, due to COVID-19 Pandemic, dated September 30, 2020 Palisades Nuclear Plant - Temporary Exemption from Biennial Emergency Preparedness Exercise ML20308A607 Frequency Requirements of 10 CFR part 50, 24

appendix E, section IV.F (EPID L-2020-LLE-0155

[COVID-19]), dated December 9, 2020 Palisades Nuclear Plant Docket No. 50-255 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Palisades Nuclear Plant - Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual ML20317A300 Force-on-Force Exercises due to COVID-19 Pandemic, dated November 12, 2020 Palisades Nuclear Plant - Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, General Criteria for ML20330A000 Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0190 [COVID-19]), dated December 3, 2020 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Docket Nos. 50-528, 50-529, 50-530 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and Independent Spent Fuel Storage Installation - Subsequent Request for Exemption ML20356A292 from Specific Requirements of 10 CFR part 26, Fitness for Duty Programs, dated December 21, 2020 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Subsequent Request for Exemption from Select Requirements of 10 CFR part 26 (EPID L- ML20357A055 2020-LLE-0238 [COVID-19]), dated December 23, 2020 Peach Bottom Atomic Power Station, Units 2 and 3 Docket Nos. 50-277 and 50-278 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force ML20318A288 Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 25

Peach Bottom Atomic Power Station, Units 2 and 3

- Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20325A017 General Criteria for Security Personnel, subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0192

[COVID-19]), dated December 10, 2020 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Perry Nuclear Power Plant, Unit No. 1 - Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) ML20304A191 Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated October 29, 2020 Perry Nuclear Power Plant, Unit No. 1 - Response to Request for Additional Information Regarding Request for Exemption - 10 CFR part 73 Force-on- ML20335A531 Force Exercises (EPID L-2020-LLE-0176), dated November 25, 2020 Perry Nuclear Power Plant, Unit No. 1 - Exemption from Certain Requirements of 10 CFR part 73, appendix B, section VI.C.3.(I)(1) Re: Annual Force- ML20309A135 on-Force Exercise for CY 2020 (EPID L-2020-LLE-0176 [COVID-19]), dated December 14, 2020 Point Beach Nuclear Plant, Units 1 and 2 Docket Nos. 50-266 and 50-301 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Point Beach Nuclear Plant, Units 1 and 2 - Request for a One-Time Exemption from 10 CFR part 73, non-public, withheld pursuant to appendix B, section VI, subsection C.3.(1)(1) 10 CFR 2.390 Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 19, 2020 Point Beach Nuclear Plant, Units 1 and 2 -

Response to Request for Additional Information, non-public, withheld pursuant to Request for Exemption from 10 CFR part 73, 10 CFR 2.390 appendix B, section VI Regarding Annual Force-On-Force Exercise, dated December 8, 2020 Point Beach Nuclear Plant, Units 1 and 2 -

Exemption from Annual Force-on-Force Exercise ML20345A000 Requirement of 10 CFR part 73, appendix B, General Criteria for Security Personnel, 26

subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0210

[COVID-19]), dated December 15, 2020 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Monticello and Prairie Island - Request for a One-Time Exemption from 10 CFR part 73, appendix B, non-public, withheld pursuant to section VI, subsection C.3(l)(1) Re: Annual Force-10 CFR 2.390 on-Force Exercises due to COVID-19 Pandemic, dated October 30, 2020 Response to Request for Additional Information, Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3(l)(1) Regarding Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Pandemic, dated December 14, 2020 Prairie Island Nuclear Generating Plant, Units 1 and 2 - Exemption from Certain Requirements of 10 CFR part 73, appendix B, General Criteria for ML20317A259 Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0177 [COVID-19]), dated December 21, 2020 Quad Cities Nuclear Power Station, Units 1 and 2 Docket Nos. 50-254 and 50-265 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding 2020 Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 Quad Cities Nuclear Power Station, Units 1 and 2 -

Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20332A175 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0193

[COVID-19]), dated December 4, 2020 27

Quad Cities Nuclear Power Station, Units 1 and 2 Docket Nos. 50-254 and 50-265 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Quad Cities Nuclear Power Station, Units 1 and 2 -

COVID-19 Related Request for Exemption from ML20339A474 10 CFR part 26 Work Hours Requirements, dated December 4, 2020 Quad Cities Nuclear Power Station, Units 1 and 2 -

Exemption from Select Requirements of ML20343A027 10 CFR part 26 (EPID L-2020-LLE-0228 [COVID-19]), dated December 17, 2020 R. E. Ginna Nuclear Power Plant Docket No. 50-244 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Exelon Generation - Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual ML20318A288 Force-on-Force Exercises due to COVID-19 Pandemic, dated November 13, 2020 R. E. Ginna Nuclear Power Plant - Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, General Criteria for ML20330A291 Security Personnel, subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0202 [COVID-19]), dated December 10, 2020 River Bend Station, Unit 1 Docket No. 50-458 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

River Bend Station, Unit 1 - One-Time Schedular Exemption Request from 10 CFR part 50, appendix E, Biennial Emergency Preparedness Exercise ML20338A539 Requirements, due to COVID-19 Public Health Emergency, dated December 3, 2020 River Bend Station, Unit 1 - Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, ML20344A135 appendix E, section IV.F.2.b (EPID-L-2020-LLE-0212 [COVID-19]), dated December 22, 2020 28

St. Lucie Plant, Unit Nos. 1 and 2 Docket Nos. 50-335 and 50-389 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

St. Lucie Plant, Unit Nos. 1 and 2 - Request for a One-Time Exemption from 10 CFR part 73, non-public, withheld pursuant to appendix B, section VI, subsection C.3.(I)(1) 10 CFR 2.390 Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 9, 2020 St. Lucie Plant, Unit Nos. 1 and 2 - Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, General Criteria for ML20352A118 Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0234) [COVID-19], dated December 18, 2020 Seabrook Station, Unit No. 1 Docket No. 50-443 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Seabrook Station, Unit No. 1 - Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) Regarding Annual ML20329A205 Force-on-Force Exercises due to COVID-19 Pandemic, dated November 23, 2020 Seabrook Station, Unit No. 1 - Response to Request for Additional Information in Response to One-Time Exemption from 10 CFR part 73, ML20343A112 appendix B, section VI, subsection C.3.(I)(1)

Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 8, 2020 Seabrook Station, Unit No. 1 - Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, General Criteria for ML20336A006 Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0219 [COVID-19]), dated December 16, 2020 Seabrook Station, Unit No. 1 Docket No. 50-443 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

29

Seabrook Station, Unit No. 1 - One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR part 50, ML20338A493 appendix E, sections IV.F.2.b and IV.F.2.c, dated December 3, 2020 Seabrook Station, Unit No. 1 - Exemption from Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE- ML20345A119 0229 and EPID L-2020-LLE-0230 [COVID-19]),

dated December 21, 2020 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Duke Energy - Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, non-public, withheld pursuant to subsection C.3.(I)(1) Regarding Annual Force-on-10 CFR 2.390 Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 Duke Energy - Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection non-public, withheld pursuant to C.3.(I)(1) Regarding Annual Force-on-Force 10 CFR 2.390 Exercises due to COVID-19 Pandemic, dated November 19, 2020 Shearon Harris Nuclear Power Plant, Unit No. 1 -

Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, ML20330A301 General Criteria for Security Personnel, subsection VI.C.3(l)(1) (EPID L-2020-LLE-0180

[COVID-19]), dated December 17, 2020 South Texas Project, Units 1 and 2 Docket Nos. 50-498 and 50-499 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

South Texas Project, Units 1 and 2 - Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) ML20321A331 Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 16, 2020 South Texas Project, Units 1 and 2 - Exemption from Annual Force-on-Force Exercise Requirement ML20330A312 of 10 CFR part 73, appendix B, General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID 30

L-2020-LLE-0205 [COVID-19]), dated December 10, 2020 Surry Power Station, Unit Nos. 1 and 2 Docket Nos. 50-280 and 50-281 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Surry Power Station, Unit Nos. 1 and 2 - Request for a One-Time Exemption from 10 CFR part 73, non-public, withheld pursuant to appendix B, section VI, subsection C.3.(I)(1) 10 CFR 2.390 Regarding Annual Force-On-Force Exercises due to COVID-19 Pandemic, dated December 3, 2020 Surry Power Station, Unit Nos. 1 and 2 - Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, General Criteria for ML20339A645 Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0226 [COVID-19]), dated December 14, 2020 Susquehanna Steam Electric Station, Units 1 and 2 Docket Nos. 50-387 and 50-388 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Susquehanna Steam Electric Station - Request for One-Time Exemption From 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) ML20329A335 Regarding Annual Force-On-Force Exercises due to COVID-19 Pandemic, dated November 24, 2020 Susquehanna Steam Electric Station, Units 1 and 2

- Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20344A458 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0222),

dated December 17, 2020 Virgil C. Summer Nuclear Station, Unit No. 1 Docket No. 50-395 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Virgil C. Summer Nuclear Station, Unit No. 1 -

Request for a One-Time Exemption from non-public, withheld pursuant to 10 CFR part 73, appendix B, section VI, subsection 10 CFR 2.390 C.3.(I)(1) Regarding Annual Force-On-Force 31

Exercises due to COVID-19 Pandemic, dated December 3, 2020 Virgil C. Summer Nuclear Station, Unit No. 1 -

Exemption from Annual Force On-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20342A003 General Criteria for Security Personnel, subsection VI.C.3.(I)(1)I (EPID L-2020-LLE-0225

[COVID-19]), dated December 18, 2020 Vogtle Electric Generating Plant, Units 1 and 2 Docket Nos. 50-424 and 50-425 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force ML20311A662 Exercises due to COVID-19 Pandemic, dated November 6, 2020 Vogtle Electric Generating Plant, Units 1 and 2 -

Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20329A392 General Criteria for Security Personnel, subsection VI C.3.(I)(1) (EPID L-2020-LLE-0216

[COVID-19]), dated December 4, 2020 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Waterford Steam Electric Station, Unit 3 - Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) ML20317A301 Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 12, 2020 Waterford Steam Electric Station, Unit 3 -

Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR part 73, appendix B, ML20338A274 General Criteria for Security Personnel, subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0186

[COVID-19]), dated December 16, 2020 32

Watts Bar Nuclear Plant, Units 1 and 2 Docket Nos. 50-390 and 50-391 DOCUMENT DESCRIPTION ADAMS ACCESSION NO.

Watts Bar Nuclear Plant, Units 1 and 2 - Request for Exemption Regarding Calendar Year 2020 ML20309A695 Force-on-Force Exercise, dated November 4, 2020 Watts Bar Nuclear Plant, Units 1 and 2 - Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, General Criteria for ML20318A036 Security Personnel, subsection VI C.3(l)(1) (EPID L-2020-LLE-0179 [COVID-19]), dated December 8, 2020 Dated: January 13, 2021.

For the Nuclear Regulatory Commission.

/RA/

James G. Danna, Chief, Plant Licensing Branch I, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.

33