EA-20-004 Clinton Power Station - Final Significance Determination for a Security-Related Preliminary Greater than Green Finding with Assessment Follow-Up; NRC Security Inspection Report 05000461/2020404
ML20307A569
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/02/2020
From: Jack Giessner
NRC/RGN-III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Lambert K
References
EA-20-004 IR 2020404
Download: ML20307A569 (3)


Text

November 2, 2020

SUBJECT:

CLINTON POWER STATION - FINAL SIGNIFICANCE DETERMINATION FOR A SECURITY-RELATED PRELIMINARY GREATER THAN GREEN FINDING WITH ASSESSMENT FOLLOW-UP; NRC SECURITY INSPECTION REPORT 05000461/2020404

Dear Mr. Hanson:

This letter provides the results of our significance determination of the preliminary Greater than Green finding identified in our previous communication dated September 3, 2020, which included Inspection Report No. 05000461/2020403 (Non-Public). This preliminary finding was discussed in detail in Section 93812 of the inspection report.

In our September 3, 2020 letter, we provided you the opportunity to attend a regulatory conference or provide a response in writing to the preliminary finding. In a telephone conversation with Mr. Steven Orth of NRC, Region III, on September 9, 2020, and in a subsequent letter dated September 10, 2020, your staff indicated that you did not contest the characterization of the risk significance of this finding and that you declined the opportunity to discuss this issue in a Regulatory Conference or to provide any additional written response.

After considering the information developed during the inspection and the information provided in your staffs letter dated September 10, 2020, the NRC has concluded that the finding is appropriately characterized as Greater than Green, a finding with greater than very low security significance. The specific details concerning the security significance of this finding are described in Inspection Report No. 05000461/2020403 (Non-Public). At this time, we have not completed our determination of any enforcement associated with the finding. We will communicate that decision in a subsequent correspondence.

According to NRC Inspection Manual Chapter (IMC) 0609, appeal rights only apply to those licensees that have either attended a regulatory conference or submitted a written response to the preliminary determination letter.

As a result of our review of Clinton Power Stations performance, including this finding, we have assessed the Clinton Power Station to be in the Regulatory Response column of the NRCs Action Matrix, effective the third quarter of 2020. Therefore, we plan to conduct a supplemental inspection using Inspection Procedure 95001, Supplemental Inspection Response To Action Matrix Column 2 Inputs, when your staff has notified us of your readiness for this inspection. This inspection procedure is conducted to provide assurance that the root cause and contributing cause of risk significant performance issues are understood, the extent of condition and the extent of cause are identified, and the corrective actions are sufficient to prevent recurrence.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or in the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If you choose to respond and Security Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely, Digitally signed by John John B. B. Giessner Date: 2020.11.02 Giessner 06:57:05 -06'00'

John B. Giessner Regional Administrator Docket No. 05000461 License No. NPF-62 cc: W. Marsh, Clinton Station Security Manager A. Khayyat, State Liaison Officer Illinois Emergency Management Agency Distribution via LISTSERV Letter to Bryan Hanson from John B. Giessner dated November 2, 2020 SUBJECT: CLINTON POWER STATION - FINAL SIGNIFICANCE DETERMINATION FOR A SECURITY-RELATED PRELIMINARYGREATER THAN GREEN FINDING WITH ASSESSMENT FOLLOW-UP; NRC SECURITY INSPECTION REPORT 05000461/2020404 Distribution:

RidsSecyMailCenter Resource Doug Dodson OCADistribution Holly Harrington Margaret Doane David Lee Daniel Dorman Andy Shuttleworth George Wilson Meghan Blair Francis Peduzzi Jessie Quichocho Juan Peralta Mike McCoppin Dave Furst Aida Rivera-Varona Jack Giessner Stacey Rosenberg Kenneth OBrien Elise Burket David Lew RidsNrrPM Clinton Resource Laura Dudes RidsNrrDorlLpl3-1 Resource Scott Morris RidsNrrDirsIrib Resource Brooke Clark Jamnes Camron Mauri Lemoncelli Allan Barker Ho Nieh Harral Logaras Brian Holian Viktoria Mitlyng Lauren Casey Prema Chandrathil David Aird Kenneth Lambert Antonios Zoulis Paul Pelke Tracy Prasad Sarah Bahksh Michael Layton DRPIII Carl Grigsby DRSIII Brett Klukan RidsOemailCenter Resource Mark Kowal OEWEB Resource Jeremy Groom ROPassessment.Resource@nrc.gov ADAMS Accession Number:

Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII-EICS RIII-DRS RIII-DRS RIII-ORA NAME KLambert: jc SOrth MShuaibi SLewman DCurtis for DATE 10/2/20 10/2/20 10/6/20 10/09/20 OFFICE OE NSIR RIII-EICS RIII NAME JPeralta Prasad JCameron JGiessner David Furst for Todd Keane for DATE 10/20/20 10/19/20 10/28/20 11/2/20 OFFICIAL RECORD COPY