ML20244D062

From kanterella
Jump to navigation Jump to search

Informs That Util Will Pursue Change from Displacement to Velocity Vibration Measurements by 891010
ML20244D062
Person / Time
Site: McGuire, Mcguire  
Issue date: 06/06/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-61271, NUDOCS 8906160076
Download: ML20244D062 (3)


Text

,

l.. g _.

t e

Dure POWER GOMPANY t

P.O. DOX 33189 -

CHARLOTrE, N.O. 28242 HALH. TUCKER TEI.EP,EONE,

1 vsom emenanswr (7o4) 373 4 531 mmi. man enoperonon 1

June 6, 1989-i

(

U. S. Nuclear Regulatory, Commission Document Control. Desk t

'Washingt.,n, D.C.

20555 (CN's 1-10)

Subject:

. : McGuire Nuclear Station, Units 1 and 2~

.2

~ Docket Nos. 50-369 and.50-370

-l Pump.and Valve Inservice Testing Program NRC Review / Program Revision 11 (Unit 1) and 7 (Unit 2)

[Re: Relief Request No. 88-07)~

(TACS'61271/61272)

Commitments Implementation Update Gentlemen J

My letter of October 31, 1988 submitted (pursuant to 10CFR50.'4 and 50.55a(g))

Unit 1 Revision 11 and Unit 2 Revision 7 of the'McGuire Nuclear Station Pump and Valve Inservice Testing (IST) Program. That comprehensive revision reflected the results of a meeting between Duke Power Company and NRC'(with technical assistance from their contracted reviewer, EG&G Idaho, Inc.) held August 16.'and--

17, 1988 to finalize the IST Program. Among the issues-discussed during the meeting, as documented in Mr. D. S. Hood's (NRC/0NRR) letter to me-dated

.i September 8,- 1988 (Ref. Pump Testing Program' questions Nos. 3,:4,.and 5),'were-

- j the accuracy of Duke's portable vibration instrumentation, the Pump Vibration-Monitoring Program units utilized, and bearing temperature measurement.

requirements.

6 As a result of the above mentioned discussions,' Notes 2 and 3 were included in.

'IST Manual Section I.1, along with General Relief Requests B and C in Section l

1.3, in the subject revisions. These noted that McGuire's vibration measurement' f

accuracy is 11%, and that the vibration measuring equipment would be upgraded to meet the IWP instrument accuracy requirement and vibration measurements 1 changed from displacement to velocity by June.1, 1989.(after changing to velocity j

vibration measurements, bearing temperature measurements would be droppe'd from j

the IST Program).

]

l This letter is to inform you that the June 1, 1989.date was.not met. ' Duke'has

^

. investigated the available vibration measuring-equipment to evaluate which.

j machine could best meet the needs of~our three nuclear stations (McGuire, Oconee, i

and Catawba).. This evaluation'is still in progress and has encountered several-i delays. Although the vibration measuring equipment to be used by each stationi l

1 J

4 PDC k ( 0 j

i

. I

______.__i.__E_____._..___._______.___.

i

_[

~I U. S. Nuclear' Regulatory Commission.

Page 2 June 6, 1989 h

.has been' determined, it has been discovered this equipment may not meet the

'l vibration instrumentation requirementsLof IWP:(and OM-6)'.

Plans have been d

--developed.to determine the best obtainable' accuracy for this equipment.- Relief.

,i

'l will be requested for'IWP Vibration Monitoring requirements that'are impractical. Also, due to delays caused' by the unexpected, steam generator: tube ~

rupture octage, McGuire has not yet implemented'the change from displacement lto R

velocity' vibration measurements. Presently, McGuire is measuring displacement ~

and performing bearing stabilization in accordance with'IWP (General ReliefL l

. Requests I.3 B and C have not been exercised for either unit).

.1

. Duke is pursuing IWP vibration accuracy requirements and hopes'to resolve the' l

problems in the near future for all three nuclear stations.' McGuire'is pursuing

~

.y l

the change from displacement to' velocity vibration measurements and plans'to-1 achieve implementation by October 10,-1989.

If there are any questions on this matter, or if: additional information is

-)

required (especially with respect to any impacts on the McGuire IST Program SER-which is currently being written, as discussed in my May 16, 1989 letter), please I

advise.

Very truly yours,.

i (L__,

i sad 5/(2I j

llal B. Tucker l

,1 PBN169/lcs l

I 1

l LL _- - = _ _

U 'S. Nuclear Regulatory Commission i

l Page 3 June 6, 1989' j

xc:

Mr. S. D. Ebneter.

Regional Administrator,. Region 11-U.S..' Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 (CN11)

Mr. Herb Rockhold EG&G Idaho, Inc.

Idaho National Engineering Laboratory 1520 Sawtelle Street Idaho Falls, Idaho -83402 (CN12)

Mr. Darl Hood, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington,.D.C.. 20555 l

Mr. P. K. VanDoorn j

NRC Resident Inspector J

McGuire Nuclear Station j

I 1

1 1

i I.

- _ _ _ _ _ _ __._ -